EPA’s GHG Reporting Program:             p    g    g  Are Your Ready?                     Joseph Ritter                 De...
Agenda• Mandatory Reporting Rule (MRR) Timeline• What has changed in 2010 that affects you• Introduction to• The takeaways...
BlueScape, Inc. GHG inventory reporting and preparedness National PSD and Title V permitting experience Modeling – AERM...
Red-Line MRR Changes• Ma 27th  May   Subpart MM – Suppliers of Petroleum Products      Denaturant that may be in ethanol...
Red-Line MRR Changes• July 20th, cont             cont.    Subpart C – Stationary Combustion Sources       Changed the m...
Red-Line MRR Changes• J l 20th, cont.  July   Subpart Y – Petroleum Refineries      Added the requirement to calculate C...
What Should I be Doing Now?• Determine your DR, ADR, and Agents  – Understand DR responsibilities• Prepare GHG inventory c...
What Should I be Doing Now?• Check for e-GGRT coming on-line• Participate in EPA training sessions• Remember submission de...
Happy Holidays       Joseph RitterBlueScape Environmental       858 735 3288       858-735-3288jritter@bluescapeinc.com  w...
Upcoming SlideShare
Loading in...5
×

BlueScape EPA's GHG Reporting Program - Are You Ready? Webinar 12-07-10

877

Published on

The webinar by Joe Ritter at BlueScape describes what companies should be doing to prepare their first GHG emissions inventory for reporting under EPA's Monitoring Recordkeeping and Reporting program. Mr. Ritter can be reached at 858-735-3288 for more information. Also see www.bluescapeinc.com.

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
877
On Slideshare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
17
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "BlueScape EPA's GHG Reporting Program - Are You Ready? Webinar 12-07-10"

  1. 1. EPA’s GHG Reporting Program: p g g Are Your Ready? Joseph Ritter December 7 2010 D b 7, www.bluescapeinc.com
  2. 2. Agenda• Mandatory Reporting Rule (MRR) Timeline• What has changed in 2010 that affects you• Introduction to• The takeaways• What can you do now
  3. 3. BlueScape, Inc. GHG inventory reporting and preparedness National PSD and Title V permitting experience Modeling – AERMOD, CALPUF Emissions inventories
  4. 4. Red-Line MRR Changes• Ma 27th May  Subpart MM – Suppliers of Petroleum Products  Denaturant that may be in ethanol products affecting calculations  Treatment of products that enter the refinery, but are not processed  Definition of a batch – API specific gravity and sulfur content determination  Must use OTAQREG to report to EPA for those operations not e GGRT operations, e-GGRT• July 20th  Subpart A – General Provisions  Changed the flow meter accuracy to 6% from 5%  Relaxed the requirements for the location of pressure and temp transmitters  Fuel billing meters calibrations do not need to be included in the Monitoring Plan and recordkeeping  Startup fuel meters are exempt from calibration requirements  Gave guidance on what to do if meter calibration failed  Limited extension of BAMM into 2011 if shutdown is required
  5. 5. Red-Line MRR Changes• July 20th, cont cont.  Subpart C – Stationary Combustion Sources  Changed the methodology to calculate CO2 from natural gas combustion if billing billi records provide d t i th d id data in therms  Numerous additions to options and requirements under Tier 4 or CEMs monitoring  Provided options to obtaining moisture content using site-specific data  Significant additions and clarification for facilities in the Acid Rain Program and those that report under Part 75  Provisions for blending of fuels  Considerable change or clarification on acceptable fuel sampling frequency and methods  Biomass combustion
  6. 6. Red-Line MRR Changes• J l 20th, cont. July  Subpart Y – Petroleum Refineries  Added the requirement to calculate CH4 and N2O emissions from fuel gas q g  Added a new equation to calculate CO2 emissions from flares  Amend equations to allow 2 alternatives for “standard condition” 60⁰F and 68 ⁰F  Allo use of lo er tier methodologies for units < 350 scfm or heat rate < Allow se lower nits 30 MMBtu/hr  Clarified the calculation methodologies for on-site and off-site sulfur recovery plants  Many others
  7. 7. What Should I be Doing Now?• Determine your DR, ADR, and Agents – Understand DR responsibilities• Prepare GHG inventory calculation tools – Accumulate facility background information• I would not assume e-GGRT will be easy to use• March 31, 2011 is coming soon ……
  8. 8. What Should I be Doing Now?• Check for e-GGRT coming on-line• Participate in EPA training sessions• Remember submission deadlines – Select DR – January 30 2011 30, – Submit 2010 Inventory – March 31, 2011
  9. 9. Happy Holidays Joseph RitterBlueScape Environmental 858 735 3288 858-735-3288jritter@bluescapeinc.com www.bluescapeinc.com p