OLADIPUPO Abayomi Fola
belovedyomifola@gmail.com, 08026959137
Expression of Interest for Non-Teaching Position (Senior Technologist)
I am interested in this position because my training and exposure which is
clearly pictured in your mission statement is aligned. My skills have given me
the opportunity to impact the students economically, intellectually and socially
and after graduation become dependable Nigerian leaders in every field of
endeavour.
I am a nugget seasoned to timely deliver quality within set budget. My skill
sets are very essential as a technologist for a growing university like Kings
where competition in education sector is keen. I am an engineer who has
practically handled special steel manufacturing in the area of steel chemical
balancing so setting up a pilot centre in the institute and becoming a centre for
steel research and development will not be difficult. I am a biogas production
expert to produce liquid and pelletized fertiliser, generation of light to run mills.
I am an industrial and process automation engineer whose experience covers
SCADA, VFD, DCS and PLC. Automation software I used are Allen Bradley
Micrologix 1500, Siemens S7 (300) and S7(200), GE-Fanuc Series 90-30,
ABB AC 500, Omron CP1E, Keyence KV24-R, Messung, Mitsubishi,
Schneider TWDLCAA24DRF, Wonderware Intouch and Intellution Fix,
Honeywell HC500C50 and ABB AC 800. My factory floor skills are 5S,
Kaizen. I have knowledge of programming languages like Ladder Builder and
Functional Block Diagram (FBD).
While in Technocrat Automation Institute Chennai, I have designed HMI
Interfacing Field Device (Timer: using Modbus converter) using ABB DCS.
Software Name: CP Programmer, Version 1.0
Design on programming software of motor, valve and lamp indicator using
time delay to ON/OFF using AB (Allen Bradley) PLC. Software Name: RS-link
Classic, RS-logic 500, RS-Emulate 500.
My entrepreneur skill and technical expertise has put me at a very high
advantage to be the best candidate for the advertised position in your
institution.
I shall look forward to your favourable kind reply.
Sincerely,
Abayomi Oladipupo
Oladipupo Abayomi Fola, B. TECH (Chemical Engineer & Automation)
13 Popoola Arandun Street Abaranje Road Ikotun Lagos. Nigeria
+234 80 26959137
E-mail: belovedyomifola@gmail.com
PROFILE
I am a flexible, hardworking, reliable, result driven professional with experience that spans across:
Production Management with 5S, Extractive Solid mineral treatment from ores, Plant Start-up and
Shutdown operations, Health, Safety and Environment, Pulverized food and Brewing Processing
Knowhow, Process Automation, Industrial Automation, World Class Special Steel manufacturing,
Project Management, Project Control (Earned Value Analysis Approach EVA), Risk Management,
Mechanised Cash Crop Farming and Lecturing.
SUMMARY OF SKILLS
Professional Skills
Over 11 years of cumulative professional experience in Chemical Engineering, 3 years of Experience
in VFD, SCADA, DCS, PLC, PAC, Pneumatic and Field Instrument, 2 years of Experience in
Operations (Start-up and Shutdown) and Malfunction Handling of Following Process Models:
Distillation Column, Steam Generator, Centrifugal Compressor, Centrifugal Pump, Heat Exchange,
Gas Turbine, Furnace, Flash Drum, Evaporator, CSTR, Plug Flow Reactor, Fixed Bed Reactor, 14
years of plate milling operation and knowledge of hammer and rolling mill machines, 5 years of
Experience in World Class Special Steel Foundry Ferro-alloy and Fluxes Manufacturing (Operations
of Electric Arc Furnace, Vacuum Slag Cleaner, Ladle Vacuum Degassing, Ladle Furnace, Continuous
Casting Machine), 5 years of experience in Latest Cash Crop Farming Technology practices and Food
processing.
Experience covers the following Industries: Manufacturing, Oil & Gas, Pharmaceutical, Power,
Mechanised Cash Crop Farming & Farm Product Processing and Non-Governmental Organisation.
Energetic and self-motivated team player, excellent leadership, oral/written communication,
interpersonal and analytical skills, experience in Project Management
Factory Floor Skill: 5S, Kaizen.
Software Information Technology
Competent with Microsoft office applications, Smart Draw and Visio for flow charts. Prince2
Foundation, MS Project & Primavera Knowledge
Experienced in the use of Process and Industrial Automation Software such as Allen Bradley
Micrologix 1500, Siemens S7 (300) and S7(200), GE-Fanuc Series 90-30, ABB AC 500, Omron
CP1E, Keyence KV24-R, Messung, Mitsubishi, Schneider TWDLCAA24DRF, Wonderware Intouch
and Intellution Fix, Honeywell HC500C50 and ABB AC 800.
Programming Languages: Ladder Builder and Functional Block Diagram (FBD).
Driving Skill: Valid Driver’s License
EDUCATION
• World Education Services (Credential Assessment Expert Canada and USA) Jun. 2014
B. Tech Chemical Engineering Assessed
• International English Language Test (Passed Overall Bound 6) IELTS Sept. 2014
• PG Diploma in Industrial Automation (PGDIA) & Advanced Diploma in Process Jan. 2013
Automation (ADPA) (Technocrat Automation Institute Chennai-600029 India)
• Master’s Certificate in Project Management Feb. 2008
(Project Management College, Hatfield, Hertfordshire, UK)
• B Tech. Chemical Engineering Dec. 2003
(Ladoke Akintola University of Technology, Ogbomoso, Oyo State)
• Senior School Certificate (SSCE) June, 1998
(Gbongan High School, Gbongan, Osun State)
WORK EXPERIENCE
Exim Consult Limited Jan. 2011- Till date
(Suite A60/61 2nd
Floor D’Plazaville, Allen Roundabout Ikeja Lagos)
Position: Project Engineer (Full time paid)
Duties:
• Variable Frequency Drive Operator for forward and reverse Motor Movement
• Instituting scale-up and scale-down processes including appropriate changes to equipment design
and configuration
• Ensuring that potential safety issues related to the project operator, the environment, the process
and the product are considered at all stages
• Establish and conduct quality control programs, operating procedures and control strategies to
ensure consistency and adherence to standards for raw materials, products and waste products or
emissions
• Project Management Roles
• Project Control (Earned Value Analysis Approach EVA) and Risk Management
Folubay Trades and Konsult Limited Apr. 2006- Dec. 2010
(Ado Ekiti and Ikoyi Processing Centres Osun State Nigeria)
Position: Manager, Water Project Coordinator (Full time paid)
Duties:
• Oversee the construction, modification, operation and maintenance of pilot plants, processing
units or processing plants;
• Supervising the processing chain of converting farm products to cakes e.g. plantain, pepper,
melon, fish and cocoa beans and so on;
• Align company HSE policy with Government regulations;
• Investigating accidents;
• Plan, Schedule and Implement safety plans;
• Inspect unsafe conditions and acts;
• And other responsibilities and duties as assigned by the Managing Director.
Federal Poly Mubi (NYSC) Feb 2004- Feb 2005
• Lecturing (Industrial Chemistry for ND & HND Levels) (Full time paid job)
TRAININGS, SEMINARS AND SPECIAL ASSIGNMENTS
Automation Trainings and Projects Chennai India 2012
• Malfunction Handling of Mentioned Process Model e.g. Distillation Column, Heat Exchange
• Supervisory Control And Data Acquisition (SCADA)
• Variable Frequency Drive (VFD)
• Design on MMI Interfacing Field Device (Timer: using Modbus converter) using ABB DCS.
Software Name: CP Programmer, Version 1.0.
• Design on programming software of motor, valve and lamp indicator using time delay to
ON/OFF. AB (Allen Bradley) PLC. Software Name: RS-link Classic, RS-logic 500, RS-Emulate
500.
World Class Iron and Steel Manufacturing, Ferroalloy and Fluxes Manufacturing Trainings
Chennai India 2009
• Electric Arc Furnace Operation (EAF)
• Vaccum Slag Clearner (VSC)
• Laddle Vaccum Deggassing (LVD)
• Laddle Furnace (LF)
• Continuous Casting Machine (CCM)
Project Management Training Project Management College (UK) 2008
• Earned Value Analysis Approach EVA
• PRINCE2 Foundation and Primavera 6
PERSONAL DATA:
Date of Birth: May 21, 1976
Sex: Male
State of Origin: Osun State
Religion: Christianity
Marital Status: Married
Number of Children: Two
REFERENCES AVAILABLE ON REQUEST
Yomi Ca
Yomi Ca
Yomi Ca
Yomi Ca
Yomi Ca
Yomi Ca
Yomi Ca

Yomi Ca

  • 1.
    OLADIPUPO Abayomi Fola belovedyomifola@gmail.com,08026959137 Expression of Interest for Non-Teaching Position (Senior Technologist) I am interested in this position because my training and exposure which is clearly pictured in your mission statement is aligned. My skills have given me the opportunity to impact the students economically, intellectually and socially and after graduation become dependable Nigerian leaders in every field of endeavour. I am a nugget seasoned to timely deliver quality within set budget. My skill sets are very essential as a technologist for a growing university like Kings where competition in education sector is keen. I am an engineer who has practically handled special steel manufacturing in the area of steel chemical balancing so setting up a pilot centre in the institute and becoming a centre for steel research and development will not be difficult. I am a biogas production expert to produce liquid and pelletized fertiliser, generation of light to run mills. I am an industrial and process automation engineer whose experience covers SCADA, VFD, DCS and PLC. Automation software I used are Allen Bradley Micrologix 1500, Siemens S7 (300) and S7(200), GE-Fanuc Series 90-30, ABB AC 500, Omron CP1E, Keyence KV24-R, Messung, Mitsubishi, Schneider TWDLCAA24DRF, Wonderware Intouch and Intellution Fix, Honeywell HC500C50 and ABB AC 800. My factory floor skills are 5S, Kaizen. I have knowledge of programming languages like Ladder Builder and Functional Block Diagram (FBD). While in Technocrat Automation Institute Chennai, I have designed HMI Interfacing Field Device (Timer: using Modbus converter) using ABB DCS. Software Name: CP Programmer, Version 1.0 Design on programming software of motor, valve and lamp indicator using time delay to ON/OFF using AB (Allen Bradley) PLC. Software Name: RS-link Classic, RS-logic 500, RS-Emulate 500. My entrepreneur skill and technical expertise has put me at a very high advantage to be the best candidate for the advertised position in your institution. I shall look forward to your favourable kind reply. Sincerely,
  • 2.
  • 3.
    Oladipupo Abayomi Fola,B. TECH (Chemical Engineer & Automation) 13 Popoola Arandun Street Abaranje Road Ikotun Lagos. Nigeria +234 80 26959137 E-mail: belovedyomifola@gmail.com PROFILE I am a flexible, hardworking, reliable, result driven professional with experience that spans across: Production Management with 5S, Extractive Solid mineral treatment from ores, Plant Start-up and Shutdown operations, Health, Safety and Environment, Pulverized food and Brewing Processing Knowhow, Process Automation, Industrial Automation, World Class Special Steel manufacturing, Project Management, Project Control (Earned Value Analysis Approach EVA), Risk Management, Mechanised Cash Crop Farming and Lecturing. SUMMARY OF SKILLS Professional Skills Over 11 years of cumulative professional experience in Chemical Engineering, 3 years of Experience in VFD, SCADA, DCS, PLC, PAC, Pneumatic and Field Instrument, 2 years of Experience in Operations (Start-up and Shutdown) and Malfunction Handling of Following Process Models: Distillation Column, Steam Generator, Centrifugal Compressor, Centrifugal Pump, Heat Exchange, Gas Turbine, Furnace, Flash Drum, Evaporator, CSTR, Plug Flow Reactor, Fixed Bed Reactor, 14 years of plate milling operation and knowledge of hammer and rolling mill machines, 5 years of Experience in World Class Special Steel Foundry Ferro-alloy and Fluxes Manufacturing (Operations of Electric Arc Furnace, Vacuum Slag Cleaner, Ladle Vacuum Degassing, Ladle Furnace, Continuous Casting Machine), 5 years of experience in Latest Cash Crop Farming Technology practices and Food processing. Experience covers the following Industries: Manufacturing, Oil & Gas, Pharmaceutical, Power, Mechanised Cash Crop Farming & Farm Product Processing and Non-Governmental Organisation. Energetic and self-motivated team player, excellent leadership, oral/written communication, interpersonal and analytical skills, experience in Project Management Factory Floor Skill: 5S, Kaizen. Software Information Technology Competent with Microsoft office applications, Smart Draw and Visio for flow charts. Prince2 Foundation, MS Project & Primavera Knowledge Experienced in the use of Process and Industrial Automation Software such as Allen Bradley Micrologix 1500, Siemens S7 (300) and S7(200), GE-Fanuc Series 90-30, ABB AC 500, Omron CP1E, Keyence KV24-R, Messung, Mitsubishi, Schneider TWDLCAA24DRF, Wonderware Intouch and Intellution Fix, Honeywell HC500C50 and ABB AC 800. Programming Languages: Ladder Builder and Functional Block Diagram (FBD). Driving Skill: Valid Driver’s License
  • 4.
    EDUCATION • World EducationServices (Credential Assessment Expert Canada and USA) Jun. 2014 B. Tech Chemical Engineering Assessed • International English Language Test (Passed Overall Bound 6) IELTS Sept. 2014 • PG Diploma in Industrial Automation (PGDIA) & Advanced Diploma in Process Jan. 2013 Automation (ADPA) (Technocrat Automation Institute Chennai-600029 India) • Master’s Certificate in Project Management Feb. 2008 (Project Management College, Hatfield, Hertfordshire, UK) • B Tech. Chemical Engineering Dec. 2003 (Ladoke Akintola University of Technology, Ogbomoso, Oyo State) • Senior School Certificate (SSCE) June, 1998 (Gbongan High School, Gbongan, Osun State) WORK EXPERIENCE Exim Consult Limited Jan. 2011- Till date (Suite A60/61 2nd Floor D’Plazaville, Allen Roundabout Ikeja Lagos) Position: Project Engineer (Full time paid) Duties: • Variable Frequency Drive Operator for forward and reverse Motor Movement • Instituting scale-up and scale-down processes including appropriate changes to equipment design and configuration • Ensuring that potential safety issues related to the project operator, the environment, the process and the product are considered at all stages • Establish and conduct quality control programs, operating procedures and control strategies to ensure consistency and adherence to standards for raw materials, products and waste products or emissions • Project Management Roles • Project Control (Earned Value Analysis Approach EVA) and Risk Management Folubay Trades and Konsult Limited Apr. 2006- Dec. 2010 (Ado Ekiti and Ikoyi Processing Centres Osun State Nigeria) Position: Manager, Water Project Coordinator (Full time paid) Duties: • Oversee the construction, modification, operation and maintenance of pilot plants, processing units or processing plants; • Supervising the processing chain of converting farm products to cakes e.g. plantain, pepper, melon, fish and cocoa beans and so on;
  • 5.
    • Align companyHSE policy with Government regulations; • Investigating accidents; • Plan, Schedule and Implement safety plans; • Inspect unsafe conditions and acts; • And other responsibilities and duties as assigned by the Managing Director. Federal Poly Mubi (NYSC) Feb 2004- Feb 2005 • Lecturing (Industrial Chemistry for ND & HND Levels) (Full time paid job) TRAININGS, SEMINARS AND SPECIAL ASSIGNMENTS Automation Trainings and Projects Chennai India 2012 • Malfunction Handling of Mentioned Process Model e.g. Distillation Column, Heat Exchange • Supervisory Control And Data Acquisition (SCADA) • Variable Frequency Drive (VFD) • Design on MMI Interfacing Field Device (Timer: using Modbus converter) using ABB DCS. Software Name: CP Programmer, Version 1.0. • Design on programming software of motor, valve and lamp indicator using time delay to ON/OFF. AB (Allen Bradley) PLC. Software Name: RS-link Classic, RS-logic 500, RS-Emulate 500. World Class Iron and Steel Manufacturing, Ferroalloy and Fluxes Manufacturing Trainings Chennai India 2009 • Electric Arc Furnace Operation (EAF) • Vaccum Slag Clearner (VSC) • Laddle Vaccum Deggassing (LVD) • Laddle Furnace (LF) • Continuous Casting Machine (CCM) Project Management Training Project Management College (UK) 2008 • Earned Value Analysis Approach EVA • PRINCE2 Foundation and Primavera 6 PERSONAL DATA:
  • 6.
    Date of Birth:May 21, 1976 Sex: Male State of Origin: Osun State Religion: Christianity Marital Status: Married Number of Children: Two REFERENCES AVAILABLE ON REQUEST