SlideShare a Scribd company logo
1 of 7
Download to read offline
EEEssspppeeerrrsssooonnn RRReeesssiiidddeeennnccceee
1234 Alpine Court
Rocklin, CA 12345
AAAdddvvvaaannnccceeeddd 333000
3 year chart
November 2009
Latitude 32 Construction & Consulting 2
IIInnntttrrroooddduuuccctttiiiooonnn
The Following is a Navigation Plan for 1234 Alpine Court, Rocklin, CA 12345.
The plan type is the ADVANCED 30. It includes a 3 year plan and a complimentary Property
Assessment.
NAVPLAN is a home financial planning tool.
It is a compilation of projects and associated budgets based on our review meeting between
yourself and Latitude 32.
At Latitude 32, we are confident that you are now at the helm of your home’s success.
NAVPLAN has the next 3 years budgeted and planned with your family goals in mind.
While unforeseen expenses occur during homeownership, NAVPLAN will limit the unexpected.
We have also enclosed a Property Assessment. We have inspected your home’s systems and
items that could become a maintenance concern over the years.
Home Statistics :
Approximate year built – 1980s
Approximate Square Footage – 1800sf.
House – Single Story Ranch
Latitude 32 Construction & Consulting 3
222000111000 --- YYYeeeaaarrr 111
Landscape –
Front Yard
o Privacy Yard
 Trellis(6x6 posts/4x6 beams/2x3 lattice)(layout 12x12)
 Shrubs
 Irrigation
o Grass
 Sod Replacement
 Embedment(clay conditions)
 Irrigation
Description Qty Unit $/Unit Total
Trellis-Construction / Paint 1 ea 1,200.00$ 1,200.00$
Sod Removals 1 600.00$ 600.00$
Embedments 1 275.00$ 275.00$
Irrigation adjustments 1 250.00$ 250.00$
Shrubs 1 200.00$ 200.00$
Ground Cover(Bark) 1 250.00$ 250.00$
Sod Installation(50'x40')approx 2 msf 500.00$ 1,000.00$
3,775.00$Budget Subtotal
Interior –
Trim work
o Trim work/Paint-
 Remove/Replace all doors with 6 panel colonist
 Remove/Replace Baseboard(all carpet areas)(3 ½” profile)
Description Qty Unit $/Unit Total
Replace Doors 12 ea 120.00$ 1,440.00$
Paint Doors 12 ea 100.00$ 1,200.00$
Replace Baseboard 500 lf 1.00$ 500.00$
Paint Baseboard 500 lf 0.50$ 250.00$
Trash Haul 1 ea 100.00$ 100.00$
3,490.00$Budget Subtotal
Latitude 32 Construction & Consulting 4
222000111111 --- YYYeeeaaarrr 222
Kitchen Remodel –
Demolition of the following :
o Appliances
o Countertops
o Cabinetry
o Drywall
o Electrical Fixtures(less ceiling fixtures)
o Plumbing Fixtures
Installations Include :
o Framing
o Electrical, Plumbing, Electrical, Mechanical, Drywall
o Cabinetry- Natural Maple(custom)
o Countertops- Granite slab
o Appliances- Stainless Steel(6 burner cooktop, double oven, dbl door fridge(CF?)
o Flooring(Ceramic tile 16x16)
o Painting
o Plumbing Fixtures (Moen) brushed nickel
Description Qty Unit $/unit Total
Demolition(complete) 1 ea 1,200$ 1,200$
Framing 1 ea 600$ 600$
Mechanical 1 ea 500$ 500$
Plumbing
Rough 1 ea 1,000$ 1,000$
Finish(Moen Brushed Nickel) 1 ea 800$ 800$
Electrical -$
Rough 1 ea 500$ 500$
Finish 1 ea 300$ 300$
Drywall(orange peel) 1 ea 1,100$ 1,100$
Cabinetry(Maple Natural) 1 ea 3,800$ 3,800$
Countertops(Granite Slab) 1 ea 4,500$ 4,500$
Backsplash(Glass Tile) 1 ea 600$ 600$
Flooring- Ceramic Tile(16x16) 160 sf 13$ 2,080$
Appliances(Stainless Steel) 1 ea 4,500$ 4,500$
Paint 1 ea 1,800$ 1,800$
23,280.00$Budget Subtotal
Latitude 32 Construction & Consulting 5
222000111222 --- YYYeeeaaarrr 333
Roof Replacement –
Demolition of existing Shake/Shingle and 1x4 skip sheeting
#30 felt underlayment
½” Plywood sheeting
Class C 30year Asphalt Shingles
Description Qty Unit Sq $/Unit Total
Demolition
Roof shingles 2600 sf 25 0.86$ 2,236.00$
Skip sheeting 1 ea 1,000.00$ 1,000.00$
Trash Haul 1 Ea 800.00$ 800.00$
Plywood(1/2" CDX) 2600 sf 25 1.14$ 2,964.00$
#30 Underlayment 2600 SF 25 16.50$ 412.50$
Asphalt 30year Roof 2600 SF 26 232.00$ 6,032.00$
Sheet Metal(drip edge) 350 lf 1.60$ 560.00$
13,444.50$Budget Subtotal
Latitude 32 Construction & Consulting 6
222000000999 PPPrrrooopppeeerrrtttyyy AAAsssssseeessssssmmmeeennnttt
Date of Property Assessment : November 4, 2009
Assessment performed by: Todd M. Cirata
Photos – Yes/No
Systems(Specifications) –
o HVAC
o Electrical Panel
o Gas Shut-Off
o Water Meter Box
o Sewer Clean out
o Water Heater
Exterior –
o Roof Type/Condition
o Flashings/Gutters
o Electrical-Lights/Outlets
o Walls-Finish/Condition
o Hardscape Type/Condition
o Landscape – Decks/Trellis/Fencing/Irrigation/Plantings
o Grading/Drainage
Interior –
o HVAC- Filter size/condition
o Electrical
 Light Fixtures/operational
 Outlets
o Plumbing
 Water Heater
 Faucets
 Toilets
 Showers/Tubs
 Traps
o Doors- Conditions(binding, rubbing, squeaking)
o Windows-Type/Operation condition
o Flooring
 Tile/Carpet/Wood – Condition
o Walls-
 Drywall/Paint - Condition
o Tile
 Showers/Baths -Condition
Garage –
o Lighting
o Venting/Sealed(Pests)
o Opener
Latitude 32 Construction & Consulting 7
CCClllooosssiiinnnggg nnnooottteeesss
A Lighthouse is to a ship,as Latitude 32 Construction& Consulting is the Beacon to your home.
Records Management -
At Latitude 32, we understand how much of a challenge managing records for your home can be, so we have
stored your November 2009 ADVANCED 30 for 1234 Alpine Ct, Rocklin, CA. in our Archives.
Just a reminder, the cost of the Navigation Plan is waived upon initiation of any work described under the
Advanced 30. Any work described under the Property Assessment is exempt from the waiver.
Staying in touch -
Latitude 32 will keep your Advanced 30 on our schedule.
Sincerely,
Latitude 32
Construction & Consulting
Ca. Lic#651996

More Related Content

What's hot (17)

Kwell unik 2021 your logo
Kwell   unik 2021 your logoKwell   unik 2021 your logo
Kwell unik 2021 your logo
 
TechTown 1st Floor Renovation
TechTown 1st Floor RenovationTechTown 1st Floor Renovation
TechTown 1st Floor Renovation
 
The Evolving Search for a New Home
The Evolving Search for a New HomeThe Evolving Search for a New Home
The Evolving Search for a New Home
 
Hardware & Apartment Supply, Co
Hardware & Apartment Supply, CoHardware & Apartment Supply, Co
Hardware & Apartment Supply, Co
 
Mahindra aura
Mahindra auraMahindra aura
Mahindra aura
 
Tenant move in, move out
Tenant move in, move outTenant move in, move out
Tenant move in, move out
 
Application checklist - dwelling unsewered
Application checklist - dwelling unseweredApplication checklist - dwelling unsewered
Application checklist - dwelling unsewered
 
Geometra design portfolio
Geometra design portfolioGeometra design portfolio
Geometra design portfolio
 
Remodeling and addition
Remodeling and additionRemodeling and addition
Remodeling and addition
 
IREO SKYON
IREO SKYONIREO SKYON
IREO SKYON
 
KENNEDY JOSEPH resume 08-12-15
KENNEDY JOSEPH resume 08-12-15KENNEDY JOSEPH resume 08-12-15
KENNEDY JOSEPH resume 08-12-15
 
My interior design work
My interior design workMy interior design work
My interior design work
 
BEVER A100x
BEVER A100xBEVER A100x
BEVER A100x
 
Jason Plumb-Portfolio-2014
Jason Plumb-Portfolio-2014Jason Plumb-Portfolio-2014
Jason Plumb-Portfolio-2014
 
Casa2 presentation
Casa2 presentationCasa2 presentation
Casa2 presentation
 
Structure case study
Structure case studyStructure case study
Structure case study
 
One wilson
One wilsonOne wilson
One wilson
 

Viewers also liked

Fort St John Goalkeeper Camp
Fort St John Goalkeeper CampFort St John Goalkeeper Camp
Fort St John Goalkeeper Campsheldano
 
Found Powerpoint Presentation
Found Powerpoint PresentationFound Powerpoint Presentation
Found Powerpoint Presentationhenleycolmedia
 
Welcome To The World Of Samaritan Help Mission
Welcome To The World Of Samaritan Help MissionWelcome To The World Of Samaritan Help Mission
Welcome To The World Of Samaritan Help MissionMamoon Akhtar
 
Watch Powerpoint Presentation
Watch Powerpoint PresentationWatch Powerpoint Presentation
Watch Powerpoint Presentationhenleycolmedia
 
Jinx Powerpoint Presentation
Jinx Powerpoint PresentationJinx Powerpoint Presentation
Jinx Powerpoint Presentationhenleycolmedia
 
Pictures from JEEcamp
Pictures from JEEcampPictures from JEEcamp
Pictures from JEEcampguestce72c9
 

Viewers also liked (6)

Fort St John Goalkeeper Camp
Fort St John Goalkeeper CampFort St John Goalkeeper Camp
Fort St John Goalkeeper Camp
 
Found Powerpoint Presentation
Found Powerpoint PresentationFound Powerpoint Presentation
Found Powerpoint Presentation
 
Welcome To The World Of Samaritan Help Mission
Welcome To The World Of Samaritan Help MissionWelcome To The World Of Samaritan Help Mission
Welcome To The World Of Samaritan Help Mission
 
Watch Powerpoint Presentation
Watch Powerpoint PresentationWatch Powerpoint Presentation
Watch Powerpoint Presentation
 
Jinx Powerpoint Presentation
Jinx Powerpoint PresentationJinx Powerpoint Presentation
Jinx Powerpoint Presentation
 
Pictures from JEEcamp
Pictures from JEEcampPictures from JEEcamp
Pictures from JEEcamp
 

Similar to Esperson Residence-Advanced 30

Tim dettlaff presentation fmli nov 13 2014
Tim dettlaff presentation   fmli nov 13 2014Tim dettlaff presentation   fmli nov 13 2014
Tim dettlaff presentation fmli nov 13 2014MikeWorsfold
 
Hpb 11 x17 booklet
Hpb 11 x17 bookletHpb 11 x17 booklet
Hpb 11 x17 bookletexmiami
 
GR SOC EXAMPLE 2017 SECURE
GR SOC EXAMPLE 2017 SECUREGR SOC EXAMPLE 2017 SECURE
GR SOC EXAMPLE 2017 SECUREJohn Grant
 
LUSIN DESIGN_30.07.2016
LUSIN DESIGN_30.07.2016LUSIN DESIGN_30.07.2016
LUSIN DESIGN_30.07.2016Shayne Andrews
 
$49-ROOF-ESTIMATE_Final Draft
$49-ROOF-ESTIMATE_Final Draft$49-ROOF-ESTIMATE_Final Draft
$49-ROOF-ESTIMATE_Final DraftJason Sloan
 
Amaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan DesignAmaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan DesignKathleenFaithMamuad
 
Commercial Passive House Case Studies
Commercial Passive House Case StudiesCommercial Passive House Case Studies
Commercial Passive House Case StudiesTE Studio
 
T2_Programación de obras_Grupo7_ValdiviesoAntonFrancoJhayro.pdf
T2_Programación de obras_Grupo7_ValdiviesoAntonFrancoJhayro.pdfT2_Programación de obras_Grupo7_ValdiviesoAntonFrancoJhayro.pdf
T2_Programación de obras_Grupo7_ValdiviesoAntonFrancoJhayro.pdfLeandroValdiviesoAnt
 
Dri expansion cost breakdown pdf-1
Dri expansion cost breakdown   pdf-1Dri expansion cost breakdown   pdf-1
Dri expansion cost breakdown pdf-1Tumehfamily
 
Going Green Without the Greenbacks, 2011
Going Green Without the Greenbacks, 2011Going Green Without the Greenbacks, 2011
Going Green Without the Greenbacks, 2011Eleanor Olsen
 

Similar to Esperson Residence-Advanced 30 (20)

Tim dettlaff presentation fmli nov 13 2014
Tim dettlaff presentation   fmli nov 13 2014Tim dettlaff presentation   fmli nov 13 2014
Tim dettlaff presentation fmli nov 13 2014
 
PARADISE ESTIMATING
PARADISE ESTIMATINGPARADISE ESTIMATING
PARADISE ESTIMATING
 
Heat Transfer Project
Heat Transfer ProjectHeat Transfer Project
Heat Transfer Project
 
Hpb 11 x17 booklet
Hpb 11 x17 bookletHpb 11 x17 booklet
Hpb 11 x17 booklet
 
GR SOC EXAMPLE 2017 SECURE
GR SOC EXAMPLE 2017 SECUREGR SOC EXAMPLE 2017 SECURE
GR SOC EXAMPLE 2017 SECURE
 
Assisi
AssisiAssisi
Assisi
 
Bill Of Quantities
Bill Of QuantitiesBill Of Quantities
Bill Of Quantities
 
LUSIN DESIGN_30.07.2016
LUSIN DESIGN_30.07.2016LUSIN DESIGN_30.07.2016
LUSIN DESIGN_30.07.2016
 
$49-ROOF-ESTIMATE_Final Draft
$49-ROOF-ESTIMATE_Final Draft$49-ROOF-ESTIMATE_Final Draft
$49-ROOF-ESTIMATE_Final Draft
 
Amaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan DesignAmaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan Design
 
QTO Sample
QTO SampleQTO Sample
QTO Sample
 
Commercial Passive House Case Studies
Commercial Passive House Case StudiesCommercial Passive House Case Studies
Commercial Passive House Case Studies
 
Mapsko Casa Bella, Sector 82, Gurgaon
Mapsko Casa Bella, Sector 82, GurgaonMapsko Casa Bella, Sector 82, Gurgaon
Mapsko Casa Bella, Sector 82, Gurgaon
 
Sample report
Sample reportSample report
Sample report
 
AIA Chicago Presentation
AIA Chicago PresentationAIA Chicago Presentation
AIA Chicago Presentation
 
T2_Programación de obras_Grupo7_ValdiviesoAntonFrancoJhayro.pdf
T2_Programación de obras_Grupo7_ValdiviesoAntonFrancoJhayro.pdfT2_Programación de obras_Grupo7_ValdiviesoAntonFrancoJhayro.pdf
T2_Programación de obras_Grupo7_ValdiviesoAntonFrancoJhayro.pdf
 
Dick Smith
Dick SmithDick Smith
Dick Smith
 
Dri expansion cost breakdown pdf-1
Dri expansion cost breakdown   pdf-1Dri expansion cost breakdown   pdf-1
Dri expansion cost breakdown pdf-1
 
Obc 2012 sb 10 becor 2017 03 29
Obc 2012 sb 10 becor 2017 03 29Obc 2012 sb 10 becor 2017 03 29
Obc 2012 sb 10 becor 2017 03 29
 
Going Green Without the Greenbacks, 2011
Going Green Without the Greenbacks, 2011Going Green Without the Greenbacks, 2011
Going Green Without the Greenbacks, 2011
 

Esperson Residence-Advanced 30

  • 1. EEEssspppeeerrrsssooonnn RRReeesssiiidddeeennnccceee 1234 Alpine Court Rocklin, CA 12345 AAAdddvvvaaannnccceeeddd 333000 3 year chart November 2009
  • 2. Latitude 32 Construction & Consulting 2 IIInnntttrrroooddduuuccctttiiiooonnn The Following is a Navigation Plan for 1234 Alpine Court, Rocklin, CA 12345. The plan type is the ADVANCED 30. It includes a 3 year plan and a complimentary Property Assessment. NAVPLAN is a home financial planning tool. It is a compilation of projects and associated budgets based on our review meeting between yourself and Latitude 32. At Latitude 32, we are confident that you are now at the helm of your home’s success. NAVPLAN has the next 3 years budgeted and planned with your family goals in mind. While unforeseen expenses occur during homeownership, NAVPLAN will limit the unexpected. We have also enclosed a Property Assessment. We have inspected your home’s systems and items that could become a maintenance concern over the years. Home Statistics : Approximate year built – 1980s Approximate Square Footage – 1800sf. House – Single Story Ranch
  • 3. Latitude 32 Construction & Consulting 3 222000111000 --- YYYeeeaaarrr 111 Landscape – Front Yard o Privacy Yard  Trellis(6x6 posts/4x6 beams/2x3 lattice)(layout 12x12)  Shrubs  Irrigation o Grass  Sod Replacement  Embedment(clay conditions)  Irrigation Description Qty Unit $/Unit Total Trellis-Construction / Paint 1 ea 1,200.00$ 1,200.00$ Sod Removals 1 600.00$ 600.00$ Embedments 1 275.00$ 275.00$ Irrigation adjustments 1 250.00$ 250.00$ Shrubs 1 200.00$ 200.00$ Ground Cover(Bark) 1 250.00$ 250.00$ Sod Installation(50'x40')approx 2 msf 500.00$ 1,000.00$ 3,775.00$Budget Subtotal Interior – Trim work o Trim work/Paint-  Remove/Replace all doors with 6 panel colonist  Remove/Replace Baseboard(all carpet areas)(3 ½” profile) Description Qty Unit $/Unit Total Replace Doors 12 ea 120.00$ 1,440.00$ Paint Doors 12 ea 100.00$ 1,200.00$ Replace Baseboard 500 lf 1.00$ 500.00$ Paint Baseboard 500 lf 0.50$ 250.00$ Trash Haul 1 ea 100.00$ 100.00$ 3,490.00$Budget Subtotal
  • 4. Latitude 32 Construction & Consulting 4 222000111111 --- YYYeeeaaarrr 222 Kitchen Remodel – Demolition of the following : o Appliances o Countertops o Cabinetry o Drywall o Electrical Fixtures(less ceiling fixtures) o Plumbing Fixtures Installations Include : o Framing o Electrical, Plumbing, Electrical, Mechanical, Drywall o Cabinetry- Natural Maple(custom) o Countertops- Granite slab o Appliances- Stainless Steel(6 burner cooktop, double oven, dbl door fridge(CF?) o Flooring(Ceramic tile 16x16) o Painting o Plumbing Fixtures (Moen) brushed nickel Description Qty Unit $/unit Total Demolition(complete) 1 ea 1,200$ 1,200$ Framing 1 ea 600$ 600$ Mechanical 1 ea 500$ 500$ Plumbing Rough 1 ea 1,000$ 1,000$ Finish(Moen Brushed Nickel) 1 ea 800$ 800$ Electrical -$ Rough 1 ea 500$ 500$ Finish 1 ea 300$ 300$ Drywall(orange peel) 1 ea 1,100$ 1,100$ Cabinetry(Maple Natural) 1 ea 3,800$ 3,800$ Countertops(Granite Slab) 1 ea 4,500$ 4,500$ Backsplash(Glass Tile) 1 ea 600$ 600$ Flooring- Ceramic Tile(16x16) 160 sf 13$ 2,080$ Appliances(Stainless Steel) 1 ea 4,500$ 4,500$ Paint 1 ea 1,800$ 1,800$ 23,280.00$Budget Subtotal
  • 5. Latitude 32 Construction & Consulting 5 222000111222 --- YYYeeeaaarrr 333 Roof Replacement – Demolition of existing Shake/Shingle and 1x4 skip sheeting #30 felt underlayment ½” Plywood sheeting Class C 30year Asphalt Shingles Description Qty Unit Sq $/Unit Total Demolition Roof shingles 2600 sf 25 0.86$ 2,236.00$ Skip sheeting 1 ea 1,000.00$ 1,000.00$ Trash Haul 1 Ea 800.00$ 800.00$ Plywood(1/2" CDX) 2600 sf 25 1.14$ 2,964.00$ #30 Underlayment 2600 SF 25 16.50$ 412.50$ Asphalt 30year Roof 2600 SF 26 232.00$ 6,032.00$ Sheet Metal(drip edge) 350 lf 1.60$ 560.00$ 13,444.50$Budget Subtotal
  • 6. Latitude 32 Construction & Consulting 6 222000000999 PPPrrrooopppeeerrrtttyyy AAAsssssseeessssssmmmeeennnttt Date of Property Assessment : November 4, 2009 Assessment performed by: Todd M. Cirata Photos – Yes/No Systems(Specifications) – o HVAC o Electrical Panel o Gas Shut-Off o Water Meter Box o Sewer Clean out o Water Heater Exterior – o Roof Type/Condition o Flashings/Gutters o Electrical-Lights/Outlets o Walls-Finish/Condition o Hardscape Type/Condition o Landscape – Decks/Trellis/Fencing/Irrigation/Plantings o Grading/Drainage Interior – o HVAC- Filter size/condition o Electrical  Light Fixtures/operational  Outlets o Plumbing  Water Heater  Faucets  Toilets  Showers/Tubs  Traps o Doors- Conditions(binding, rubbing, squeaking) o Windows-Type/Operation condition o Flooring  Tile/Carpet/Wood – Condition o Walls-  Drywall/Paint - Condition o Tile  Showers/Baths -Condition Garage – o Lighting o Venting/Sealed(Pests) o Opener
  • 7. Latitude 32 Construction & Consulting 7 CCClllooosssiiinnnggg nnnooottteeesss A Lighthouse is to a ship,as Latitude 32 Construction& Consulting is the Beacon to your home. Records Management - At Latitude 32, we understand how much of a challenge managing records for your home can be, so we have stored your November 2009 ADVANCED 30 for 1234 Alpine Ct, Rocklin, CA. in our Archives. Just a reminder, the cost of the Navigation Plan is waived upon initiation of any work described under the Advanced 30. Any work described under the Property Assessment is exempt from the waiver. Staying in touch - Latitude 32 will keep your Advanced 30 on our schedule. Sincerely, Latitude 32 Construction & Consulting Ca. Lic#651996