Bharat Heavy Electricals Ltd.
AN GOVERNMENT OF INDIA UNDERTAKEN
INSULATOR PLANT, JAGDISHPUR (AMETHI) U.P.
Prepared by:
Bhupendra Kumar Shukla
Reg. No: 11205580
Roll No: RM1204B43
School of Mechanical Engineering
Lovely Professional University, Jalandhar
About the Company
1964 Established Heavy Electricals (India) Limited
1972 In July the operation of all four plants were integrated
1974 In January Heavy Electricals (India) Ltd. Merged with BHEL.
BHEL is largest engineering manufacturing enterprises in India in the energy related/ infrastructure
sector, today BHEL was established more than 50 Years ago, ushering in the indigenous Heavy
Electricals Equipment in India- a dream that has been more than realized with a well- recognized track
record of performance. The company has been earning profit continuously since 1971-72 and paying
dividends since 1976-77.
2012 The Hon’ble President of India, Shri Pranab Mukharjee, presenting the
National Energy Conservation Award 2012 to Mr. B. Prasad Rao, Chief &
Managing Director (CMD), BHEL.
2014 BHEL bags India Today Best Maharatna PSU Award for Global Presence &
Innovation
Trophy conferring Maharatna status on BHEL
from Hon’ble President of India in recognition
of company’s consistent high performance
Sh. R. Krishnan, Director (HR) BHEL was
conferred NIT-Trichy’s Distinguished Alumnus
Award by the former President of India,
Dr. A.P.J. Abdul Kalam as part of Golden
Jubilee celebrations of the Institute
BHEL PRODUCT PORTFOLIO, JAGDISHPUR
The Product portfolio divided into three categories:
1. L T Type insulators
2. Disk Type Insulators
3. CERALINS
L T TYPE INSULATORS
a) Pin Type (10KN, with distance of
230/280/320mm)
b) Guy/Stay/Strain (53/89/110KN with
distance of 42/52/65/72mm)
c) Post/Suspended Type
Disk Type Insulator
Code Strength(KN)
01 160 (CD-280
mm)
02 70/90/120
03 45
06 120(CD-280
mm)
08 210
11 120
13 120
14 70/90/120
15 70/90/120/160
17 70/90/120
BHEL JAGDISHPUR INSULATOR PLANT
Insulator Plant, Jagdishpur was inaugurated on March 03rd, 1984 by the Hon’ble Prime Minister
of India Late Smt. Indira Gandhi, as 11th manufacturing unit of BHEL in Amethi District, 78 Km
away from Lucknow on Lucknow-Sultanpur National Highway. BHEL’s glorious experience in the
ceramic field with technical collaboration with M/s. NGK, Japan, the world leader in Insulator
Technology, set the pace for the commissioning of this plant. This unit has been provided with
the most modern and sophisticated facilities.
BHEL's Heavy Electrical Plant, Bhopal 2x363 MW Gas-based Power Plant, OTPC-Palatana
MANUFACTURING OF INSULATORS
1. For Manufacturing of Disc Insulator
Storage
 Slip House
 Jiggering Unit
 Finishing Unit
 Glazing Unit
 Firing Unit
 Assembly Unit
 Testing Unit
 Dispatch Unit
2. For Manufacturing of Hollow Bushing
 Storage
 Slip House
 Jiggering Unit
 Finishing Unit
 Glazing Unit
 Firing Unit
 Assembly Unit
 Testing Unit
 Dispatch Unit
Flow Process of Insulators
Disc
Insulator
Hollow
Bushing
Disc and Hollow Insulators both
are manufactured by the Cake
1. SB CAKE for the Disc Ins.
2. AB CAKE for the Hollow Bush
Slip House
•Ball Mill(mixing)
•3 Ton, 1760 ltr for 16
Hrs. + 2 Ton 3800 ltr
for 2 hrs.
Tank Storage
•Cake Formation
•Hardness (22±2)
•1.5 to 2.5 hrs
•128*2=
256,100*4=400
•So Total 856 Piece in
one shift
•Remove Moisture
Pugging
•Remove Air Gap
•Blank Formation
•Pressure 720mm Hg
•Blank Φ180
•Length=220
Jiggering
•Making Shape of Cell
•Primary Die
•Secondary Die
Chain Dryer
•Remove Moisture
through CD
•2.5 Hours
Finishing
• On Lathe Machine
Tunnel Dryer
• Moisture Removal
• On diffreent
Tempreture Zone
• 35°Ϲ-45°Ϲ-62°Ϲ-
103°Ϲ-62°Ϲ
Glazing
• Drying(Dust
Collecter)
• Painting
• Marking(Stamp of
BHEL)
Kiln
• At 1200°Ϲ for 58
hours.
Testing
• Hydraullic Testing
of 220 Kg for Head
Test.
Time Testing (TCT)
• 15min Cold
• 1min Hot
• Temp. diff >70°Ϲ
Assembly
• Cell+Cap
• (spacer)+
• Cement+Pin
Spray
• Betromens Paint
• for the head joint
Steam Testing
• To attach cement for 4
hrs
• Dip in Cold Water for 72
hours
• 30<steam<62°Ϲ
Mechanical Testing
•30-32 Piece
•tensile Load of 100 Kg
•Cap and Pin Testing
Electrical Testing
•32000 Volt Current Supply
•Total 1,56,000 Volt Supply for
the cell testing
Packing
•Assembly Product packing
Complete Flow Process
Ball Mill Machine Sanding Glaze Brown Glaze
Slip House
Raw Material for the Cake is Mixed in the Mixing
Tank under Slip House
Cake Formation 80% of the Moisture has been removed
through this.
Jiggering Plant
Pugging Machine
Under this the Blanks are
formed though the Pugging
machine, the remaining 22%
moisture has been removed.
D= 80mm L= 220mm
PUGG MILL
Jiggering Plant
Under this the formation of Insulator has been done
The two dies Primary and Secondary dies
Model Drying Chamber for Hollow Bushing Dust Collector, for the Insulators
Glazing Machine for Painting
GLAZING PLANT
Stamping on Cell Shatal Kiln Shatal Kiln at 1200 deg-cen
STAMPING & FIRING UNIT
Hydraulic Test Electrical Testing, 156000Volt
Mechanical Testing 100KN Tensile
Force
ASSEMBLY & TESTING
Packing & Dispatch
Thank You

More Related Content

What's hot

B.H.E.L., Haridwar Summer Training Report
B.H.E.L., Haridwar Summer Training ReportB.H.E.L., Haridwar Summer Training Report
B.H.E.L., Haridwar Summer Training ReportAbhishek Kumar
 
BHEL PROJECT REPORT ( TRAINING REPORT )
 BHEL PROJECT REPORT ( TRAINING REPORT ) BHEL PROJECT REPORT ( TRAINING REPORT )
BHEL PROJECT REPORT ( TRAINING REPORT )jaideep kishanpuri
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipatpratikguptateddy
 
Bhel Haridwar training ppt
Bhel Haridwar training pptBhel Haridwar training ppt
Bhel Haridwar training pptAditya Sharma
 
BHEL INDUSTRIAL TRAINNING REPORT
BHEL INDUSTRIAL TRAINNING REPORTBHEL INDUSTRIAL TRAINNING REPORT
BHEL INDUSTRIAL TRAINNING REPORTSai Chandu Chandu
 
INTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCINTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCADITYA ARYAN
 
Sipat thermal power plant
Sipat thermal power plantSipat thermal power plant
Sipat thermal power plantJinendra Ninama
 
BHEL summer internship report
BHEL summer internship reportBHEL summer internship report
BHEL summer internship reportShivam Teotia
 
Internship report of NTPC kawas ,summer internship report of ntpc
Internship report of  NTPC kawas ,summer internship report of ntpcInternship report of  NTPC kawas ,summer internship report of ntpc
Internship report of NTPC kawas ,summer internship report of ntpcLalitGoyal27
 
DPL Vocational Training Report
DPL Vocational Training ReportDPL Vocational Training Report
DPL Vocational Training ReportShivendra Bhushan
 
BHEL SUMMER TRAAINING RANIPUR HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA
BHEL SUMMER TRAAINING RANIPUR  HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA BHEL SUMMER TRAAINING RANIPUR  HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA
BHEL SUMMER TRAAINING RANIPUR HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA Jatin Tiwari
 
A Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationA Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationLekhraJ Meena
 
Project report of kota super thermal power plant
Project report of kota super thermal power plantProject report of kota super thermal power plant
Project report of kota super thermal power plantHîmãńshu Mêęńä
 
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALVOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALMilind Punj
 
BHEL steam turbine manufacturing
BHEL steam turbine manufacturingBHEL steam turbine manufacturing
BHEL steam turbine manufacturingSakshyam Rai
 
CV of K F Karim, Operation Engineer
CV of K F Karim, Operation EngineerCV of K F Karim, Operation Engineer
CV of K F Karim, Operation EngineerKazi Ferdousul Karim
 

What's hot (20)

B.H.E.L., Haridwar Summer Training Report
B.H.E.L., Haridwar Summer Training ReportB.H.E.L., Haridwar Summer Training Report
B.H.E.L., Haridwar Summer Training Report
 
Bhel training report
Bhel training reportBhel training report
Bhel training report
 
BHEL PROJECT REPORT ( TRAINING REPORT )
 BHEL PROJECT REPORT ( TRAINING REPORT ) BHEL PROJECT REPORT ( TRAINING REPORT )
BHEL PROJECT REPORT ( TRAINING REPORT )
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipat
 
Bhel Haridwar training ppt
Bhel Haridwar training pptBhel Haridwar training ppt
Bhel Haridwar training ppt
 
BHEL INDUSTRIAL TRAINNING REPORT
BHEL INDUSTRIAL TRAINNING REPORTBHEL INDUSTRIAL TRAINNING REPORT
BHEL INDUSTRIAL TRAINNING REPORT
 
vijay resume QEC
vijay resume  QECvijay resume  QEC
vijay resume QEC
 
INTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCINTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPC
 
Bhel report nikhil
Bhel  report nikhilBhel  report nikhil
Bhel report nikhil
 
Sipat thermal power plant
Sipat thermal power plantSipat thermal power plant
Sipat thermal power plant
 
BHEL summer internship report
BHEL summer internship reportBHEL summer internship report
BHEL summer internship report
 
Internship report of NTPC kawas ,summer internship report of ntpc
Internship report of  NTPC kawas ,summer internship report of ntpcInternship report of  NTPC kawas ,summer internship report of ntpc
Internship report of NTPC kawas ,summer internship report of ntpc
 
DPL Vocational Training Report
DPL Vocational Training ReportDPL Vocational Training Report
DPL Vocational Training Report
 
BHEL SUMMER TRAAINING RANIPUR HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA
BHEL SUMMER TRAAINING RANIPUR  HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA BHEL SUMMER TRAAINING RANIPUR  HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA
BHEL SUMMER TRAAINING RANIPUR HARIDWAR JATIN TIWARI GLA UNIVERSITY MATHURA
 
A Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationA Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power Station
 
Project report of kota super thermal power plant
Project report of kota super thermal power plantProject report of kota super thermal power plant
Project report of kota super thermal power plant
 
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALVOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
 
Ntpc Report
Ntpc ReportNtpc Report
Ntpc Report
 
BHEL steam turbine manufacturing
BHEL steam turbine manufacturingBHEL steam turbine manufacturing
BHEL steam turbine manufacturing
 
CV of K F Karim, Operation Engineer
CV of K F Karim, Operation EngineerCV of K F Karim, Operation Engineer
CV of K F Karim, Operation Engineer
 

Similar to BHEL LPU

Profile of the saravana global energy ltd
Profile of the saravana global energy ltdProfile of the saravana global energy ltd
Profile of the saravana global energy ltdKumar TS
 
DCC Training Report Final
DCC Training Report FinalDCC Training Report Final
DCC Training Report FinalSOUPARNO ROY
 
Turbine manufacturing at BHEL Haridwar
Turbine manufacturing at BHEL HaridwarTurbine manufacturing at BHEL Haridwar
Turbine manufacturing at BHEL HaridwarABHISHEK CHAURASIYA
 
Gurtej bhel report
Gurtej bhel reportGurtej bhel report
Gurtej bhel reportGurtej Rai
 
Industrial Training Report bhel haridwar.
Industrial Training Report bhel haridwar.Industrial Training Report bhel haridwar.
Industrial Training Report bhel haridwar.Rishabh Nishad
 
bhel-haridwar-block-2-heavy-fabrication-training-report
bhel-haridwar-block-2-heavy-fabrication-training-reportbhel-haridwar-block-2-heavy-fabrication-training-report
bhel-haridwar-block-2-heavy-fabrication-training-reportnishant454545
 
Industrial training report
Industrial training report Industrial training report
Industrial training report Gaurav Chauhan
 
Summer Training Report on thermal power plant
Summer Training Report on thermal power plantSummer Training Report on thermal power plant
Summer Training Report on thermal power plantMohdAreebQureshi
 
Engr Ahmad raza Internship report on 600mw ccpp giddupdf
Engr Ahmad raza Internship report on 600mw ccpp giddupdfEngr Ahmad raza Internship report on 600mw ccpp giddupdf
Engr Ahmad raza Internship report on 600mw ccpp giddupdfKhalidAyaz3
 
Rohit pandey bhel training report
Rohit pandey bhel training reportRohit pandey bhel training report
Rohit pandey bhel training reportROHIT PANDEY
 
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANTBanti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT94600banti
 
Bhel vocational training_report
Bhel vocational training_reportBhel vocational training_report
Bhel vocational training_reportPrashant Pal
 
Bhel project report by kishore kumar patri
Bhel project report by kishore kumar patriBhel project report by kishore kumar patri
Bhel project report by kishore kumar patriKishore Kumar Patri
 
BHEL project report by Kishore Kumar Patri
BHEL project report by Kishore Kumar PatriBHEL project report by Kishore Kumar Patri
BHEL project report by Kishore Kumar PatriKishore Kumar Patri
 

Similar to BHEL LPU (20)

Shashi
ShashiShashi
Shashi
 
Profile of the saravana global energy ltd
Profile of the saravana global energy ltdProfile of the saravana global energy ltd
Profile of the saravana global energy ltd
 
DCC Training Report Final
DCC Training Report FinalDCC Training Report Final
DCC Training Report Final
 
Turbine manufacturing at BHEL Haridwar
Turbine manufacturing at BHEL HaridwarTurbine manufacturing at BHEL Haridwar
Turbine manufacturing at BHEL Haridwar
 
Gurtej bhel report
Gurtej bhel reportGurtej bhel report
Gurtej bhel report
 
Industrial Training Report bhel haridwar.
Industrial Training Report bhel haridwar.Industrial Training Report bhel haridwar.
Industrial Training Report bhel haridwar.
 
bhel-haridwar-block-2-heavy-fabrication-training-report
bhel-haridwar-block-2-heavy-fabrication-training-reportbhel-haridwar-block-2-heavy-fabrication-training-report
bhel-haridwar-block-2-heavy-fabrication-training-report
 
Industrial trainning r_gemco
Industrial trainning r_gemcoIndustrial trainning r_gemco
Industrial trainning r_gemco
 
Industrial training report
Industrial training report Industrial training report
Industrial training report
 
Summer Training Report on thermal power plant
Summer Training Report on thermal power plantSummer Training Report on thermal power plant
Summer Training Report on thermal power plant
 
Engr Ahmad raza Internship report on 600mw ccpp giddupdf
Engr Ahmad raza Internship report on 600mw ccpp giddupdfEngr Ahmad raza Internship report on 600mw ccpp giddupdf
Engr Ahmad raza Internship report on 600mw ccpp giddupdf
 
Rohit pandey bhel training report
Rohit pandey bhel training reportRohit pandey bhel training report
Rohit pandey bhel training report
 
Report ntpc
Report ntpcReport ntpc
Report ntpc
 
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANTBanti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT
 
Manoj
ManojManoj
Manoj
 
Bhel vocational training_report
Bhel vocational training_reportBhel vocational training_report
Bhel vocational training_report
 
Bsp sail project
Bsp sail projectBsp sail project
Bsp sail project
 
Alstom india
Alstom indiaAlstom india
Alstom india
 
Bhel project report by kishore kumar patri
Bhel project report by kishore kumar patriBhel project report by kishore kumar patri
Bhel project report by kishore kumar patri
 
BHEL project report by Kishore Kumar Patri
BHEL project report by Kishore Kumar PatriBHEL project report by Kishore Kumar Patri
BHEL project report by Kishore Kumar Patri
 

BHEL LPU

  • 1. Bharat Heavy Electricals Ltd. AN GOVERNMENT OF INDIA UNDERTAKEN INSULATOR PLANT, JAGDISHPUR (AMETHI) U.P.
  • 2. Prepared by: Bhupendra Kumar Shukla Reg. No: 11205580 Roll No: RM1204B43 School of Mechanical Engineering Lovely Professional University, Jalandhar
  • 3. About the Company 1964 Established Heavy Electricals (India) Limited 1972 In July the operation of all four plants were integrated 1974 In January Heavy Electricals (India) Ltd. Merged with BHEL. BHEL is largest engineering manufacturing enterprises in India in the energy related/ infrastructure sector, today BHEL was established more than 50 Years ago, ushering in the indigenous Heavy Electricals Equipment in India- a dream that has been more than realized with a well- recognized track record of performance. The company has been earning profit continuously since 1971-72 and paying dividends since 1976-77. 2012 The Hon’ble President of India, Shri Pranab Mukharjee, presenting the National Energy Conservation Award 2012 to Mr. B. Prasad Rao, Chief & Managing Director (CMD), BHEL. 2014 BHEL bags India Today Best Maharatna PSU Award for Global Presence & Innovation
  • 4. Trophy conferring Maharatna status on BHEL from Hon’ble President of India in recognition of company’s consistent high performance Sh. R. Krishnan, Director (HR) BHEL was conferred NIT-Trichy’s Distinguished Alumnus Award by the former President of India, Dr. A.P.J. Abdul Kalam as part of Golden Jubilee celebrations of the Institute
  • 5. BHEL PRODUCT PORTFOLIO, JAGDISHPUR The Product portfolio divided into three categories: 1. L T Type insulators 2. Disk Type Insulators 3. CERALINS L T TYPE INSULATORS a) Pin Type (10KN, with distance of 230/280/320mm) b) Guy/Stay/Strain (53/89/110KN with distance of 42/52/65/72mm) c) Post/Suspended Type Disk Type Insulator Code Strength(KN) 01 160 (CD-280 mm) 02 70/90/120 03 45 06 120(CD-280 mm) 08 210 11 120 13 120 14 70/90/120 15 70/90/120/160 17 70/90/120
  • 6. BHEL JAGDISHPUR INSULATOR PLANT Insulator Plant, Jagdishpur was inaugurated on March 03rd, 1984 by the Hon’ble Prime Minister of India Late Smt. Indira Gandhi, as 11th manufacturing unit of BHEL in Amethi District, 78 Km away from Lucknow on Lucknow-Sultanpur National Highway. BHEL’s glorious experience in the ceramic field with technical collaboration with M/s. NGK, Japan, the world leader in Insulator Technology, set the pace for the commissioning of this plant. This unit has been provided with the most modern and sophisticated facilities. BHEL's Heavy Electrical Plant, Bhopal 2x363 MW Gas-based Power Plant, OTPC-Palatana
  • 7. MANUFACTURING OF INSULATORS 1. For Manufacturing of Disc Insulator Storage  Slip House  Jiggering Unit  Finishing Unit  Glazing Unit  Firing Unit  Assembly Unit  Testing Unit  Dispatch Unit 2. For Manufacturing of Hollow Bushing  Storage  Slip House  Jiggering Unit  Finishing Unit  Glazing Unit  Firing Unit  Assembly Unit  Testing Unit  Dispatch Unit
  • 8. Flow Process of Insulators Disc Insulator Hollow Bushing Disc and Hollow Insulators both are manufactured by the Cake 1. SB CAKE for the Disc Ins. 2. AB CAKE for the Hollow Bush
  • 9.
  • 10. Slip House •Ball Mill(mixing) •3 Ton, 1760 ltr for 16 Hrs. + 2 Ton 3800 ltr for 2 hrs. Tank Storage •Cake Formation •Hardness (22±2) •1.5 to 2.5 hrs •128*2= 256,100*4=400 •So Total 856 Piece in one shift •Remove Moisture Pugging •Remove Air Gap •Blank Formation •Pressure 720mm Hg •Blank Φ180 •Length=220 Jiggering •Making Shape of Cell •Primary Die •Secondary Die Chain Dryer •Remove Moisture through CD •2.5 Hours Finishing • On Lathe Machine Tunnel Dryer • Moisture Removal • On diffreent Tempreture Zone • 35°Ϲ-45°Ϲ-62°Ϲ- 103°Ϲ-62°Ϲ Glazing • Drying(Dust Collecter) • Painting • Marking(Stamp of BHEL) Kiln • At 1200°Ϲ for 58 hours. Testing • Hydraullic Testing of 220 Kg for Head Test. Time Testing (TCT) • 15min Cold • 1min Hot • Temp. diff >70°Ϲ Assembly • Cell+Cap • (spacer)+ • Cement+Pin Spray • Betromens Paint • for the head joint Steam Testing • To attach cement for 4 hrs • Dip in Cold Water for 72 hours • 30<steam<62°Ϲ Mechanical Testing •30-32 Piece •tensile Load of 100 Kg •Cap and Pin Testing Electrical Testing •32000 Volt Current Supply •Total 1,56,000 Volt Supply for the cell testing Packing •Assembly Product packing Complete Flow Process
  • 11. Ball Mill Machine Sanding Glaze Brown Glaze Slip House
  • 12. Raw Material for the Cake is Mixed in the Mixing Tank under Slip House Cake Formation 80% of the Moisture has been removed through this. Jiggering Plant
  • 13. Pugging Machine Under this the Blanks are formed though the Pugging machine, the remaining 22% moisture has been removed. D= 80mm L= 220mm PUGG MILL
  • 14. Jiggering Plant Under this the formation of Insulator has been done The two dies Primary and Secondary dies
  • 15. Model Drying Chamber for Hollow Bushing Dust Collector, for the Insulators Glazing Machine for Painting GLAZING PLANT
  • 16. Stamping on Cell Shatal Kiln Shatal Kiln at 1200 deg-cen STAMPING & FIRING UNIT
  • 17. Hydraulic Test Electrical Testing, 156000Volt Mechanical Testing 100KN Tensile Force ASSEMBLY & TESTING

Editor's Notes

  1. 1# BHEL's Heavy Electrical Plant, Bhopal 2# 2x363 MW Gas-based Power Plant, OTPC-Palatana