SlideShare a Scribd company logo
1 of 7
Download to read offline
NOA No.: 13-0404.07
Expiration Date: 06/12/18
Approval Date: 06/20/13
Page 1 of 7
MIAMI-DADE COUNTY
PRODUCT CONTROL SECTION
DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER) 11805 SW 26 Street, Room 208
BOARD AND CODE ADMINISTRATION DIVISION Miami, Florida 33175-2474
T (786) 315-2590 F (786) 315-2599
NOTICE OF ACCEPTANCE (NOA) www.miamidade.gov/economy
LAPOLLA Industries, Inc.
15402 Vantage Parkway East
Suite 322
Houston, TX 77032
SCOPE:
This NOA is being issued under the applicable rules and regulations governing the use of construction materials. The
documentation submitted has been reviewed and accepted by Miami-Dade County RER - Product Control Section to be
used in Miami Dade County and other areas where allowed by the Authority Having Jurisdiction (AHJ).
This NOA shall not be valid after the expiration date stated below. The Miami-Dade County Product Control Section
(In Miami Dade County) and/or the AHJ (in areas other than Miami Dade County) reserve the right to have this product
or material tested for quality assurance purposes. If this product or material fails to perform in the accepted manner, the
manufacturer will incur the expense of such testing and the AHJ may immediately revoke, modify, or suspend the use
of such product or material within their jurisdiction. RER reserves the right to revoke this acceptance, if it is
determined by Miami-Dade County Product Control Section that this product or material fails to meet the requirements
of the applicable building code.
This product is approved as described herein, and has been designed to comply with the Florida Building Code
including the High Velocity Hurricane Zone of the Florida Building Code.
DESCRIPTION: Spray Polyurethane Foam – Foam Lok LPA 2500, 2800, 3000 over Recover Decks
LABELING: Each unit shall bear a permanent label with the manufacturer's name or logo, city, state and following
statement: "Miami-Dade County Product Control Approved", unless otherwise noted herein.
RENEWAL of this NOA shall be considered after a renewal application has been filed and there has been no change
in the applicable building code negatively affecting the performance of this product.
TERMINATION of this NOA will occur after the expiration date or if there has been a revision or change in the
materials, use, and/or manufacture of the product or process. Misuse of this NOA as an endorsement of any product, for
sales, advertising or any other purposes shall automatically terminate this NOA. Failure to comply with any section of
this NOA shall be cause for termination and removal of NOA.
ADVERTISEMENT: The NOA number preceded by the words Miami-Dade County, Florida, and followed
by the expiration date may be displayed in advertising literature. If any portion of the NOA is displayed, then
it shall be done in its entirety.
INSPECTION: A copy of this entire NOA shall be provided to the user by the manufacturer or its distributors and
shall be available for inspection at the job site at the request of the Building Official.
This renews NOA# 09-0610.06 and consists of pages 1 through 7.
The submitted documentation was reviewed by Alex Tigera.
NOA No.: 13-0404.07
Expiration Date: 06/12/18
Approval Date: 06/20/13
Page 2 of 7
ROOFING COMPONENT APPROVAL
Category: Roofing
Sub-Category: Spray Applied Polyurethane Roof System
Materials: Polyurethane
Deck Type Recover
Maximum Design Pressure -502.5 psf
TRADE NAMES OF PRODUCTS MANUFACTURED OR LABELED BY APPLICANT:
Product Dimensions Test Specifications Product Description
Foam-LOK LPA 2500 2.5 lbs/ft3
density TAS 110 Polyurethane spray applied foam that utilizes
an HFC blowing agent intended for roofing
applications.
Foam-LOK LPA 2800 2.8 lbs/ft3
density TAS 110 Polyurethane spray applied foam that utilizes
an HFC blowing agent intended for roofing
applications.
Foam-LOK LPA 3000 3.0 lbs/ft3
density TAS 110 Polyurethane spray applied foam that utilizes
an HFC blowing agent intended for roofing
applications.
Therm-O-Flex TF 1000
Series Elastomeric Roof
Coating
N/A ASTM D6083 A premium quality, fluid applied elastomeric
roof coating.
RCS-5000 Series
Restoration Coatings
N/A ASTM D6083 A premium quality, fluid applied elastomeric
roof coating.
Therm-O-Prime N/A A single component, water soluble acrylic
emulsion primer to prepare Galvanized Metal,
Concrete, Asphalt Substrates and Scarified
Foam for new SPF installations.
TRADE NAMES OF PRODUCTS MANUFACTURED BY OTHERS:
Product Dimensions
Test Specifications Product
Description Manufacturer
Any Miami-Dade
County Approved
Roof Coating
N/A As Required by
Miami-Dade County
PCA
Roof coating for application over
polyurethane spray applied foam.
Generic.
(with current PCA)
NOA No.: 13-0404.07
Expiration Date: 06/12/18
Approval Date: 06/20/13
Page 3 of 7
EVIDENCE SUBMITTED:
Test Agency Test Identifier Test Name/Report Date
PRI Construction Materials Technologies LPII-007-02-01 TAS 110 01/27/10
LPII-008-02-01 TAS 110 01/27/10
LPII-005-02-01 TAS 110 06/12/07
PRI Asphalt Technologies LPII- 002-02-01 ASTM D 6083/TAS 114-H 10/19/05
Underwriters Laboratories 07NK08120 UL 790 07/16/07
R14353 Fire Classification 06/26/05
Factory Mutual Research Corp. 3023796 Class 4470 10/02/05
Atlantic & Caribbean Roof 07-061 TAS 114-D 10/16/07
Consulting, LLC 08-001 TAS 114-D 01/22/08
NOA No.: 13-0404.07
Expiration Date: 06/12/18
Approval Date: 06/20/13
Page 4 of 7
APPROVED ASSEMBLIES:
Deck Type 7: Recover over granular surfaced membranes
Deck Description: Wood, Steel, Concrete, Granule Surfaced Modified Bitumen
System Type A(1): Sprayed polyurethane foam covered with an Approved Miami-Dade County roof coating
All General and System Limitations apply.
Surface
Preparation:
For recover applications, existing roof shall be in compliance with applicable Building Code
and Roofing Application Standard RAS 109.
Substrate shall be primed in accordance with LAPOLLA Industries, Inc. recommendations,
and shall be free of loose dirt, grease, oil or other contaminants prior to priming or foam
application. Remove all loose dirt or debris by use of compressed air, vacuum or brooming.
No washing shall be permitted. Oil, grease, release agents or other contaminants shall be
removed with proper cleaning solutions.
Primers shall be applied in accordance with the manufacturer’s instructions. All primers must
be thoroughly dry and cured prior to foam application.
Polyurethane Foam
Application:
The polyurethane foam shall be applied uniformly over the entire surface of the concrete deck
at the specified thickness in compliance with the requirements set forth Roofing Application
Standard RAS 109. The sprayed polyurethane foam shall be feathered at the edges to produce
a smooth transition.
Protective Coating
Application:
Shall apply a Miami-Dade County approved roof coating with a current NOA applied in
accordance with the guidelines listed in the NOA.
Polyurethane foam surface shall be free of moisture, dust, debris, oils, tars, grease or other
materials that will impair adhesion of the protective coverings. Any damage or defects to the
polyurethane foam surface shall be repaired prior to the coating application. The coating shall
be applied the same day as the foam when possible. If more than 72 hours elapse prior to the
application of the coatings, the polyurethane foam shall be inspected for UV degradation.
Maximum Design
Pressure:
-502.5 psf.
NOA No.: 13-0404.07
Expiration Date: 06/12/18
Approval Date: 06/20/13
Page 5 of 7
Deck Type 7: Recover over smooth surfaced membranes
Deck Description: Wood, Steel, Concrete, Granule Surfaced Modified Bitumen
System Type A(2): Sprayed polyurethane foam covered with an Approved Miami-Dade County roof coating
All General and System Limitations apply.
Surface
Preparation:
For recover applications, existing roof shall be in compliance with applicable Building Code
and Roofing Application Standard RAS 109.
Substrate shall be primed in accordance with LAPOLLA Industries, Inc. recommendations,
and shall be free of loose dirt, grease, oil or other contaminants prior to priming or foam
application. Remove all loose dirt or debris by use of compressed air, vacuum or brooming.
No washing shall be permitted. Oil, grease, release agents or other contaminants shall be
removed with proper cleaning solutions.
Primers shall be applied in accordance with the manufacturer’s instructions. All primers must
be thoroughly dry and cured prior to foam application.
Polyurethane Foam
Application:
The polyurethane foam shall be applied uniformly over the entire surface of the concrete deck
at the specified thickness in compliance with the requirements set forth Roofing Application
Standard RAS 109. The sprayed polyurethane foam shall be feathered at the edges to produce
a smooth transition.
Protective Coating
Application:
Shall apply a Miami-Dade County approved roof coating with a current NOA applied in
accordance with the guidelines listed in the NOA.
Polyurethane foam surface shall be free of moisture, dust, debris, oils, tars, grease or other
materials that will impair adhesion of the protective coverings. Any damage or defects to the
polyurethane foam surface shall be repaired prior to the coating application. The coating shall
be applied the same day as the foam when possible. If more than 72 hours elapse prior to the
application of the coatings, the polyurethane foam shall be inspected for UV degradation.
Maximum Design
Pressure:
-447.5 psf.
NOA No.: 13-0404.07
Expiration Date: 06/12/18
Approval Date: 06/20/13
Page 6 of 7
TABLE 1
AMBIENT HUMIDITY APPLICATION LIMITS
SPRAYED POLYURETHANE FOAM
RECOVER SYSTEM LIMITATIONS:
1. The moisture content of an existing roof system shall be in compliance with applicable Building Code.
2. Existing low slope roof systems shall be tested for uplift resistance in compliance with Testing Application
Standard TAS 124 to the calculated design pressures of the field, perimeter and corner areas, determined in
compliance with applicable Building Code.
3. Lightning rods shall be masked prior to foaming. Lightning rod cables shall not be embedded in the polyurethane
foam and should be removed prior to foaming. Electrical and mechanical conduits should be relocated or raised
above the finished roof surface.
30
40
50
60
70
80
90
100
110
Dew point and relative humidity for given dry bulb temperature.
Foam Enterprises
Air Temp/ Humidity/ Dew Point Guideline
AirTemp.
Humidity
Dew Point
45 67 40.5 50 70 45.5 55 72 50.5 60 75 55.5
45 50 55 60 65 70 75 80 85 90 95 100
67 70 72 75 78 80 78 75 70 64 58 50
40.5 45.5 50.5 55.5 60.5 65.5 70 73.5 77 79.5 82 83
LAPOLLA Industries, Inc.
Air Temp/ Humidity/ Dew Point Guideline
NOA No.: 13-0404.07
Expiration Date: 06/12/18
Approval Date: 06/20/13
Page 7 of 7
GENERAL LIMITATIONS:
1. Fire classification is not part of this acceptance, refer to a current Approved Roofing Materials Directory for fire
ratings of this product
2. Spray polyurethane foam shall not be sprayed when ambient temperature is within 5 degrees of the dew point.
Ambient humidity applications limits shall be as listed in Table 1 herein. Contractor shall monitor and record
environmental conditions in the Job Log in compliance with RAS 109. Job Log shall be maintained at the job site
and accessible to The Building Official.
3. Flashings and waterproof coverings for expansion joints shall be of compatible materials and in accordance with
LAPOLLA Industries, Inc. published literature.
4. Miscellaneous materials such as adhesives, elastomeric caulking compounds, metal, vents and drains shall be a
composite part of the roof system and shall be compatible with the foam and coating.
5. All attachment and sizing of perimeter nailers, metal profile, and/or flashing termination designs shall conform to
Roofing Application Standard RAS 111 and the wind load requirements of applicable building code.
6. The maximum designed pressure limitation listed shall be applicable to all roof pressure zones (i.e. field,
perimeters, and corners). Neither rational analysis, nor extrapolation shall be permitted for enhanced fastening at
enhanced pressure zones (i.e. perimeters, extended corners and corners).
END OF THIS ACCEPTANCE

More Related Content

Similar to WeatherTight Systems - Spray Foam Roofing Contractor

General Arrangement Drawings
General Arrangement DrawingsGeneral Arrangement Drawings
General Arrangement Drawings
Mark Flynn
 
2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF
WorldofAllLyrics
 
Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)
ghani386
 
RAJ UPDATED CV IN WORD
RAJ UPDATED CV IN WORDRAJ UPDATED CV IN WORD
RAJ UPDATED CV IN WORD
saravana raj
 
Damage Control Brochure
Damage Control BrochureDamage Control Brochure
Damage Control Brochure
Elizabeth Lenz
 
Crawford Tracey AIA Course: Glazing Design
Crawford Tracey AIA Course: Glazing DesignCrawford Tracey AIA Course: Glazing Design
Crawford Tracey AIA Course: Glazing Design
Donovan and Associates
 
8D Sample -JC 19inch Sidewall Crack
8D Sample -JC 19inch Sidewall Crack8D Sample -JC 19inch Sidewall Crack
8D Sample -JC 19inch Sidewall Crack
Peter Zhou
 

Similar to WeatherTight Systems - Spray Foam Roofing Contractor (20)

General Arrangement Drawings
General Arrangement DrawingsGeneral Arrangement Drawings
General Arrangement Drawings
 
NDDH North Dakota Industrial Stormwater Permit
NDDH North Dakota Industrial Stormwater PermitNDDH North Dakota Industrial Stormwater Permit
NDDH North Dakota Industrial Stormwater Permit
 
Plastifloor Park Deck Waterproofing System_Flyer
Plastifloor Park Deck Waterproofing System_FlyerPlastifloor Park Deck Waterproofing System_Flyer
Plastifloor Park Deck Waterproofing System_Flyer
 
Hydraulic catalogue
Hydraulic catalogueHydraulic catalogue
Hydraulic catalogue
 
2011 CTM Session 2: Terminology for Products
2011 CTM Session 2: Terminology for Products2011 CTM Session 2: Terminology for Products
2011 CTM Session 2: Terminology for Products
 
Case Study - drivable waterproofing
Case Study - drivable waterproofing Case Study - drivable waterproofing
Case Study - drivable waterproofing
 
2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF
 
Saes h-001 - 2016
Saes h-001 - 2016Saes h-001 - 2016
Saes h-001 - 2016
 
Roof maintenance
Roof maintenanceRoof maintenance
Roof maintenance
 
Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)
 
Tobslak toughtop 20
Tobslak toughtop 20Tobslak toughtop 20
Tobslak toughtop 20
 
RAJ UPDATED CV IN WORD
RAJ UPDATED CV IN WORDRAJ UPDATED CV IN WORD
RAJ UPDATED CV IN WORD
 
Molykote anti friction coatings selection guide
Molykote  anti friction coatings selection guideMolykote  anti friction coatings selection guide
Molykote anti friction coatings selection guide
 
App guide general surface prep guide
App guide general surface prep guideApp guide general surface prep guide
App guide general surface prep guide
 
Gg cs hualien_1.07
Gg cs hualien_1.07Gg cs hualien_1.07
Gg cs hualien_1.07
 
CGPPI profile
CGPPI profileCGPPI profile
CGPPI profile
 
Spec u kon fsi 2021
Spec u kon fsi 2021Spec u kon fsi 2021
Spec u kon fsi 2021
 
Damage Control Brochure
Damage Control BrochureDamage Control Brochure
Damage Control Brochure
 
Crawford Tracey AIA Course: Glazing Design
Crawford Tracey AIA Course: Glazing DesignCrawford Tracey AIA Course: Glazing Design
Crawford Tracey AIA Course: Glazing Design
 
8D Sample -JC 19inch Sidewall Crack
8D Sample -JC 19inch Sidewall Crack8D Sample -JC 19inch Sidewall Crack
8D Sample -JC 19inch Sidewall Crack
 

Recently uploaded

Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
vineshkumarsajnani12
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
ZurliaSoop
 

Recently uploaded (20)

Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 

WeatherTight Systems - Spray Foam Roofing Contractor

  • 1. NOA No.: 13-0404.07 Expiration Date: 06/12/18 Approval Date: 06/20/13 Page 1 of 7 MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER) 11805 SW 26 Street, Room 208 BOARD AND CODE ADMINISTRATION DIVISION Miami, Florida 33175-2474 T (786) 315-2590 F (786) 315-2599 NOTICE OF ACCEPTANCE (NOA) www.miamidade.gov/economy LAPOLLA Industries, Inc. 15402 Vantage Parkway East Suite 322 Houston, TX 77032 SCOPE: This NOA is being issued under the applicable rules and regulations governing the use of construction materials. The documentation submitted has been reviewed and accepted by Miami-Dade County RER - Product Control Section to be used in Miami Dade County and other areas where allowed by the Authority Having Jurisdiction (AHJ). This NOA shall not be valid after the expiration date stated below. The Miami-Dade County Product Control Section (In Miami Dade County) and/or the AHJ (in areas other than Miami Dade County) reserve the right to have this product or material tested for quality assurance purposes. If this product or material fails to perform in the accepted manner, the manufacturer will incur the expense of such testing and the AHJ may immediately revoke, modify, or suspend the use of such product or material within their jurisdiction. RER reserves the right to revoke this acceptance, if it is determined by Miami-Dade County Product Control Section that this product or material fails to meet the requirements of the applicable building code. This product is approved as described herein, and has been designed to comply with the Florida Building Code including the High Velocity Hurricane Zone of the Florida Building Code. DESCRIPTION: Spray Polyurethane Foam – Foam Lok LPA 2500, 2800, 3000 over Recover Decks LABELING: Each unit shall bear a permanent label with the manufacturer's name or logo, city, state and following statement: "Miami-Dade County Product Control Approved", unless otherwise noted herein. RENEWAL of this NOA shall be considered after a renewal application has been filed and there has been no change in the applicable building code negatively affecting the performance of this product. TERMINATION of this NOA will occur after the expiration date or if there has been a revision or change in the materials, use, and/or manufacture of the product or process. Misuse of this NOA as an endorsement of any product, for sales, advertising or any other purposes shall automatically terminate this NOA. Failure to comply with any section of this NOA shall be cause for termination and removal of NOA. ADVERTISEMENT: The NOA number preceded by the words Miami-Dade County, Florida, and followed by the expiration date may be displayed in advertising literature. If any portion of the NOA is displayed, then it shall be done in its entirety. INSPECTION: A copy of this entire NOA shall be provided to the user by the manufacturer or its distributors and shall be available for inspection at the job site at the request of the Building Official. This renews NOA# 09-0610.06 and consists of pages 1 through 7. The submitted documentation was reviewed by Alex Tigera.
  • 2. NOA No.: 13-0404.07 Expiration Date: 06/12/18 Approval Date: 06/20/13 Page 2 of 7 ROOFING COMPONENT APPROVAL Category: Roofing Sub-Category: Spray Applied Polyurethane Roof System Materials: Polyurethane Deck Type Recover Maximum Design Pressure -502.5 psf TRADE NAMES OF PRODUCTS MANUFACTURED OR LABELED BY APPLICANT: Product Dimensions Test Specifications Product Description Foam-LOK LPA 2500 2.5 lbs/ft3 density TAS 110 Polyurethane spray applied foam that utilizes an HFC blowing agent intended for roofing applications. Foam-LOK LPA 2800 2.8 lbs/ft3 density TAS 110 Polyurethane spray applied foam that utilizes an HFC blowing agent intended for roofing applications. Foam-LOK LPA 3000 3.0 lbs/ft3 density TAS 110 Polyurethane spray applied foam that utilizes an HFC blowing agent intended for roofing applications. Therm-O-Flex TF 1000 Series Elastomeric Roof Coating N/A ASTM D6083 A premium quality, fluid applied elastomeric roof coating. RCS-5000 Series Restoration Coatings N/A ASTM D6083 A premium quality, fluid applied elastomeric roof coating. Therm-O-Prime N/A A single component, water soluble acrylic emulsion primer to prepare Galvanized Metal, Concrete, Asphalt Substrates and Scarified Foam for new SPF installations. TRADE NAMES OF PRODUCTS MANUFACTURED BY OTHERS: Product Dimensions Test Specifications Product Description Manufacturer Any Miami-Dade County Approved Roof Coating N/A As Required by Miami-Dade County PCA Roof coating for application over polyurethane spray applied foam. Generic. (with current PCA)
  • 3. NOA No.: 13-0404.07 Expiration Date: 06/12/18 Approval Date: 06/20/13 Page 3 of 7 EVIDENCE SUBMITTED: Test Agency Test Identifier Test Name/Report Date PRI Construction Materials Technologies LPII-007-02-01 TAS 110 01/27/10 LPII-008-02-01 TAS 110 01/27/10 LPII-005-02-01 TAS 110 06/12/07 PRI Asphalt Technologies LPII- 002-02-01 ASTM D 6083/TAS 114-H 10/19/05 Underwriters Laboratories 07NK08120 UL 790 07/16/07 R14353 Fire Classification 06/26/05 Factory Mutual Research Corp. 3023796 Class 4470 10/02/05 Atlantic & Caribbean Roof 07-061 TAS 114-D 10/16/07 Consulting, LLC 08-001 TAS 114-D 01/22/08
  • 4. NOA No.: 13-0404.07 Expiration Date: 06/12/18 Approval Date: 06/20/13 Page 4 of 7 APPROVED ASSEMBLIES: Deck Type 7: Recover over granular surfaced membranes Deck Description: Wood, Steel, Concrete, Granule Surfaced Modified Bitumen System Type A(1): Sprayed polyurethane foam covered with an Approved Miami-Dade County roof coating All General and System Limitations apply. Surface Preparation: For recover applications, existing roof shall be in compliance with applicable Building Code and Roofing Application Standard RAS 109. Substrate shall be primed in accordance with LAPOLLA Industries, Inc. recommendations, and shall be free of loose dirt, grease, oil or other contaminants prior to priming or foam application. Remove all loose dirt or debris by use of compressed air, vacuum or brooming. No washing shall be permitted. Oil, grease, release agents or other contaminants shall be removed with proper cleaning solutions. Primers shall be applied in accordance with the manufacturer’s instructions. All primers must be thoroughly dry and cured prior to foam application. Polyurethane Foam Application: The polyurethane foam shall be applied uniformly over the entire surface of the concrete deck at the specified thickness in compliance with the requirements set forth Roofing Application Standard RAS 109. The sprayed polyurethane foam shall be feathered at the edges to produce a smooth transition. Protective Coating Application: Shall apply a Miami-Dade County approved roof coating with a current NOA applied in accordance with the guidelines listed in the NOA. Polyurethane foam surface shall be free of moisture, dust, debris, oils, tars, grease or other materials that will impair adhesion of the protective coverings. Any damage or defects to the polyurethane foam surface shall be repaired prior to the coating application. The coating shall be applied the same day as the foam when possible. If more than 72 hours elapse prior to the application of the coatings, the polyurethane foam shall be inspected for UV degradation. Maximum Design Pressure: -502.5 psf.
  • 5. NOA No.: 13-0404.07 Expiration Date: 06/12/18 Approval Date: 06/20/13 Page 5 of 7 Deck Type 7: Recover over smooth surfaced membranes Deck Description: Wood, Steel, Concrete, Granule Surfaced Modified Bitumen System Type A(2): Sprayed polyurethane foam covered with an Approved Miami-Dade County roof coating All General and System Limitations apply. Surface Preparation: For recover applications, existing roof shall be in compliance with applicable Building Code and Roofing Application Standard RAS 109. Substrate shall be primed in accordance with LAPOLLA Industries, Inc. recommendations, and shall be free of loose dirt, grease, oil or other contaminants prior to priming or foam application. Remove all loose dirt or debris by use of compressed air, vacuum or brooming. No washing shall be permitted. Oil, grease, release agents or other contaminants shall be removed with proper cleaning solutions. Primers shall be applied in accordance with the manufacturer’s instructions. All primers must be thoroughly dry and cured prior to foam application. Polyurethane Foam Application: The polyurethane foam shall be applied uniformly over the entire surface of the concrete deck at the specified thickness in compliance with the requirements set forth Roofing Application Standard RAS 109. The sprayed polyurethane foam shall be feathered at the edges to produce a smooth transition. Protective Coating Application: Shall apply a Miami-Dade County approved roof coating with a current NOA applied in accordance with the guidelines listed in the NOA. Polyurethane foam surface shall be free of moisture, dust, debris, oils, tars, grease or other materials that will impair adhesion of the protective coverings. Any damage or defects to the polyurethane foam surface shall be repaired prior to the coating application. The coating shall be applied the same day as the foam when possible. If more than 72 hours elapse prior to the application of the coatings, the polyurethane foam shall be inspected for UV degradation. Maximum Design Pressure: -447.5 psf.
  • 6. NOA No.: 13-0404.07 Expiration Date: 06/12/18 Approval Date: 06/20/13 Page 6 of 7 TABLE 1 AMBIENT HUMIDITY APPLICATION LIMITS SPRAYED POLYURETHANE FOAM RECOVER SYSTEM LIMITATIONS: 1. The moisture content of an existing roof system shall be in compliance with applicable Building Code. 2. Existing low slope roof systems shall be tested for uplift resistance in compliance with Testing Application Standard TAS 124 to the calculated design pressures of the field, perimeter and corner areas, determined in compliance with applicable Building Code. 3. Lightning rods shall be masked prior to foaming. Lightning rod cables shall not be embedded in the polyurethane foam and should be removed prior to foaming. Electrical and mechanical conduits should be relocated or raised above the finished roof surface. 30 40 50 60 70 80 90 100 110 Dew point and relative humidity for given dry bulb temperature. Foam Enterprises Air Temp/ Humidity/ Dew Point Guideline AirTemp. Humidity Dew Point 45 67 40.5 50 70 45.5 55 72 50.5 60 75 55.5 45 50 55 60 65 70 75 80 85 90 95 100 67 70 72 75 78 80 78 75 70 64 58 50 40.5 45.5 50.5 55.5 60.5 65.5 70 73.5 77 79.5 82 83 LAPOLLA Industries, Inc. Air Temp/ Humidity/ Dew Point Guideline
  • 7. NOA No.: 13-0404.07 Expiration Date: 06/12/18 Approval Date: 06/20/13 Page 7 of 7 GENERAL LIMITATIONS: 1. Fire classification is not part of this acceptance, refer to a current Approved Roofing Materials Directory for fire ratings of this product 2. Spray polyurethane foam shall not be sprayed when ambient temperature is within 5 degrees of the dew point. Ambient humidity applications limits shall be as listed in Table 1 herein. Contractor shall monitor and record environmental conditions in the Job Log in compliance with RAS 109. Job Log shall be maintained at the job site and accessible to The Building Official. 3. Flashings and waterproof coverings for expansion joints shall be of compatible materials and in accordance with LAPOLLA Industries, Inc. published literature. 4. Miscellaneous materials such as adhesives, elastomeric caulking compounds, metal, vents and drains shall be a composite part of the roof system and shall be compatible with the foam and coating. 5. All attachment and sizing of perimeter nailers, metal profile, and/or flashing termination designs shall conform to Roofing Application Standard RAS 111 and the wind load requirements of applicable building code. 6. The maximum designed pressure limitation listed shall be applicable to all roof pressure zones (i.e. field, perimeters, and corners). Neither rational analysis, nor extrapolation shall be permitted for enhanced fastening at enhanced pressure zones (i.e. perimeters, extended corners and corners). END OF THIS ACCEPTANCE