Page 1 GAO-15-510R Navy Phased Modernization
441 G St. N.W.
Washington, DC 20548
May 20, 2015
Congressional Committees
Surface Ships: Status of the Navy’s Phased Modernization Plan
In March 2014, as part of the President’s Budget for Fiscal Year 2015, the Navy proposed a
Phased Modernization Plan that included placing 11 Ticonderoga-class cruisers (large surface
combatants) and three dock-landing ships (amphibious ships) into a phased modernization and
maintenance period to reduce near-term funding requirements and as a means to extend the life
of the ships.
House Report 113-446 accompanying the National Defense Authorization Act for Fiscal Year
2015 included a provision for GAO to review the costs, cost savings, benefits, and risks
associated with the Navy’s Phased Modernization Plan. This report (1) describes the
implementation plans the Navy developed for phased modernization and (2) assesses the
extent to which the Navy identified and analyzed alternatives for achieving the goals of phased
modernization.
In February 2015, as part of the President’s Budget for Fiscal Year 2016, the Navy proposed a
revised Phased Modernization Plan that significantly altered its original proposal. However, it
was not until we completed our review that the Navy provided us with a limited amount of
information about their revised phased modernization plans.
We provided a briefing of our preliminary results to the House Armed Services Committee staff
in March 2015. This report formally transmits an updated briefing regarding the final results of
our work in response to the provision in House Report 113-446 (see the enclosure).
To conduct our work, we evaluated relevant Navy documentation, such as briefing slides and
planning documents. We also interviewed Navy headquarters and fleet officials and obtained
testimonial evidence regarding the process the Navy followed in developing its Phased
Modernization Plan and the alternatives it considered. To the extent that documentation was
available, we corroborated the testimonial evidence and discussed any conflicting evidence with
Navy officials. For example, we reviewed internal briefing slides and summary papers that Navy
officials provided to us. We visited and spoke with experts on cruiser maintenance and
modernization at two Navy shipyards in Norfolk, Virginia, and San Diego, California, where the
Navy anticipates work will be performed on the ships included in phased modernization. We
also interviewed Department of Defense (DOD) and Navy officials, including officials from the
Office of the Secretary of Defense, Cost Assessment and Program Evaluation; Office of the
Chief of Naval Operations; Naval Sea Systems Command; Fleet Forces Command; and Naval
Surface Forces.
We conducted our work from July 2014 to May 2015 in accordance with generally accepted
government auditing standards. Those standards require that we plan and perform the audit to
obtain sufficient, appropriate evidence to provide a reasonable basis for our findings and
Page 2 GAO-15-510R Navy Phased Modernization
conclusions based on our audit objectives. We believe that the evidence obtained provides a
reasonable basis for our findings and conclusions based on our audit objectives.
In summary, we found that the Navy’s Phased Modernization Plan, introduced in March 2014,
would have placed 11 cruisers and three dock-landing ships into a reduced operating status for
maintenance and modernization. The cruisers were to be minimally manned while in phased
modernization for between 5 and 12 years and then returned to the fleet. In February 2015,
however, the Navy proposed a revision to its original Phased Modernization Plan. The revised
plan for its cruisers placed limits on the number of ships that would be in phased
modernization, and how long they would stay in that status. Specifically, the revised plan stated
that each year no more than two cruisers would be placed in phased modernization; no cruiser
would remain in phased modernization for more than 4 years; and no more than six cruisers
would be in phased modernization at the same time. According to Navy officials, the planning
efforts surrounding the dock-landing ships would not significantly differ from normal long-term
maintenance planning efforts.
The Navy did not consider any formal alternatives to the original Phased Modernization Plan
and revised the plan primarily to respond to congressional concerns that removing cruisers from
the fleet would exacerbate existing capacity shortfalls. Navy officials stated that the primary
motivation for phased modernization was to delay modernization costs and that the plans have
evolved over time. Our analysis found that under the revised plan put forward by the Navy in
February 2015, some of the benefits and risks the Navy identified for the original plan may
increase while others may decrease. For example, the Navy expected the original plan to
sustain the Air Defense Commander platform—which is the role played by cruisers in
coordinating air defense for the 11 carrier strike groups—into the 2040s. We expect this benefit
to be reduced under the revised plan because cruisers will be in phased modernization for a
shorter period, and thus the Navy will not be able to sustain the cruisers into the 2040s as under
the original plan. Similarly, the Navy identified having fewer cruisers available for independent
operations as a risk of implementing its original Phased Modernization Plan. Given that fewer
cruisers will be in phased modernization at one time, we expect that this risk will decrease under
the revised plan.
We are not making any recommendations in this report.
Agency Comments and Our Evaluation
We provided a draft of this report to DOD for comment. DOD did not provide formal written
comments on this report. The Navy provided technical comments and we incorporated these
comments as appropriate.
- - - - -
We are sending copies of this report to the Secretary of Defense; the Secretary of the Navy; and
appropriate congressional committees. In addition, the report is available at no charge on the
GAO website at http://www.gao.gov.
Page 3 GAO-15-510R Navy Phased Modernization
If you or your staff members have any questions about this report, please contact me at (404)
679-1816 or pendletonj@gao.gov. Contact points for our Offices of Congressional Relations and
Public Affairs may be found on the last page of this report. GAO staff who made key
contributions to this report include Michael Ferren (Assistant Director), Pedro Almoguera,
Matthew Jacobs, Sharon Reid, Jillena Roberts, Michael Silver, Amie Steele, Erik Wilkins-
McKee, and Michael Willems.
John H. Pendleton
Director
Defense Capabilities and Management
Enclosure
Page 4 GAO-15-510R Navy Phased Modernization
List of Committees
The Honorable John McCain
Chairman
The Honorable Jack Reed
Ranking Member
Committee on Armed Services
United States Senate
The Honorable Thad Cochran
Chairman
The Honorable Richard Durbin
Ranking Member
Subcommittee on Defense
Committee on Appropriations
United States Senate
The Honorable Mac Thornberry
Chairman
The Honorable Adam Smith
Ranking Member
Committee on Armed Services
House of Representatives
The Honorable Rodney Frelinghuysen
Chairman
The Honorable Pete Visclosky
Ranking Member
Subcommittee on Defense
Committee on Appropriations
House of Representatives
Surface Ships: Status of the Navy’s
Phased Modernization Plan
Briefing for Congressional Committees
Page 5
Enclosure
GAO-15-510R Navy Phased Modernization
Contents
• Objectives
• Scope and Methodology
• Background
• Summary
• Objective 1: What implementation plan did the Navy develop
for phased modernization?
• Objective 2: To what extent did the Navy identify and analyze
alternatives for achieving the goals of phased modernization?
Page 6
Enclosure
GAO-15-510R Navy Phased Modernization
Objectives
• House Report 113-446 accompanying the National Defense
Authorization Act for Fiscal Year 2015 included a provision for
GAO to review the costs, cost savings, benefits, and risks
associated with the Navy’s Phased Modernization Plan.
• This briefing:
(1) describes the implementation plans the Navy developed
for phased modernization and
(2) assesses the extent to which the Navy identified and
analyzed alternatives for achieving the goals of phased
modernization.
Page 7
Enclosure
GAO-15-510R Navy Phased Modernization
Scope and Methodology
• To describe the Navy’s Phased Modernization Plan, we interviewed Navy headquarters and
fleet officials and obtained testimonial evidence regarding the process the Navy followed in
developing its Phased Modernization Plan. To the extent that documentation was available,
we corroborated the testimonial evidence and discussed conflicting evidence with Navy
officials.
• To assess the extent to which the Navy identified and analyzed alternatives for achieving
the goals of phased modernization, we evaluated relevant Navy documentation, such as
briefing slides and planning documents, and we interviewed Navy officials.
• For both objectives, we visited and spoke with experts on cruiser maintenance and
modernization at two shipyards in Norfolk, Virginia, and San Diego, California, where the
Navy anticipates work will be performed on the ships included in phased modernization. We
also interviewed Department of Defense (DOD) and Navy officials, including officials from
the Office of the Secretary of Defense, Cost Assessment and Program Evaluation; Office of
the Chief of Naval Operations; Naval Sea Systems Command; Fleet Forces Command; and
Naval Surface Forces. We did not validate the Navy’s expected benefits and risks for the
original Phased Modernization Plan.
• We obtained technical comments from the Navy and incorporated them as appropriate.
Page 8
Enclosure
GAO-15-510R Navy Phased Modernization
Background
Page 9
Figure 1: Key Navy and Congressional Actions for Cruisers and Dock-Landing Ships
• In March 2014, as part of the President’s Budget for Fiscal Year 2015, the
Navy proposed a Phased Modernization Plan that included placing 11
Ticonderoga-class cruisers (large surface combatants) and three dock-
landing ships (amphibious ships) into a phased modernization and
maintenance period to reduce near-term funding requirements and as a
means to extend the life of the ships.
• This action followed a series of key Navy and congressional actions for
cruisers and dock-landing ships as shown in figure 1.
Enclosure
GAO-15-510R Navy Phased Modernization
Summary
The Navy’s Phased Modernization Plan placed 11 cruisers and three dock-landing ships
into a reduced operating status for maintenance and modernization. The ships were to be
minimally manned while in phased modernization for between 5 and 12 years and then
returned to the fleet.
In February 2015, the Navy revised its original Phased Modernization Plan and put forth a
new plan for its cruisers. The new plan stated that each year no more than two cruisers
would be placed in phased modernization; no cruiser would remain in phased
modernization for more than 4 years; and no more than six cruisers would be in phased
modernization at the same time.
The Navy did not consider any formal alternatives to the original Phased Modernization
Plan. Navy officials stated that the plan evolved over time and informal discussions were
held within the Navy to determine the best plan. In addition, the Navy identified benefits
and risks of its original Phased Modernization Plan. Under the new plan, some of the
benefits and risks the Navy identified in its original plan may increase while others may
decrease.
Page 10
Enclosure
GAO-15-510R Navy Phased Modernization
Objective 1: What implementation plan did the
Navy develop for phased modernization?
• The Navy’s Phased Modernization Plan placed 11 cruisers and three
dock-landing ships into a reduced operating status for maintenance and
modernization. The cruisers would be minimally manned while in the
reduced status for between 5 and 12 years. The manning would allow
essential tasks to be completed while reducing costs, according to Navy
officials.
• According to Navy officials, under the Phased Modernization Plan, the
planning efforts surrounding the dock-landing ships would not differ
significantly from the normal long-term maintenance planning efforts. The
modernization and maintenance period for the dock-landing ships is
scheduled to be 4 years. However, unlike the cruisers, the dock-landing
ships are to undergo phased modernization one at a time. Therefore, we
focused on the Navy’s Phased Modernization Plan as it relates to cruisers.
• The plan calls for six of the cruisers to reside in San Diego and five to be
located in Norfolk during the maintenance and modernization period.
• Figure 2 shows the homeports for Phased Modernization Plan cruisers as
of February 2015.
Page 11
Enclosure
GAO-15-510R Navy Phased Modernization
Objective 1: What implementation plan did the Navy
develop for phased modernization? (cont.)
Page 12
Figure 2: Homeports for Phased Modernization Plan Cruisers as of February 2015
Enclosure
GAO-15-510R Navy Phased Modernization
Objective 1: What implementation plan did the Navy
develop for phased modernization? (cont.)
• The Navy’s original plan identified, at a broad level, the work to be
conducted as part of modernization efforts, equipment storage
procedures, and roles and responsibilities.
• The plan did not define crew size for the ships during the
modernization and maintenance period or fully identify expected
costs during the maintenance period, according to Navy officials.1
• The plan did not fully establish guidance for “cannibalization” or
rotatable pool equipment or identify all the parts that would be
available for use in the rotatable pool.
• Figure 3 shows the expected effect on the service life of the cruisers
included in the Phased Modernization Plan.
Page 13
Enclosure
GAO-15-510R Navy Phased Modernization
1In technical comments, Navy officials stated that they determined the crew size for the revised plan to be 45 billets per ship.
Objective 1: What implementation plan did the Navy
develop for phased modernization? (cont.)
Page 14
Figure 3: Navy’s Expected Effect of Original Phased Modernization Plan on Service Life of Cruisers
Enclosure
GAO-15-510R Navy Phased Modernization
Objective 1: What implementation plan did the Navy
develop for phased modernization? (cont.)
Current Status
• Since March 2014, the implementation of the Phased Modernization Plan has
been delayed as the Navy waited for congressional approval, according to
officials.
• The National Defense Authorization Act for Fiscal Year 2015 requires the Navy to
modernize two cruisers beginning in fiscal year 2015, subject to certain terms and
conditions, and requires reporting on the modernization effort.
• The Navy plans to induct USS Cowpens (CG-63) and USS Gettysburg (CG-64)
into modernization in fiscal year 2015 and USS Vicksburg (CG-69) and USS
Chosin (CG-65) in fiscal year 2016. In 2014, the Navy placed the USS Gettysburg
into an induction continuous maintenance availability period in preparation for
transitioning the ship into phased modernization, according to Navy officials.
• In February 2015, as part of the President’s fiscal year 2016 budget request, the
Navy introduced a new “2-4-6” version of the Phased Modernization Plan. The 2-
4-6 plan stipulates that each year no more than two cruisers will be placed in
phased modernization; no cruiser will remain in phased modernization for more
than 4 years; and no more than six cruisers may be in phased modernization at
the same time.
Page 15
Enclosure
. GAO-15-510R Navy Phased Modernization
Objective 2: To what extent did the Navy identify and analyze
alternatives for achieving the goals of phased modernization?
• According to Navy officials, the Navy did not consider any formal alternatives to the
original Phased Modernization Plan submitted as part of the President’s Budget for
Fiscal Year 2015. Navy officials stated that the Navy’s Phased Modernization Plan
evolved after Congress rejected the Navy’s earlier proposal to decommission nine
ships and that there were discussions held to determine the best plan.
• The Navy discussed the details of phased modernization in telephone and e-mail
correspondence, according to Navy and DOD officials. As these communications are
largely undocumented, it is unclear the extent to which the Navy considered formal
alternatives associated with the plan.
• The Navy identified benefits and risks of its original Phased Modernization Plan. The
following tables show these benefits and risks as well as GAO’s analysis of the likely
effect of the new 2-4-6 version of the plan, which was part of the Navy’s budget
submission for fiscal year 2016.
• According to Navy officials, because Congress did not approve its Phased
Modernization Plan, the Navy made further modifications to the plan and adopted the
2-4-6 plan, which the officials believe is consistent with congressional intent.
GAO-15-510R Navy Phased ModernizationPage 16
Enclosure
Objective 2: To what extent did the Navy identify and analyze
alternatives for achieving the goals of phased modernization?
(cont.)
Table 1: Expected Benefits of Initial Phased Modernization Plan and Revised 2-4-6 Plan, as Identified by Navy Officials and GAO
Original plan to remove 11
cruisers all at once
Expected benefit identified by Navy Change in expected benefit under 2-4-6 plan
identified by GAO
Long-term benefits to cruiser fleet • Expected service life of cruisers will increase by approximately 5 years. By
placing cruisers in storage; performing hull, mechanical, and electrical
maintenance, and modernizing combat systems, the Navy anticipates it will be
able to extend expected operational service life from 35 to 40 years.
• The Air Defense Commander platform for 11 carrier strike groups is sustained
into the 2040s. This means cruisers can retain their role in leading and
coordinating the defense of the carrier strike group.
Reduced benefit
• Navy anticipates it will be able to extend
expected service life, but this will not sustain the
cruisers into the 2040s as under the original
plan.
Supports ship-building industry • Navy officials stated phased modernization will provide the shipbuilding
industry with a more predictable, sustained workflow.
Reduced benefit
• Shipbuilding industry workflow is less predictable
due to shortened time frames to complete work.
Cost avoidance • The Navy estimates a short-term cost avoidance of about $3.8 billion for
cruisers. Specifically, the Navy anticipates avoiding $1.6 billion in personnel
and $2.2 billion in operations and maintenance costs from fiscal year 2015
through 2019.
Reduced benefit
• The Navy will not achieve anticipated cost
avoidance. Navy originally planned to have a
combined total of 99 years of cost avoidance.
Under the revised plan, it will have a maximum of
44 years of cost avoidance.
Rotatable pool equipment • Parts would be removed from cruisers when they enter phased modernization
and placed in a rotatable pool where they are available for other cruisers that
were not part of the Phased Modernization Plan.
Page 17
Source: Navy information and GAO analysis.
Enclosure
GAO-15-510R Navy Phased Modernization
Table 2: Expected Risks of Initial Phased Modernization Plan and Revised 2-4-6 Plan, as Identified by Navy Officials and GAO
Original plan to remove 11
cruisers all at once
Expected risk identified by Navya Change in risk under 2-4-6 plan identified by GAO
Returning cruisers to the fleet
quickly
• Navy officials stated concerns about the ability to quickly
return cruisers to the fleet, in the event of an emergency. They
estimated it would take about 12 to 24 months to return a ship
to operational status depending on factors such as where the
cruiser is in the modernization process and how quickly a new
crew could be assembled and trained.
Reduced risk
• Cruisers will be removed from the fleet in a staggered fashion
and returned more quickly.
• Cruisers will remain in reduced operational status for shorter
time frames.
• At most, the Navy would need to bring back 6 cruisers rather
than 11.
Dry-dock availability • Phased modernization ships receiving hull, mechanical, and
electrical upgrades in San Diego and Norfolk require a dry-
dock period of about 120 days and will compete for dry-dock
space with other ships receiving scheduled maintenance.
• The Optimized Fleet Response Plan (O-FRP) places pressure
on the Navy to complete maintenance on time so ships can
deploy on schedule.
• San Diego has two dry-docks capable of supporting cruisers,
and Navy officials in San Diego stated that over the course of
the next 2 years, dry-docks in San Diego have no more than 5
day periods where the docks are not scheduled for use.
Increased risk
• Phased modernization ships receiving hull, mechanical, and
electrical upgrades will continue to compete for dry-dock space,
but the risk will increase as the work must be completed in
shorter time frames.
• Due to shorter time frames for modernization and the limited
openings in the dry-dock schedule, the Navy risks either taking
more than the required 4 years to complete modernization or
causing other Navy ships to miss their O-FRP timelines.
Page 18
Objective 2: To what extent did the Navy identify and analyze
alternatives for achieving the goals of phased modernization?
Source: Navy information and GAO analysis.
aWhile risk factors have been identified by the Navy, they have not been quantified or subjected to a risk or sensitivity analysis.
Enclosure
GAO-15-510R Navy Phased Modernization
Table 2: Expected Risks of Initial Phased Modernization Plan and Revised "2-4-6" Plan, as Identified by Navy Officials and GAO
Original plan to remove 11
cruisers all at once
Expected risk identified by Navy Change in risk under 2-4-6 plan identified by GAO
Effects on non-phased
modernization cruisers (CGs 52 –
62)
• Cruisers not included in phased modernization may
experience increased demand to meet the needs of the
fleet. These demands may lead to the following:
• Additional costs to maintain cruisers that
must operate at a higher tempo.
• Reduced time to perform continuous
maintenance availabilities.
Reduced risk
• Cruisers will be returned to the fleet more quickly, increasing the
Navy’s flexibility by making more cruisers available to meet demands
and potentially reducing the operational tempo of non-phased-
modernization cruisers.
Fewer cruisers available for
independent operations
• Each of the 11 non-phased-modernization cruisers will
be matched on a one-to-one basis to a carrier strike
group and may have less flexibility to deploy
independently.
Reduced risk
• Cruisers will be returned to the fleet more quickly. More active cruisers
gives the Navy greater flexibility to deploy cruisers independent of
carrier strike groups.
Ballistic missile defense capability • As the four cruisers with ballistic missile defense
capability enter phased modernization, there will be
fewer ballistic missile defense ships in the fleet.
Reduced risk
• Fewer ballistic missile defense capable cruisers will be removed from
the fleet at one time.
• No reduction in ballistic missile defense capable cruisers in fiscal year
2015 and fiscal year 2016.
Rotatable pool equipment Increased risk
• There will be fewer available parts for a larger number of ships that
remain in the operational fleet.
• There is a potential increase in costs to procure unavailable parts.
• Ships awaiting parts have potentially lower operational availability.
Page 19
(351948)
Objective 2: To what extent did the Navy identify and analyze
alternatives for achieving the goals of phased modernization?
(cont.)
Source: Navy information and GAO analysis.
Enclosure
GAO-15-510R Navy Phased Modernization
This is a work of the U.S. government and is not subject to copyright protection in the
United States. The published product may be reproduced and distributed in its entirety
without further permission from GAO. However, because this work may contain
copyrighted images or other material, permission from the copyright holder may be
necessary if you wish to reproduce this material separately.
The Government Accountability Office, the audit, evaluation, and
investigative arm of Congress, exists to support Congress in meeting its
constitutional responsibilities and to help improve the performance and
accountability of the federal government for the American people. GAO
examines the use of public funds; evaluates federal programs and
policies; and provides analyses, recommendations, and other assistance
to help Congress make informed oversight, policy, and funding decisions.
GAO’s commitment to good government is reflected in its core values of
accountability, integrity, and reliability.
The fastest and easiest way to obtain copies of GAO documents at no
cost is through GAO’s website (www.gao.gov). Each weekday afternoon,
GAO posts on its website newly released reports, testimony, and
correspondence. To have GAO e-mail you a list of newly posted products,
go to www.gao.gov and select “E-mail Updates.”
The price of each GAO publication reflects GAO’s actual cost of
production and distribution and depends on the number of pages in the
publication and whether the publication is printed in color or black and
white. Pricing and ordering information is posted on GAO’s website,
http://www.gao.gov/ordering.htm.
Place orders by calling (202) 512-6000, toll free (866) 801-7077, or
TDD (202) 512-2537.
Orders may be paid for using American Express, Discover Card,
MasterCard, Visa, check, or money order. Call for additional information.
Connect with GAO on Facebook, Flickr, Twitter, and YouTube.
Subscribe to our RSS Feeds or E-mail Updates. Listen to our Podcasts.
Visit GAO on the web at www.gao.gov.
Contact:
Website: www.gao.gov/fraudnet/fraudnet.htm
E-mail: fraudnet@gao.gov
Automated answering system: (800) 424-5454 or (202) 512-7470
Katherine Siggerud, Managing Director, siggerudk@gao.gov, (202) 512-
4400, U.S. Government Accountability Office, 441 G Street NW, Room
7125, Washington, DC 20548
Chuck Young, Managing Director, youngc1@gao.gov, (202) 512-4800
U.S. Government Accountability Office, 441 G Street NW, Room 7149
Washington, DC 20548
GAO’s Mission
Obtaining Copies of
GAO Reports and
Testimony
Order by Phone
Connect with GAO
To Report Fraud,
Waste, and Abuse in
Federal Programs
Congressional
Relations
Public Affairs
Please Print on Recycled Paper.

More Related Content

What's hot

Donato Current Resume[1]
Donato Current Resume[1]Donato Current Resume[1]
Donato Current Resume[1]D.j. Donato
 
Appendix d theme review final_dec2010a
Appendix d theme review final_dec2010aAppendix d theme review final_dec2010a
Appendix d theme review final_dec2010aSevern Estuary
 
Bechtel Resume - Capt Guru N. Misra - August 1 2014
Bechtel Resume - Capt Guru N. Misra - August 1 2014Bechtel Resume - Capt Guru N. Misra - August 1 2014
Bechtel Resume - Capt Guru N. Misra - August 1 2014Guru Misra
 
Watch keeping duties , responsibilities and cargo documentation
Watch keeping duties ,  responsibilities and cargo documentationWatch keeping duties ,  responsibilities and cargo documentation
Watch keeping duties , responsibilities and cargo documentationOladokun Sulaiman Olanrewaju
 
Resume hdc and list of ships(1)
Resume hdc and list of ships(1)Resume hdc and list of ships(1)
Resume hdc and list of ships(1)Hugh Curran
 
Resume Minkow Chronological
Resume Minkow ChronologicalResume Minkow Chronological
Resume Minkow Chronologicalthemink2
 
Session 7 - Aaron Jackson Presentation
Session 7 - Aaron Jackson PresentationSession 7 - Aaron Jackson Presentation
Session 7 - Aaron Jackson PresentationNavy Webmaster
 
Appendix b stakeholder engagement and consultation final_dec2010
Appendix b stakeholder engagement and consultation final_dec2010Appendix b stakeholder engagement and consultation final_dec2010
Appendix b stakeholder engagement and consultation final_dec2010Severn Estuary
 
Stability Standards and Testing of Commercial Vessels on Inland Waters (ISS)
Stability Standards and Testing of Commercial Vessels on Inland Waters (ISS)Stability Standards and Testing of Commercial Vessels on Inland Waters (ISS)
Stability Standards and Testing of Commercial Vessels on Inland Waters (ISS)NASBLA
 
Brett C. Mahon's Resume
Brett C. Mahon's ResumeBrett C. Mahon's Resume
Brett C. Mahon's ResumeBrett Mahon
 
bbwstormwaterbasinstechnicalanalysis
bbwstormwaterbasinstechnicalanalysisbbwstormwaterbasinstechnicalanalysis
bbwstormwaterbasinstechnicalanalysisRegina Majercak, PE
 

What's hot (20)

James River Partnership 2013
James River Partnership 2013James River Partnership 2013
James River Partnership 2013
 
James riverpartnership2003
James riverpartnership2003James riverpartnership2003
James riverpartnership2003
 
Donato Current Resume[1]
Donato Current Resume[1]Donato Current Resume[1]
Donato Current Resume[1]
 
VMET_Document
VMET_DocumentVMET_Document
VMET_Document
 
Appendix d theme review final_dec2010a
Appendix d theme review final_dec2010aAppendix d theme review final_dec2010a
Appendix d theme review final_dec2010a
 
Bechtel Resume - Capt Guru N. Misra - August 1 2014
Bechtel Resume - Capt Guru N. Misra - August 1 2014Bechtel Resume - Capt Guru N. Misra - August 1 2014
Bechtel Resume - Capt Guru N. Misra - August 1 2014
 
Detailer fet brief (15 aug 2013)
Detailer fet brief (15 aug 2013)Detailer fet brief (15 aug 2013)
Detailer fet brief (15 aug 2013)
 
Pers 40 brief-june_2011
Pers 40 brief-june_2011Pers 40 brief-june_2011
Pers 40 brief-june_2011
 
Our navy 1981 cc
Our navy 1981 ccOur navy 1981 cc
Our navy 1981 cc
 
Watch keeping duties , responsibilities and cargo documentation
Watch keeping duties ,  responsibilities and cargo documentationWatch keeping duties ,  responsibilities and cargo documentation
Watch keeping duties , responsibilities and cargo documentation
 
Resume hdc and list of ships(1)
Resume hdc and list of ships(1)Resume hdc and list of ships(1)
Resume hdc and list of ships(1)
 
Opertion Assessment MTTP 2015
Opertion Assessment MTTP 2015Opertion Assessment MTTP 2015
Opertion Assessment MTTP 2015
 
Resume Minkow Chronological
Resume Minkow ChronologicalResume Minkow Chronological
Resume Minkow Chronological
 
Fleet engagement brief NPC (15 aug 2013)
Fleet engagement brief NPC (15 aug 2013)Fleet engagement brief NPC (15 aug 2013)
Fleet engagement brief NPC (15 aug 2013)
 
Session 7 - Aaron Jackson Presentation
Session 7 - Aaron Jackson PresentationSession 7 - Aaron Jackson Presentation
Session 7 - Aaron Jackson Presentation
 
Appendix b stakeholder engagement and consultation final_dec2010
Appendix b stakeholder engagement and consultation final_dec2010Appendix b stakeholder engagement and consultation final_dec2010
Appendix b stakeholder engagement and consultation final_dec2010
 
Stability Standards and Testing of Commercial Vessels on Inland Waters (ISS)
Stability Standards and Testing of Commercial Vessels on Inland Waters (ISS)Stability Standards and Testing of Commercial Vessels on Inland Waters (ISS)
Stability Standards and Testing of Commercial Vessels on Inland Waters (ISS)
 
Brett C. Mahon's Resume
Brett C. Mahon's ResumeBrett C. Mahon's Resume
Brett C. Mahon's Resume
 
Survey Records 2013-2016
Survey Records 2013-2016Survey Records 2013-2016
Survey Records 2013-2016
 
bbwstormwaterbasinstechnicalanalysis
bbwstormwaterbasinstechnicalanalysisbbwstormwaterbasinstechnicalanalysis
bbwstormwaterbasinstechnicalanalysis
 

Viewers also liked

One Day Challenge - Ré engagez vos équipes !
One Day Challenge - Ré engagez vos équipes !One Day Challenge - Ré engagez vos équipes !
One Day Challenge - Ré engagez vos équipes !Le Shift
 
Sexualidadresponsable b2 denisse
Sexualidadresponsable b2 denisseSexualidadresponsable b2 denisse
Sexualidadresponsable b2 denisseDenngreen
 
US DOD Program Acquisition Cost by Weapon System for FY16 Feb 2015
US DOD Program Acquisition Cost by Weapon System for FY16 Feb 2015US DOD Program Acquisition Cost by Weapon System for FY16 Feb 2015
US DOD Program Acquisition Cost by Weapon System for FY16 Feb 2015Tom "Blad" Lindblad
 
DOD Joint Doctrine on Amphibious Operations (Aug 2014)
DOD Joint Doctrine on Amphibious Operations (Aug 2014)DOD Joint Doctrine on Amphibious Operations (Aug 2014)
DOD Joint Doctrine on Amphibious Operations (Aug 2014)Tom "Blad" Lindblad
 
FY2016 Army PRESBUD Highlights (Feb 2015)
FY2016 Army PRESBUD Highlights (Feb 2015)FY2016 Army PRESBUD Highlights (Feb 2015)
FY2016 Army PRESBUD Highlights (Feb 2015)Tom "Blad" Lindblad
 
Army Capability Integration Center - America's Army Globally Responsive, Regi...
Army Capability Integration Center - America's Army Globally Responsive, Regi...Army Capability Integration Center - America's Army Globally Responsive, Regi...
Army Capability Integration Center - America's Army Globally Responsive, Regi...Tom "Blad" Lindblad
 

Viewers also liked (8)

Semana santa2
Semana santa2Semana santa2
Semana santa2
 
One Day Challenge - Ré engagez vos équipes !
One Day Challenge - Ré engagez vos équipes !One Day Challenge - Ré engagez vos équipes !
One Day Challenge - Ré engagez vos équipes !
 
Sexualidadresponsable b2 denisse
Sexualidadresponsable b2 denisseSexualidadresponsable b2 denisse
Sexualidadresponsable b2 denisse
 
US DOD Program Acquisition Cost by Weapon System for FY16 Feb 2015
US DOD Program Acquisition Cost by Weapon System for FY16 Feb 2015US DOD Program Acquisition Cost by Weapon System for FY16 Feb 2015
US DOD Program Acquisition Cost by Weapon System for FY16 Feb 2015
 
FY2015 Navy Budget Highlights
FY2015 Navy Budget HighlightsFY2015 Navy Budget Highlights
FY2015 Navy Budget Highlights
 
DOD Joint Doctrine on Amphibious Operations (Aug 2014)
DOD Joint Doctrine on Amphibious Operations (Aug 2014)DOD Joint Doctrine on Amphibious Operations (Aug 2014)
DOD Joint Doctrine on Amphibious Operations (Aug 2014)
 
FY2016 Army PRESBUD Highlights (Feb 2015)
FY2016 Army PRESBUD Highlights (Feb 2015)FY2016 Army PRESBUD Highlights (Feb 2015)
FY2016 Army PRESBUD Highlights (Feb 2015)
 
Army Capability Integration Center - America's Army Globally Responsive, Regi...
Army Capability Integration Center - America's Army Globally Responsive, Regi...Army Capability Integration Center - America's Army Globally Responsive, Regi...
Army Capability Integration Center - America's Army Globally Responsive, Regi...
 

Similar to GAO - Surface Ships: Status of the Navy’s Phased Modernization Plan

A8558 edc1d13949ebb19d5d921dc4077.hmtg 116-as29-wstate-wolfej-20190328
A8558 edc1d13949ebb19d5d921dc4077.hmtg 116-as29-wstate-wolfej-20190328A8558 edc1d13949ebb19d5d921dc4077.hmtg 116-as29-wstate-wolfej-20190328
A8558 edc1d13949ebb19d5d921dc4077.hmtg 116-as29-wstate-wolfej-20190328https://www.cia.gov.com
 
CRS USMC ACV Background and Issues Mar 19 2014
CRS USMC ACV Background and Issues Mar 19 2014CRS USMC ACV Background and Issues Mar 19 2014
CRS USMC ACV Background and Issues Mar 19 2014Tom "Blad" Lindblad
 
Gao soldier load ppe
Gao soldier load ppeGao soldier load ppe
Gao soldier load ppeJA Larson
 
CRS Report on Marine Corps Amphibious Combat Vehicle and MPC (Jan 2014)
CRS Report on Marine Corps Amphibious Combat Vehicle and MPC (Jan 2014)CRS Report on Marine Corps Amphibious Combat Vehicle and MPC (Jan 2014)
CRS Report on Marine Corps Amphibious Combat Vehicle and MPC (Jan 2014)Tom "Blad" Lindblad
 
CG CIAO-Based Strategic Transformation Overview Brief 20070301
CG CIAO-Based Strategic Transformation Overview Brief 20070301CG CIAO-Based Strategic Transformation Overview Brief 20070301
CG CIAO-Based Strategic Transformation Overview Brief 20070301Peter Stinson
 
The Capacity of the Navy’s Shipyards to Maintain Its Submarines
The Capacity of the Navy’s Shipyards to Maintain Its SubmarinesThe Capacity of the Navy’s Shipyards to Maintain Its Submarines
The Capacity of the Navy’s Shipyards to Maintain Its SubmarinesCongressional Budget Office
 
Carnival splendor
Carnival splendorCarnival splendor
Carnival splendorJomonJohny5
 
2007 USMC Lightening The Backpack Load
2007 USMC Lightening The Backpack Load2007 USMC Lightening The Backpack Load
2007 USMC Lightening The Backpack LoadJA Larson
 
CRS - Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carri...
CRS - Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carri...CRS - Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carri...
CRS - Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carri...Tom "Blad" Lindblad
 
Eye on Defense March 2015
Eye on Defense March 2015Eye on Defense March 2015
Eye on Defense March 2015Ankur Gupta
 
Project Agrippa H4D 2021 Lessons Learned
Project Agrippa H4D 2021 Lessons LearnedProject Agrippa H4D 2021 Lessons Learned
Project Agrippa H4D 2021 Lessons LearnedStanford University
 
201504_Johnson_Resume_linkedin
201504_Johnson_Resume_linkedin201504_Johnson_Resume_linkedin
201504_Johnson_Resume_linkedinJoseph Johnson
 
K Caradona Resume 5DEC16-1
K Caradona  Resume 5DEC16-1K Caradona  Resume 5DEC16-1
K Caradona Resume 5DEC16-1Kevin Caradona
 

Similar to GAO - Surface Ships: Status of the Navy’s Phased Modernization Plan (20)

A8558 edc1d13949ebb19d5d921dc4077.hmtg 116-as29-wstate-wolfej-20190328
A8558 edc1d13949ebb19d5d921dc4077.hmtg 116-as29-wstate-wolfej-20190328A8558 edc1d13949ebb19d5d921dc4077.hmtg 116-as29-wstate-wolfej-20190328
A8558 edc1d13949ebb19d5d921dc4077.hmtg 116-as29-wstate-wolfej-20190328
 
Amphibious Shipping Shortfalls
Amphibious Shipping ShortfallsAmphibious Shipping Shortfalls
Amphibious Shipping Shortfalls
 
CRS USMC ACV Background and Issues Mar 19 2014
CRS USMC ACV Background and Issues Mar 19 2014CRS USMC ACV Background and Issues Mar 19 2014
CRS USMC ACV Background and Issues Mar 19 2014
 
Cnog%202010
Cnog%202010Cnog%202010
Cnog%202010
 
Gao soldier load ppe
Gao soldier load ppeGao soldier load ppe
Gao soldier load ppe
 
Npc force weekly 5 9 dec 2011
Npc force weekly 5 9 dec  2011Npc force weekly 5 9 dec  2011
Npc force weekly 5 9 dec 2011
 
CRS Report on Marine Corps Amphibious Combat Vehicle and MPC (Jan 2014)
CRS Report on Marine Corps Amphibious Combat Vehicle and MPC (Jan 2014)CRS Report on Marine Corps Amphibious Combat Vehicle and MPC (Jan 2014)
CRS Report on Marine Corps Amphibious Combat Vehicle and MPC (Jan 2014)
 
Reserve Force Weekly20 Nov 09
Reserve Force Weekly20 Nov 09Reserve Force Weekly20 Nov 09
Reserve Force Weekly20 Nov 09
 
CG CIAO-Based Strategic Transformation Overview Brief 20070301
CG CIAO-Based Strategic Transformation Overview Brief 20070301CG CIAO-Based Strategic Transformation Overview Brief 20070301
CG CIAO-Based Strategic Transformation Overview Brief 20070301
 
The Capacity of the Navy’s Shipyards to Maintain Its Submarines
The Capacity of the Navy’s Shipyards to Maintain Its SubmarinesThe Capacity of the Navy’s Shipyards to Maintain Its Submarines
The Capacity of the Navy’s Shipyards to Maintain Its Submarines
 
Carnival splendor
Carnival splendorCarnival splendor
Carnival splendor
 
Nov 01 2012 rhumblines-warfighting first
Nov 01 2012 rhumblines-warfighting firstNov 01 2012 rhumblines-warfighting first
Nov 01 2012 rhumblines-warfighting first
 
Manning at sea sdip vsdp_files
Manning at sea sdip vsdp_filesManning at sea sdip vsdp_files
Manning at sea sdip vsdp_files
 
2007 USMC Lightening The Backpack Load
2007 USMC Lightening The Backpack Load2007 USMC Lightening The Backpack Load
2007 USMC Lightening The Backpack Load
 
CRS - Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carri...
CRS - Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carri...CRS - Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carri...
CRS - Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carri...
 
Eye on Defense March 2015
Eye on Defense March 2015Eye on Defense March 2015
Eye on Defense March 2015
 
Project Agrippa H4D 2021 Lessons Learned
Project Agrippa H4D 2021 Lessons LearnedProject Agrippa H4D 2021 Lessons Learned
Project Agrippa H4D 2021 Lessons Learned
 
201504_Johnson_Resume_linkedin
201504_Johnson_Resume_linkedin201504_Johnson_Resume_linkedin
201504_Johnson_Resume_linkedin
 
Force Weekly 26 Mar 10
Force Weekly 26 Mar 10Force Weekly 26 Mar 10
Force Weekly 26 Mar 10
 
K Caradona Resume 5DEC16-1
K Caradona  Resume 5DEC16-1K Caradona  Resume 5DEC16-1
K Caradona Resume 5DEC16-1
 

More from Tom "Blad" Lindblad

2017 U.S. Marine Corps Aviation Plan
2017 U.S. Marine Corps Aviation Plan2017 U.S. Marine Corps Aviation Plan
2017 U.S. Marine Corps Aviation PlanTom "Blad" Lindblad
 
CSBA - FY-2016 Weapon Systems Factbook
CSBA - FY-2016  Weapon Systems FactbookCSBA - FY-2016  Weapon Systems Factbook
CSBA - FY-2016 Weapon Systems FactbookTom "Blad" Lindblad
 
The Tustin Hangars - Titans of History
The Tustin Hangars - Titans of HistoryThe Tustin Hangars - Titans of History
The Tustin Hangars - Titans of HistoryTom "Blad" Lindblad
 
Commanant Marine Corps' Planning 2015 Planning Guidance
Commanant Marine Corps' Planning 2015 Planning GuidanceCommanant Marine Corps' Planning 2015 Planning Guidance
Commanant Marine Corps' Planning 2015 Planning GuidanceTom "Blad" Lindblad
 
Updated Commandant USMC Planning Guidance
Updated Commandant USMC Planning GuidanceUpdated Commandant USMC Planning Guidance
Updated Commandant USMC Planning GuidanceTom "Blad" Lindblad
 
Sec Def Military Decorations and Awards Review
Sec Def  Military Decorations and Awards Review Sec Def  Military Decorations and Awards Review
Sec Def Military Decorations and Awards Review Tom "Blad" Lindblad
 
MCRP 5-12D Organization of United States Marine Corps 26 Aug15
MCRP 5-12D Organization of United States Marine Corps 26 Aug15MCRP 5-12D Organization of United States Marine Corps 26 Aug15
MCRP 5-12D Organization of United States Marine Corps 26 Aug15Tom "Blad" Lindblad
 
Rand Reforming Military Retirement July 2015
Rand Reforming Military Retirement July 2015Rand Reforming Military Retirement July 2015
Rand Reforming Military Retirement July 2015Tom "Blad" Lindblad
 
DOD 2015 China Military Power Report
DOD 2015 China Military Power ReportDOD 2015 China Military Power Report
DOD 2015 China Military Power ReportTom "Blad" Lindblad
 
Doing Business with DHS (Feb 2015)
Doing Business with DHS  (Feb 2015)Doing Business with DHS  (Feb 2015)
Doing Business with DHS (Feb 2015)Tom "Blad" Lindblad
 
USMC UAS Family of Systems (April 2015)
USMC UAS Family of Systems (April 2015)USMC UAS Family of Systems (April 2015)
USMC UAS Family of Systems (April 2015)Tom "Blad" Lindblad
 
USMC Expeditionary Force 21 MAGTF Ground Combat Element (2015)
USMC Expeditionary Force 21 MAGTF Ground Combat Element (2015)USMC Expeditionary Force 21 MAGTF Ground Combat Element (2015)
USMC Expeditionary Force 21 MAGTF Ground Combat Element (2015)Tom "Blad" Lindblad
 
Commandant of Marine Corps Posture Statement_2015 to Congress
Commandant of Marine Corps Posture Statement_2015 to CongressCommandant of Marine Corps Posture Statement_2015 to Congress
Commandant of Marine Corps Posture Statement_2015 to CongressTom "Blad" Lindblad
 
Report of the Military Compensation and Retirement Modernization Commission-2...
Report of the Military Compensation and Retirement Modernization Commission-2...Report of the Military Compensation and Retirement Modernization Commission-2...
Report of the Military Compensation and Retirement Modernization Commission-2...Tom "Blad" Lindblad
 
Joint Capabilities Integration and Development System
Joint Capabilities Integration and Development SystemJoint Capabilities Integration and Development System
Joint Capabilities Integration and Development SystemTom "Blad" Lindblad
 
CRS Casualty Statistics: Operations Inherent Resolve, New Dawn, Iraqi Freedo...
CRS  Casualty Statistics: Operations Inherent Resolve, New Dawn, Iraqi Freedo...CRS  Casualty Statistics: Operations Inherent Resolve, New Dawn, Iraqi Freedo...
CRS Casualty Statistics: Operations Inherent Resolve, New Dawn, Iraqi Freedo...Tom "Blad" Lindblad
 
CBO Long-Term Implications of FY2015 FYDP Nov 2014
CBO Long-Term Implications of FY2015 FYDP Nov 2014CBO Long-Term Implications of FY2015 FYDP Nov 2014
CBO Long-Term Implications of FY2015 FYDP Nov 2014Tom "Blad" Lindblad
 
2014 Defense Security Cooperation Agency (DSCA) Strategic Plan Vision 2020
2014 Defense Security Cooperation Agency (DSCA) Strategic Plan   Vision 20202014 Defense Security Cooperation Agency (DSCA) Strategic Plan   Vision 2020
2014 Defense Security Cooperation Agency (DSCA) Strategic Plan Vision 2020Tom "Blad" Lindblad
 
Department of Defense Instruction 5143_DUSD Intelligence 24Oct14
Department of Defense Instruction 5143_DUSD Intelligence 24Oct14Department of Defense Instruction 5143_DUSD Intelligence 24Oct14
Department of Defense Instruction 5143_DUSD Intelligence 24Oct14Tom "Blad" Lindblad
 

More from Tom "Blad" Lindblad (20)

2017 U.S. Marine Corps Aviation Plan
2017 U.S. Marine Corps Aviation Plan2017 U.S. Marine Corps Aviation Plan
2017 U.S. Marine Corps Aviation Plan
 
CSBA - FY-2016 Weapon Systems Factbook
CSBA - FY-2016  Weapon Systems FactbookCSBA - FY-2016  Weapon Systems Factbook
CSBA - FY-2016 Weapon Systems Factbook
 
The Tustin Hangars - Titans of History
The Tustin Hangars - Titans of HistoryThe Tustin Hangars - Titans of History
The Tustin Hangars - Titans of History
 
Commanant Marine Corps' Planning 2015 Planning Guidance
Commanant Marine Corps' Planning 2015 Planning GuidanceCommanant Marine Corps' Planning 2015 Planning Guidance
Commanant Marine Corps' Planning 2015 Planning Guidance
 
Updated Commandant USMC Planning Guidance
Updated Commandant USMC Planning GuidanceUpdated Commandant USMC Planning Guidance
Updated Commandant USMC Planning Guidance
 
Sec Def Military Decorations and Awards Review
Sec Def  Military Decorations and Awards Review Sec Def  Military Decorations and Awards Review
Sec Def Military Decorations and Awards Review
 
MCRP 5-12D Organization of United States Marine Corps 26 Aug15
MCRP 5-12D Organization of United States Marine Corps 26 Aug15MCRP 5-12D Organization of United States Marine Corps 26 Aug15
MCRP 5-12D Organization of United States Marine Corps 26 Aug15
 
Rand Reforming Military Retirement July 2015
Rand Reforming Military Retirement July 2015Rand Reforming Military Retirement July 2015
Rand Reforming Military Retirement July 2015
 
DOD 2015 China Military Power Report
DOD 2015 China Military Power ReportDOD 2015 China Military Power Report
DOD 2015 China Military Power Report
 
Doing Business with DHS (Feb 2015)
Doing Business with DHS  (Feb 2015)Doing Business with DHS  (Feb 2015)
Doing Business with DHS (Feb 2015)
 
USMC UAS Family of Systems (April 2015)
USMC UAS Family of Systems (April 2015)USMC UAS Family of Systems (April 2015)
USMC UAS Family of Systems (April 2015)
 
USMC Expeditionary Force 21 MAGTF Ground Combat Element (2015)
USMC Expeditionary Force 21 MAGTF Ground Combat Element (2015)USMC Expeditionary Force 21 MAGTF Ground Combat Element (2015)
USMC Expeditionary Force 21 MAGTF Ground Combat Element (2015)
 
Commandant of Marine Corps Posture Statement_2015 to Congress
Commandant of Marine Corps Posture Statement_2015 to CongressCommandant of Marine Corps Posture Statement_2015 to Congress
Commandant of Marine Corps Posture Statement_2015 to Congress
 
Report of the Military Compensation and Retirement Modernization Commission-2...
Report of the Military Compensation and Retirement Modernization Commission-2...Report of the Military Compensation and Retirement Modernization Commission-2...
Report of the Military Compensation and Retirement Modernization Commission-2...
 
Joint Capabilities Integration and Development System
Joint Capabilities Integration and Development SystemJoint Capabilities Integration and Development System
Joint Capabilities Integration and Development System
 
CRS Casualty Statistics: Operations Inherent Resolve, New Dawn, Iraqi Freedo...
CRS  Casualty Statistics: Operations Inherent Resolve, New Dawn, Iraqi Freedo...CRS  Casualty Statistics: Operations Inherent Resolve, New Dawn, Iraqi Freedo...
CRS Casualty Statistics: Operations Inherent Resolve, New Dawn, Iraqi Freedo...
 
CBO Long-Term Implications of FY2015 FYDP Nov 2014
CBO Long-Term Implications of FY2015 FYDP Nov 2014CBO Long-Term Implications of FY2015 FYDP Nov 2014
CBO Long-Term Implications of FY2015 FYDP Nov 2014
 
2014 Defense Security Cooperation Agency (DSCA) Strategic Plan Vision 2020
2014 Defense Security Cooperation Agency (DSCA) Strategic Plan   Vision 20202014 Defense Security Cooperation Agency (DSCA) Strategic Plan   Vision 2020
2014 Defense Security Cooperation Agency (DSCA) Strategic Plan Vision 2020
 
2015 Marine Corps Aviation Plan
2015 Marine Corps Aviation Plan2015 Marine Corps Aviation Plan
2015 Marine Corps Aviation Plan
 
Department of Defense Instruction 5143_DUSD Intelligence 24Oct14
Department of Defense Instruction 5143_DUSD Intelligence 24Oct14Department of Defense Instruction 5143_DUSD Intelligence 24Oct14
Department of Defense Instruction 5143_DUSD Intelligence 24Oct14
 

Recently uploaded

Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.NaveedKhaskheli1
 
IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest2
 
Opportunities, challenges, and power of media and information
Opportunities, challenges, and power of media and informationOpportunities, challenges, and power of media and information
Opportunities, challenges, and power of media and informationReyMonsales
 
Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeAbdulGhani778830
 
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkcomplaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkbhavenpr
 
Top 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdfTop 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdfauroraaudrey4826
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdfGerald Furnkranz
 
Referendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoReferendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoSABC News
 
Manipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpkManipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpkbhavenpr
 
Quiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the roundsQuiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the roundsnaxymaxyy
 
Brief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert OppenheimerBrief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert OppenheimerOmarCabrera39
 
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep VictoryAP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victoryanjanibaddipudi1
 
VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012ankitnayak356677
 

Recently uploaded (13)

Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.
 
IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global News
 
Opportunities, challenges, and power of media and information
Opportunities, challenges, and power of media and informationOpportunities, challenges, and power of media and information
Opportunities, challenges, and power of media and information
 
Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for Justice
 
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkcomplaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
 
Top 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdfTop 10 Wealthiest People In The World.pdf
Top 10 Wealthiest People In The World.pdf
 
57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf
 
Referendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoReferendum Party 2024 Election Manifesto
Referendum Party 2024 Election Manifesto
 
Manipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpkManipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpk
 
Quiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the roundsQuiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the rounds
 
Brief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert OppenheimerBrief biography of Julius Robert Oppenheimer
Brief biography of Julius Robert Oppenheimer
 
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep VictoryAP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
AP Election Survey 2024: TDP-Janasena-BJP Alliance Set To Sweep Victory
 
VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012
 

GAO - Surface Ships: Status of the Navy’s Phased Modernization Plan

  • 1. Page 1 GAO-15-510R Navy Phased Modernization 441 G St. N.W. Washington, DC 20548 May 20, 2015 Congressional Committees Surface Ships: Status of the Navy’s Phased Modernization Plan In March 2014, as part of the President’s Budget for Fiscal Year 2015, the Navy proposed a Phased Modernization Plan that included placing 11 Ticonderoga-class cruisers (large surface combatants) and three dock-landing ships (amphibious ships) into a phased modernization and maintenance period to reduce near-term funding requirements and as a means to extend the life of the ships. House Report 113-446 accompanying the National Defense Authorization Act for Fiscal Year 2015 included a provision for GAO to review the costs, cost savings, benefits, and risks associated with the Navy’s Phased Modernization Plan. This report (1) describes the implementation plans the Navy developed for phased modernization and (2) assesses the extent to which the Navy identified and analyzed alternatives for achieving the goals of phased modernization. In February 2015, as part of the President’s Budget for Fiscal Year 2016, the Navy proposed a revised Phased Modernization Plan that significantly altered its original proposal. However, it was not until we completed our review that the Navy provided us with a limited amount of information about their revised phased modernization plans. We provided a briefing of our preliminary results to the House Armed Services Committee staff in March 2015. This report formally transmits an updated briefing regarding the final results of our work in response to the provision in House Report 113-446 (see the enclosure). To conduct our work, we evaluated relevant Navy documentation, such as briefing slides and planning documents. We also interviewed Navy headquarters and fleet officials and obtained testimonial evidence regarding the process the Navy followed in developing its Phased Modernization Plan and the alternatives it considered. To the extent that documentation was available, we corroborated the testimonial evidence and discussed any conflicting evidence with Navy officials. For example, we reviewed internal briefing slides and summary papers that Navy officials provided to us. We visited and spoke with experts on cruiser maintenance and modernization at two Navy shipyards in Norfolk, Virginia, and San Diego, California, where the Navy anticipates work will be performed on the ships included in phased modernization. We also interviewed Department of Defense (DOD) and Navy officials, including officials from the Office of the Secretary of Defense, Cost Assessment and Program Evaluation; Office of the Chief of Naval Operations; Naval Sea Systems Command; Fleet Forces Command; and Naval Surface Forces. We conducted our work from July 2014 to May 2015 in accordance with generally accepted government auditing standards. Those standards require that we plan and perform the audit to obtain sufficient, appropriate evidence to provide a reasonable basis for our findings and
  • 2. Page 2 GAO-15-510R Navy Phased Modernization conclusions based on our audit objectives. We believe that the evidence obtained provides a reasonable basis for our findings and conclusions based on our audit objectives. In summary, we found that the Navy’s Phased Modernization Plan, introduced in March 2014, would have placed 11 cruisers and three dock-landing ships into a reduced operating status for maintenance and modernization. The cruisers were to be minimally manned while in phased modernization for between 5 and 12 years and then returned to the fleet. In February 2015, however, the Navy proposed a revision to its original Phased Modernization Plan. The revised plan for its cruisers placed limits on the number of ships that would be in phased modernization, and how long they would stay in that status. Specifically, the revised plan stated that each year no more than two cruisers would be placed in phased modernization; no cruiser would remain in phased modernization for more than 4 years; and no more than six cruisers would be in phased modernization at the same time. According to Navy officials, the planning efforts surrounding the dock-landing ships would not significantly differ from normal long-term maintenance planning efforts. The Navy did not consider any formal alternatives to the original Phased Modernization Plan and revised the plan primarily to respond to congressional concerns that removing cruisers from the fleet would exacerbate existing capacity shortfalls. Navy officials stated that the primary motivation for phased modernization was to delay modernization costs and that the plans have evolved over time. Our analysis found that under the revised plan put forward by the Navy in February 2015, some of the benefits and risks the Navy identified for the original plan may increase while others may decrease. For example, the Navy expected the original plan to sustain the Air Defense Commander platform—which is the role played by cruisers in coordinating air defense for the 11 carrier strike groups—into the 2040s. We expect this benefit to be reduced under the revised plan because cruisers will be in phased modernization for a shorter period, and thus the Navy will not be able to sustain the cruisers into the 2040s as under the original plan. Similarly, the Navy identified having fewer cruisers available for independent operations as a risk of implementing its original Phased Modernization Plan. Given that fewer cruisers will be in phased modernization at one time, we expect that this risk will decrease under the revised plan. We are not making any recommendations in this report. Agency Comments and Our Evaluation We provided a draft of this report to DOD for comment. DOD did not provide formal written comments on this report. The Navy provided technical comments and we incorporated these comments as appropriate. - - - - - We are sending copies of this report to the Secretary of Defense; the Secretary of the Navy; and appropriate congressional committees. In addition, the report is available at no charge on the GAO website at http://www.gao.gov.
  • 3. Page 3 GAO-15-510R Navy Phased Modernization If you or your staff members have any questions about this report, please contact me at (404) 679-1816 or pendletonj@gao.gov. Contact points for our Offices of Congressional Relations and Public Affairs may be found on the last page of this report. GAO staff who made key contributions to this report include Michael Ferren (Assistant Director), Pedro Almoguera, Matthew Jacobs, Sharon Reid, Jillena Roberts, Michael Silver, Amie Steele, Erik Wilkins- McKee, and Michael Willems. John H. Pendleton Director Defense Capabilities and Management Enclosure
  • 4. Page 4 GAO-15-510R Navy Phased Modernization List of Committees The Honorable John McCain Chairman The Honorable Jack Reed Ranking Member Committee on Armed Services United States Senate The Honorable Thad Cochran Chairman The Honorable Richard Durbin Ranking Member Subcommittee on Defense Committee on Appropriations United States Senate The Honorable Mac Thornberry Chairman The Honorable Adam Smith Ranking Member Committee on Armed Services House of Representatives The Honorable Rodney Frelinghuysen Chairman The Honorable Pete Visclosky Ranking Member Subcommittee on Defense Committee on Appropriations House of Representatives
  • 5. Surface Ships: Status of the Navy’s Phased Modernization Plan Briefing for Congressional Committees Page 5 Enclosure GAO-15-510R Navy Phased Modernization
  • 6. Contents • Objectives • Scope and Methodology • Background • Summary • Objective 1: What implementation plan did the Navy develop for phased modernization? • Objective 2: To what extent did the Navy identify and analyze alternatives for achieving the goals of phased modernization? Page 6 Enclosure GAO-15-510R Navy Phased Modernization
  • 7. Objectives • House Report 113-446 accompanying the National Defense Authorization Act for Fiscal Year 2015 included a provision for GAO to review the costs, cost savings, benefits, and risks associated with the Navy’s Phased Modernization Plan. • This briefing: (1) describes the implementation plans the Navy developed for phased modernization and (2) assesses the extent to which the Navy identified and analyzed alternatives for achieving the goals of phased modernization. Page 7 Enclosure GAO-15-510R Navy Phased Modernization
  • 8. Scope and Methodology • To describe the Navy’s Phased Modernization Plan, we interviewed Navy headquarters and fleet officials and obtained testimonial evidence regarding the process the Navy followed in developing its Phased Modernization Plan. To the extent that documentation was available, we corroborated the testimonial evidence and discussed conflicting evidence with Navy officials. • To assess the extent to which the Navy identified and analyzed alternatives for achieving the goals of phased modernization, we evaluated relevant Navy documentation, such as briefing slides and planning documents, and we interviewed Navy officials. • For both objectives, we visited and spoke with experts on cruiser maintenance and modernization at two shipyards in Norfolk, Virginia, and San Diego, California, where the Navy anticipates work will be performed on the ships included in phased modernization. We also interviewed Department of Defense (DOD) and Navy officials, including officials from the Office of the Secretary of Defense, Cost Assessment and Program Evaluation; Office of the Chief of Naval Operations; Naval Sea Systems Command; Fleet Forces Command; and Naval Surface Forces. We did not validate the Navy’s expected benefits and risks for the original Phased Modernization Plan. • We obtained technical comments from the Navy and incorporated them as appropriate. Page 8 Enclosure GAO-15-510R Navy Phased Modernization
  • 9. Background Page 9 Figure 1: Key Navy and Congressional Actions for Cruisers and Dock-Landing Ships • In March 2014, as part of the President’s Budget for Fiscal Year 2015, the Navy proposed a Phased Modernization Plan that included placing 11 Ticonderoga-class cruisers (large surface combatants) and three dock- landing ships (amphibious ships) into a phased modernization and maintenance period to reduce near-term funding requirements and as a means to extend the life of the ships. • This action followed a series of key Navy and congressional actions for cruisers and dock-landing ships as shown in figure 1. Enclosure GAO-15-510R Navy Phased Modernization
  • 10. Summary The Navy’s Phased Modernization Plan placed 11 cruisers and three dock-landing ships into a reduced operating status for maintenance and modernization. The ships were to be minimally manned while in phased modernization for between 5 and 12 years and then returned to the fleet. In February 2015, the Navy revised its original Phased Modernization Plan and put forth a new plan for its cruisers. The new plan stated that each year no more than two cruisers would be placed in phased modernization; no cruiser would remain in phased modernization for more than 4 years; and no more than six cruisers would be in phased modernization at the same time. The Navy did not consider any formal alternatives to the original Phased Modernization Plan. Navy officials stated that the plan evolved over time and informal discussions were held within the Navy to determine the best plan. In addition, the Navy identified benefits and risks of its original Phased Modernization Plan. Under the new plan, some of the benefits and risks the Navy identified in its original plan may increase while others may decrease. Page 10 Enclosure GAO-15-510R Navy Phased Modernization
  • 11. Objective 1: What implementation plan did the Navy develop for phased modernization? • The Navy’s Phased Modernization Plan placed 11 cruisers and three dock-landing ships into a reduced operating status for maintenance and modernization. The cruisers would be minimally manned while in the reduced status for between 5 and 12 years. The manning would allow essential tasks to be completed while reducing costs, according to Navy officials. • According to Navy officials, under the Phased Modernization Plan, the planning efforts surrounding the dock-landing ships would not differ significantly from the normal long-term maintenance planning efforts. The modernization and maintenance period for the dock-landing ships is scheduled to be 4 years. However, unlike the cruisers, the dock-landing ships are to undergo phased modernization one at a time. Therefore, we focused on the Navy’s Phased Modernization Plan as it relates to cruisers. • The plan calls for six of the cruisers to reside in San Diego and five to be located in Norfolk during the maintenance and modernization period. • Figure 2 shows the homeports for Phased Modernization Plan cruisers as of February 2015. Page 11 Enclosure GAO-15-510R Navy Phased Modernization
  • 12. Objective 1: What implementation plan did the Navy develop for phased modernization? (cont.) Page 12 Figure 2: Homeports for Phased Modernization Plan Cruisers as of February 2015 Enclosure GAO-15-510R Navy Phased Modernization
  • 13. Objective 1: What implementation plan did the Navy develop for phased modernization? (cont.) • The Navy’s original plan identified, at a broad level, the work to be conducted as part of modernization efforts, equipment storage procedures, and roles and responsibilities. • The plan did not define crew size for the ships during the modernization and maintenance period or fully identify expected costs during the maintenance period, according to Navy officials.1 • The plan did not fully establish guidance for “cannibalization” or rotatable pool equipment or identify all the parts that would be available for use in the rotatable pool. • Figure 3 shows the expected effect on the service life of the cruisers included in the Phased Modernization Plan. Page 13 Enclosure GAO-15-510R Navy Phased Modernization 1In technical comments, Navy officials stated that they determined the crew size for the revised plan to be 45 billets per ship.
  • 14. Objective 1: What implementation plan did the Navy develop for phased modernization? (cont.) Page 14 Figure 3: Navy’s Expected Effect of Original Phased Modernization Plan on Service Life of Cruisers Enclosure GAO-15-510R Navy Phased Modernization
  • 15. Objective 1: What implementation plan did the Navy develop for phased modernization? (cont.) Current Status • Since March 2014, the implementation of the Phased Modernization Plan has been delayed as the Navy waited for congressional approval, according to officials. • The National Defense Authorization Act for Fiscal Year 2015 requires the Navy to modernize two cruisers beginning in fiscal year 2015, subject to certain terms and conditions, and requires reporting on the modernization effort. • The Navy plans to induct USS Cowpens (CG-63) and USS Gettysburg (CG-64) into modernization in fiscal year 2015 and USS Vicksburg (CG-69) and USS Chosin (CG-65) in fiscal year 2016. In 2014, the Navy placed the USS Gettysburg into an induction continuous maintenance availability period in preparation for transitioning the ship into phased modernization, according to Navy officials. • In February 2015, as part of the President’s fiscal year 2016 budget request, the Navy introduced a new “2-4-6” version of the Phased Modernization Plan. The 2- 4-6 plan stipulates that each year no more than two cruisers will be placed in phased modernization; no cruiser will remain in phased modernization for more than 4 years; and no more than six cruisers may be in phased modernization at the same time. Page 15 Enclosure . GAO-15-510R Navy Phased Modernization
  • 16. Objective 2: To what extent did the Navy identify and analyze alternatives for achieving the goals of phased modernization? • According to Navy officials, the Navy did not consider any formal alternatives to the original Phased Modernization Plan submitted as part of the President’s Budget for Fiscal Year 2015. Navy officials stated that the Navy’s Phased Modernization Plan evolved after Congress rejected the Navy’s earlier proposal to decommission nine ships and that there were discussions held to determine the best plan. • The Navy discussed the details of phased modernization in telephone and e-mail correspondence, according to Navy and DOD officials. As these communications are largely undocumented, it is unclear the extent to which the Navy considered formal alternatives associated with the plan. • The Navy identified benefits and risks of its original Phased Modernization Plan. The following tables show these benefits and risks as well as GAO’s analysis of the likely effect of the new 2-4-6 version of the plan, which was part of the Navy’s budget submission for fiscal year 2016. • According to Navy officials, because Congress did not approve its Phased Modernization Plan, the Navy made further modifications to the plan and adopted the 2-4-6 plan, which the officials believe is consistent with congressional intent. GAO-15-510R Navy Phased ModernizationPage 16 Enclosure
  • 17. Objective 2: To what extent did the Navy identify and analyze alternatives for achieving the goals of phased modernization? (cont.) Table 1: Expected Benefits of Initial Phased Modernization Plan and Revised 2-4-6 Plan, as Identified by Navy Officials and GAO Original plan to remove 11 cruisers all at once Expected benefit identified by Navy Change in expected benefit under 2-4-6 plan identified by GAO Long-term benefits to cruiser fleet • Expected service life of cruisers will increase by approximately 5 years. By placing cruisers in storage; performing hull, mechanical, and electrical maintenance, and modernizing combat systems, the Navy anticipates it will be able to extend expected operational service life from 35 to 40 years. • The Air Defense Commander platform for 11 carrier strike groups is sustained into the 2040s. This means cruisers can retain their role in leading and coordinating the defense of the carrier strike group. Reduced benefit • Navy anticipates it will be able to extend expected service life, but this will not sustain the cruisers into the 2040s as under the original plan. Supports ship-building industry • Navy officials stated phased modernization will provide the shipbuilding industry with a more predictable, sustained workflow. Reduced benefit • Shipbuilding industry workflow is less predictable due to shortened time frames to complete work. Cost avoidance • The Navy estimates a short-term cost avoidance of about $3.8 billion for cruisers. Specifically, the Navy anticipates avoiding $1.6 billion in personnel and $2.2 billion in operations and maintenance costs from fiscal year 2015 through 2019. Reduced benefit • The Navy will not achieve anticipated cost avoidance. Navy originally planned to have a combined total of 99 years of cost avoidance. Under the revised plan, it will have a maximum of 44 years of cost avoidance. Rotatable pool equipment • Parts would be removed from cruisers when they enter phased modernization and placed in a rotatable pool where they are available for other cruisers that were not part of the Phased Modernization Plan. Page 17 Source: Navy information and GAO analysis. Enclosure GAO-15-510R Navy Phased Modernization
  • 18. Table 2: Expected Risks of Initial Phased Modernization Plan and Revised 2-4-6 Plan, as Identified by Navy Officials and GAO Original plan to remove 11 cruisers all at once Expected risk identified by Navya Change in risk under 2-4-6 plan identified by GAO Returning cruisers to the fleet quickly • Navy officials stated concerns about the ability to quickly return cruisers to the fleet, in the event of an emergency. They estimated it would take about 12 to 24 months to return a ship to operational status depending on factors such as where the cruiser is in the modernization process and how quickly a new crew could be assembled and trained. Reduced risk • Cruisers will be removed from the fleet in a staggered fashion and returned more quickly. • Cruisers will remain in reduced operational status for shorter time frames. • At most, the Navy would need to bring back 6 cruisers rather than 11. Dry-dock availability • Phased modernization ships receiving hull, mechanical, and electrical upgrades in San Diego and Norfolk require a dry- dock period of about 120 days and will compete for dry-dock space with other ships receiving scheduled maintenance. • The Optimized Fleet Response Plan (O-FRP) places pressure on the Navy to complete maintenance on time so ships can deploy on schedule. • San Diego has two dry-docks capable of supporting cruisers, and Navy officials in San Diego stated that over the course of the next 2 years, dry-docks in San Diego have no more than 5 day periods where the docks are not scheduled for use. Increased risk • Phased modernization ships receiving hull, mechanical, and electrical upgrades will continue to compete for dry-dock space, but the risk will increase as the work must be completed in shorter time frames. • Due to shorter time frames for modernization and the limited openings in the dry-dock schedule, the Navy risks either taking more than the required 4 years to complete modernization or causing other Navy ships to miss their O-FRP timelines. Page 18 Objective 2: To what extent did the Navy identify and analyze alternatives for achieving the goals of phased modernization? Source: Navy information and GAO analysis. aWhile risk factors have been identified by the Navy, they have not been quantified or subjected to a risk or sensitivity analysis. Enclosure GAO-15-510R Navy Phased Modernization
  • 19. Table 2: Expected Risks of Initial Phased Modernization Plan and Revised "2-4-6" Plan, as Identified by Navy Officials and GAO Original plan to remove 11 cruisers all at once Expected risk identified by Navy Change in risk under 2-4-6 plan identified by GAO Effects on non-phased modernization cruisers (CGs 52 – 62) • Cruisers not included in phased modernization may experience increased demand to meet the needs of the fleet. These demands may lead to the following: • Additional costs to maintain cruisers that must operate at a higher tempo. • Reduced time to perform continuous maintenance availabilities. Reduced risk • Cruisers will be returned to the fleet more quickly, increasing the Navy’s flexibility by making more cruisers available to meet demands and potentially reducing the operational tempo of non-phased- modernization cruisers. Fewer cruisers available for independent operations • Each of the 11 non-phased-modernization cruisers will be matched on a one-to-one basis to a carrier strike group and may have less flexibility to deploy independently. Reduced risk • Cruisers will be returned to the fleet more quickly. More active cruisers gives the Navy greater flexibility to deploy cruisers independent of carrier strike groups. Ballistic missile defense capability • As the four cruisers with ballistic missile defense capability enter phased modernization, there will be fewer ballistic missile defense ships in the fleet. Reduced risk • Fewer ballistic missile defense capable cruisers will be removed from the fleet at one time. • No reduction in ballistic missile defense capable cruisers in fiscal year 2015 and fiscal year 2016. Rotatable pool equipment Increased risk • There will be fewer available parts for a larger number of ships that remain in the operational fleet. • There is a potential increase in costs to procure unavailable parts. • Ships awaiting parts have potentially lower operational availability. Page 19 (351948) Objective 2: To what extent did the Navy identify and analyze alternatives for achieving the goals of phased modernization? (cont.) Source: Navy information and GAO analysis. Enclosure GAO-15-510R Navy Phased Modernization
  • 20. This is a work of the U.S. government and is not subject to copyright protection in the United States. The published product may be reproduced and distributed in its entirety without further permission from GAO. However, because this work may contain copyrighted images or other material, permission from the copyright holder may be necessary if you wish to reproduce this material separately.
  • 21. The Government Accountability Office, the audit, evaluation, and investigative arm of Congress, exists to support Congress in meeting its constitutional responsibilities and to help improve the performance and accountability of the federal government for the American people. GAO examines the use of public funds; evaluates federal programs and policies; and provides analyses, recommendations, and other assistance to help Congress make informed oversight, policy, and funding decisions. GAO’s commitment to good government is reflected in its core values of accountability, integrity, and reliability. The fastest and easiest way to obtain copies of GAO documents at no cost is through GAO’s website (www.gao.gov). Each weekday afternoon, GAO posts on its website newly released reports, testimony, and correspondence. To have GAO e-mail you a list of newly posted products, go to www.gao.gov and select “E-mail Updates.” The price of each GAO publication reflects GAO’s actual cost of production and distribution and depends on the number of pages in the publication and whether the publication is printed in color or black and white. Pricing and ordering information is posted on GAO’s website, http://www.gao.gov/ordering.htm. Place orders by calling (202) 512-6000, toll free (866) 801-7077, or TDD (202) 512-2537. Orders may be paid for using American Express, Discover Card, MasterCard, Visa, check, or money order. Call for additional information. Connect with GAO on Facebook, Flickr, Twitter, and YouTube. Subscribe to our RSS Feeds or E-mail Updates. Listen to our Podcasts. Visit GAO on the web at www.gao.gov. Contact: Website: www.gao.gov/fraudnet/fraudnet.htm E-mail: fraudnet@gao.gov Automated answering system: (800) 424-5454 or (202) 512-7470 Katherine Siggerud, Managing Director, siggerudk@gao.gov, (202) 512- 4400, U.S. Government Accountability Office, 441 G Street NW, Room 7125, Washington, DC 20548 Chuck Young, Managing Director, youngc1@gao.gov, (202) 512-4800 U.S. Government Accountability Office, 441 G Street NW, Room 7149 Washington, DC 20548 GAO’s Mission Obtaining Copies of GAO Reports and Testimony Order by Phone Connect with GAO To Report Fraud, Waste, and Abuse in Federal Programs Congressional Relations Public Affairs Please Print on Recycled Paper.