Faswall® Building Project
- 11. Detail of lintel
prior to
pouring
(Faswall webs
removed to
create
monolithic
header).
Other
methods for
forming lintels
are available.
- 12. Window buck installed just for stacking and pouring. It is removed since
window/door frames fasten direct to the Faswall material.
Editor's Notes
- First course in level!
- Vapor barrier installed with additional perimeter insulation
- Rigid foam insulation in, ready for tubing
- Tubing loops installed
- Faswall erects quickly
- Some limited shimming may be necessary to keep wall plumb
- Flexible conduit installed prior to filling
- Minimal bracing needed compared to other ICF’s
- Detail of a lintel prior to pouring (Faswall webs removed to create monolithic header)
- Window buck installed just for stacking and pouring. Is removed since windows and doors fasten direct to the Faswall material.
- Ready to pour