The document lists various construction activities required for building Al Ameera Food Factory along with the necessary requirements and approvals needed for each activity. Some activities like RTA NOC require a NOC, portacabins, and materials for an access road. DM sand transfer requires a NOC, excavation NOC, laboratory confirmation letter, safety equipment, and an HSE plan. Dewatering needs a NOC, waste skip, surveyor, shuttering, subcontractors, and testing apparatus. The document then lists 21 different construction activities that will be involved in building the factory.