14. Zonal Stretchy
3D Weft Stretchy (Zonal Stretchy)
Two Color Design
Less stretchyLarge stretchy
Zonal Stretchy
Non-stretch
Non-stretch
Large stretch
Less stretch
20. Post - Treatment
ò 1. Avoid shrinkage issue
ò 2. Cutting die available
(no frayed edge & better seam strength result )
21. How to Start ? : Whole package
Effects
2 layers (see through)
3D raised
Weft stretch
.AI file with shell pattern Clear color way map
22. Material limitations
ò Maximum 12-color design (backing color is included)
ò 120cm maximum width for non-stretch design
120cm (weft)
warp
weft
23. Lead-time
ò Sample lead-time : 2-3 weeks
- Total new design with existing 216 color yarns
- We need 2 more weeks if samples need customized color yarn
ò Production lead-time : 4-6 weeks (depends on the quantity)
- Forecast is needed for us to prepare color yarn
24. MOQ
ò MOQ:
§ For one piece upper: 2,000 pairs per article per color
§ For continuous/random pattern: 1,000 yards
à 3 continuous sizes should share one upper/ shape
Example: size M6.5#, M7#, M7.5# => use the same upper/ shape 1
size M8#, M8.5#, M9# => use the same upper/ shape 2
size M 9.5#, M10#, M10.5# => use the same upper/ shape 3
à So we’ll offer 3 shapes (shape 1,2,3) for 9 sizes (M6.5#~ M10.5#)
² We must receive all shapes (for all sizes) and correct colors to prepare
samples for your confirmation 6-8 weeks before production.
25. Capacity
ò Current: 37 machines (1 machine = 100Y/day)
Daily capacity: 3,700Y (1Y= 3 pairs )
à We plan to have 61 machines by the end of 2015.
450,000 pairs/ month (calculated by 25 working days)