PresentEmployer:-
I am workingwith M/s Hyundai Engineering&Construction Co.Ltd., Since June 2013 onwards as an Engineer
(Electrical)astesting,Commissioning,OperationandMaintenance ofOil & Gas,power Plant-Electrical power
System.
Previous Experience:-
Bajaj EnergyPvt.Limited (Bajaj Group):-
Worked with M/sBajaj EnergyPvt.Limited asElectricalEngineerfrom April05, 2011to June 15, 2013 for
OperationandMaintenance ofCoalbasedThermalpowerplanthavingtotal capacityof 90 MW (2 X 45 MW)
with CFBCboilercapacityof 190 TPH project activitieslike, testing & commissioning,operation&maintenance
of electricalequipments.
Ultratech Cement Limited (Aditya Birla Group):-
Work with M/sUltratech CementLimited,1X25MVCPP, Unit–Rawan CementWorksRaipur(C.G.) from
24 Dec 2007to 2 April, 2011,As an Asst Engineer(Electrical)Iwas looking Electrical Operationand
Maintenance ofKILN, RawMill,CoalMill,LimeStoneStacker& Reclaimer,6.6KV, 132/6.6 MPSSSubstation,
Transmission Line4.4Km,minescrusher&cross-countryBelt conveyor Minesto RawMilPlant..
Monnet Ispat & Energy Ltd:-
Work with M/sMonnetIspat&EnergyLtd.Naharpali Raigargh(C.G.) as anAsst ElectricalEngineerin
Thermalpowerplanthavingcapacityof 2 X 45 MW projectfrom 8August, 2005to 21 December,2007.
2. Responsibility:
Involve in Energy Conservation. On line monitoring of Electrical Power Measurements System.
Monitoring the Load Variation on drives and Coordinating with Operation.
Ensuring all works is carried out as per technical specification & quality Assurance plan.
Plan of major minor shutdown and attend any breakdown Coordination’s with operation for day
to day Preventive maintenance. ImplementationofPreventive and Predictivemaintenance
schedules.
Insure the Spare material stock and Quantity in our store ofsite and inventory management.
Attend site coordination meeting on regular basis, Reduce the Break down Hours, Reduce the
Power Consumption. Why -Why analysis ForAny repetitive Break Down & unplannedBreakdown.
Experience in protection Relay systems:-
132 KV Grid Line protection with relays Micom P341, P441, vector surge relayMRG 21 HRD
MICOM P111,P341,P121 (REF), P225,P521, P632, MotorProtectionREM 610,MPR 300 (Siemens),
Transformer Diff. Protection MICOM P632 & All types Electromagnetic Relays.
Working with installation commissioning Protection Relays MICOM 122, MICOM 127, MICOM 341,
MICOM 441, MICOM 630 & Generator Protection RelaySIPROTEC 7UM 622 Siemens
VFD panels, LT & HT panel , ACB & SF6,VCB breakers & relaytesting
ESP Transformer, Motorized valve, CT & PT Testing.
Relays for HT drives, CTMM, CTZM and Thermal Relays for LT Drives
Job Profile Summary: -
synchronizingpanel, GeneratorExcitation& AVR Panel(ABB) , GeneratorProtectionrelaypanel,
VFD panels, LT &HT panel, ACB & SF6,VCB breakers, ,ESP Transformer, Motorized valve
Power& DistributionTransformer (28MVA, 25 MVA and 2 MVA) O & M
H.T.Switchgears< Switchgears –PCC& MCC(L&T Make).
Overhauling,replacementandMaintenanceofAll kindof LT Motors& HT motors(upto 4375KW Slip
RingInductionMotor)
Generatorprotection(Micom P343),FeederProtectionRelay(Micom111),HT MotorProtection
(Micom 225andMicom630),Diff. Protection& All types ElectromagneticRelays.
ShutdownMaintenanceandManpowerplanningandExecution.
O & M of 132/11KV and switchyard equipments.ESPOperationandmaintenance
TG SetsOperation& Maintenance
220/110DC Volt Battery chargerswithBattery Bank Installation,Operation & Maintenance.
Coolingtower,DM Plant, Coal HandlingPlantSmoothOperation&Maintenance
OnlinemonitoringofElectricalPowerMeasurementsSystem & EnergyConservation.
CloseMonitoringofElectricalEquipmentsParameters.
EnsureSmoothOperationof PowerPlant.
PowerGeneration& DistributionDailyProgress report.
3. Computer knowledge:-
MS office, SAP, ERP, Window 2007, Window2010
Achievements:
WinnerofthebestElectrical Installation,in all cementPlantsin theAnnual MEMC&Safetyweek.
BilaspurRegion DGMSbetween allcementPlantsin 2009.
Educational Qualification:
Qualification Board/University Division Percentage Year
B. Tech (Electrical) JRN, Technical University 1st Division 65 % 2010
Diploma (Electrical ) BTE (U.P.) 1st Division 77% 2004
12th (U.P Board) UP Board 2nd Division 52% 2001
10th (U.P Board) UP Board 1st Division 64% 1999
Personaldetails:
Name Subhash Chand
Father’sname Bharat Lal
Date of birth 10.07.1983.
Nationality Indian
MaritalStatus Married.
Gender Male
TotalExperience: 10 years
CurrentSalary 2300 USD /month
ExpectedSalary Negotiable
NoticePeriod 1 month
Passport Details
Passport No H4351298
Date of issue 03/09/2010
Date of expiry - 02/09/2020
Declaration:
I herebydeclarethat the above information furnishedistrue to the best of myknowledge.
Date: ThankingYou
Place: Subhashchand Sharma