SlideShare a Scribd company logo
1 of 27
Download to read offline
888-867-2360 www.tmpservices.com
Installation Manual
Galv-Alum Over 30” Design
Proudly Made in the USA
2
Installation Guide
Tools Required:
Generator (or power from building)
” Drill (heavy duty)
Abrasive Saw (hot saw)
Dry Wall Screw Gun for Self Tapping Screws
Combination Wrench and Socket Set 9/16”
4’ or 6’ Level (preferably smart level)
C-Clamp (preferably locking type)
3/8” and 5/16” Magnet Drive Hex Bit Attachment
7/16” Drill Bit
Measuring Tape
String Line (if using optional offset)
View Packing List:
Each ramp system is shipped with a packing list, TMP layout of the site
design, and sales order. Be sure to check that all items are on hand prior to
beginning the installation.
3
Table of Contents
Getting Started Page 4-5
Installing First Landing Section Page 6-10
Installing First Ramp Section Page 11-12
Installing Toe Section Page 13
Installing Guardrails Page 14
Drilling Guardrails Page 15
Installing Angle Bracing Page 16-17
Touch Up and Completion Page 18
Options Page 19-27
4
Getting Started
A. Unpack ramp. All handrails and hardware are packaged in between ramp and
landing sections.
Figure A
B. Measure from grade to door threshold. This will give you the approximate ramp
length.
Please Note: Maximum slope is per 1:12 code.
Figure B
C. Now measure the end of the building in the direction of the ramp, grade to where
door threshold would be if door were in that location.
Figure C
5
D. If measurement is less than original door threshold measurement, you are gaining
grade; your ramp length will be the difference in the two measurements shorter.
Example: Grade to threshold is 30”, grade at end of building to threshold
is 24”, and ramp length will now be approximately 24’. If the reverse is
true, grade to threshold is 30”, grade at end of building to threshold is 36”,
and ramp length will now be approximately 36’. (Note: Per code, in a
1:12 slope, any ramp with the length of 30’ of more, must have
intermediate resting stop, this would make ramp length 42’.)
E. Lay out landing and ramp sections, as they will approximately be installed.
Figure D
F. Lay out legs in groups of same length. You want to use the longer legs at
landings and first ramp sections and sleeve through pockets. Shorter legs for
inside leg pockets that do not sleeve through and towards the end of the ramp.
Legs with half pads are used for the toe section of the ramp.
Figure E
6
Installing First Landing Section
A. It is important that you get the first landing and the first ramp section set level at
connection, as all other sections will follow the same line.
B. Stand landing section on its side and place the longest legs through the welded
pockets (in all four corners). Adjust leg length to 1/8” below the grade to door
threshold measurement. Hand-tighten set screws.
Figure F
C. Place landing with legs attached under threshold. Re-adjust legs to level landing.
Make sure door swings over landing section smoothly.
Figure G
7
D. Make sure the placement of the landing at threshold leaves a 42” diagonal from
the door to the center of the intersection of landing and first ramp section.
(Please see TMP drawings that show the typical filler detail. Or refer to Figure I
and Figure I-1).
Figure H
Figure I
Figure I-1
Please Note: Landing must maintain a 60” inside dimension.
8
E. Also, when legs sleeve through welded pockets, they must sleeve a minimum of
18” above top of landing deck.
Figure J
F. Measure for center legs. Measure from top of center leg pockets to grade, and
subtract 2” for play. Cut your center legs.
Figure K
G. Insert your center legs, and hand-tighten screws.
Figure L
9
H. Place landing under threshold again, re-level by loosening and tightening
setscrews.
Please Note: Place 1/8” shim under level to provide drainage, which will give you
” drainage in 6’ way from door.
Figure M
I. Attach (1) angle clip under the landing on each side of door using (2) each ”x4”
lags. Use self-tapping screws to 1 ” steel landing members.
Figure N
J. Make sure all leg plates are firmly on the ground. Using ” drill with 7/16” drill
bit, drill through predrilled holes of all legs underneath landing.
Figure O
10
K. Now insert guardrails through legs. For the landing, all guardrails will be plumb
straight up and down.
Please Note: If you have common landing sections, you will only sleeve
(2) out of (3) legs as you are sharing legs at connections.
Figure P
L. When guardrails are in correctly, bottom of guardrail attachment will be flush
with deck at bottom, and top of guardrails will be flush with adjacent guardrail. It
is important that top is flush to make continuous guardrail.
Figure Q
M. Drill through pre-drilled holes and legs directly above and below landing surface.
Use 2 ” bolts and nuts for single legs, and 4” bolts and nuts for two leg
connections. Bolt top hole. There should be a total of three holes to be bolted per
each vertical. (2) bottom holes must be drilled through legs.
11
Installing First Ramp Section:
A. Using smart level, measure grade drop for 1:12, or approximate 6” drop (ramp
section is 6’ long). Insert male end of ramp section into female end of landing
section.
Figure R
B. Place legs through welded pockets adjusting for smart level measurement or 6” if
approximating and slide ramp section in over approximately 1 ”, enough to clear
when guardrail is assembled.
Please Note: You have only 4 legs per ramp section, as you share a leg at top
with the landing.
Figure S
12
C. Using smart level, measure 1:12 and adjust legs with setscrews. Be sure to level
across ramp.
Figure T
D. Continue with all ramp sections using steps A-D, until the toe ramp section is
reached.
13
Installing Toe Section
A. The last section to be installed is the toe section. This is basically the same as a
ramp section, except the last welded pocket is flush with the bottom-framing
member.
Figure U
B. Measure and complete the same as a ramp section. However, since you are at or
close to grade, you can only screw in self-tapping screws through welded pocket
into legs.
Please Note: 6’ clearance required at end transition, end transition by
others.
Figure V
Figure W
14
Installing Guardrails
A. Slide guardrails over bottom and center legs. Put in all handrails down the same
row and complete the opposite side as well. Make sure all guardrails are flush.
Now you are ready to drill.
Please Note: At the top of every ramp section, there is no leg as it is
shared with the bottom leg of the section above.
B. The guardrail that you use for the toe section will have the 12” return attached.
Please Note: Per code, 12” extension required past end transition of ramp.
Figure X
Figure Y
15
Drilling Guardrails
A. Drill in (2) locations as you did in the landing section and bolt in (3) locations.
Start with the pre-drilled hole below the deck surface and drill through the
inserted legs. Slide in bolt and tighten with nut.
B. You need to remove the next guardrail in line to drill the center hole. Remove
and drill. Replace and add bolt and nut. Add the upper bolt through the pre-
drilled holes and tighten.
Figure Z
C. Continue the same procedure until you put in the last guardrail section. Because
the last section (or toe section) is sitting on the ground, you can only secure the
bottom leg to guardrail with self-tapping screws.
Figure AA
16
Installing Angle Bracing
A. Angle bracing is required when landing or ramp decking is 24” or over. Bracing
is required at the corner of each landing and 6’ o.c. under the landing. Each ramp
section takes (2) outside braces and 6’ o.c. under the ramp, since they share legs
with either a landing or a ramp. Once the landing surface falls below 24”, angle
bracing is not required.
Angle Bracing Installing Angle Bracing
Figures BB
B. Attach to legs on the inside of landing, so angle support does not stick past the
edge of landing, thus allowing for optional skirting.
Side View of Landing Front View of Ramp
Figures CC
17
Side View of Landing
Figures DD
Front View of Ramp
Figure EE
C. Use (2) self-tapping screws, (1) in top and (1) in bottom of each support.
18
Touch Up and Completion
A. You should have completed the ramp. Check handrails for burrs. Run your hands
along the handrails. If there are any burrs, take grinder and grind until smooth.
Use touch-up paint (98% zinc solution) and touch up areas void of galvanized
coating.
Please Note: Touch up paint not included.
Figures FF
19
Options
Optional Off Set:
A. Move first ramp section inward 2” from outside landing.
B. Using string line, attach to top of landing surface, and run to grade at length of
ramp sections provided. Attach string line to grade. This will be the slope you set
your ramp sections to.
For Example: If threshold height is anywhere from 24” to 30”, 30’ of
ramp is provided, measure your string line out 30’.
C. When you have the correct slope matching the string line, follow A-G on
installing ramp sections.
Figures GG
20
Optional Switchback Landing:
Please Note: When a switchback is used, (1) 4’x6’ ramp section will have
a male-to-male connection. Please be sure this ramp section is used prior
to the switchback section.
A. Stand both 6’x9’ level section on its sides. Slide legs through welded pockets and
adjust to level all (4) corners.
Figure HH
B. Flip landing over to top side and connect into existing ramp section (with male-to-
male connection). Recheck for level.
Figure II
C. Continue following steps and installation of ramp.
21
Optional Level Landing:
A. Stand 4’x6’ level section on its side. Slide legs through welded pockets and
adjust to level all (4) corners.
Figure JJ
B. Flip landing over to the topside and connect into existing ramp pockets, recheck
for level.
C. Continue follow steps A-G on installing ramp sections.
Figure KK
22
Optional Grab-Rail Attachment:
A. Start at the top with the landing. You either have (1) straight handrail extension
and (1) wrap-around handrail extension or (2) wrap-around handrail extensions,
depending on the design of the landing.
Figures LL
B. Insert posts to end of 1 ” guardrails at top of landing where handrail extensions
or wrap-around occur, this makes inside handrail continuous. Drill and bolt.
Figures MM
C. You will attach handrail brackets first. At each post where 6’ guardrails connect
you will add (1) handrail bracket.
Figure NN
23
D. When the 1 3/16” tubing is attached on top of that bracket, the top of the tubing-
handrail must be between 34” to 38” above the deck surface. Wherever you
measure, you must be consistent all the way down. Measure and mark your
locations for each bracket, attach with (2) self-tapping screws.
Figure OO
E. Handrail pipe is 6’ long to fit perfectly between sections. At the top, the
extension is attached that either loops down or wraps around. For straight
extension loop has a down slope, and at the bottom of the ramp the loops have an
up slope. These extensions require extra brackets to attach to the bottom portion
of loop.
Figure PP
24
F. The wrap-around loop is attached with a bracket and plate that fits between round
4” on center pickets.
Figure QQ
G. Secure top pipe-handrail to brackets starting at top wrap-around or straight loops,
with self-tapping screws through bracket into pipe. End of pipe should fit
halfway on to bracket, with the internal sleeve placed to accept front end of next
pipe section. Use self-tapping screws to secure all the way down, and on both
sides. Bottom ramp loops will have two brackets, one at the top and one at the
bottom.
25
Optional Step Attachment:
A. Install landing per instructions on Installing First Landing Section.
B. Measure outside edge of landing from finished floor to top surface of landing, this
will determine your measurement of your step height.
C. Flip step on side and proceed to sleeve legs in 4 corners of step.
Please Note: One leg with half pad will need to be installed in top sleeve,
where is will butt up against outside of landing.
Figure RR
D. Start at top of step rise and measure to end of base pad on let, measurement
should be the same as your landing height.
E. Flip step over on its stop side and butt again landing. Make sure top of step rise is
flush against top surface of landing.
Please Note: Leg with half pad will sit on top of leg with full pad.
Figure SS
F. Proceed to adjust bottom legs so they are level.
26
G. Sleeve in step guardrail over legs.
Figure TT
H. Sleeve wrap-around loop and straight extension into inner handrails of step at top
of landing, secure with back-plate between round 4” on center pickets.
Straight Extension Wrap-Around Loop
Figures UU
Please Note: If entire grab rails are to be attached, please refer to the
Optional Grab Rail Attachment instructions.
27
I. After guardrails are installed, screw in self-tapping screws 12” on center at top of
step riser.
Figure VV
J. Follow Up Touch Up Procedures.
Figure WW

More Related Content

Viewers also liked

Viewers also liked (9)

Semana De ObservaciÒn De Tecnica 90
Semana De ObservaciÒn De Tecnica 90Semana De ObservaciÒn De Tecnica 90
Semana De ObservaciÒn De Tecnica 90
 
Placas tectonicas
Placas tectonicasPlacas tectonicas
Placas tectonicas
 
presentation sun valley
presentation sun valleypresentation sun valley
presentation sun valley
 
Defensa de riesgo
Defensa de riesgoDefensa de riesgo
Defensa de riesgo
 
Age of empires 4
Age of empires 4Age of empires 4
Age of empires 4
 
Matthew-Bester-and-Neil-Slatcher
Matthew-Bester-and-Neil-SlatcherMatthew-Bester-and-Neil-Slatcher
Matthew-Bester-and-Neil-Slatcher
 
Age of empires 7
Age of empires 7Age of empires 7
Age of empires 7
 
Carlito N. Siervo Jr
Carlito N. Siervo JrCarlito N. Siervo Jr
Carlito N. Siervo Jr
 
Caso+clinico+grupo+dr+garrido
Caso+clinico+grupo+dr+garridoCaso+clinico+grupo+dr+garrido
Caso+clinico+grupo+dr+garrido
 

Similar to Galv-Alum Over 30

Installation Manual Aluminum
Installation Manual AluminumInstallation Manual Aluminum
Installation Manual Aluminumtmpservices01
 
iMovR Xtend Monitor Arm Manual
iMovR Xtend Monitor Arm ManualiMovR Xtend Monitor Arm Manual
iMovR Xtend Monitor Arm ManualiMovR
 
Xtend Dual Screen Crossbar Monitor Arm Assembly Instructions
Xtend Dual Screen Crossbar Monitor Arm Assembly InstructionsXtend Dual Screen Crossbar Monitor Arm Assembly Instructions
Xtend Dual Screen Crossbar Monitor Arm Assembly InstructionsiMovR
 
Concerto Monitor Arm Manual
Concerto Monitor Arm ManualConcerto Monitor Arm Manual
Concerto Monitor Arm ManualiMovR
 
Xtend Dual Screen Crossbar Monitor Arm - Assembly
Xtend Dual Screen Crossbar Monitor Arm - AssemblyXtend Dual Screen Crossbar Monitor Arm - Assembly
Xtend Dual Screen Crossbar Monitor Arm - AssemblyiMovR
 
Vignola Gazebo Assembly Manual
Vignola Gazebo Assembly ManualVignola Gazebo Assembly Manual
Vignola Gazebo Assembly ManualGiller Doit
 
9. How to install asphalt roofing on a shed
9. How to install asphalt roofing on a shed9. How to install asphalt roofing on a shed
9. How to install asphalt roofing on a shedicreatablesseo
 
thi cong vach ngan ve sinh compact
thi cong vach ngan ve sinh compactthi cong vach ngan ve sinh compact
thi cong vach ngan ve sinh compactTrần Khánh
 
iMovr Omega Olympus Manual 12 24-15
iMovr Omega Olympus Manual 12 24-15iMovr Omega Olympus Manual 12 24-15
iMovr Omega Olympus Manual 12 24-15iMovR
 
Cantilever Heavy Duty Ladder plus Work Platform
Cantilever Heavy Duty Ladder plus Work PlatformCantilever Heavy Duty Ladder plus Work Platform
Cantilever Heavy Duty Ladder plus Work PlatformJanine O
 
4. How to build shed roof rafters
4. How to build shed roof rafters4. How to build shed roof rafters
4. How to build shed roof raftersicreatablesseo
 
CoFold Mortice Sliding Folding Door Gear Installation Instructions
CoFold Mortice Sliding Folding Door Gear Installation InstructionsCoFold Mortice Sliding Folding Door Gear Installation Instructions
CoFold Mortice Sliding Folding Door Gear Installation InstructionsCoastal Joinery Hardware
 
Build instructions Homeslice Tower ver 070514
Build instructions   Homeslice Tower ver 070514Build instructions   Homeslice Tower ver 070514
Build instructions Homeslice Tower ver 070514Jeff Vetterick
 
How to assemble a sink base vanity 48 60
How to assemble a sink base vanity 48 60How to assemble a sink base vanity 48 60
How to assemble a sink base vanity 48 60Domain CabinetsDirect
 
8. How to install trim on the storage shed
8. How to install trim on the storage shed8. How to install trim on the storage shed
8. How to install trim on the storage shedicreatablesseo
 
Victory rig
Victory rigVictory rig
Victory rigJLRev
 
Caterpillar cat m318 excavator (prefix 6 es) service repair manual (6es00001 ...
Caterpillar cat m318 excavator (prefix 6 es) service repair manual (6es00001 ...Caterpillar cat m318 excavator (prefix 6 es) service repair manual (6es00001 ...
Caterpillar cat m318 excavator (prefix 6 es) service repair manual (6es00001 ...cdfxsa
 

Similar to Galv-Alum Over 30 (20)

Installation Manual Aluminum
Installation Manual AluminumInstallation Manual Aluminum
Installation Manual Aluminum
 
Mobile Wire Shelving Installation Instructions
Mobile Wire Shelving Installation InstructionsMobile Wire Shelving Installation Instructions
Mobile Wire Shelving Installation Instructions
 
iMovR Xtend Monitor Arm Manual
iMovR Xtend Monitor Arm ManualiMovR Xtend Monitor Arm Manual
iMovR Xtend Monitor Arm Manual
 
Xtend Dual Screen Crossbar Monitor Arm Assembly Instructions
Xtend Dual Screen Crossbar Monitor Arm Assembly InstructionsXtend Dual Screen Crossbar Monitor Arm Assembly Instructions
Xtend Dual Screen Crossbar Monitor Arm Assembly Instructions
 
Concerto Monitor Arm Manual
Concerto Monitor Arm ManualConcerto Monitor Arm Manual
Concerto Monitor Arm Manual
 
Xtend Dual Screen Crossbar Monitor Arm - Assembly
Xtend Dual Screen Crossbar Monitor Arm - AssemblyXtend Dual Screen Crossbar Monitor Arm - Assembly
Xtend Dual Screen Crossbar Monitor Arm - Assembly
 
Vignola Gazebo Assembly Manual
Vignola Gazebo Assembly ManualVignola Gazebo Assembly Manual
Vignola Gazebo Assembly Manual
 
9. How to install asphalt roofing on a shed
9. How to install asphalt roofing on a shed9. How to install asphalt roofing on a shed
9. How to install asphalt roofing on a shed
 
thi cong vach ngan ve sinh compact
thi cong vach ngan ve sinh compactthi cong vach ngan ve sinh compact
thi cong vach ngan ve sinh compact
 
iMovr Omega Olympus Manual 12 24-15
iMovr Omega Olympus Manual 12 24-15iMovr Omega Olympus Manual 12 24-15
iMovr Omega Olympus Manual 12 24-15
 
EVANNEX EcoHitch for Tesla Model S Install Guide
EVANNEX EcoHitch for Tesla Model S Install GuideEVANNEX EcoHitch for Tesla Model S Install Guide
EVANNEX EcoHitch for Tesla Model S Install Guide
 
Cantilever Heavy Duty Ladder plus Work Platform
Cantilever Heavy Duty Ladder plus Work PlatformCantilever Heavy Duty Ladder plus Work Platform
Cantilever Heavy Duty Ladder plus Work Platform
 
4. How to build shed roof rafters
4. How to build shed roof rafters4. How to build shed roof rafters
4. How to build shed roof rafters
 
CoFold Mortice Sliding Folding Door Gear Installation Instructions
CoFold Mortice Sliding Folding Door Gear Installation InstructionsCoFold Mortice Sliding Folding Door Gear Installation Instructions
CoFold Mortice Sliding Folding Door Gear Installation Instructions
 
Build instructions Homeslice Tower ver 070514
Build instructions   Homeslice Tower ver 070514Build instructions   Homeslice Tower ver 070514
Build instructions Homeslice Tower ver 070514
 
How to assemble a sink base vanity
How to assemble a sink base vanityHow to assemble a sink base vanity
How to assemble a sink base vanity
 
How to assemble a sink base vanity 48 60
How to assemble a sink base vanity 48 60How to assemble a sink base vanity 48 60
How to assemble a sink base vanity 48 60
 
8. How to install trim on the storage shed
8. How to install trim on the storage shed8. How to install trim on the storage shed
8. How to install trim on the storage shed
 
Victory rig
Victory rigVictory rig
Victory rig
 
Caterpillar cat m318 excavator (prefix 6 es) service repair manual (6es00001 ...
Caterpillar cat m318 excavator (prefix 6 es) service repair manual (6es00001 ...Caterpillar cat m318 excavator (prefix 6 es) service repair manual (6es00001 ...
Caterpillar cat m318 excavator (prefix 6 es) service repair manual (6es00001 ...
 

Recently uploaded

(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCRsoniya singh
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...lizamodels9
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
A.I. Bot Summit 3 Opening Keynote - Perry Belcher
A.I. Bot Summit 3 Opening Keynote - Perry BelcherA.I. Bot Summit 3 Opening Keynote - Perry Belcher
A.I. Bot Summit 3 Opening Keynote - Perry BelcherPerry Belcher
 
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756dollysharma2066
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedKaiNexus
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadAyesha Khan
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxgeorgebrinton95
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...
NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...Khaled Al Awadi
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 

Recently uploaded (20)

(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
A.I. Bot Summit 3 Opening Keynote - Perry Belcher
A.I. Bot Summit 3 Opening Keynote - Perry BelcherA.I. Bot Summit 3 Opening Keynote - Perry Belcher
A.I. Bot Summit 3 Opening Keynote - Perry Belcher
 
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...
NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 

Galv-Alum Over 30

  • 1. 888-867-2360 www.tmpservices.com Installation Manual Galv-Alum Over 30” Design Proudly Made in the USA
  • 2. 2 Installation Guide Tools Required: Generator (or power from building) ” Drill (heavy duty) Abrasive Saw (hot saw) Dry Wall Screw Gun for Self Tapping Screws Combination Wrench and Socket Set 9/16” 4’ or 6’ Level (preferably smart level) C-Clamp (preferably locking type) 3/8” and 5/16” Magnet Drive Hex Bit Attachment 7/16” Drill Bit Measuring Tape String Line (if using optional offset) View Packing List: Each ramp system is shipped with a packing list, TMP layout of the site design, and sales order. Be sure to check that all items are on hand prior to beginning the installation.
  • 3. 3 Table of Contents Getting Started Page 4-5 Installing First Landing Section Page 6-10 Installing First Ramp Section Page 11-12 Installing Toe Section Page 13 Installing Guardrails Page 14 Drilling Guardrails Page 15 Installing Angle Bracing Page 16-17 Touch Up and Completion Page 18 Options Page 19-27
  • 4. 4 Getting Started A. Unpack ramp. All handrails and hardware are packaged in between ramp and landing sections. Figure A B. Measure from grade to door threshold. This will give you the approximate ramp length. Please Note: Maximum slope is per 1:12 code. Figure B C. Now measure the end of the building in the direction of the ramp, grade to where door threshold would be if door were in that location. Figure C
  • 5. 5 D. If measurement is less than original door threshold measurement, you are gaining grade; your ramp length will be the difference in the two measurements shorter. Example: Grade to threshold is 30”, grade at end of building to threshold is 24”, and ramp length will now be approximately 24’. If the reverse is true, grade to threshold is 30”, grade at end of building to threshold is 36”, and ramp length will now be approximately 36’. (Note: Per code, in a 1:12 slope, any ramp with the length of 30’ of more, must have intermediate resting stop, this would make ramp length 42’.) E. Lay out landing and ramp sections, as they will approximately be installed. Figure D F. Lay out legs in groups of same length. You want to use the longer legs at landings and first ramp sections and sleeve through pockets. Shorter legs for inside leg pockets that do not sleeve through and towards the end of the ramp. Legs with half pads are used for the toe section of the ramp. Figure E
  • 6. 6 Installing First Landing Section A. It is important that you get the first landing and the first ramp section set level at connection, as all other sections will follow the same line. B. Stand landing section on its side and place the longest legs through the welded pockets (in all four corners). Adjust leg length to 1/8” below the grade to door threshold measurement. Hand-tighten set screws. Figure F C. Place landing with legs attached under threshold. Re-adjust legs to level landing. Make sure door swings over landing section smoothly. Figure G
  • 7. 7 D. Make sure the placement of the landing at threshold leaves a 42” diagonal from the door to the center of the intersection of landing and first ramp section. (Please see TMP drawings that show the typical filler detail. Or refer to Figure I and Figure I-1). Figure H Figure I Figure I-1 Please Note: Landing must maintain a 60” inside dimension.
  • 8. 8 E. Also, when legs sleeve through welded pockets, they must sleeve a minimum of 18” above top of landing deck. Figure J F. Measure for center legs. Measure from top of center leg pockets to grade, and subtract 2” for play. Cut your center legs. Figure K G. Insert your center legs, and hand-tighten screws. Figure L
  • 9. 9 H. Place landing under threshold again, re-level by loosening and tightening setscrews. Please Note: Place 1/8” shim under level to provide drainage, which will give you ” drainage in 6’ way from door. Figure M I. Attach (1) angle clip under the landing on each side of door using (2) each ”x4” lags. Use self-tapping screws to 1 ” steel landing members. Figure N J. Make sure all leg plates are firmly on the ground. Using ” drill with 7/16” drill bit, drill through predrilled holes of all legs underneath landing. Figure O
  • 10. 10 K. Now insert guardrails through legs. For the landing, all guardrails will be plumb straight up and down. Please Note: If you have common landing sections, you will only sleeve (2) out of (3) legs as you are sharing legs at connections. Figure P L. When guardrails are in correctly, bottom of guardrail attachment will be flush with deck at bottom, and top of guardrails will be flush with adjacent guardrail. It is important that top is flush to make continuous guardrail. Figure Q M. Drill through pre-drilled holes and legs directly above and below landing surface. Use 2 ” bolts and nuts for single legs, and 4” bolts and nuts for two leg connections. Bolt top hole. There should be a total of three holes to be bolted per each vertical. (2) bottom holes must be drilled through legs.
  • 11. 11 Installing First Ramp Section: A. Using smart level, measure grade drop for 1:12, or approximate 6” drop (ramp section is 6’ long). Insert male end of ramp section into female end of landing section. Figure R B. Place legs through welded pockets adjusting for smart level measurement or 6” if approximating and slide ramp section in over approximately 1 ”, enough to clear when guardrail is assembled. Please Note: You have only 4 legs per ramp section, as you share a leg at top with the landing. Figure S
  • 12. 12 C. Using smart level, measure 1:12 and adjust legs with setscrews. Be sure to level across ramp. Figure T D. Continue with all ramp sections using steps A-D, until the toe ramp section is reached.
  • 13. 13 Installing Toe Section A. The last section to be installed is the toe section. This is basically the same as a ramp section, except the last welded pocket is flush with the bottom-framing member. Figure U B. Measure and complete the same as a ramp section. However, since you are at or close to grade, you can only screw in self-tapping screws through welded pocket into legs. Please Note: 6’ clearance required at end transition, end transition by others. Figure V Figure W
  • 14. 14 Installing Guardrails A. Slide guardrails over bottom and center legs. Put in all handrails down the same row and complete the opposite side as well. Make sure all guardrails are flush. Now you are ready to drill. Please Note: At the top of every ramp section, there is no leg as it is shared with the bottom leg of the section above. B. The guardrail that you use for the toe section will have the 12” return attached. Please Note: Per code, 12” extension required past end transition of ramp. Figure X Figure Y
  • 15. 15 Drilling Guardrails A. Drill in (2) locations as you did in the landing section and bolt in (3) locations. Start with the pre-drilled hole below the deck surface and drill through the inserted legs. Slide in bolt and tighten with nut. B. You need to remove the next guardrail in line to drill the center hole. Remove and drill. Replace and add bolt and nut. Add the upper bolt through the pre- drilled holes and tighten. Figure Z C. Continue the same procedure until you put in the last guardrail section. Because the last section (or toe section) is sitting on the ground, you can only secure the bottom leg to guardrail with self-tapping screws. Figure AA
  • 16. 16 Installing Angle Bracing A. Angle bracing is required when landing or ramp decking is 24” or over. Bracing is required at the corner of each landing and 6’ o.c. under the landing. Each ramp section takes (2) outside braces and 6’ o.c. under the ramp, since they share legs with either a landing or a ramp. Once the landing surface falls below 24”, angle bracing is not required. Angle Bracing Installing Angle Bracing Figures BB B. Attach to legs on the inside of landing, so angle support does not stick past the edge of landing, thus allowing for optional skirting. Side View of Landing Front View of Ramp Figures CC
  • 17. 17 Side View of Landing Figures DD Front View of Ramp Figure EE C. Use (2) self-tapping screws, (1) in top and (1) in bottom of each support.
  • 18. 18 Touch Up and Completion A. You should have completed the ramp. Check handrails for burrs. Run your hands along the handrails. If there are any burrs, take grinder and grind until smooth. Use touch-up paint (98% zinc solution) and touch up areas void of galvanized coating. Please Note: Touch up paint not included. Figures FF
  • 19. 19 Options Optional Off Set: A. Move first ramp section inward 2” from outside landing. B. Using string line, attach to top of landing surface, and run to grade at length of ramp sections provided. Attach string line to grade. This will be the slope you set your ramp sections to. For Example: If threshold height is anywhere from 24” to 30”, 30’ of ramp is provided, measure your string line out 30’. C. When you have the correct slope matching the string line, follow A-G on installing ramp sections. Figures GG
  • 20. 20 Optional Switchback Landing: Please Note: When a switchback is used, (1) 4’x6’ ramp section will have a male-to-male connection. Please be sure this ramp section is used prior to the switchback section. A. Stand both 6’x9’ level section on its sides. Slide legs through welded pockets and adjust to level all (4) corners. Figure HH B. Flip landing over to top side and connect into existing ramp section (with male-to- male connection). Recheck for level. Figure II C. Continue following steps and installation of ramp.
  • 21. 21 Optional Level Landing: A. Stand 4’x6’ level section on its side. Slide legs through welded pockets and adjust to level all (4) corners. Figure JJ B. Flip landing over to the topside and connect into existing ramp pockets, recheck for level. C. Continue follow steps A-G on installing ramp sections. Figure KK
  • 22. 22 Optional Grab-Rail Attachment: A. Start at the top with the landing. You either have (1) straight handrail extension and (1) wrap-around handrail extension or (2) wrap-around handrail extensions, depending on the design of the landing. Figures LL B. Insert posts to end of 1 ” guardrails at top of landing where handrail extensions or wrap-around occur, this makes inside handrail continuous. Drill and bolt. Figures MM C. You will attach handrail brackets first. At each post where 6’ guardrails connect you will add (1) handrail bracket. Figure NN
  • 23. 23 D. When the 1 3/16” tubing is attached on top of that bracket, the top of the tubing- handrail must be between 34” to 38” above the deck surface. Wherever you measure, you must be consistent all the way down. Measure and mark your locations for each bracket, attach with (2) self-tapping screws. Figure OO E. Handrail pipe is 6’ long to fit perfectly between sections. At the top, the extension is attached that either loops down or wraps around. For straight extension loop has a down slope, and at the bottom of the ramp the loops have an up slope. These extensions require extra brackets to attach to the bottom portion of loop. Figure PP
  • 24. 24 F. The wrap-around loop is attached with a bracket and plate that fits between round 4” on center pickets. Figure QQ G. Secure top pipe-handrail to brackets starting at top wrap-around or straight loops, with self-tapping screws through bracket into pipe. End of pipe should fit halfway on to bracket, with the internal sleeve placed to accept front end of next pipe section. Use self-tapping screws to secure all the way down, and on both sides. Bottom ramp loops will have two brackets, one at the top and one at the bottom.
  • 25. 25 Optional Step Attachment: A. Install landing per instructions on Installing First Landing Section. B. Measure outside edge of landing from finished floor to top surface of landing, this will determine your measurement of your step height. C. Flip step on side and proceed to sleeve legs in 4 corners of step. Please Note: One leg with half pad will need to be installed in top sleeve, where is will butt up against outside of landing. Figure RR D. Start at top of step rise and measure to end of base pad on let, measurement should be the same as your landing height. E. Flip step over on its stop side and butt again landing. Make sure top of step rise is flush against top surface of landing. Please Note: Leg with half pad will sit on top of leg with full pad. Figure SS F. Proceed to adjust bottom legs so they are level.
  • 26. 26 G. Sleeve in step guardrail over legs. Figure TT H. Sleeve wrap-around loop and straight extension into inner handrails of step at top of landing, secure with back-plate between round 4” on center pickets. Straight Extension Wrap-Around Loop Figures UU Please Note: If entire grab rails are to be attached, please refer to the Optional Grab Rail Attachment instructions.
  • 27. 27 I. After guardrails are installed, screw in self-tapping screws 12” on center at top of step riser. Figure VV J. Follow Up Touch Up Procedures. Figure WW