SlideShare a Scribd company logo
1 of 47
Measuring and Improving
Maintenance Performance
Salih O. Duffuaa
Systems Engineering Department
King Fahd University of Petroleum and Minerals
Presentation Plan
 Introduction
 Evolution of Maintenance Management
 Why Measure
 Performance Measurement
– Structured Auditing
– Key performance indicator
– Benchmarking
 Improvement process
 Case Studies
Role of Maintenance
 Maintenance is defined as the
combination of activities by which
equipment, assets or a system is
kept or restored to a state in which
it can perform its designated
function. It is an important factor in
product or service quality and can
be used as a strategy for successful
competition
Introduction
PLANNING ORGANIZING
Maintenance
Process
Maintenance strategy
Maintenance Load Forecasting
Maintenance Capacity
Maintenance Organization
Maintenance Scheduling
Process design
Standards
Performance Measurement
Project Management
MONITOR
FEEDBACK
CONTROL
Work control
Material control
Inventory control
Cost control
Managing for quality
INPUT OUTPUT
Operational
Machines
Equipment
&
Facilities
Labor
Equipment
Management
Spares
Variations in
Maintenance
Demand
* Scheduling
Maintenance Versus Organization
Objectives
 The objectives and goals of an
organization depends on the organization
state, strategy and type of business. Some
objectives are
– Meet or exceed customer satisfaction
– Maximizing profit, Meet set targets
– Meet set safety standard,
– Zero product defect
 Does Maintenance affect these goals?
Evolution of Maintenance
Management
 Prior to 50th: Necessary evil
 50-70 : Preventive maintenance
 70th : Life cycle costing, RCM and
Productive maintenance.
 80 : TPM an RCM
 9oth-date: Strategic view of maintenance
Why Measure
 What can be measured will be
understood better.
 What can be measured can be assessed.
 What can be measured can be managed.
 What can be measured can be improved.
Measuring Maintenance
Performance
 What to measure?
 How to measure?
 What to do with measurement output?
Continuous Improvement
Develop Measurement
System (1)
Evaluate Maintenance
System (2)
Identify most deficient areas (3)
Identify root causes of deficiencies
(4)
Develop and implement corrective
and preventive actions (5)
Measurement System
 Structured Audit
 Performance Indicators
 Benchmarking ( can be utilized by both)
Structured Audit Approach
 What is an audit
 Standard for the audit ( factors for
audit)
 Organization of the audit
 Expected out put of the audit
Structured Audit
 The American Heritage Dictionary defines audit as: “an examination of
records or accounts to check their accuracy”.
 Thomas and Henke (1989), “Auditing is a process in which one person
verifies the assertions of an other”.
 Carmichael et al (1996), defines audit as : “Auditing is an independent
investigation of some particular activity”.
 (http://www.columbia) defines an audit as a formal or official
examination and verification of the activities of an organizational unit,
system, function, or other aspect of the organization's operations. It may
include a review of (1) economy and efficiency of operations; (2)
effectiveness in achieving program results; and (3) compliance with laws,
regulations, and other rules. The audit results in a written report
Standard for the Audit
 Factors/activities to be examined.
 Standard for each factor.
 Aggregation of sub-factors and factors.
Audit Factors
 1. Strategic Management
 Maintenance mission and objectives
 Alliance of process with mission and
objectives.
 Values
 Performance measurement
 Effective strategies
 Strategy assessment
Audit Factors
 2. Organization and staffing
 Organization structure
 Job description
 responsibilities and supervision
 Polices and procedures
 Shops organization
 3. Human resources
 Shop manning
 Employee motivation
Audit Factors
 4. Training
 Management training
 Planner training
 Craft training
 5. Management control and budget
 6.1 Budget planning
 Reporting and feedback
 Effective control
Audit Factors
 6. Work order planning and scheduling
 Priority system
 Work order system and procedures
 Emergency & shutdown scheduling
 Planning procedures
 7. Facilities and resources
 8. Stores and material
 9. Preventive maintenance and equipment
history
 1o. Engineering Condition monitoring
Audit Factors
 11. Information technology
 12. Performance analysis and appraisal
 13. Safety in maintenance
 14. Maintenance and the Environment
 The audit program we are using has 90
questions distributed over the above 14
main factors.
Audit Plan and Execution
 Examine the audit program to reflect
plant special characteristics.
 Form audit team from consultant in plant
personnel.
 Regular meeting.
 Corrective and preventive actions.
A case of a Process Plant in Saudi
Arabia : Audit Raw Score

Factor
number
Score
(Si)
Idealscore
(Li)
Factor
number
Score
(Si)
IdealScore
(Li)
1
2
3
4
5
6
7
7.00
6.20
6.75
7.33
7.25
8.00
7.14
10
10
10
10
10
10
10
8
9
10
11
12
13
14
9.67
6.70
7.82
7.80
6.00
3.00
8.00
10
10
10
10
10
10
10
Factors Weight Using AHP
Factor
number
Normalized
weight
Factor
number
Normalized
weight
1
2
3
4
5
6
7
0.52
0.117
0.078
0.026
0.117
0.104
0.063
8
9
10
11
12
13
14
0.065
0.039
0.065
0.052
0.091
0.052
0.078
Audit Analysis
10
Si
Si
=
C.A.I.
Index
Audit
Composite
14
1
14
1
14
1


 



 i
i
i
i
i
i w
I
w
w
PWD
d
d
i
i
i
i
















1
14
100
d wiI w S w I S
i i i i i i i
   
( )
ABC on the Table
Factor
number
Percentage
weighted
deviation
Cumulative
percentage
weighted
deviation
Factor
number
Percentage
weighted
deviation
Cumulative
percentage
weighted
deviation
2
13
12
5
3
6
7
0.152
0.125
0.125
0.110
0.087
0.071
0.062
0.152
0.277
0.402
0.512
0.599
0.670
0.732
1
14
10
11
4
8
0.053
0.053
0.048
0.039
0.024
0.008
0.785
0.838
0.886
0.925
0.949
1.00
Improvement Actions
 Factor 2: Organization and Staffing
– Document procedures for PM
– Supervisor technician ratio
– Establish a suitable planner-worker ratio.
– Decentralize some of the maintenance activities.
 Factor 13: Safety in maintenance
– Include safety within maintenance process
– Enforce safety rules
– Training program for maintenance personnel.
Performance Measures
 An alternative or integrated approach
with structured auditing ?
 It links processes to objectives.
Performance Measures
 There are literally hundreds of potential indicators
 “Appropriate” indicators depend on many factors,
such as
– Level in the organization to use the information
– Existing data collection systems, and how easily modified
– Staff availability to develop/maintain systems
– Demands of managers &teams for the information, and their
level of sophistication (foreman vs. MBA)
 Frequency of reporting also is situation dependent
 Stratification options by plant, department, machine,
product line, etc., are important
Managerial Classification
 Macro Indicator
– Macro-indicators (for upper management,
primarily)
 Micro Indicator
– Micro-indicators (for lower levels of
management)
Macro Indicator
 maintenance expense dollars as a percent
of replacement asset value.
 maintenance expense dollars per unit
produced
 maintenance expense dollars as a percent
of plant controllable expenses
 regulatory compliance indicators
 Productive capacity
Micro-Indicator
 maintenance budget compliance (budget
vs. expense)
 monthly expense dollars (by equipment
type)
 percent overtime (3-9% sometimes cited
as ideal)
 percent emergency work
System Classification
 Input Measures Primarily Cost Measures
 Output measures
 Within The System Measures
Input Measures
 Input Measures are Mostly Related To
Cost
 Labor : Cost of trades, semi-skilled etc
 Materials and spares
 Contracts
 Shop Service
 Equipment Rentals
 Maintenance Overhead
 Company Overhead
Output Measures
 Availability : Measure of Uptime
 Reliability : Mean-time-between-failure
 MTBF = S-d/f , f is number of failures
 Mean Time To Repair: Measure of
Duration of Repair
 MTTR = d/f
 Utilization = Scheduled Time/C T
 CT = Calendar Time
Output Measures
 Process Rate (PR) : Measure of the Equipment
Cycle Time in The Process
 PR = Ideal Cycle Time/Actual Cycle time
 Quality Rate (QR) : Measure of equipment
Precision
 Total Produced - Rejected/Downgrades/ Total
 Overall equipment Effectiveness
 OEE = A* PR *QR
 Productive capacity
 OEE * Utlization
Measures Within The System
 Work Distribution : Time Spent in each work
category
 Delays : Time spent waiting for instructions
 parts, travel,breaks, Start and Quits
 Compliance : Measures to Track Compliance
with various plans, such as PM, Shutdown
schedules etc.
Measures Within The System
 Backlog : Amount of Work Planned but
not Completed by Plant, Area, Craft, etc
 Failure Analysis: Tracks improvement
analysis, such Number of New PM
Routines, Number of Root Cause
Analysis of Breakdowns Undertaken.
Indicators Selection Criteria
 Reflect business objectives.
 Impact customer satisfaction.
 Quality of product or service
 Describe the performance of key process.
 Performance of critical equipment.
 Safety and environment.
Balance Scorecard Approach
 Financial
 Customer
 Internal
 Learning and growth
Improvement Approach
 Identify areas were goals are not met
 Use Pareto chart to prioritize areas
 Root cause analysis
 Corrective and preventive actions
 Implement actions
 Measure and check
Benchmarking
 Formal Definition
Benchmarking is the continuous, systematic
process of measuring our products, services, and
practices against the toughest competitors or those
companies recognized as industry leaders.
Working Definition
Benchmarking is a basis of establishing rational
performance goals through the search for best
industry practices that will lead to superior
performance.
A Related Definition
Benchmark: An industry standard
 Descriptive Benchmarks or Practices
 Quantitative Benchmarks or Performance
Measurements
Benchmarking As An Improvement
Tool
 How Benchmarking Makes Possible
Improvements
 The gap between internal and external
practices creates the need for
improvement
 Understanding industry best practices
identifies what you must improve.
 Externally benchmarked practices
developed from others give a picture of
the endpoint after improvement.
Types of Benchmarking
 Internal
– Similar processes (data is available).
 External
– Type of industry (competitors)
– Best in industry (non-competitors)
Benchmarking Process

BENCHMARKING PROCESS
BENCHMARK METRICS BENCHMARK PRACTICES
BENCHMARK GAP
 HOW MUCH
 WHERE
 WHEN
HOW TO CLOSE THE GAP
 IMPROVED KNOWLEDGE
 IMPROVE PRACTICES
 IMPROVED PROCESSES
MANAGEMENT
COMMITMENT
ORGANIZATION
COMMUNICATION
EMPLOYEE
PARTICIPATION
SUPERIOR
PERFORMANCE
Benchmarking as a Process of
Improvement
 Know your own operation, both its strengths and
weaknesses.
 Know those industries that excel at the
maintenance processes used in your operation,
including competitors, sector leaders, and those
in other industries
 Set challenging targets for your maintenance
performance measures; incorporate the best
practices
 Measure results and strive continually for
superior performance
Key Factors for Success
 Management commitment for
improvement.
 Create a culture of Maintenance
Kaizen.
 People motivation, growth and
continuous learning.
 Quality circle for process improvement
 Reward based performance.
 Technology as a means for enabling.
Conclusion
 Maintenance Should managed as a
business unit.
 Maintenance performance must be
aligned with company strategic
directions.
 Three approached for improvement are
presented- Structured audits,
Performance Indicators and
Benchmarking.
Conclusion
 Culture of continuous improvement
(C.I) must be created to sustain C. I.
 Leadership and management
commitment are key to creating the
culture of C.I.
Thank you for your patience
Any Questions or comments.

More Related Content

Similar to Measuring and Improving MP1.ppt

Operational Transformation in Banking Operations
Operational Transformation in Banking OperationsOperational Transformation in Banking Operations
Operational Transformation in Banking OperationsRajeev De Roy
 
Managerial Control
Managerial ControlManagerial Control
Managerial Controlguestead93f3
 
Quality management
Quality managementQuality management
Quality managementvishal patel
 
PROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.pptPROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.pptAhtashamArshad4
 
Quality audit slideshare
Quality audit slideshare Quality audit slideshare
Quality audit slideshare chaitrali1995
 
Brief About IMS, QMS, ISO 9001, 14001, 18001
Brief About IMS, QMS, ISO 9001, 14001, 18001Brief About IMS, QMS, ISO 9001, 14001, 18001
Brief About IMS, QMS, ISO 9001, 14001, 18001Chetan Rathi
 
As9100 c 2009-standard
As9100 c 2009-standardAs9100 c 2009-standard
As9100 c 2009-standardSunil Arora
 
Iso 9001 2015 process audit checklist
Iso 9001 2015 process audit checklistIso 9001 2015 process audit checklist
Iso 9001 2015 process audit checklistCinthiia Akamii
 
Sap Approach
Sap ApproachSap Approach
Sap ApproachJacques
 
Quality Management
Quality ManagementQuality Management
Quality ManagementJoanmaines
 
Inform the selection of 5 efficiency and 8 effectiveness measures. This frame...
Inform the selection of 5 efficiency and 8 effectiveness measures. This frame...Inform the selection of 5 efficiency and 8 effectiveness measures. This frame...
Inform the selection of 5 efficiency and 8 effectiveness measures. This frame...TURKI , PMP
 
Performance Measurement
Performance MeasurementPerformance Measurement
Performance Measurementlleuciuc1
 
Week 4Quality ManagementOPERATIONS MANAGEMENT.docx
Week 4Quality ManagementOPERATIONS MANAGEMENT.docxWeek 4Quality ManagementOPERATIONS MANAGEMENT.docx
Week 4Quality ManagementOPERATIONS MANAGEMENT.docxmelbruce90096
 
Maintenance Leading and Lagging Key Performance Indicators (KPIs)
Maintenance Leading and Lagging Key Performance Indicators (KPIs)Maintenance Leading and Lagging Key Performance Indicators (KPIs)
Maintenance Leading and Lagging Key Performance Indicators (KPIs)Ricky Smith CMRP
 
Building continuous auditing capabilities
Building continuous auditing capabilitiesBuilding continuous auditing capabilities
Building continuous auditing capabilitiesWafaa N. AbuSadah
 

Similar to Measuring and Improving MP1.ppt (20)

Operational Transformation in Banking Operations
Operational Transformation in Banking OperationsOperational Transformation in Banking Operations
Operational Transformation in Banking Operations
 
3a 6 Self Audit Process
3a   6   Self Audit Process3a   6   Self Audit Process
3a 6 Self Audit Process
 
Managerial Control
Managerial ControlManagerial Control
Managerial Control
 
Managerial Control
Managerial ControlManagerial Control
Managerial Control
 
Quality management
Quality managementQuality management
Quality management
 
PROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.pptPROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.ppt
 
Quality audit slideshare
Quality audit slideshare Quality audit slideshare
Quality audit slideshare
 
Brief About IMS, QMS, ISO 9001, 14001, 18001
Brief About IMS, QMS, ISO 9001, 14001, 18001Brief About IMS, QMS, ISO 9001, 14001, 18001
Brief About IMS, QMS, ISO 9001, 14001, 18001
 
As9100 c 2009-standard
As9100 c 2009-standardAs9100 c 2009-standard
As9100 c 2009-standard
 
Iso 9001 2015 process audit checklist
Iso 9001 2015 process audit checklistIso 9001 2015 process audit checklist
Iso 9001 2015 process audit checklist
 
Sap Approach
Sap ApproachSap Approach
Sap Approach
 
Technical Audit
Technical  AuditTechnical  Audit
Technical Audit
 
Spc assignment
Spc assignmentSpc assignment
Spc assignment
 
Quality Management
Quality ManagementQuality Management
Quality Management
 
Inform the selection of 5 efficiency and 8 effectiveness measures. This frame...
Inform the selection of 5 efficiency and 8 effectiveness measures. This frame...Inform the selection of 5 efficiency and 8 effectiveness measures. This frame...
Inform the selection of 5 efficiency and 8 effectiveness measures. This frame...
 
Performance Measurement
Performance MeasurementPerformance Measurement
Performance Measurement
 
Week 4Quality ManagementOPERATIONS MANAGEMENT.docx
Week 4Quality ManagementOPERATIONS MANAGEMENT.docxWeek 4Quality ManagementOPERATIONS MANAGEMENT.docx
Week 4Quality ManagementOPERATIONS MANAGEMENT.docx
 
Maintenance Leading and Lagging Key Performance Indicators (KPIs)
Maintenance Leading and Lagging Key Performance Indicators (KPIs)Maintenance Leading and Lagging Key Performance Indicators (KPIs)
Maintenance Leading and Lagging Key Performance Indicators (KPIs)
 
Building continuous auditing capabilities
Building continuous auditing capabilitiesBuilding continuous auditing capabilities
Building continuous auditing capabilities
 
Test process
Test processTest process
Test process
 

Recently uploaded

India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportMintel Group
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 

Recently uploaded (20)

India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample Report
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 

Measuring and Improving MP1.ppt

  • 1. Measuring and Improving Maintenance Performance Salih O. Duffuaa Systems Engineering Department King Fahd University of Petroleum and Minerals
  • 2. Presentation Plan  Introduction  Evolution of Maintenance Management  Why Measure  Performance Measurement – Structured Auditing – Key performance indicator – Benchmarking  Improvement process  Case Studies
  • 3. Role of Maintenance  Maintenance is defined as the combination of activities by which equipment, assets or a system is kept or restored to a state in which it can perform its designated function. It is an important factor in product or service quality and can be used as a strategy for successful competition
  • 4. Introduction PLANNING ORGANIZING Maintenance Process Maintenance strategy Maintenance Load Forecasting Maintenance Capacity Maintenance Organization Maintenance Scheduling Process design Standards Performance Measurement Project Management MONITOR FEEDBACK CONTROL Work control Material control Inventory control Cost control Managing for quality INPUT OUTPUT Operational Machines Equipment & Facilities Labor Equipment Management Spares Variations in Maintenance Demand * Scheduling
  • 5. Maintenance Versus Organization Objectives  The objectives and goals of an organization depends on the organization state, strategy and type of business. Some objectives are – Meet or exceed customer satisfaction – Maximizing profit, Meet set targets – Meet set safety standard, – Zero product defect  Does Maintenance affect these goals?
  • 6. Evolution of Maintenance Management  Prior to 50th: Necessary evil  50-70 : Preventive maintenance  70th : Life cycle costing, RCM and Productive maintenance.  80 : TPM an RCM  9oth-date: Strategic view of maintenance
  • 7. Why Measure  What can be measured will be understood better.  What can be measured can be assessed.  What can be measured can be managed.  What can be measured can be improved.
  • 8. Measuring Maintenance Performance  What to measure?  How to measure?  What to do with measurement output?
  • 9. Continuous Improvement Develop Measurement System (1) Evaluate Maintenance System (2) Identify most deficient areas (3) Identify root causes of deficiencies (4) Develop and implement corrective and preventive actions (5)
  • 10. Measurement System  Structured Audit  Performance Indicators  Benchmarking ( can be utilized by both)
  • 11. Structured Audit Approach  What is an audit  Standard for the audit ( factors for audit)  Organization of the audit  Expected out put of the audit
  • 12. Structured Audit  The American Heritage Dictionary defines audit as: “an examination of records or accounts to check their accuracy”.  Thomas and Henke (1989), “Auditing is a process in which one person verifies the assertions of an other”.  Carmichael et al (1996), defines audit as : “Auditing is an independent investigation of some particular activity”.  (http://www.columbia) defines an audit as a formal or official examination and verification of the activities of an organizational unit, system, function, or other aspect of the organization's operations. It may include a review of (1) economy and efficiency of operations; (2) effectiveness in achieving program results; and (3) compliance with laws, regulations, and other rules. The audit results in a written report
  • 13. Standard for the Audit  Factors/activities to be examined.  Standard for each factor.  Aggregation of sub-factors and factors.
  • 14. Audit Factors  1. Strategic Management  Maintenance mission and objectives  Alliance of process with mission and objectives.  Values  Performance measurement  Effective strategies  Strategy assessment
  • 15. Audit Factors  2. Organization and staffing  Organization structure  Job description  responsibilities and supervision  Polices and procedures  Shops organization  3. Human resources  Shop manning  Employee motivation
  • 16. Audit Factors  4. Training  Management training  Planner training  Craft training  5. Management control and budget  6.1 Budget planning  Reporting and feedback  Effective control
  • 17. Audit Factors  6. Work order planning and scheduling  Priority system  Work order system and procedures  Emergency & shutdown scheduling  Planning procedures  7. Facilities and resources  8. Stores and material  9. Preventive maintenance and equipment history  1o. Engineering Condition monitoring
  • 18. Audit Factors  11. Information technology  12. Performance analysis and appraisal  13. Safety in maintenance  14. Maintenance and the Environment  The audit program we are using has 90 questions distributed over the above 14 main factors.
  • 19. Audit Plan and Execution  Examine the audit program to reflect plant special characteristics.  Form audit team from consultant in plant personnel.  Regular meeting.  Corrective and preventive actions.
  • 20. A case of a Process Plant in Saudi Arabia : Audit Raw Score  Factor number Score (Si) Idealscore (Li) Factor number Score (Si) IdealScore (Li) 1 2 3 4 5 6 7 7.00 6.20 6.75 7.33 7.25 8.00 7.14 10 10 10 10 10 10 10 8 9 10 11 12 13 14 9.67 6.70 7.82 7.80 6.00 3.00 8.00 10 10 10 10 10 10 10
  • 21. Factors Weight Using AHP Factor number Normalized weight Factor number Normalized weight 1 2 3 4 5 6 7 0.52 0.117 0.078 0.026 0.117 0.104 0.063 8 9 10 11 12 13 14 0.065 0.039 0.065 0.052 0.091 0.052 0.078
  • 22. Audit Analysis 10 Si Si = C.A.I. Index Audit Composite 14 1 14 1 14 1         i i i i i i w I w w PWD d d i i i i                 1 14 100 d wiI w S w I S i i i i i i i     ( )
  • 23. ABC on the Table Factor number Percentage weighted deviation Cumulative percentage weighted deviation Factor number Percentage weighted deviation Cumulative percentage weighted deviation 2 13 12 5 3 6 7 0.152 0.125 0.125 0.110 0.087 0.071 0.062 0.152 0.277 0.402 0.512 0.599 0.670 0.732 1 14 10 11 4 8 0.053 0.053 0.048 0.039 0.024 0.008 0.785 0.838 0.886 0.925 0.949 1.00
  • 24. Improvement Actions  Factor 2: Organization and Staffing – Document procedures for PM – Supervisor technician ratio – Establish a suitable planner-worker ratio. – Decentralize some of the maintenance activities.  Factor 13: Safety in maintenance – Include safety within maintenance process – Enforce safety rules – Training program for maintenance personnel.
  • 25. Performance Measures  An alternative or integrated approach with structured auditing ?  It links processes to objectives.
  • 26. Performance Measures  There are literally hundreds of potential indicators  “Appropriate” indicators depend on many factors, such as – Level in the organization to use the information – Existing data collection systems, and how easily modified – Staff availability to develop/maintain systems – Demands of managers &teams for the information, and their level of sophistication (foreman vs. MBA)  Frequency of reporting also is situation dependent  Stratification options by plant, department, machine, product line, etc., are important
  • 27. Managerial Classification  Macro Indicator – Macro-indicators (for upper management, primarily)  Micro Indicator – Micro-indicators (for lower levels of management)
  • 28. Macro Indicator  maintenance expense dollars as a percent of replacement asset value.  maintenance expense dollars per unit produced  maintenance expense dollars as a percent of plant controllable expenses  regulatory compliance indicators  Productive capacity
  • 29. Micro-Indicator  maintenance budget compliance (budget vs. expense)  monthly expense dollars (by equipment type)  percent overtime (3-9% sometimes cited as ideal)  percent emergency work
  • 30. System Classification  Input Measures Primarily Cost Measures  Output measures  Within The System Measures
  • 31. Input Measures  Input Measures are Mostly Related To Cost  Labor : Cost of trades, semi-skilled etc  Materials and spares  Contracts  Shop Service  Equipment Rentals  Maintenance Overhead  Company Overhead
  • 32. Output Measures  Availability : Measure of Uptime  Reliability : Mean-time-between-failure  MTBF = S-d/f , f is number of failures  Mean Time To Repair: Measure of Duration of Repair  MTTR = d/f  Utilization = Scheduled Time/C T  CT = Calendar Time
  • 33. Output Measures  Process Rate (PR) : Measure of the Equipment Cycle Time in The Process  PR = Ideal Cycle Time/Actual Cycle time  Quality Rate (QR) : Measure of equipment Precision  Total Produced - Rejected/Downgrades/ Total  Overall equipment Effectiveness  OEE = A* PR *QR  Productive capacity  OEE * Utlization
  • 34. Measures Within The System  Work Distribution : Time Spent in each work category  Delays : Time spent waiting for instructions  parts, travel,breaks, Start and Quits  Compliance : Measures to Track Compliance with various plans, such as PM, Shutdown schedules etc.
  • 35. Measures Within The System  Backlog : Amount of Work Planned but not Completed by Plant, Area, Craft, etc  Failure Analysis: Tracks improvement analysis, such Number of New PM Routines, Number of Root Cause Analysis of Breakdowns Undertaken.
  • 36. Indicators Selection Criteria  Reflect business objectives.  Impact customer satisfaction.  Quality of product or service  Describe the performance of key process.  Performance of critical equipment.  Safety and environment.
  • 37. Balance Scorecard Approach  Financial  Customer  Internal  Learning and growth
  • 38. Improvement Approach  Identify areas were goals are not met  Use Pareto chart to prioritize areas  Root cause analysis  Corrective and preventive actions  Implement actions  Measure and check
  • 39. Benchmarking  Formal Definition Benchmarking is the continuous, systematic process of measuring our products, services, and practices against the toughest competitors or those companies recognized as industry leaders. Working Definition Benchmarking is a basis of establishing rational performance goals through the search for best industry practices that will lead to superior performance. A Related Definition Benchmark: An industry standard  Descriptive Benchmarks or Practices  Quantitative Benchmarks or Performance Measurements
  • 40. Benchmarking As An Improvement Tool  How Benchmarking Makes Possible Improvements  The gap between internal and external practices creates the need for improvement  Understanding industry best practices identifies what you must improve.  Externally benchmarked practices developed from others give a picture of the endpoint after improvement.
  • 41. Types of Benchmarking  Internal – Similar processes (data is available).  External – Type of industry (competitors) – Best in industry (non-competitors)
  • 42. Benchmarking Process  BENCHMARKING PROCESS BENCHMARK METRICS BENCHMARK PRACTICES BENCHMARK GAP  HOW MUCH  WHERE  WHEN HOW TO CLOSE THE GAP  IMPROVED KNOWLEDGE  IMPROVE PRACTICES  IMPROVED PROCESSES MANAGEMENT COMMITMENT ORGANIZATION COMMUNICATION EMPLOYEE PARTICIPATION SUPERIOR PERFORMANCE
  • 43. Benchmarking as a Process of Improvement  Know your own operation, both its strengths and weaknesses.  Know those industries that excel at the maintenance processes used in your operation, including competitors, sector leaders, and those in other industries  Set challenging targets for your maintenance performance measures; incorporate the best practices  Measure results and strive continually for superior performance
  • 44. Key Factors for Success  Management commitment for improvement.  Create a culture of Maintenance Kaizen.  People motivation, growth and continuous learning.  Quality circle for process improvement  Reward based performance.  Technology as a means for enabling.
  • 45. Conclusion  Maintenance Should managed as a business unit.  Maintenance performance must be aligned with company strategic directions.  Three approached for improvement are presented- Structured audits, Performance Indicators and Benchmarking.
  • 46. Conclusion  Culture of continuous improvement (C.I) must be created to sustain C. I.  Leadership and management commitment are key to creating the culture of C.I.
  • 47. Thank you for your patience Any Questions or comments.