From stakeholders to shareholders
EMOVE: Estuaries on the MOVE
Gerald Jan Ellen
Marcel Taal
Stephanie Janssen
Deltares
6 juli 2015
Content
• From stakeholders to shareholders?
• Step 1: Convening Assessment
• Step 2: Shared understanding
• Step 3: Designing projects and vital coalitions
• Parallel - Step 4: Landing
6 juli 2015
From stakeholders to shareholders?
6 juli 2015
http://www.emove-project.eu/
Step 1: Convening Assessment
• Interviews with important stakeholders (both the Dutch and
Flemish): Harbours, Nature, Agriculture.
6 juli 2015
• Show the economic value of the agricultural sector
• Space for harbour development
• Creating mutual understanding between stakeholders as
partners
• Developing a strategy similar to ‘room for the river’ which
combines nature and agriculture.
• Insight in the tourist potential of the Schelde estuary.
• Creating a shared ‘language’ defining what concepts mean
for the Schelde estuary.
• Use existing knowledge and creating level playing field by
sharing knowledge/research
• More attention towards the explanation and communication
of the ecological value of the Schelde estuary.
• ’It takes two to tango’
Step 2: Shared Understanding
Pressure cooker ‘joint fact-finding’ (McCreary et.al. 2000)
• State of the art paper: looking back taking stock
• Discussing interests, conditions and opportunities
• Discussing the information/knowledge in different forms/ways
• Working together on project ideas/concepts
6 juli 2015
Step 3: Designing projects and vital coalitions
1. Start with the energy/enthusiasm of the stakeholders instead of a
large problem or with a strategy that the stakeholders could react
upon.
2. Give the stakeholders the opportunity to bring in the issues that
they thought were important for sustainable development of the
estuary.
3. By getting the stakeholders to actually put down their ideas
together, they also feel responsible for those ideas, which also
helped them to create a coalition.
4. Timing: in our case taking advantage of a ‘window of opportunity’:
the fact that there was recently a new stakeholder platform in the
Schelde, which was also looking for activities to undertake,
helped us in the EMOVE project substantially.
6 juli 2015
Paralel - step 4: Landing
• Prepare for safe (political) landing;
• Let stakeholders keep responsibility/initiative;
• Balancing act: from keeping results going to
public organisations taking over.
6 juli 2015

More Related Content

Viewers also liked

Stakeholder and Shareholder
Stakeholder and ShareholderStakeholder and Shareholder
Stakeholder and ShareholderLenny Rosadiawan
 
Introduction to motivation and emotion
Introduction to motivation and emotionIntroduction to motivation and emotion
Introduction to motivation and emotionJames Neill
 
Strategic financial management
Strategic financial managementStrategic financial management
Strategic financial managementBINOY JOHN
 
Agency theory
Agency theoryAgency theory
Agency theorysagarphul
 

Viewers also liked (6)

Stakeholder and Shareholder
Stakeholder and ShareholderStakeholder and Shareholder
Stakeholder and Shareholder
 
Valuation of goodwill
Valuation of goodwillValuation of goodwill
Valuation of goodwill
 
Introduction to motivation and emotion
Introduction to motivation and emotionIntroduction to motivation and emotion
Introduction to motivation and emotion
 
The Rise Of China
The Rise Of ChinaThe Rise Of China
The Rise Of China
 
Strategic financial management
Strategic financial managementStrategic financial management
Strategic financial management
 
Agency theory
Agency theoryAgency theory
Agency theory
 

More from Deltares

DSD-INT 2023 Hydrology User Days - Intro - Day 3 - Kroon
DSD-INT 2023 Hydrology User Days - Intro - Day 3 - KroonDSD-INT 2023 Hydrology User Days - Intro - Day 3 - Kroon
DSD-INT 2023 Hydrology User Days - Intro - Day 3 - KroonDeltares
 
DSD-INT 2023 Demo EPIC Response Assessment Methodology (ERAM) - Couvin Rodriguez
DSD-INT 2023 Demo EPIC Response Assessment Methodology (ERAM) - Couvin RodriguezDSD-INT 2023 Demo EPIC Response Assessment Methodology (ERAM) - Couvin Rodriguez
DSD-INT 2023 Demo EPIC Response Assessment Methodology (ERAM) - Couvin RodriguezDeltares
 
DSD-INT 2023 Demo Climate Stress Testing Tool (CST Tool) - Taner
DSD-INT 2023 Demo Climate Stress Testing Tool (CST Tool) - TanerDSD-INT 2023 Demo Climate Stress Testing Tool (CST Tool) - Taner
DSD-INT 2023 Demo Climate Stress Testing Tool (CST Tool) - TanerDeltares
 
DSD-INT 2023 Demo Climate Resilient Cities Tool (CRC Tool) - Rooze
DSD-INT 2023 Demo Climate Resilient Cities Tool (CRC Tool) - RoozeDSD-INT 2023 Demo Climate Resilient Cities Tool (CRC Tool) - Rooze
DSD-INT 2023 Demo Climate Resilient Cities Tool (CRC Tool) - RoozeDeltares
 
DSD-INT 2023 Approaches for assessing multi-hazard risk - Ward
DSD-INT 2023 Approaches for assessing multi-hazard risk - WardDSD-INT 2023 Approaches for assessing multi-hazard risk - Ward
DSD-INT 2023 Approaches for assessing multi-hazard risk - WardDeltares
 
DSD-INT 2023 Dynamic Adaptive Policy Pathways (DAPP) - Theory & Showcase - Wa...
DSD-INT 2023 Dynamic Adaptive Policy Pathways (DAPP) - Theory & Showcase - Wa...DSD-INT 2023 Dynamic Adaptive Policy Pathways (DAPP) - Theory & Showcase - Wa...
DSD-INT 2023 Dynamic Adaptive Policy Pathways (DAPP) - Theory & Showcase - Wa...Deltares
 
DSD-INT 2023 Global hydrological modelling to support worldwide water assessm...
DSD-INT 2023 Global hydrological modelling to support worldwide water assessm...DSD-INT 2023 Global hydrological modelling to support worldwide water assessm...
DSD-INT 2023 Global hydrological modelling to support worldwide water assessm...Deltares
 
DSD-INT 2023 Modelling implications - IPCC Working Group II - From AR6 to AR7...
DSD-INT 2023 Modelling implications - IPCC Working Group II - From AR6 to AR7...DSD-INT 2023 Modelling implications - IPCC Working Group II - From AR6 to AR7...
DSD-INT 2023 Modelling implications - IPCC Working Group II - From AR6 to AR7...Deltares
 
DSD-INT 2023 Knowledge and tools for Climate Adaptation - Jeuken
DSD-INT 2023 Knowledge and tools for Climate Adaptation - JeukenDSD-INT 2023 Knowledge and tools for Climate Adaptation - Jeuken
DSD-INT 2023 Knowledge and tools for Climate Adaptation - JeukenDeltares
 
DSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - Bootsma
DSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - BootsmaDSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - Bootsma
DSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - BootsmaDeltares
 
DSD-INT 2023 Create your own MODFLOW 6 sub-variant - Muller
DSD-INT 2023 Create your own MODFLOW 6 sub-variant - MullerDSD-INT 2023 Create your own MODFLOW 6 sub-variant - Muller
DSD-INT 2023 Create your own MODFLOW 6 sub-variant - MullerDeltares
 
DSD-INT 2023 Example of unstructured MODFLOW 6 modelling in California - Romero
DSD-INT 2023 Example of unstructured MODFLOW 6 modelling in California - RomeroDSD-INT 2023 Example of unstructured MODFLOW 6 modelling in California - Romero
DSD-INT 2023 Example of unstructured MODFLOW 6 modelling in California - RomeroDeltares
 
DSD-INT 2023 Challenges and developments in groundwater modeling - Bakker
DSD-INT 2023 Challenges and developments in groundwater modeling - BakkerDSD-INT 2023 Challenges and developments in groundwater modeling - Bakker
DSD-INT 2023 Challenges and developments in groundwater modeling - BakkerDeltares
 
DSD-INT 2023 Demo new features iMOD Suite - van Engelen
DSD-INT 2023 Demo new features iMOD Suite - van EngelenDSD-INT 2023 Demo new features iMOD Suite - van Engelen
DSD-INT 2023 Demo new features iMOD Suite - van EngelenDeltares
 
DSD-INT 2023 iMOD and new developments - Davids
DSD-INT 2023 iMOD and new developments - DavidsDSD-INT 2023 iMOD and new developments - Davids
DSD-INT 2023 iMOD and new developments - DavidsDeltares
 
DSD-INT 2023 Recent MODFLOW Developments - Langevin
DSD-INT 2023 Recent MODFLOW Developments - LangevinDSD-INT 2023 Recent MODFLOW Developments - Langevin
DSD-INT 2023 Recent MODFLOW Developments - LangevinDeltares
 
DSD-INT 2023 Hydrology User Days - Presentations - Day 2
DSD-INT 2023 Hydrology User Days - Presentations - Day 2DSD-INT 2023 Hydrology User Days - Presentations - Day 2
DSD-INT 2023 Hydrology User Days - Presentations - Day 2Deltares
 
DSD-INT 2023 Needs related to user interfaces - Snippen
DSD-INT 2023 Needs related to user interfaces - SnippenDSD-INT 2023 Needs related to user interfaces - Snippen
DSD-INT 2023 Needs related to user interfaces - SnippenDeltares
 
DSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - Bootsma
DSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - BootsmaDSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - Bootsma
DSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - BootsmaDeltares
 
DSD-INT 2023 Parameterization of a RIBASIM model and the network lumping appr...
DSD-INT 2023 Parameterization of a RIBASIM model and the network lumping appr...DSD-INT 2023 Parameterization of a RIBASIM model and the network lumping appr...
DSD-INT 2023 Parameterization of a RIBASIM model and the network lumping appr...Deltares
 

More from Deltares (20)

DSD-INT 2023 Hydrology User Days - Intro - Day 3 - Kroon
DSD-INT 2023 Hydrology User Days - Intro - Day 3 - KroonDSD-INT 2023 Hydrology User Days - Intro - Day 3 - Kroon
DSD-INT 2023 Hydrology User Days - Intro - Day 3 - Kroon
 
DSD-INT 2023 Demo EPIC Response Assessment Methodology (ERAM) - Couvin Rodriguez
DSD-INT 2023 Demo EPIC Response Assessment Methodology (ERAM) - Couvin RodriguezDSD-INT 2023 Demo EPIC Response Assessment Methodology (ERAM) - Couvin Rodriguez
DSD-INT 2023 Demo EPIC Response Assessment Methodology (ERAM) - Couvin Rodriguez
 
DSD-INT 2023 Demo Climate Stress Testing Tool (CST Tool) - Taner
DSD-INT 2023 Demo Climate Stress Testing Tool (CST Tool) - TanerDSD-INT 2023 Demo Climate Stress Testing Tool (CST Tool) - Taner
DSD-INT 2023 Demo Climate Stress Testing Tool (CST Tool) - Taner
 
DSD-INT 2023 Demo Climate Resilient Cities Tool (CRC Tool) - Rooze
DSD-INT 2023 Demo Climate Resilient Cities Tool (CRC Tool) - RoozeDSD-INT 2023 Demo Climate Resilient Cities Tool (CRC Tool) - Rooze
DSD-INT 2023 Demo Climate Resilient Cities Tool (CRC Tool) - Rooze
 
DSD-INT 2023 Approaches for assessing multi-hazard risk - Ward
DSD-INT 2023 Approaches for assessing multi-hazard risk - WardDSD-INT 2023 Approaches for assessing multi-hazard risk - Ward
DSD-INT 2023 Approaches for assessing multi-hazard risk - Ward
 
DSD-INT 2023 Dynamic Adaptive Policy Pathways (DAPP) - Theory & Showcase - Wa...
DSD-INT 2023 Dynamic Adaptive Policy Pathways (DAPP) - Theory & Showcase - Wa...DSD-INT 2023 Dynamic Adaptive Policy Pathways (DAPP) - Theory & Showcase - Wa...
DSD-INT 2023 Dynamic Adaptive Policy Pathways (DAPP) - Theory & Showcase - Wa...
 
DSD-INT 2023 Global hydrological modelling to support worldwide water assessm...
DSD-INT 2023 Global hydrological modelling to support worldwide water assessm...DSD-INT 2023 Global hydrological modelling to support worldwide water assessm...
DSD-INT 2023 Global hydrological modelling to support worldwide water assessm...
 
DSD-INT 2023 Modelling implications - IPCC Working Group II - From AR6 to AR7...
DSD-INT 2023 Modelling implications - IPCC Working Group II - From AR6 to AR7...DSD-INT 2023 Modelling implications - IPCC Working Group II - From AR6 to AR7...
DSD-INT 2023 Modelling implications - IPCC Working Group II - From AR6 to AR7...
 
DSD-INT 2023 Knowledge and tools for Climate Adaptation - Jeuken
DSD-INT 2023 Knowledge and tools for Climate Adaptation - JeukenDSD-INT 2023 Knowledge and tools for Climate Adaptation - Jeuken
DSD-INT 2023 Knowledge and tools for Climate Adaptation - Jeuken
 
DSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - Bootsma
DSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - BootsmaDSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - Bootsma
DSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - Bootsma
 
DSD-INT 2023 Create your own MODFLOW 6 sub-variant - Muller
DSD-INT 2023 Create your own MODFLOW 6 sub-variant - MullerDSD-INT 2023 Create your own MODFLOW 6 sub-variant - Muller
DSD-INT 2023 Create your own MODFLOW 6 sub-variant - Muller
 
DSD-INT 2023 Example of unstructured MODFLOW 6 modelling in California - Romero
DSD-INT 2023 Example of unstructured MODFLOW 6 modelling in California - RomeroDSD-INT 2023 Example of unstructured MODFLOW 6 modelling in California - Romero
DSD-INT 2023 Example of unstructured MODFLOW 6 modelling in California - Romero
 
DSD-INT 2023 Challenges and developments in groundwater modeling - Bakker
DSD-INT 2023 Challenges and developments in groundwater modeling - BakkerDSD-INT 2023 Challenges and developments in groundwater modeling - Bakker
DSD-INT 2023 Challenges and developments in groundwater modeling - Bakker
 
DSD-INT 2023 Demo new features iMOD Suite - van Engelen
DSD-INT 2023 Demo new features iMOD Suite - van EngelenDSD-INT 2023 Demo new features iMOD Suite - van Engelen
DSD-INT 2023 Demo new features iMOD Suite - van Engelen
 
DSD-INT 2023 iMOD and new developments - Davids
DSD-INT 2023 iMOD and new developments - DavidsDSD-INT 2023 iMOD and new developments - Davids
DSD-INT 2023 iMOD and new developments - Davids
 
DSD-INT 2023 Recent MODFLOW Developments - Langevin
DSD-INT 2023 Recent MODFLOW Developments - LangevinDSD-INT 2023 Recent MODFLOW Developments - Langevin
DSD-INT 2023 Recent MODFLOW Developments - Langevin
 
DSD-INT 2023 Hydrology User Days - Presentations - Day 2
DSD-INT 2023 Hydrology User Days - Presentations - Day 2DSD-INT 2023 Hydrology User Days - Presentations - Day 2
DSD-INT 2023 Hydrology User Days - Presentations - Day 2
 
DSD-INT 2023 Needs related to user interfaces - Snippen
DSD-INT 2023 Needs related to user interfaces - SnippenDSD-INT 2023 Needs related to user interfaces - Snippen
DSD-INT 2023 Needs related to user interfaces - Snippen
 
DSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - Bootsma
DSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - BootsmaDSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - Bootsma
DSD-INT 2023 Coupling RIBASIM to a MODFLOW groundwater model - Bootsma
 
DSD-INT 2023 Parameterization of a RIBASIM model and the network lumping appr...
DSD-INT 2023 Parameterization of a RIBASIM model and the network lumping appr...DSD-INT 2023 Parameterization of a RIBASIM model and the network lumping appr...
DSD-INT 2023 Parameterization of a RIBASIM model and the network lumping appr...
 

Iahr2015 from stakeholder to shareholder, janssen, deltares, 29062015

  • 1. From stakeholders to shareholders EMOVE: Estuaries on the MOVE Gerald Jan Ellen Marcel Taal Stephanie Janssen Deltares 6 juli 2015
  • 2. Content • From stakeholders to shareholders? • Step 1: Convening Assessment • Step 2: Shared understanding • Step 3: Designing projects and vital coalitions • Parallel - Step 4: Landing 6 juli 2015
  • 3. From stakeholders to shareholders? 6 juli 2015 http://www.emove-project.eu/
  • 4. Step 1: Convening Assessment • Interviews with important stakeholders (both the Dutch and Flemish): Harbours, Nature, Agriculture. 6 juli 2015 • Show the economic value of the agricultural sector • Space for harbour development • Creating mutual understanding between stakeholders as partners • Developing a strategy similar to ‘room for the river’ which combines nature and agriculture. • Insight in the tourist potential of the Schelde estuary. • Creating a shared ‘language’ defining what concepts mean for the Schelde estuary. • Use existing knowledge and creating level playing field by sharing knowledge/research • More attention towards the explanation and communication of the ecological value of the Schelde estuary. • ’It takes two to tango’
  • 5. Step 2: Shared Understanding Pressure cooker ‘joint fact-finding’ (McCreary et.al. 2000) • State of the art paper: looking back taking stock • Discussing interests, conditions and opportunities • Discussing the information/knowledge in different forms/ways • Working together on project ideas/concepts 6 juli 2015
  • 6. Step 3: Designing projects and vital coalitions 1. Start with the energy/enthusiasm of the stakeholders instead of a large problem or with a strategy that the stakeholders could react upon. 2. Give the stakeholders the opportunity to bring in the issues that they thought were important for sustainable development of the estuary. 3. By getting the stakeholders to actually put down their ideas together, they also feel responsible for those ideas, which also helped them to create a coalition. 4. Timing: in our case taking advantage of a ‘window of opportunity’: the fact that there was recently a new stakeholder platform in the Schelde, which was also looking for activities to undertake, helped us in the EMOVE project substantially. 6 juli 2015
  • 7. Paralel - step 4: Landing • Prepare for safe (political) landing; • Let stakeholders keep responsibility/initiative; • Balancing act: from keeping results going to public organisations taking over. 6 juli 2015