PROJECT SCOPE
The Association of Village Council Presidents (AVCP) goal for
the Yukon-Kuskokwim Freight and Energy Corridor project is
to develop a practical link between the Yukon and Kuskokwim
River systems that will enhance connectivity among
communities in the region. The proposed corridor will allow
for travel, trade, and access to public facilities and other
modes of transportation within the Yukon-Kuskokwim Delta
(Y-K Delta).
PROJECT BACKGROUND
The project started in 2009, when the community of Kalskag
requested that the Denali Commission’s Transportation
Program provide a reconnaissance study on connecting the
Yukon and Kuskokwim River Systems. The Denali Commission
suggested that AVCP provide Kalskag with transportation
planning support, and since then, AVCP has taken a lead role
in helping Kalskag move the project forward.
STAGEI: Completed in late 2011, the reconnaissance study
demonstrated practicality to construct a transportation
corridor in the Portage Mountains between the Yukon and
Kuskokwim Rivers. Various corridor options wereidentified.
STAGE II: Completed in September 2015, a Corridor Plan
documented the preferred route between the rivers, prepared a
concept design of the route, and documented the long-term
economic viability. Final selection of a transportation corridor
will be subject to a future environmental and public process.
CURRENT STATUS
STAGE III: DOWL will support AVCP in finalizing the planning
process, with a focus on completing the subsistence and
cultural resource studies, public outreach, identifying
potential barge improvement projects, and beginning the
corridor preservation process by coordinating with existing
planning efforts currently in progress at other agencies. The
Stage III tasks will help AVCP move forward with design, and
secure federal and state funding for future work.
BUDGET
The preliminary planning estimate to complete the design and
construction for the project is $150 million. The project is
being developed in accordance with Federal Highway
Administration (FHWA) guidelines.
Corridor Concepts from Stages I & II
PUBLIC INVOLVEMENT APPROACH
AND SCHEDULE
DOWL will implement the Calista Elders Council Model that
will include a gathering of locals and affected communities to
share information on place names, cultural, subsistence, and
transportation stories from the elders. Ann Fienup-Riordan,
who has worked in the Southwest Yukon-Kuskokwim region
since 1976, and Calista Elders Council since 1999, will be a
key advisor in implementing this model. To the extent
practicable, all public meetings will be translated in Yupik.
Upcoming gatherings are as follows:
 March 12, 2018
Tribal Gathering—Bethel, Alaska
 March – May 2018
Topic Specific Gatherings (Holy Cross, Anvik, Grayling,
Shageluk, Chuathbaluk, Lower Kalskag, Upper Kalskag,
Russian Mission, Atmautluak, and Aniak)
To sign up for notifications about upcoming gatherings
or project milestones, please email
aspafford@dowl.com
FOR MORE INFORMATION, CONTACT:
Clarence Daniel AVCP ● AVCP Project Manager ● (907) 543-7461 l
clarence@avcp.org
Adison Spafford ● DOWL Planning Lead ● (907) 562-2000
aspafford@dowl.com
Source: AVCP and
CH2M
WE WANT TO HEAR FROM YOU!
Please provide us with input on the project so we can develop a project that is appropriate for the Y-K Delta
benefiting all residents in the region.
What does the Y-K Freight Corridor Project mean to you?
What does the Y-K Freight Corridor Project mean to your community?
Other comments:
To receive project information, please provide your name, email, and postal address:
Name:
Address:
Email:
Telephone:
To submit comments, or for additional information contact: Adison Spafford, Transportation Planner
DOWL ● 4041 B Street ● Anchorage, Alaska 99503
Telephone: 907-562-2000 ● Fax: 907-563-3953 ● Email: aspafford@dowl.com

More Related Content

Similar to Y-K Corridor fact sheet

Kingston Greenline & Ulster County Trails Summit - Agenda and Trail Resources
Kingston Greenline & Ulster County Trails Summit - Agenda and Trail ResourcesKingston Greenline & Ulster County Trails Summit - Agenda and Trail Resources
Kingston Greenline & Ulster County Trails Summit - Agenda and Trail Resources
The Kingston Land Trust
 
RV 2014: Mobile Workshop #15- Integrating Transit into Large Institutions (Fo...
RV 2014: Mobile Workshop #15- Integrating Transit into Large Institutions (Fo...RV 2014: Mobile Workshop #15- Integrating Transit into Large Institutions (Fo...
RV 2014: Mobile Workshop #15- Integrating Transit into Large Institutions (Fo...
Rail~Volution
 
NY Empire State Trail
NY Empire State TrailNY Empire State Trail
NY Empire State Trail
NY_Bicycling
 
WASLA 2022 How I Helped Build A Freeway and Destroy a City.pdf
WASLA 2022 How I Helped Build A Freeway and Destroy a City.pdfWASLA 2022 How I Helped Build A Freeway and Destroy a City.pdf
WASLA 2022 How I Helped Build A Freeway and Destroy a City.pdf
Alex Mann
 
How I Helped Build A Freeway and Destroy a City (WASLA 2022)
How I Helped Build A Freeway and Destroy a City (WASLA 2022)How I Helped Build A Freeway and Destroy a City (WASLA 2022)
How I Helped Build A Freeway and Destroy a City (WASLA 2022)
Alex Mann
 
Bakun
BakunBakun
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
Sarah Doyle
 
Uganda investment benefits from the nile basin cooperation
Uganda investment benefits from the nile basin cooperationUganda investment benefits from the nile basin cooperation
Uganda investment benefits from the nile basin cooperation
Polycarp Otieno Onyango
 
Hsc decision hapa trail 121913
Hsc decision hapa trail 121913Hsc decision hapa trail 121913
Hsc decision hapa trail 121913
Honolulu Civil Beat
 
Auckland-Transport-Alignment-Project-Foundation-Report
Auckland-Transport-Alignment-Project-Foundation-ReportAuckland-Transport-Alignment-Project-Foundation-Report
Auckland-Transport-Alignment-Project-Foundation-Report
Ernst Z
 
Srdc bartrams to passyunk final_report
Srdc bartrams to passyunk final_reportSrdc bartrams to passyunk final_report
Srdc bartrams to passyunk final_report
Paul Vernon
 
NELSAP NEWS APRIL 2021.pdf
NELSAP NEWS APRIL 2021.pdfNELSAP NEWS APRIL 2021.pdf
NELSAP NEWS APRIL 2021.pdf
Polycarp Otieno Onyango
 
Sn woodfibre update-01
Sn woodfibre update-01Sn woodfibre update-01
Sn woodfibre update-01
Clarissa Brown
 
PAKISTAN: PIVOTAL LINK OF CENTRAL EURASIAN MEGA CORRIDOR BY ZAHID ANWAR
PAKISTAN: PIVOTAL LINK OF CENTRAL EURASIAN MEGA CORRIDOR BY ZAHID ANWARPAKISTAN: PIVOTAL LINK OF CENTRAL EURASIAN MEGA CORRIDOR BY ZAHID ANWAR
PAKISTAN: PIVOTAL LINK OF CENTRAL EURASIAN MEGA CORRIDOR BY ZAHID ANWAR
hizahid
 
Global Projects Center - East End Crossing
Global Projects Center - East End CrossingGlobal Projects Center - East End Crossing
Global Projects Center - East End Crossing
João Vitor Dutra
 
BC Sir John A. MacDonald BC In A Pet.
BC Sir John A. MacDonald BC In A Pet.BC Sir John A. MacDonald BC In A Pet.
BC Sir John A. MacDonald BC In A Pet.
P. Anna Paddon
 
Kenya investment benefits from the nile basin cooperation
Kenya investment benefits from the nile basin cooperationKenya investment benefits from the nile basin cooperation
Kenya investment benefits from the nile basin cooperation
Polycarp Otieno Onyango
 
Kingston Greenline & Ulster County Trails Summit - Summit Presentation
Kingston Greenline & Ulster County Trails Summit - Summit PresentationKingston Greenline & Ulster County Trails Summit - Summit Presentation
Kingston Greenline & Ulster County Trails Summit - Summit Presentation
The Kingston Land Trust
 
Lirr presentation draft pm
Lirr presentation draft pmLirr presentation draft pm
Lirr presentation draft pm
Andre Bermudez
 
What if 280 came down
What if 280 came downWhat if 280 came down
What if 280 came down
emilypeckenham
 

Similar to Y-K Corridor fact sheet (20)

Kingston Greenline & Ulster County Trails Summit - Agenda and Trail Resources
Kingston Greenline & Ulster County Trails Summit - Agenda and Trail ResourcesKingston Greenline & Ulster County Trails Summit - Agenda and Trail Resources
Kingston Greenline & Ulster County Trails Summit - Agenda and Trail Resources
 
RV 2014: Mobile Workshop #15- Integrating Transit into Large Institutions (Fo...
RV 2014: Mobile Workshop #15- Integrating Transit into Large Institutions (Fo...RV 2014: Mobile Workshop #15- Integrating Transit into Large Institutions (Fo...
RV 2014: Mobile Workshop #15- Integrating Transit into Large Institutions (Fo...
 
NY Empire State Trail
NY Empire State TrailNY Empire State Trail
NY Empire State Trail
 
WASLA 2022 How I Helped Build A Freeway and Destroy a City.pdf
WASLA 2022 How I Helped Build A Freeway and Destroy a City.pdfWASLA 2022 How I Helped Build A Freeway and Destroy a City.pdf
WASLA 2022 How I Helped Build A Freeway and Destroy a City.pdf
 
How I Helped Build A Freeway and Destroy a City (WASLA 2022)
How I Helped Build A Freeway and Destroy a City (WASLA 2022)How I Helped Build A Freeway and Destroy a City (WASLA 2022)
How I Helped Build A Freeway and Destroy a City (WASLA 2022)
 
Bakun
BakunBakun
Bakun
 
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
MICA Kilisut Harbor Restoration Project Presentation- January 20th, 2014
 
Uganda investment benefits from the nile basin cooperation
Uganda investment benefits from the nile basin cooperationUganda investment benefits from the nile basin cooperation
Uganda investment benefits from the nile basin cooperation
 
Hsc decision hapa trail 121913
Hsc decision hapa trail 121913Hsc decision hapa trail 121913
Hsc decision hapa trail 121913
 
Auckland-Transport-Alignment-Project-Foundation-Report
Auckland-Transport-Alignment-Project-Foundation-ReportAuckland-Transport-Alignment-Project-Foundation-Report
Auckland-Transport-Alignment-Project-Foundation-Report
 
Srdc bartrams to passyunk final_report
Srdc bartrams to passyunk final_reportSrdc bartrams to passyunk final_report
Srdc bartrams to passyunk final_report
 
NELSAP NEWS APRIL 2021.pdf
NELSAP NEWS APRIL 2021.pdfNELSAP NEWS APRIL 2021.pdf
NELSAP NEWS APRIL 2021.pdf
 
Sn woodfibre update-01
Sn woodfibre update-01Sn woodfibre update-01
Sn woodfibre update-01
 
PAKISTAN: PIVOTAL LINK OF CENTRAL EURASIAN MEGA CORRIDOR BY ZAHID ANWAR
PAKISTAN: PIVOTAL LINK OF CENTRAL EURASIAN MEGA CORRIDOR BY ZAHID ANWARPAKISTAN: PIVOTAL LINK OF CENTRAL EURASIAN MEGA CORRIDOR BY ZAHID ANWAR
PAKISTAN: PIVOTAL LINK OF CENTRAL EURASIAN MEGA CORRIDOR BY ZAHID ANWAR
 
Global Projects Center - East End Crossing
Global Projects Center - East End CrossingGlobal Projects Center - East End Crossing
Global Projects Center - East End Crossing
 
BC Sir John A. MacDonald BC In A Pet.
BC Sir John A. MacDonald BC In A Pet.BC Sir John A. MacDonald BC In A Pet.
BC Sir John A. MacDonald BC In A Pet.
 
Kenya investment benefits from the nile basin cooperation
Kenya investment benefits from the nile basin cooperationKenya investment benefits from the nile basin cooperation
Kenya investment benefits from the nile basin cooperation
 
Kingston Greenline & Ulster County Trails Summit - Summit Presentation
Kingston Greenline & Ulster County Trails Summit - Summit PresentationKingston Greenline & Ulster County Trails Summit - Summit Presentation
Kingston Greenline & Ulster County Trails Summit - Summit Presentation
 
Lirr presentation draft pm
Lirr presentation draft pmLirr presentation draft pm
Lirr presentation draft pm
 
What if 280 came down
What if 280 came downWhat if 280 came down
What if 280 came down
 

Recently uploaded

Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball playEric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
enizeyimana36
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 
Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
NazakatAliKhoso2
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
mamunhossenbd75
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 

Recently uploaded (20)

Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball playEric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 
Textile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdfTextile Chemical Processing and Dyeing.pdf
Textile Chemical Processing and Dyeing.pdf
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 

Y-K Corridor fact sheet

  • 1. Upnaurtukut “We are preparing the region for the future.” FACT SHEET Association of Village Council Presidents Yukon-Kuskokwim Freight and Energy Corridor Project PROJECT SCOPE The Association of Village Council Presidents (AVCP) goal for the Yukon-Kuskokwim Freight and Energy Corridor project is to develop a practical link between the Yukon and Kuskokwim River systems that will enhance connectivity among communities in the region. The proposed corridor will allow for travel, trade, and access to public facilities and other modes of transportation within the Yukon-Kuskokwim Delta (Y-K Delta). PROJECT BACKGROUND The project started in 2009, when the community of Kalskag requested that the Denali Commission’s Transportation Program provide a reconnaissance study on connecting the Yukon and Kuskokwim River Systems. The Denali Commission suggested that AVCP provide Kalskag with transportation planning support, and since then, AVCP has taken a lead role in helping Kalskag move the project forward. STAGEI: Completed in late 2011, the reconnaissance study demonstrated practicality to construct a transportation corridor in the Portage Mountains between the Yukon and Kuskokwim Rivers. Various corridor options wereidentified. STAGE II: Completed in September 2015, a Corridor Plan documented the preferred route between the rivers, prepared a concept design of the route, and documented the long-term economic viability. Final selection of a transportation corridor will be subject to a future environmental and public process. CURRENT STATUS STAGE III: DOWL will support AVCP in finalizing the planning process, with a focus on completing the subsistence and cultural resource studies, public outreach, identifying potential barge improvement projects, and beginning the corridor preservation process by coordinating with existing planning efforts currently in progress at other agencies. The Stage III tasks will help AVCP move forward with design, and secure federal and state funding for future work. BUDGET The preliminary planning estimate to complete the design and construction for the project is $150 million. The project is being developed in accordance with Federal Highway Administration (FHWA) guidelines. Corridor Concepts from Stages I & II PUBLIC INVOLVEMENT APPROACH AND SCHEDULE DOWL will implement the Calista Elders Council Model that will include a gathering of locals and affected communities to share information on place names, cultural, subsistence, and transportation stories from the elders. Ann Fienup-Riordan, who has worked in the Southwest Yukon-Kuskokwim region since 1976, and Calista Elders Council since 1999, will be a key advisor in implementing this model. To the extent practicable, all public meetings will be translated in Yupik. Upcoming gatherings are as follows:  March 12, 2018 Tribal Gathering—Bethel, Alaska  March – May 2018 Topic Specific Gatherings (Holy Cross, Anvik, Grayling, Shageluk, Chuathbaluk, Lower Kalskag, Upper Kalskag, Russian Mission, Atmautluak, and Aniak) To sign up for notifications about upcoming gatherings or project milestones, please email aspafford@dowl.com FOR MORE INFORMATION, CONTACT: Clarence Daniel AVCP ● AVCP Project Manager ● (907) 543-7461 l clarence@avcp.org Adison Spafford ● DOWL Planning Lead ● (907) 562-2000 aspafford@dowl.com Source: AVCP and CH2M
  • 2. WE WANT TO HEAR FROM YOU! Please provide us with input on the project so we can develop a project that is appropriate for the Y-K Delta benefiting all residents in the region. What does the Y-K Freight Corridor Project mean to you? What does the Y-K Freight Corridor Project mean to your community? Other comments: To receive project information, please provide your name, email, and postal address: Name: Address: Email: Telephone: To submit comments, or for additional information contact: Adison Spafford, Transportation Planner DOWL ● 4041 B Street ● Anchorage, Alaska 99503 Telephone: 907-562-2000 ● Fax: 907-563-3953 ● Email: aspafford@dowl.com