Desert Claim Wind Power 
Photo simulation of Desert Claim
enXco Development Corporation’s 190 MW Desert Claim Wind Power Project received a 
unanimous recommendation by the Washington state Energy Facility Site Evaluation Council 
(“EFSEC”) to Governor Gregiore who approved Desert Claim’s Site Certification Agreement 
February 1, 2010.  
As Project Director, David Steeb initiated development of Desert Claim in 2002 when Kittitas 
County was selected as an ideal location for wind projects based on the county’s commercial 
wind resource quality and large tracts of grazing land. By recognizing the importance of locating 
Desert Claim with its onsite access to the multiple transmission lines of the Bonneville Power 
Administration and Puget Sound Energy, the project benefits from being west of the Mid‐
Columbia market trading hub, thus eliminating critical and costly transmission delivery 
problems and unknowns.  
While permitting the 5,200 acre site, proactive development of the Safety Zone Setback to 
address tower collapse and blade and ice throws; setting sound limits at the site boundary to 
meet state night‐time residential requirements; reaching agreement with the 7 non‐
participating landowners within 2,500 feet of a turbine; and commissioning a detailed study 
using local professors from Central Washington University to do a first‐of‐its‐kind, community‐
focused, economic benefits and jobs evaluation, all lead to the successful permitting of the 
controversial project.  
The Desert Claim Wind Power project received its Site Certification Agreement (“SCA”) from 
Washington State in February 2010. This was the culmination of extensive public and agency 
comment, land use proceedings, environmental studies and consultation, thoroughly reviewed 
by EFSEC. The SCA is an all‐inclusive permit with EFSEC serving as the single point of contact for 
mobilization, construction, commissioning, and throughout the operation of Desert Claim. The 
complete SCA and environmental documentation, as well as studies and proceedings, can be 
reviewed at EFSEC’s website under Desert Claim.   
enXco Development Corporation 
As Director of Business Development for the Pacific Northwest from 
2001 to 2005, David Steeb launched enXco’s presence in the region. He developed their NW 
pipeline strategy based on his knowledge of future regional energy needs and power markets 
to secure land leases for over 1000 MW of potential wind projects across Washington, Oregon, 
Idaho, Montana and Utah.  
He was enXco’s representative to the Central Washington Resource Energy Collaborative, a 
partnership between Kittitas County, Central Washington University, Puget Sound Energy, 
enXco Development Corporation, and the Economic Development Group of Kittitas County. In 
2009, this partnership formed an Innovation Partnership Zone program through the 
Washington State Department of Commerce to attract and encourage renewable energy 
research, workforce training, and companies to locate and create commercially viable products 
and jobs in the county. 
 
 

Wind Power Origination & Development