SlideShare a Scribd company logo
1 of 2
Download to read offline
TxDOT PROJECT TRACKER “Work with others to provide safe and reliable transportation solutions for Texas.”
TxDOT photo archivesState Highway 183 Corridor
MIDTOWN EXPRESS • PROJECT TRACKER SPRING • 2015
MIDTOWN EXPRESSMIDTOWN EXPRESS
0396_030415
PROJECT HISTORY/TIMELINE
• Major Investment Study for future expansion: 1998-2000
• Unsolicited proposal received for SH 183/I-820 corridor redevelopment
between Interstate 35W (I-35W) and I-35E: 2002
ENVIRONMENTAL REVIEW STATUS
• SH 183 schematic for 2+2 and 3+3 managed lanes in Dallas
County was approved in 2012
• SH 183 schematic for 3+3 managed lanes in Tarrant County was
approved in 2009
• SH 114 schematic for 2+2 managed lanes (Dallas County) was
approved in 2009
• Loop 12 schematic for 2R managed lanes (Dallas County) was
approved in 2002
• Original environmental approval(s) by Federal Highway Administration
(FHWA): SH 183 EAs: FONSI-2004 and 2009, Re-evaluations-2011 and
2012; Loop 12: FONSI-2002, Re-evaluation-2008; SH 114: FONSI-2009
• FHWA Environmental Re-evaluations: SH 183 (Dallas County), Loop
12, and SH 114, were approved April 17, 2014
• SH 183’s (Section 2E -Tarrant County) re-evaluation was approved by
the FHWA on March 11, 2014
• Initial Section 408 permit submittal gained concurrence by US Army
Corp. of Engineers on July 21, 2014
PROJECT PROGRESS
• Southgate Mobility Partners (SGMP) was given conditional award
on May 29, 2014
• Financial Public Hearings were held simultaneously on June 24, 2014
in Dallas County and in Tarrant County
• The contract between TxDOT and SGMP was executed on November
20, 2014 and the project reached Notice to Proceed 1 (NTP1) on
December 2, 2014.
• SGMP conducted a Public Meeting on March 19th to present design
changes in Segment 2E.
• A groundbreaking celebration and open house are being planned
for April.
• Website was launched (www.drivemidtown.com) and the hotline was
activated (844-4-183-114) for the project.
PROJECT FACTS (INTERIM)
LENGTH
– SH 183 from SH 121 to I-35E: 14.8 miles
– SH 114 from SH 183 to International Pkwy.: 10.5 miles
– Loop 12 from SH 183 to I-35E: 2.5 miles
COST (Shown in 2014 dollars)
– Interim: $847.6 million (Design and Construction)
– Ultimate: $3.8 billion
EARLY PROJECTS
– Eastbound frontage road, Irving Blvd. Connection to William
Brewster Dr. and sound walls: $8 million (construction cost),
complete
– SH 114/LP 12 Diamond Interchange (interim): $240 million
(construction cost), complete
– Initial right-of-way (ROW) acquisition: $298 million
MIDTOWN EXPRESS PROPOSED PROJECT PHASES
INTERIM – Estimated substantial completion 2018
– Obtain ROW
– Reconstruct portions of frontage roads
– Reconstruct portions of general purpose lanes
– Construct one managed toll lane in each direction
– Construct one managed lane westbound on SH 114 from SH 161
to International Parkway
ULTIMATE – Estimated operation TBD
– Add one general purpose lane in each direction in some locations
– Up to three managed toll lanes in each direction in some locations
– Continuous frontage roads where applicable
– Diamond Interchange completion
SCHEDULE
• Interim Construction Start (Anticipated): Spring 2015
• Interim Substantial Completion (Anticipated): 2018
• Ultimate construction to begin when funds become available
OVERVIEW
The Midtown Express, formerly SH 183 Managed Lanes Project,
will increase the capacity and reconstruct portions of State Highway
(SH) 183, SH 114 and Loop 12. SH 183 has served North Texas’growing
transportation needs since the 1940s. The current roadway dates back
to 1959, and has remained relatively unchanged since 1973 when an
additional mainlane in each direction was added. Today, the highway
serves as a primary artery between Dallas and FortWorth, but it can no
longer adequately meet the demand of 150,000 to 170,000 vehicles a
day. Plans for the interim project will increase the capacity of SH 183
and portions of SH 114 and Loop 12, with the addition ofTEXpress (toll
managed) Lanes. The TEXpress Lanes will feature dynamic tolling de-
signed to keep traffic moving at 50 mph. Construction of the interim
improvements will begin this year.
DALLAS & FORT WORTHDISTRICTST WORTHDISTRIRIRIIIRIIIRRIRRRRRRRR CTS
Royal Ln. Royal Ln.
NBeltLineRd.
NBeltLineRd.
Glade Rd.
Trinity Blvd.
SStoryRd.
SMacArthurBlvd.
WestmorelandRd.
North
Lake
DFW
Int’l.
Airport
DFW
Int’l.
Airport
Dallas
Love
Field
N
1 mile
DALLASCO.
TARRANTCO.
TARRANTCO.
12
12
12
121
121
121
121
121
114
114
114
114
183 183
183
183
114
161
161
161
348
482
360
360
26
97
97
10
77
77
77
635
635
635
35E
35E
35E
35E
Midtown Express Project
InternationalPkwy.
President Ge
orgeBushTurnpike
E Belt Line Rd.
IrvingB
lvd.
Irving Blvd.
DALLASCO.
W Euless Blvd.
Hall Johnson Rd.
157
IndustrialBlvd.
NMainSt.
Frontage
lanes
(Each dir.)
General
purpose
lanes
(Each dir.)
Managed
lanes (toll)
(Each dir.)
LOOP 12 BETWEEN SH 183
AND I-35E
0 - 3
0 - 3
2 - 3
3
3
4
0
1
2R
Existing
Interim
Ultimate
Project
Configuration
Frontage
lanes
(Each dir.)
General
purpose
lanes
(Each dir.)
Managed
lanes (toll)
(Each dir.)
2 - 3
2 - 3
2 - 4
3
3
4
0
1
2 - 3
Existing
Interim
Ultimate
Project
Configuration
Frontage
lanes
(Each dir.)
General
purpose
lanes
(Each dir.)
Managed
lanes (toll)
(Each dir.)
SH 114 BETWEEN
INTERNATIONAL PKWY
AND ROCHELLE BLVD
0 - 4
0 - 4
2 - 4
2 - 4
2 - 4
4
0
1*
2
Existing
Interim
Ultimate
Project
Configuration
SH 183 BETWEEN SH 121
AND I-35E
NOTE: Not to scale.
*Managed lane in WB direction only from International Pkwy to SH 161. TxDOT graphic
PROJECT CONTACTS
MIDTOWN EXPRESS • PROJECT TRACKER SPRING • 2015
MIDTOWN EXPRESS • PROJECT TRACKER
Selma Stockstill
Public Information Manager
SouthGate Mobility Partners
7651 Esters Blvd.
Irving, TX 75063
972-536-8620
Tony Hartzel
TxDOT DFW Strategic Projects
Public Information Supervisor
4777 East Highway 80
Mesquite, TX 75150
(214) 320-4481
Texas Department of Transportation
4777 East Highway 80
Mesquite, TX 75150
214-320-6100
Project website: www.drivemidtown.com
0396_030415
DALLAS & FORT WORTHDISTRICTS

More Related Content

What's hot

Kennedy Station Design Update Meeting Presentation
Kennedy Station Design Update Meeting PresentationKennedy Station Design Update Meeting Presentation
Kennedy Station Design Update Meeting PresentationCrosstown TO
 
Final Presentation (Transportation Planning & Design)
Final Presentation (Transportation Planning & Design)Final Presentation (Transportation Planning & Design)
Final Presentation (Transportation Planning & Design)Josia Tannos, EIT
 
Herndon Station Metro Garage
Herndon Station Metro GarageHerndon Station Metro Garage
Herndon Station Metro GarageFairfax County
 
Fairfax County Little River Turnpike Walkway August 2020
Fairfax County Little River Turnpike Walkway August 2020Fairfax County Little River Turnpike Walkway August 2020
Fairfax County Little River Turnpike Walkway August 2020Fairfax County
 
Center City Connector Executive Summary
Center City Connector Executive SummaryCenter City Connector Executive Summary
Center City Connector Executive SummaryZach Shaner
 
APWA Reporter - Cermak-McCormick Place Elevated Green Line Station
APWA Reporter - Cermak-McCormick Place Elevated Green Line StationAPWA Reporter - Cermak-McCormick Place Elevated Green Line Station
APWA Reporter - Cermak-McCormick Place Elevated Green Line StationT.Y. Lin International
 
1 hudson yards project (peter wertheim)
1   hudson yards project (peter wertheim)1   hudson yards project (peter wertheim)
1 hudson yards project (peter wertheim)www.theurbanvision.com
 
Sr710 study update_power_point final final
Sr710 study update_power_point final finalSr710 study update_power_point final final
Sr710 study update_power_point final finalpeggydrouet
 
Ce 4710 presentation 2
Ce 4710 presentation 2Ce 4710 presentation 2
Ce 4710 presentation 2Matthew White
 
Eglinton Station Open House
Eglinton Station Open HouseEglinton Station Open House
Eglinton Station Open HouseCrosstown TO
 
Crosstown business opportunties and info session presentation
Crosstown business opportunties and info session presentationCrosstown business opportunties and info session presentation
Crosstown business opportunties and info session presentationCrosstown TO
 

What's hot (20)

Kennedy Station Design Update Meeting Presentation
Kennedy Station Design Update Meeting PresentationKennedy Station Design Update Meeting Presentation
Kennedy Station Design Update Meeting Presentation
 
Final Presentation (Transportation Planning & Design)
Final Presentation (Transportation Planning & Design)Final Presentation (Transportation Planning & Design)
Final Presentation (Transportation Planning & Design)
 
Herndon Station Metro Garage
Herndon Station Metro GarageHerndon Station Metro Garage
Herndon Station Metro Garage
 
Item #7 PPT Broadway Ellwood Replat
Item #7   PPT Broadway Ellwood ReplatItem #7   PPT Broadway Ellwood Replat
Item #7 PPT Broadway Ellwood Replat
 
Fairfax County Little River Turnpike Walkway August 2020
Fairfax County Little River Turnpike Walkway August 2020Fairfax County Little River Turnpike Walkway August 2020
Fairfax County Little River Turnpike Walkway August 2020
 
Removing Toronto's Expressway One Piece at a Time
Removing Toronto's Expressway One Piece at a TimeRemoving Toronto's Expressway One Piece at a Time
Removing Toronto's Expressway One Piece at a Time
 
Paquette, Jason 2016 CV
Paquette, Jason 2016 CVPaquette, Jason 2016 CV
Paquette, Jason 2016 CV
 
Center City Connector Executive Summary
Center City Connector Executive SummaryCenter City Connector Executive Summary
Center City Connector Executive Summary
 
NTE Seg3A-B-C
NTE Seg3A-B-CNTE Seg3A-B-C
NTE Seg3A-B-C
 
APWA Reporter - Cermak-McCormick Place Elevated Green Line Station
APWA Reporter - Cermak-McCormick Place Elevated Green Line StationAPWA Reporter - Cermak-McCormick Place Elevated Green Line Station
APWA Reporter - Cermak-McCormick Place Elevated Green Line Station
 
PORTFOLIO_AntonioPeriago_2015
PORTFOLIO_AntonioPeriago_2015PORTFOLIO_AntonioPeriago_2015
PORTFOLIO_AntonioPeriago_2015
 
Item #5 PPT Broadway Ellwood
Item #5   PPT Broadway EllwoodItem #5   PPT Broadway Ellwood
Item #5 PPT Broadway Ellwood
 
1 hudson yards project (peter wertheim)
1   hudson yards project (peter wertheim)1   hudson yards project (peter wertheim)
1 hudson yards project (peter wertheim)
 
Six Points Reconfiguration - Community Update June, 2014
Six Points Reconfiguration - Community Update June, 2014Six Points Reconfiguration - Community Update June, 2014
Six Points Reconfiguration - Community Update June, 2014
 
Sr710 study update_power_point final final
Sr710 study update_power_point final finalSr710 study update_power_point final final
Sr710 study update_power_point final final
 
Grid Layout-CPs
Grid Layout-CPsGrid Layout-CPs
Grid Layout-CPs
 
Ce 4710 presentation 2
Ce 4710 presentation 2Ce 4710 presentation 2
Ce 4710 presentation 2
 
Eglinton Station Open House
Eglinton Station Open HouseEglinton Station Open House
Eglinton Station Open House
 
Crosstown business opportunties and info session presentation
Crosstown business opportunties and info session presentationCrosstown business opportunties and info session presentation
Crosstown business opportunties and info session presentation
 
Theodor Nicolas Master
Theodor Nicolas MasterTheodor Nicolas Master
Theodor Nicolas Master
 

Viewers also liked

Інноваційна концепція змісту підручників із зарубіжної літератури для загальн...
Інноваційна концепція змісту підручників із зарубіжної літератури для загальн...Інноваційна концепція змісту підручників із зарубіжної літератури для загальн...
Інноваційна концепція змісту підручників із зарубіжної літератури для загальн...Електронні книги Ранок
 
Learn to speak so that other people listen.
Learn to speak so that other people listen.Learn to speak so that other people listen.
Learn to speak so that other people listen.Sameer Mathur
 
Derecho penal.
Derecho penal.Derecho penal.
Derecho penal.148790
 
CCIMP RDV TIC simplification administrative
CCIMP RDV TIC simplification administrativeCCIMP RDV TIC simplification administrative
CCIMP RDV TIC simplification administrativeCOMPETITIC
 
More followers keek free
More followers keek freeMore followers keek free
More followers keek freewarner623
 
More followers keek
More followers keekMore followers keek
More followers keekwarner623
 
Stakeholder feedback data
Stakeholder feedback dataStakeholder feedback data
Stakeholder feedback datalyacosta09
 

Viewers also liked (13)

Resume Tee
Resume TeeResume Tee
Resume Tee
 
NXT
NXTNXT
NXT
 
Інноваційна концепція змісту підручників із зарубіжної літератури для загальн...
Інноваційна концепція змісту підручників із зарубіжної літератури для загальн...Інноваційна концепція змісту підручників із зарубіжної літератури для загальн...
Інноваційна концепція змісту підручників із зарубіжної літератури для загальн...
 
Learn to speak so that other people listen.
Learn to speak so that other people listen.Learn to speak so that other people listen.
Learn to speak so that other people listen.
 
Сучасна стабільна лінія підручників
Сучасна стабільна лінія підручниківСучасна стабільна лінія підручників
Сучасна стабільна лінія підручників
 
Modelo 1 a 1
Modelo 1 a 1Modelo 1 a 1
Modelo 1 a 1
 
Test 1 pg 3
Test 1 pg 3Test 1 pg 3
Test 1 pg 3
 
Derecho penal.
Derecho penal.Derecho penal.
Derecho penal.
 
CCIMP RDV TIC simplification administrative
CCIMP RDV TIC simplification administrativeCCIMP RDV TIC simplification administrative
CCIMP RDV TIC simplification administrative
 
Test 1 pg 1
Test 1 pg 1Test 1 pg 1
Test 1 pg 1
 
More followers keek free
More followers keek freeMore followers keek free
More followers keek free
 
More followers keek
More followers keekMore followers keek
More followers keek
 
Stakeholder feedback data
Stakeholder feedback dataStakeholder feedback data
Stakeholder feedback data
 

Similar to sh183_tracker

RACER_casestudy_buickcity_0115
RACER_casestudy_buickcity_0115RACER_casestudy_buickcity_0115
RACER_casestudy_buickcity_0115Bernadette Grafton
 
New Hampshire State Bridge Profile
New Hampshire State Bridge ProfileNew Hampshire State Bridge Profile
New Hampshire State Bridge Profileartba
 
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnels
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnelsProposal to reclaim Chicago's lakefront from the highway using immersed tunnels
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnelsJames Chuck
 
Mount Vernon District 2018 Paving and Restriping
Mount Vernon District 2018 Paving and RestripingMount Vernon District 2018 Paving and Restriping
Mount Vernon District 2018 Paving and RestripingFairfax County
 
2009-11_UTA-SL Chamber Airport TRAX et al
2009-11_UTA-SL Chamber Airport TRAX et al2009-11_UTA-SL Chamber Airport TRAX et al
2009-11_UTA-SL Chamber Airport TRAX et alSalt Lake Chamber
 
Sr 826 (palmetto expressway)interchange reconstruction
Sr 826 (palmetto expressway)interchange reconstructionSr 826 (palmetto expressway)interchange reconstruction
Sr 826 (palmetto expressway)interchange reconstructiongbfengineering
 
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4Fairfax County
 
Florida State Bridge Profile
Florida State Bridge ProfileFlorida State Bridge Profile
Florida State Bridge Profileartba
 
Dranesville District 2018 Paving and Restriping
Dranesville District 2018 Paving and RestripingDranesville District 2018 Paving and Restriping
Dranesville District 2018 Paving and RestripingFairfax County
 
New Mexico State Bridge Profile
New Mexico State Bridge ProfileNew Mexico State Bridge Profile
New Mexico State Bridge Profileartba
 
Colorado State Bridge Profile
Colorado State Bridge ProfileColorado State Bridge Profile
Colorado State Bridge Profileartba
 
Springfield District 2018 Paving and Restriping: Public Information Meeting A...
Springfield District 2018 Paving and Restriping: Public Information Meeting A...Springfield District 2018 Paving and Restriping: Public Information Meeting A...
Springfield District 2018 Paving and Restriping: Public Information Meeting A...Fairfax County
 
MSI Developer Council Presentation - February 2017: Regional Transportation D...
MSI Developer Council Presentation - February 2017: Regional Transportation D...MSI Developer Council Presentation - February 2017: Regional Transportation D...
MSI Developer Council Presentation - February 2017: Regional Transportation D...Brad Howard
 
Connecticut State Bridge Profile
Connecticut State Bridge ProfileConnecticut State Bridge Profile
Connecticut State Bridge Profileartba
 

Similar to sh183_tracker (20)

RACER_casestudy_buickcity_0115
RACER_casestudy_buickcity_0115RACER_casestudy_buickcity_0115
RACER_casestudy_buickcity_0115
 
New Hampshire State Bridge Profile
New Hampshire State Bridge ProfileNew Hampshire State Bridge Profile
New Hampshire State Bridge Profile
 
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnels
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnelsProposal to reclaim Chicago's lakefront from the highway using immersed tunnels
Proposal to reclaim Chicago's lakefront from the highway using immersed tunnels
 
Mount Vernon District 2018 Paving and Restriping
Mount Vernon District 2018 Paving and RestripingMount Vernon District 2018 Paving and Restriping
Mount Vernon District 2018 Paving and Restriping
 
2009-11_UTA-SL Chamber Airport TRAX et al
2009-11_UTA-SL Chamber Airport TRAX et al2009-11_UTA-SL Chamber Airport TRAX et al
2009-11_UTA-SL Chamber Airport TRAX et al
 
North Dakota Regional Report
North Dakota Regional ReportNorth Dakota Regional Report
North Dakota Regional Report
 
Sr 826 (palmetto expressway)interchange reconstruction
Sr 826 (palmetto expressway)interchange reconstructionSr 826 (palmetto expressway)interchange reconstruction
Sr 826 (palmetto expressway)interchange reconstruction
 
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4
 
Florida State Bridge Profile
Florida State Bridge ProfileFlorida State Bridge Profile
Florida State Bridge Profile
 
Hwy 290 Construction wo Videos
Hwy 290 Construction wo VideosHwy 290 Construction wo Videos
Hwy 290 Construction wo Videos
 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
 
Dranesville District 2018 Paving and Restriping
Dranesville District 2018 Paving and RestripingDranesville District 2018 Paving and Restriping
Dranesville District 2018 Paving and Restriping
 
New Mexico State Bridge Profile
New Mexico State Bridge ProfileNew Mexico State Bridge Profile
New Mexico State Bridge Profile
 
Colorado State Bridge Profile
Colorado State Bridge ProfileColorado State Bridge Profile
Colorado State Bridge Profile
 
Springfield District 2018 Paving and Restriping: Public Information Meeting A...
Springfield District 2018 Paving and Restriping: Public Information Meeting A...Springfield District 2018 Paving and Restriping: Public Information Meeting A...
Springfield District 2018 Paving and Restriping: Public Information Meeting A...
 
Rapid Transit Corridors Workshop, January 8, 2015
Rapid Transit Corridors Workshop, January 8, 2015Rapid Transit Corridors Workshop, January 8, 2015
Rapid Transit Corridors Workshop, January 8, 2015
 
Technical Report
Technical ReportTechnical Report
Technical Report
 
MSI Developer Council Presentation - February 2017: Regional Transportation D...
MSI Developer Council Presentation - February 2017: Regional Transportation D...MSI Developer Council Presentation - February 2017: Regional Transportation D...
MSI Developer Council Presentation - February 2017: Regional Transportation D...
 
FNK rev 06.08.15
FNK rev 06.08.15FNK rev 06.08.15
FNK rev 06.08.15
 
Connecticut State Bridge Profile
Connecticut State Bridge ProfileConnecticut State Bridge Profile
Connecticut State Bridge Profile
 

sh183_tracker

  • 1. TxDOT PROJECT TRACKER “Work with others to provide safe and reliable transportation solutions for Texas.” TxDOT photo archivesState Highway 183 Corridor MIDTOWN EXPRESS • PROJECT TRACKER SPRING • 2015 MIDTOWN EXPRESSMIDTOWN EXPRESS 0396_030415 PROJECT HISTORY/TIMELINE • Major Investment Study for future expansion: 1998-2000 • Unsolicited proposal received for SH 183/I-820 corridor redevelopment between Interstate 35W (I-35W) and I-35E: 2002 ENVIRONMENTAL REVIEW STATUS • SH 183 schematic for 2+2 and 3+3 managed lanes in Dallas County was approved in 2012 • SH 183 schematic for 3+3 managed lanes in Tarrant County was approved in 2009 • SH 114 schematic for 2+2 managed lanes (Dallas County) was approved in 2009 • Loop 12 schematic for 2R managed lanes (Dallas County) was approved in 2002 • Original environmental approval(s) by Federal Highway Administration (FHWA): SH 183 EAs: FONSI-2004 and 2009, Re-evaluations-2011 and 2012; Loop 12: FONSI-2002, Re-evaluation-2008; SH 114: FONSI-2009 • FHWA Environmental Re-evaluations: SH 183 (Dallas County), Loop 12, and SH 114, were approved April 17, 2014 • SH 183’s (Section 2E -Tarrant County) re-evaluation was approved by the FHWA on March 11, 2014 • Initial Section 408 permit submittal gained concurrence by US Army Corp. of Engineers on July 21, 2014 PROJECT PROGRESS • Southgate Mobility Partners (SGMP) was given conditional award on May 29, 2014 • Financial Public Hearings were held simultaneously on June 24, 2014 in Dallas County and in Tarrant County • The contract between TxDOT and SGMP was executed on November 20, 2014 and the project reached Notice to Proceed 1 (NTP1) on December 2, 2014. • SGMP conducted a Public Meeting on March 19th to present design changes in Segment 2E. • A groundbreaking celebration and open house are being planned for April. • Website was launched (www.drivemidtown.com) and the hotline was activated (844-4-183-114) for the project. PROJECT FACTS (INTERIM) LENGTH – SH 183 from SH 121 to I-35E: 14.8 miles – SH 114 from SH 183 to International Pkwy.: 10.5 miles – Loop 12 from SH 183 to I-35E: 2.5 miles COST (Shown in 2014 dollars) – Interim: $847.6 million (Design and Construction) – Ultimate: $3.8 billion EARLY PROJECTS – Eastbound frontage road, Irving Blvd. Connection to William Brewster Dr. and sound walls: $8 million (construction cost), complete – SH 114/LP 12 Diamond Interchange (interim): $240 million (construction cost), complete – Initial right-of-way (ROW) acquisition: $298 million MIDTOWN EXPRESS PROPOSED PROJECT PHASES INTERIM – Estimated substantial completion 2018 – Obtain ROW – Reconstruct portions of frontage roads – Reconstruct portions of general purpose lanes – Construct one managed toll lane in each direction – Construct one managed lane westbound on SH 114 from SH 161 to International Parkway ULTIMATE – Estimated operation TBD – Add one general purpose lane in each direction in some locations – Up to three managed toll lanes in each direction in some locations – Continuous frontage roads where applicable – Diamond Interchange completion SCHEDULE • Interim Construction Start (Anticipated): Spring 2015 • Interim Substantial Completion (Anticipated): 2018 • Ultimate construction to begin when funds become available OVERVIEW The Midtown Express, formerly SH 183 Managed Lanes Project, will increase the capacity and reconstruct portions of State Highway (SH) 183, SH 114 and Loop 12. SH 183 has served North Texas’growing transportation needs since the 1940s. The current roadway dates back to 1959, and has remained relatively unchanged since 1973 when an additional mainlane in each direction was added. Today, the highway serves as a primary artery between Dallas and FortWorth, but it can no longer adequately meet the demand of 150,000 to 170,000 vehicles a day. Plans for the interim project will increase the capacity of SH 183 and portions of SH 114 and Loop 12, with the addition ofTEXpress (toll managed) Lanes. The TEXpress Lanes will feature dynamic tolling de- signed to keep traffic moving at 50 mph. Construction of the interim improvements will begin this year. DALLAS & FORT WORTHDISTRICTST WORTHDISTRIRIRIIIRIIIRRIRRRRRRRR CTS
  • 2. Royal Ln. Royal Ln. NBeltLineRd. NBeltLineRd. Glade Rd. Trinity Blvd. SStoryRd. SMacArthurBlvd. WestmorelandRd. North Lake DFW Int’l. Airport DFW Int’l. Airport Dallas Love Field N 1 mile DALLASCO. TARRANTCO. TARRANTCO. 12 12 12 121 121 121 121 121 114 114 114 114 183 183 183 183 114 161 161 161 348 482 360 360 26 97 97 10 77 77 77 635 635 635 35E 35E 35E 35E Midtown Express Project InternationalPkwy. President Ge orgeBushTurnpike E Belt Line Rd. IrvingB lvd. Irving Blvd. DALLASCO. W Euless Blvd. Hall Johnson Rd. 157 IndustrialBlvd. NMainSt. Frontage lanes (Each dir.) General purpose lanes (Each dir.) Managed lanes (toll) (Each dir.) LOOP 12 BETWEEN SH 183 AND I-35E 0 - 3 0 - 3 2 - 3 3 3 4 0 1 2R Existing Interim Ultimate Project Configuration Frontage lanes (Each dir.) General purpose lanes (Each dir.) Managed lanes (toll) (Each dir.) 2 - 3 2 - 3 2 - 4 3 3 4 0 1 2 - 3 Existing Interim Ultimate Project Configuration Frontage lanes (Each dir.) General purpose lanes (Each dir.) Managed lanes (toll) (Each dir.) SH 114 BETWEEN INTERNATIONAL PKWY AND ROCHELLE BLVD 0 - 4 0 - 4 2 - 4 2 - 4 2 - 4 4 0 1* 2 Existing Interim Ultimate Project Configuration SH 183 BETWEEN SH 121 AND I-35E NOTE: Not to scale. *Managed lane in WB direction only from International Pkwy to SH 161. TxDOT graphic PROJECT CONTACTS MIDTOWN EXPRESS • PROJECT TRACKER SPRING • 2015 MIDTOWN EXPRESS • PROJECT TRACKER Selma Stockstill Public Information Manager SouthGate Mobility Partners 7651 Esters Blvd. Irving, TX 75063 972-536-8620 Tony Hartzel TxDOT DFW Strategic Projects Public Information Supervisor 4777 East Highway 80 Mesquite, TX 75150 (214) 320-4481 Texas Department of Transportation 4777 East Highway 80 Mesquite, TX 75150 214-320-6100 Project website: www.drivemidtown.com 0396_030415 DALLAS & FORT WORTHDISTRICTS