SlideShare a Scribd company logo
1 of 3
CURRICULAM-VITAE
SUBHASHCHAND SHARMA
Electrical Engineer(PowerPlant)
HyundaiEngineering&Const. Co. Ltd.
Abudhabi-UnitedArab Emirate
Contact-+971-566269399,+91-9918214964(India)
Email:subhashelect@gmail.com,subhashelect@yahoo.co.in
CareerObjective:-
Intend to builda careerwitha leadingcorporateofhi-techenvironmentwithcommitted&dedicatedpeople,
whichwillhelpmeto exploremyself fullyand realize my potentialand Willingto work as a key player in
challengingandcreativeenvironment.
PresentEmployer:-
I am workingwith M/s Hyundai Engineering&Construction Co.Ltd., Since June 2013 onwards as an Engineer
(Electrical)astesting,Commissioning,OperationandMaintenance ofOil & Gas,power Plant-Electrical power
System.
Previous Experience:-
Bajaj EnergyPvt.Limited (Bajaj Group):-
Worked with M/sBajaj EnergyPvt.Limited asElectricalEngineerfrom April05, 2011to June 15, 2013 for
OperationandMaintenance ofCoalbasedThermalpowerplanthavingtotal capacityof 90 MW (2 X 45 MW)
with CFBCboilercapacityof 190 TPH project activitieslike, testing & commissioning,operation&maintenance
of electricalequipments.
Ultratech Cement Limited (Aditya Birla Group):-
Work with M/sUltratech CementLimited,1X25MVCPP, Unit–Rawan CementWorksRaipur(C.G.) from
24 Dec 2007to 2 April, 2011,As an Asst Engineer(Electrical)Iwas looking Electrical Operationand
Maintenance ofKILN, RawMill,CoalMill,LimeStoneStacker& Reclaimer,6.6KV, 132/6.6 MPSSSubstation,
Transmission Line4.4Km,minescrusher&cross-countryBelt conveyor Minesto RawMilPlant..
Monnet Ispat & Energy Ltd:-
Work with M/sMonnetIspat&EnergyLtd.Naharpali Raigargh(C.G.) as anAsst ElectricalEngineerin
Thermalpowerplanthavingcapacityof 2 X 45 MW projectfrom 8August, 2005to 21 December,2007.
Responsibility:
 Involve in Energy Conservation. On line monitoring of Electrical Power Measurements System.
 Monitoring the Load Variation on drives and Coordinating with Operation.
 Ensuring all works is carried out as per technical specification & quality Assurance plan.
 Plan of major minor shutdown and attend any breakdown Coordination’s with operation for day
to day Preventive maintenance. ImplementationofPreventive and Predictivemaintenance
schedules.
 Insure the Spare material stock and Quantity in our store ofsite and inventory management.
 Attend site coordination meeting on regular basis, Reduce the Break down Hours, Reduce the
Power Consumption. Why -Why analysis ForAny repetitive Break Down & unplannedBreakdown.
Experience in protection Relay systems:-
 132 KV Grid Line protection with relays Micom P341, P441, vector surge relayMRG 21 HRD
 MICOM P111,P341,P121 (REF), P225,P521, P632, MotorProtectionREM 610,MPR 300 (Siemens),
Transformer Diff. Protection MICOM P632 & All types Electromagnetic Relays.
 Working with installation commissioning Protection Relays MICOM 122, MICOM 127, MICOM 341,
MICOM 441, MICOM 630 & Generator Protection RelaySIPROTEC 7UM 622 Siemens
 VFD panels, LT & HT panel , ACB & SF6,VCB breakers & relaytesting
 ESP Transformer, Motorized valve, CT & PT Testing.
 Relays for HT drives, CTMM, CTZM and Thermal Relays for LT Drives
Job Profile Summary: -
 synchronizingpanel, GeneratorExcitation& AVR Panel(ABB) , GeneratorProtectionrelaypanel,
VFD panels, LT &HT panel, ACB & SF6,VCB breakers, ,ESP Transformer, Motorized valve
 Power& DistributionTransformer (28MVA, 25 MVA and 2 MVA) O & M
 H.T.Switchgears&LT Switchgears –PCC& MCC(L&T Make).
 Overhauling,replacementandMaintenanceofAll kindof LT Motors& HT motors(upto 4375KW Slip
RingInductionMotor)
 Generatorprotection(Micom P343),FeederProtectionRelay(Micom111),HT MotorProtection
(Micom 225andMicom630),Diff. Protection& All types ElectromagneticRelays.
 ShutdownMaintenanceandManpowerplanningandExecution.
 O & M of 132/11KV and switchyard equipments.ESPOperationandmaintenance
 TG SetsOperation& Maintenance
 220/110DC Volt Battery chargerswithBattery Bank Installation,Operation & Maintenance.
 Coolingtower,DM Plant, Coal HandlingPlantSmoothOperation&Maintenance
 OnlinemonitoringofElectricalPowerMeasurementsSystem & EnergyConservation.
 CloseMonitoringofElectricalEquipmentsParameters.
 EnsureSmoothOperationof PowerPlant.
 PowerGeneration& DistributionDailyProgress report.
Computer knowledge:-
MS office, SAP, ERP, Window 2007, Window2010
Achievements:
WinnerofthebestElectrical Installation,in all cementPlantsin theAnnual MEMC&Safetyweek.
BilaspurRegion DGMSbetween allcementPlantsin 2009.
Educational Qualification:
Qualification Board/University Division Percentage Year
B. Tech (Electrical) JRN, Technical University 1st Division 65 % 2010
Diploma (Electrical ) BTE (U.P.) 1st Division 77% 2004
12th (U.P Board) UP Board 2nd Division 52% 2001
10th (U.P Board) UP Board 1st Division 64% 1999
Personaldetails:
Name Subhash Chand
Father’sname Bharat Lal
Date of birth 10.07.1983.
Nationality Indian
MaritalStatus Married.
Gender Male
TotalExperience: 10 years
CurrentSalary 2300 USD /month
ExpectedSalary Negotiable
NoticePeriod 1 month
Passport Details
Passport No H4351298
Date of issue 03/09/2010
Date of expiry - 02/09/2020
Declaration:
I herebydeclarethat the above information furnishedistrue to the best of myknowledge.
Date: ThankingYou
Place: Subhashchand Sharma

More Related Content

What's hot (20)

resume 11-2015
resume 11-2015resume 11-2015
resume 11-2015
 
subrat resume
subrat resumesubrat resume
subrat resume
 
RESUME.CV
RESUME.CVRESUME.CV
RESUME.CV
 
amit cv electrical engineer
amit cv electrical engineeramit cv electrical engineer
amit cv electrical engineer
 
Morpal mehara 2016- cv
Morpal mehara 2016- cvMorpal mehara 2016- cv
Morpal mehara 2016- cv
 
SOURABH SONI
SOURABH SONISOURABH SONI
SOURABH SONI
 
Mani CV - Power Plant Maintenance
Mani CV - Power Plant MaintenanceMani CV - Power Plant Maintenance
Mani CV - Power Plant Maintenance
 
Hamada's cv
Hamada's cvHamada's cv
Hamada's cv
 
CV Solar
CV SolarCV Solar
CV Solar
 
Nagaganesh M_original
Nagaganesh M_originalNagaganesh M_original
Nagaganesh M_original
 
CV_akhilesh
CV_akhileshCV_akhilesh
CV_akhilesh
 
Vadivel N
Vadivel NVadivel N
Vadivel N
 
PRAVASH _PANDA RESUME....2015
PRAVASH _PANDA RESUME....2015PRAVASH _PANDA RESUME....2015
PRAVASH _PANDA RESUME....2015
 
sai resume new
sai resume newsai resume new
sai resume new
 
Niresh Resume i
Niresh Resume iNiresh Resume i
Niresh Resume i
 
c.v. SURAJ CHANDANGIRIWAR new -NCC
c.v. SURAJ CHANDANGIRIWAR new -NCCc.v. SURAJ CHANDANGIRIWAR new -NCC
c.v. SURAJ CHANDANGIRIWAR new -NCC
 
rashgggg
rashggggrashgggg
rashgggg
 
Shahid Hassan iti
Shahid Hassan itiShahid Hassan iti
Shahid Hassan iti
 
1. Ikram up date cv
1. Ikram up date cv1. Ikram up date cv
1. Ikram up date cv
 
vijay new resume[1].DOC
vijay new resume[1].DOCvijay new resume[1].DOC
vijay new resume[1].DOC
 

Similar to Subhash_sharma_NMDC (20)

Resume
ResumeResume
Resume
 
SASIdharan p CV
SASIdharan p CVSASIdharan p CV
SASIdharan p CV
 
Sharad lodhi
Sharad lodhiSharad lodhi
Sharad lodhi
 
yogesh Barvadiya (3)
yogesh Barvadiya (3)yogesh Barvadiya (3)
yogesh Barvadiya (3)
 
H TYAGI LATEST (1)
H TYAGI LATEST (1)H TYAGI LATEST (1)
H TYAGI LATEST (1)
 
KJVYAS_SCL
KJVYAS_SCLKJVYAS_SCL
KJVYAS_SCL
 
dharma cv . Ts
dharma cv . Tsdharma cv . Ts
dharma cv . Ts
 
Cv
CvCv
Cv
 
PRAVASH _PANDA RESUME....2015
PRAVASH _PANDA RESUME....2015PRAVASH _PANDA RESUME....2015
PRAVASH _PANDA RESUME....2015
 
Rajesh Patel Resume
Rajesh Patel ResumeRajesh Patel Resume
Rajesh Patel Resume
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
CVJ_29466149_20150624093911
CVJ_29466149_20150624093911CVJ_29466149_20150624093911
CVJ_29466149_20150624093911
 
Sanjay Mondal Presentation
Sanjay Mondal PresentationSanjay Mondal Presentation
Sanjay Mondal Presentation
 
JIGNESH
JIGNESHJIGNESH
JIGNESH
 
JIGNESH
JIGNESHJIGNESH
JIGNESH
 
SURESHPALANI cv 2017
SURESHPALANI cv 2017SURESHPALANI cv 2017
SURESHPALANI cv 2017
 
CV bharat new
CV    bharat newCV    bharat new
CV bharat new
 
utsav cv
utsav cvutsav cv
utsav cv
 
Eng_Nigah_Hussain_Packages
Eng_Nigah_Hussain_PackagesEng_Nigah_Hussain_Packages
Eng_Nigah_Hussain_Packages
 
DEBASIS BEHERA_Original
DEBASIS BEHERA_OriginalDEBASIS BEHERA_Original
DEBASIS BEHERA_Original
 

Subhash_sharma_NMDC

  • 1. CURRICULAM-VITAE SUBHASHCHAND SHARMA Electrical Engineer(PowerPlant) HyundaiEngineering&Const. Co. Ltd. Abudhabi-UnitedArab Emirate Contact-+971-566269399,+91-9918214964(India) Email:subhashelect@gmail.com,subhashelect@yahoo.co.in CareerObjective:- Intend to builda careerwitha leadingcorporateofhi-techenvironmentwithcommitted&dedicatedpeople, whichwillhelpmeto exploremyself fullyand realize my potentialand Willingto work as a key player in challengingandcreativeenvironment. PresentEmployer:- I am workingwith M/s Hyundai Engineering&Construction Co.Ltd., Since June 2013 onwards as an Engineer (Electrical)astesting,Commissioning,OperationandMaintenance ofOil & Gas,power Plant-Electrical power System. Previous Experience:- Bajaj EnergyPvt.Limited (Bajaj Group):- Worked with M/sBajaj EnergyPvt.Limited asElectricalEngineerfrom April05, 2011to June 15, 2013 for OperationandMaintenance ofCoalbasedThermalpowerplanthavingtotal capacityof 90 MW (2 X 45 MW) with CFBCboilercapacityof 190 TPH project activitieslike, testing & commissioning,operation&maintenance of electricalequipments. Ultratech Cement Limited (Aditya Birla Group):- Work with M/sUltratech CementLimited,1X25MVCPP, Unit–Rawan CementWorksRaipur(C.G.) from 24 Dec 2007to 2 April, 2011,As an Asst Engineer(Electrical)Iwas looking Electrical Operationand Maintenance ofKILN, RawMill,CoalMill,LimeStoneStacker& Reclaimer,6.6KV, 132/6.6 MPSSSubstation, Transmission Line4.4Km,minescrusher&cross-countryBelt conveyor Minesto RawMilPlant.. Monnet Ispat & Energy Ltd:- Work with M/sMonnetIspat&EnergyLtd.Naharpali Raigargh(C.G.) as anAsst ElectricalEngineerin Thermalpowerplanthavingcapacityof 2 X 45 MW projectfrom 8August, 2005to 21 December,2007.
  • 2. Responsibility:  Involve in Energy Conservation. On line monitoring of Electrical Power Measurements System.  Monitoring the Load Variation on drives and Coordinating with Operation.  Ensuring all works is carried out as per technical specification & quality Assurance plan.  Plan of major minor shutdown and attend any breakdown Coordination’s with operation for day to day Preventive maintenance. ImplementationofPreventive and Predictivemaintenance schedules.  Insure the Spare material stock and Quantity in our store ofsite and inventory management.  Attend site coordination meeting on regular basis, Reduce the Break down Hours, Reduce the Power Consumption. Why -Why analysis ForAny repetitive Break Down & unplannedBreakdown. Experience in protection Relay systems:-  132 KV Grid Line protection with relays Micom P341, P441, vector surge relayMRG 21 HRD  MICOM P111,P341,P121 (REF), P225,P521, P632, MotorProtectionREM 610,MPR 300 (Siemens), Transformer Diff. Protection MICOM P632 & All types Electromagnetic Relays.  Working with installation commissioning Protection Relays MICOM 122, MICOM 127, MICOM 341, MICOM 441, MICOM 630 & Generator Protection RelaySIPROTEC 7UM 622 Siemens  VFD panels, LT & HT panel , ACB & SF6,VCB breakers & relaytesting  ESP Transformer, Motorized valve, CT & PT Testing.  Relays for HT drives, CTMM, CTZM and Thermal Relays for LT Drives Job Profile Summary: -  synchronizingpanel, GeneratorExcitation& AVR Panel(ABB) , GeneratorProtectionrelaypanel, VFD panels, LT &HT panel, ACB & SF6,VCB breakers, ,ESP Transformer, Motorized valve  Power& DistributionTransformer (28MVA, 25 MVA and 2 MVA) O & M  H.T.Switchgears&LT Switchgears –PCC& MCC(L&T Make).  Overhauling,replacementandMaintenanceofAll kindof LT Motors& HT motors(upto 4375KW Slip RingInductionMotor)  Generatorprotection(Micom P343),FeederProtectionRelay(Micom111),HT MotorProtection (Micom 225andMicom630),Diff. Protection& All types ElectromagneticRelays.  ShutdownMaintenanceandManpowerplanningandExecution.  O & M of 132/11KV and switchyard equipments.ESPOperationandmaintenance  TG SetsOperation& Maintenance  220/110DC Volt Battery chargerswithBattery Bank Installation,Operation & Maintenance.  Coolingtower,DM Plant, Coal HandlingPlantSmoothOperation&Maintenance  OnlinemonitoringofElectricalPowerMeasurementsSystem & EnergyConservation.  CloseMonitoringofElectricalEquipmentsParameters.  EnsureSmoothOperationof PowerPlant.  PowerGeneration& DistributionDailyProgress report.
  • 3. Computer knowledge:- MS office, SAP, ERP, Window 2007, Window2010 Achievements: WinnerofthebestElectrical Installation,in all cementPlantsin theAnnual MEMC&Safetyweek. BilaspurRegion DGMSbetween allcementPlantsin 2009. Educational Qualification: Qualification Board/University Division Percentage Year B. Tech (Electrical) JRN, Technical University 1st Division 65 % 2010 Diploma (Electrical ) BTE (U.P.) 1st Division 77% 2004 12th (U.P Board) UP Board 2nd Division 52% 2001 10th (U.P Board) UP Board 1st Division 64% 1999 Personaldetails: Name Subhash Chand Father’sname Bharat Lal Date of birth 10.07.1983. Nationality Indian MaritalStatus Married. Gender Male TotalExperience: 10 years CurrentSalary 2300 USD /month ExpectedSalary Negotiable NoticePeriod 1 month Passport Details Passport No H4351298 Date of issue 03/09/2010 Date of expiry - 02/09/2020 Declaration: I herebydeclarethat the above information furnishedistrue to the best of myknowledge. Date: ThankingYou Place: Subhashchand Sharma