Challenges in automation which testers face often lead to subsequent failures. Learn how to respond to these common challenges by developing a solid business case for increased automation adoption by engaging manual testers in the testing organization, being technology agnostic, and stabilizing test scripts regardless of applications changes.
How To Transform the Manual Testing Process to Incorporate Test AutomationRanorex
Although most testing organizations have some automation, it's usually a subset of their overall testing efforts. Typically the processes have been previously defined, and the automation team must adapt accordingly. The major issue is that test automation work and deliverables do not always fit into a defined manual testing process.
Learn how to transform your manual testing procedures and how to incorporate test automation into your overall testing process.
How Manual Testers Can Break into Automation Without Programming SkillsRanorex
Adoption of automating tests has not happened as quickly as organizations need. As more companies move toward implementing agile development as their software development lifecycle, more features are being implemented and released more quickly. This leaves less time for full regression testing of the system, nonetheless this should still be done. Manual testers need to transform into test automation testers as well.
Learn how to make this jump as a manual tester and focus on the right areas first e.g. automation test structure, object recognition and results interpretation.
In this Quality Assurance Training session, you will learn about Automation Tools Overview. Topic covered in this session are:
• SQL Basic Operators and Function
• Software Testing Tool – Overview
• Advantage- Automation
• Disadvantage - Automation
• Grouping of Automation Tool
• Functional Tool
• Source Code Testing Tool
• Performance Tool
• Test Management Tool
• Security Testing Tool
For more information, about this quality assurance training, visit this link: https://www.mindsmapped.com/courses/quality-assurance/software-testing-training-with-hands-on-project-on-e-commerce-application/
Provides overview of Software Functional Test Automation, What tool you should use? What are the benefits? How to select tool that best fit you?
Compiled after going through 50 plus slides from internet
From http://wiki.directi.com/x/AgAa - This is a 24 slide internal presentation covering virtues of Automated Testing vs Manual Testing. Inkeeping with our agile adoption this presentation covers various advantages (11 to be specific) obtained in using TDD and Automated Testing as opposed to Manual Testing
How To Transform the Manual Testing Process to Incorporate Test AutomationRanorex
Although most testing organizations have some automation, it's usually a subset of their overall testing efforts. Typically the processes have been previously defined, and the automation team must adapt accordingly. The major issue is that test automation work and deliverables do not always fit into a defined manual testing process.
Learn how to transform your manual testing procedures and how to incorporate test automation into your overall testing process.
How Manual Testers Can Break into Automation Without Programming SkillsRanorex
Adoption of automating tests has not happened as quickly as organizations need. As more companies move toward implementing agile development as their software development lifecycle, more features are being implemented and released more quickly. This leaves less time for full regression testing of the system, nonetheless this should still be done. Manual testers need to transform into test automation testers as well.
Learn how to make this jump as a manual tester and focus on the right areas first e.g. automation test structure, object recognition and results interpretation.
In this Quality Assurance Training session, you will learn about Automation Tools Overview. Topic covered in this session are:
• SQL Basic Operators and Function
• Software Testing Tool – Overview
• Advantage- Automation
• Disadvantage - Automation
• Grouping of Automation Tool
• Functional Tool
• Source Code Testing Tool
• Performance Tool
• Test Management Tool
• Security Testing Tool
For more information, about this quality assurance training, visit this link: https://www.mindsmapped.com/courses/quality-assurance/software-testing-training-with-hands-on-project-on-e-commerce-application/
Provides overview of Software Functional Test Automation, What tool you should use? What are the benefits? How to select tool that best fit you?
Compiled after going through 50 plus slides from internet
From http://wiki.directi.com/x/AgAa - This is a 24 slide internal presentation covering virtues of Automated Testing vs Manual Testing. Inkeeping with our agile adoption this presentation covers various advantages (11 to be specific) obtained in using TDD and Automated Testing as opposed to Manual Testing
What are the Key drivers for automation? What are the Challenges in Agile automation and How to deal with them? How to automate? Who will automate? Which tool to select? Commercial or open source? What to automate? Which features? Here is what our experience says
This is a presentation given at the Hangzhou Scrum Forum 2009, sponsored by Perficient, China. The topic is how to incorporate automated functional testing into an agile project, and also some best practices, tips, and warnings.
www.perficient.com
Building a Test Automation Strategy for SuccessLee Barnes
Choosing an appropriate tool and building the right framework are typically thought of as the main challenges in implementing successful test automation. However, long term success requires that other key questions must be answered including:
- What are our objectives?
- How should we be organized?
- Will our processes need to change?
- Will our test environment support test automation?
- What skills will we need?
- How and when should we implement?
In this workshop, Lee will discuss how to assess your test automation readiness and build a strategy for long term success. You will interactively walk through the assessment process and build a test automation strategy based on input from the group. Attend this workshop and you will take away a blue print and best practices for building an effective test automation strategy in your organization.
• Understand the key aspects of a successful test automation function
• Learn how to assess your test automation readiness
• Develop a test automation strategy specific to your organization
Test Automation Best Practices (with SOA test approach)Leonard Fingerman
Today we hear a lot of buzz about the latest & greatest test automation tools like Selenium, Rational Functional Tester or HP LoadRunner but to make your test automation effort successful it might take more than just having the right tool. This presentation will try to uncover major pitfalls typically involved with test automation efforts. It will provide guidance on successful strategy as well as differences among third-generation frameworks like keyword-driven, data-driven and hybrid. It will also cover various aspects of SOA test automation
Test Automation - Everything You Need To KnowBugRaptors
Businesses face difficulty due to rapidly changing dynamic applications, and here test automation service provider can solves all your woes. Accelerate the release of your product with test automation solutions. Check out the PPT to know more or visit Bugraptors portfolio at www.bugraptors.com
Test Automation
Test automation is the use of test automation software like Selenium or self-developed testware to execute test cases.
Test automation is mostly used to automate repetitive testing tasks in a formalized way. It is also used to execute tests that would be difficult to perform manually like performance testing.
There are many advantages of test automation that are mostly related to the repeatability of the tests and the speed of test execution. There are a lot of commercial and open source tools available which can be grouped into two main categories; Code-Driven and Graphical User Interface Testing. Thus the key success factor in test automation is selecting the right tool and have a specialized test automation team.
It is to use test automation tools by considering ROI (return on investment). Otherwise it is quite easy to waste big amount of energy, commitment and definitely money.
With more than 500 clients, Keytorc is the leading software testing company in EMEA region that have competencies of automating any kind of software in diverse industries.
For more information about test automation tools and Keytorc’s test automation service you can contact with our performance test engineers: www.keytorc.com or blogs.keytorc.com
Test Otomasyonu:
Test otomasyonu özellikle tekrarlayan ve manuel olarak yapılması zor olan testlerin Selenium gibi test otomasyon araçları kullanılarak ya da özel olarak geliştirilen test otomasyon scriptleri ile yapılmasıdır. Bu bakımdan:
- Regresyon testleri
- Performans testleri
- Yük ve Stres testleri
- Test yönetimi
test otomasyonuna en uygun test tipleri ve aktiviteleridir.
Test otomasyonunun en büyük faydaları:
- testlerin hıznının artırılması
- testlerin kapsamının artırılması
- testlerin doğruluğunun artırılması
- testlerin raporlama kalitesinin artırılmasıdır.
Test otomasyonu doğru araç seçimi yapılmaması, ya da test otomasyonunu bilen uzman bir ekip tarafından yapılmaması durumunda faydadan çok zarar getirmektedir.
EMEA bölgesindeki lider yazılım test firması olan Keytorc’un test otomasyon ekibiyle iletişime geçmek için: www.keytorc.com ya da blogs.keytorc.com
HCMC Software Testing Club - The 1st Meetup
By Thao Vo
Selecting a most suitable automated testing tool is one of big challenges in software test automation. Choosing a test tool is as complicated as getting married to a person. If you marry with an inappropriate person, you tend to break up sooner or later. Similarly, without a suitable test tool, we will deadly end up with failed test automation effort. There are a variety of automated testing tools with different testing types and technologies. How to define a set of criteria of requirements to meet our goal, and making a right tool will help us prevent later problems from the executing of successful testing project. This topic is intended to share steps and criteria to select an appropriate automated testing tool.
6 Traits of a Successful Test Automation ArchitectureErdem YILDIRIM
The sector demands that software development life cycle to be delivered faster and cheaper with increasing quality and reliability. TLC (testing life cycle) is a crucuel part of the time, cost and quality level for AUT (Application Under Test). Market got to point that all long ornate talks can be summed up in one word: EFFICIENCY. In quality aspect, automating testing activities had already been came forward to reduce development cycle times, cost, resources allocated with traditional test along past years. It's OK that automation increased the efficiency of the test process, so what about the efficiency of automation itself? Why most of the test automation projects fail (even if you're not aware of it is actually failing)? Because, automating without good test architecture may result in a lot of activity, but little value (if you are lucky). We will talk about following 6 main traits to build a successful test automation architecture; selection/implementation of test levels to be automated, design principles/patterns, locater strategy, tools / framework selection (aside from SeWD / Java), methodology (E2E Testing, TDD, BDD, Continuous Testing) and OOP pillars.
Why Automation Fails—in Theory and PracticeTechWell
Testers face common challenges in automation. Unfortunately, these challenges often lead to subsequent failures. Jim Trentadue explains a variety of automation perceptions and myths―the perception that a significant increase in time and people is needed to implement automation; the myth that, once automation is achieved, testers will not be needed; the myth that scripted automation will serve all the testing needs for an application; the perception that developers and testers can add automation to a project without additional time, resources, or training; the belief that anyone can implement automation. The testing organization must ramp up quickly on the test automation process and the prep-work analysis that needs to be done including when to start, how to structure the tests, and what system to start with. Learn how to respond to these common challenges by developing a solid business case for increased automation adoption by engaging manual testers in the testing organization, being technology agnostic, and stabilizing test scripts regardless of applications changes.
What are the Key drivers for automation? What are the Challenges in Agile automation and How to deal with them? How to automate? Who will automate? Which tool to select? Commercial or open source? What to automate? Which features? Here is what our experience says
This is a presentation given at the Hangzhou Scrum Forum 2009, sponsored by Perficient, China. The topic is how to incorporate automated functional testing into an agile project, and also some best practices, tips, and warnings.
www.perficient.com
Building a Test Automation Strategy for SuccessLee Barnes
Choosing an appropriate tool and building the right framework are typically thought of as the main challenges in implementing successful test automation. However, long term success requires that other key questions must be answered including:
- What are our objectives?
- How should we be organized?
- Will our processes need to change?
- Will our test environment support test automation?
- What skills will we need?
- How and when should we implement?
In this workshop, Lee will discuss how to assess your test automation readiness and build a strategy for long term success. You will interactively walk through the assessment process and build a test automation strategy based on input from the group. Attend this workshop and you will take away a blue print and best practices for building an effective test automation strategy in your organization.
• Understand the key aspects of a successful test automation function
• Learn how to assess your test automation readiness
• Develop a test automation strategy specific to your organization
Test Automation Best Practices (with SOA test approach)Leonard Fingerman
Today we hear a lot of buzz about the latest & greatest test automation tools like Selenium, Rational Functional Tester or HP LoadRunner but to make your test automation effort successful it might take more than just having the right tool. This presentation will try to uncover major pitfalls typically involved with test automation efforts. It will provide guidance on successful strategy as well as differences among third-generation frameworks like keyword-driven, data-driven and hybrid. It will also cover various aspects of SOA test automation
Test Automation - Everything You Need To KnowBugRaptors
Businesses face difficulty due to rapidly changing dynamic applications, and here test automation service provider can solves all your woes. Accelerate the release of your product with test automation solutions. Check out the PPT to know more or visit Bugraptors portfolio at www.bugraptors.com
Test Automation
Test automation is the use of test automation software like Selenium or self-developed testware to execute test cases.
Test automation is mostly used to automate repetitive testing tasks in a formalized way. It is also used to execute tests that would be difficult to perform manually like performance testing.
There are many advantages of test automation that are mostly related to the repeatability of the tests and the speed of test execution. There are a lot of commercial and open source tools available which can be grouped into two main categories; Code-Driven and Graphical User Interface Testing. Thus the key success factor in test automation is selecting the right tool and have a specialized test automation team.
It is to use test automation tools by considering ROI (return on investment). Otherwise it is quite easy to waste big amount of energy, commitment and definitely money.
With more than 500 clients, Keytorc is the leading software testing company in EMEA region that have competencies of automating any kind of software in diverse industries.
For more information about test automation tools and Keytorc’s test automation service you can contact with our performance test engineers: www.keytorc.com or blogs.keytorc.com
Test Otomasyonu:
Test otomasyonu özellikle tekrarlayan ve manuel olarak yapılması zor olan testlerin Selenium gibi test otomasyon araçları kullanılarak ya da özel olarak geliştirilen test otomasyon scriptleri ile yapılmasıdır. Bu bakımdan:
- Regresyon testleri
- Performans testleri
- Yük ve Stres testleri
- Test yönetimi
test otomasyonuna en uygun test tipleri ve aktiviteleridir.
Test otomasyonunun en büyük faydaları:
- testlerin hıznının artırılması
- testlerin kapsamının artırılması
- testlerin doğruluğunun artırılması
- testlerin raporlama kalitesinin artırılmasıdır.
Test otomasyonu doğru araç seçimi yapılmaması, ya da test otomasyonunu bilen uzman bir ekip tarafından yapılmaması durumunda faydadan çok zarar getirmektedir.
EMEA bölgesindeki lider yazılım test firması olan Keytorc’un test otomasyon ekibiyle iletişime geçmek için: www.keytorc.com ya da blogs.keytorc.com
HCMC Software Testing Club - The 1st Meetup
By Thao Vo
Selecting a most suitable automated testing tool is one of big challenges in software test automation. Choosing a test tool is as complicated as getting married to a person. If you marry with an inappropriate person, you tend to break up sooner or later. Similarly, without a suitable test tool, we will deadly end up with failed test automation effort. There are a variety of automated testing tools with different testing types and technologies. How to define a set of criteria of requirements to meet our goal, and making a right tool will help us prevent later problems from the executing of successful testing project. This topic is intended to share steps and criteria to select an appropriate automated testing tool.
6 Traits of a Successful Test Automation ArchitectureErdem YILDIRIM
The sector demands that software development life cycle to be delivered faster and cheaper with increasing quality and reliability. TLC (testing life cycle) is a crucuel part of the time, cost and quality level for AUT (Application Under Test). Market got to point that all long ornate talks can be summed up in one word: EFFICIENCY. In quality aspect, automating testing activities had already been came forward to reduce development cycle times, cost, resources allocated with traditional test along past years. It's OK that automation increased the efficiency of the test process, so what about the efficiency of automation itself? Why most of the test automation projects fail (even if you're not aware of it is actually failing)? Because, automating without good test architecture may result in a lot of activity, but little value (if you are lucky). We will talk about following 6 main traits to build a successful test automation architecture; selection/implementation of test levels to be automated, design principles/patterns, locater strategy, tools / framework selection (aside from SeWD / Java), methodology (E2E Testing, TDD, BDD, Continuous Testing) and OOP pillars.
Why Automation Fails—in Theory and PracticeTechWell
Testers face common challenges in automation. Unfortunately, these challenges often lead to subsequent failures. Jim Trentadue explains a variety of automation perceptions and myths―the perception that a significant increase in time and people is needed to implement automation; the myth that, once automation is achieved, testers will not be needed; the myth that scripted automation will serve all the testing needs for an application; the perception that developers and testers can add automation to a project without additional time, resources, or training; the belief that anyone can implement automation. The testing organization must ramp up quickly on the test automation process and the prep-work analysis that needs to be done including when to start, how to structure the tests, and what system to start with. Learn how to respond to these common challenges by developing a solid business case for increased automation adoption by engaging manual testers in the testing organization, being technology agnostic, and stabilizing test scripts regardless of applications changes.
Questions for successful test automation projectsDaniel Ionita
Test automation is not only about coding. Successful test automation involves critical thinking and clarity of objectives before actually beginning development. This material provides guidance in putting some of the right questions and how to think as for having an efficient and effective test automation in the context of your project.
How to manage your testing automation project ttm methodologyRam Yonish
מנהלים רבים וארגונים רבים מיישמים אוטומציה בתהליך הבדיקות שלהם אבל עדיין מרגישים שההחזר על ההשקעה נמוך ואף שלילי. מחקרים רבים מראים כי הבעיה נובעת מחוסר תיאום ציפיות, זיהוי לא נכון של הבעיות שהכלים באים לפתור, בחירת כלי לא מתאים ותהליך הטמעה שגוי.
מתודולוגיית TMM (Testing tools management) באה לתת מענה בדיוק לבעיות שהוצגו. המתודולוגיה כוללת הגדרת השלבים השונים בפרויקט אוטומציה, החל מהגדרת הבעיה, דרך בחירת הכלי, בחינת הכלי, הטמעה ומדידת האפקטיביות שלו לכל אורך הפרויקט
Learn how to establish a greater sense of confidence in your release cycle, along with the practices and processes to create a high-performing engineering culture within your team.
Manual testing requires testers to cycle through the data continuously, utilize various input combinations, record observations, and compare outcomes to intended behavior. Automated testing leveraging test data automation accelerates all of these operations, and testing teams may execute automated tests across many operating systems and hardware setups using a single tool.
Improving ROI with Scriptless Test AutomationMindfire LLC
This is where scriptless test automation comes into the picture. Businesses today may utilize Scriptless Test Automation to automate test cases without having to worry about the complexities of coding. It speeds up the time to learn and build code, resulting in a shorter time to market, a greater return on investment, and increased coverage with little maintenance.
Top Ten Tips for Tackling Test Automation Webinar Presentation.pptxInflectra
Inflectra and Checkpoint Technologies co-hosted the webinar: Top Ten Tips for Tackling Test Automation. In this webinar, Adam Sandman (Inflectra) and Bob Crews (Checkpoint Technologies) explored the challenges surrounding test automation and offered their tips on overcoming them.
Find the recording of the Webinar on our YouTube channel: https://www.youtube.com/watch?v=vY1MbW4qWnQ
Webinar Agenda:
-Top 10 challenges of test automation with impact and solutions
-Impacts: potential risks if challenges are not overcome
-Solutions: tips to overcoming the challenges
-Automated functional testing
-Criteria of an Automation Assessment
-Addressing several challenges with Inflectra's Spira and Rapise
Webinar Presenters:
Adam Sandman is the Founder and CEO of Inflectra. He has been working in the IT industry for the past 25+ years. His areas of expertise span software architecture to agile development, software testing, test automation, and project management. He is interested in technology, business, and enabling people to follow their passions. At Inflectra, Adam is responsible for researching the tools, technologies, and processes in the software testing and quality assurance space. Adam is a prolific speaker whose speaking engagements range from StarEast, and Eurostar to STPcons, DevGeekWeek, Swiss Testing Day, NDIA, STARCanada, TestingMind, Agile DevOps West, StarWest, testCon, JFTL, and many more.
Bob Crews, Co-Founder and CEO of Checkpoint Technologies, is a consultant with 34 years of IT experience in full life-cycle development and software testing. Bob and his organization provide services and solutions focused on QA with a concentration in functional, performance and application security testing. He’s assisted organizations such as Harvard University, Raymond James, the FBI, and the Department of Veterans Affairs in developing teams, processes, and solutions to help organizations deliver higher quality software faster. He’s consulted for over 290 organizations on QA, effective software testing, strategic test planning, enhanced test automation, and risk-based testing. He’s exceptionally enthusiastic about the future of IT and software testing and believes “The best is yet ahead!”
There is no doubt about the importance of automated frameworks in the Agile environment and as part of the day-to-day testing process. These are some insights to guide any automation project.
Epistemic Interaction - tuning interfaces to provide information for AI supportAlan Dix
Paper presented at SYNERGY workshop at AVI 2024, Genoa, Italy. 3rd June 2024
https://alandix.com/academic/papers/synergy2024-epistemic/
As machine learning integrates deeper into human-computer interactions, the concept of epistemic interaction emerges, aiming to refine these interactions to enhance system adaptability. This approach encourages minor, intentional adjustments in user behaviour to enrich the data available for system learning. This paper introduces epistemic interaction within the context of human-system communication, illustrating how deliberate interaction design can improve system understanding and adaptation. Through concrete examples, we demonstrate the potential of epistemic interaction to significantly advance human-computer interaction by leveraging intuitive human communication strategies to inform system design and functionality, offering a novel pathway for enriching user-system engagements.
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Ramesh Iyer
In today's fast-changing business world, Companies that adapt and embrace new ideas often need help to keep up with the competition. However, fostering a culture of innovation takes much work. It takes vision, leadership and willingness to take risks in the right proportion. Sachin Dev Duggal, co-founder of Builder.ai, has perfected the art of this balance, creating a company culture where creativity and growth are nurtured at each stage.
State of ICS and IoT Cyber Threat Landscape Report 2024 previewPrayukth K V
The IoT and OT threat landscape report has been prepared by the Threat Research Team at Sectrio using data from Sectrio, cyber threat intelligence farming facilities spread across over 85 cities around the world. In addition, Sectrio also runs AI-based advanced threat and payload engagement facilities that serve as sinks to attract and engage sophisticated threat actors, and newer malware including new variants and latent threats that are at an earlier stage of development.
The latest edition of the OT/ICS and IoT security Threat Landscape Report 2024 also covers:
State of global ICS asset and network exposure
Sectoral targets and attacks as well as the cost of ransom
Global APT activity, AI usage, actor and tactic profiles, and implications
Rise in volumes of AI-powered cyberattacks
Major cyber events in 2024
Malware and malicious payload trends
Cyberattack types and targets
Vulnerability exploit attempts on CVEs
Attacks on counties – USA
Expansion of bot farms – how, where, and why
In-depth analysis of the cyber threat landscape across North America, South America, Europe, APAC, and the Middle East
Why are attacks on smart factories rising?
Cyber risk predictions
Axis of attacks – Europe
Systemic attacks in the Middle East
Download the full report from here:
https://sectrio.com/resources/ot-threat-landscape-reports/sectrio-releases-ot-ics-and-iot-security-threat-landscape-report-2024/
Key Trends Shaping the Future of Infrastructure.pdfCheryl Hung
Keynote at DIGIT West Expo, Glasgow on 29 May 2024.
Cheryl Hung, ochery.com
Sr Director, Infrastructure Ecosystem, Arm.
The key trends across hardware, cloud and open-source; exploring how these areas are likely to mature and develop over the short and long-term, and then considering how organisations can position themselves to adapt and thrive.
Essentials of Automations: Optimizing FME Workflows with ParametersSafe Software
Are you looking to streamline your workflows and boost your projects’ efficiency? Do you find yourself searching for ways to add flexibility and control over your FME workflows? If so, you’re in the right place.
Join us for an insightful dive into the world of FME parameters, a critical element in optimizing workflow efficiency. This webinar marks the beginning of our three-part “Essentials of Automation” series. This first webinar is designed to equip you with the knowledge and skills to utilize parameters effectively: enhancing the flexibility, maintainability, and user control of your FME projects.
Here’s what you’ll gain:
- Essentials of FME Parameters: Understand the pivotal role of parameters, including Reader/Writer, Transformer, User, and FME Flow categories. Discover how they are the key to unlocking automation and optimization within your workflows.
- Practical Applications in FME Form: Delve into key user parameter types including choice, connections, and file URLs. Allow users to control how a workflow runs, making your workflows more reusable. Learn to import values and deliver the best user experience for your workflows while enhancing accuracy.
- Optimization Strategies in FME Flow: Explore the creation and strategic deployment of parameters in FME Flow, including the use of deployment and geometry parameters, to maximize workflow efficiency.
- Pro Tips for Success: Gain insights on parameterizing connections and leveraging new features like Conditional Visibility for clarity and simplicity.
We’ll wrap up with a glimpse into future webinars, followed by a Q&A session to address your specific questions surrounding this topic.
Don’t miss this opportunity to elevate your FME expertise and drive your projects to new heights of efficiency.
Securing your Kubernetes cluster_ a step-by-step guide to success !KatiaHIMEUR1
Today, after several years of existence, an extremely active community and an ultra-dynamic ecosystem, Kubernetes has established itself as the de facto standard in container orchestration. Thanks to a wide range of managed services, it has never been so easy to set up a ready-to-use Kubernetes cluster.
However, this ease of use means that the subject of security in Kubernetes is often left for later, or even neglected. This exposes companies to significant risks.
In this talk, I'll show you step-by-step how to secure your Kubernetes cluster for greater peace of mind and reliability.
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...UiPathCommunity
💥 Speed, accuracy, and scaling – discover the superpowers of GenAI in action with UiPath Document Understanding and Communications Mining™:
See how to accelerate model training and optimize model performance with active learning
Learn about the latest enhancements to out-of-the-box document processing – with little to no training required
Get an exclusive demo of the new family of UiPath LLMs – GenAI models specialized for processing different types of documents and messages
This is a hands-on session specifically designed for automation developers and AI enthusiasts seeking to enhance their knowledge in leveraging the latest intelligent document processing capabilities offered by UiPath.
Speakers:
👨🏫 Andras Palfi, Senior Product Manager, UiPath
👩🏫 Lenka Dulovicova, Product Program Manager, UiPath
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...James Anderson
Effective Application Security in Software Delivery lifecycle using Deployment Firewall and DBOM
The modern software delivery process (or the CI/CD process) includes many tools, distributed teams, open-source code, and cloud platforms. Constant focus on speed to release software to market, along with the traditional slow and manual security checks has caused gaps in continuous security as an important piece in the software supply chain. Today organizations feel more susceptible to external and internal cyber threats due to the vast attack surface in their applications supply chain and the lack of end-to-end governance and risk management.
The software team must secure its software delivery process to avoid vulnerability and security breaches. This needs to be achieved with existing tool chains and without extensive rework of the delivery processes. This talk will present strategies and techniques for providing visibility into the true risk of the existing vulnerabilities, preventing the introduction of security issues in the software, resolving vulnerabilities in production environments quickly, and capturing the deployment bill of materials (DBOM).
Speakers:
Bob Boule
Robert Boule is a technology enthusiast with PASSION for technology and making things work along with a knack for helping others understand how things work. He comes with around 20 years of solution engineering experience in application security, software continuous delivery, and SaaS platforms. He is known for his dynamic presentations in CI/CD and application security integrated in software delivery lifecycle.
Gopinath Rebala
Gopinath Rebala is the CTO of OpsMx, where he has overall responsibility for the machine learning and data processing architectures for Secure Software Delivery. Gopi also has a strong connection with our customers, leading design and architecture for strategic implementations. Gopi is a frequent speaker and well-known leader in continuous delivery and integrating security into software delivery.
JMeter webinar - integration with InfluxDB and GrafanaRTTS
Watch this recorded webinar about real-time monitoring of application performance. See how to integrate Apache JMeter, the open-source leader in performance testing, with InfluxDB, the open-source time-series database, and Grafana, the open-source analytics and visualization application.
In this webinar, we will review the benefits of leveraging InfluxDB and Grafana when executing load tests and demonstrate how these tools are used to visualize performance metrics.
Length: 30 minutes
Session Overview
-------------------------------------------
During this webinar, we will cover the following topics while demonstrating the integrations of JMeter, InfluxDB and Grafana:
- What out-of-the-box solutions are available for real-time monitoring JMeter tests?
- What are the benefits of integrating InfluxDB and Grafana into the load testing stack?
- Which features are provided by Grafana?
- Demonstration of InfluxDB and Grafana using a practice web application
To view the webinar recording, go to:
https://www.rttsweb.com/jmeter-integration-webinar
5. 5
TestAutomationIndustryRecap
» First Record Playback tools appeared about 20-25
years ago
» The primary objective was to test desktop
applications. Some tools could test broken URL
links, but not dig into the objects
» The tester was required to have scripting or
programming knowledge to make the tests run
effectively, even in Record Playback
6. 6
TestAutomationIndustryRecap
» Below is an evolution ofTest Automation
Frameworks:
Record
Playback
Structured
Testing
(invokes
more
conditions)
Data Driven
Keyword
Driven
Model /
Object
Based
Actions
Based
Hybrid
(combines 2
or more of
the previous
frameworks)
8. 8
TestAutomationIndustryOutlook
» Number of test automation tools have increased to
over 25-30, primarily focused on taking the scripting
/ programming out of the equation for the manual
testers
» Technical complexities have increased considerably
to cover the following:
9. 9
TestAutomationIndustryOutlook
» License models now offer aTest Execution only
component, apart from the license to create and
maintain the automated tests and object repository
» Tools have the capability to integrate with various
Continuous Integration tools andTest Management
solutions
11. 11
TestAutomationAdoptionChallenges
» New challenges below have slowed the test
automation productivity:
» Rapid deployment times to production
» Shifts from aWaterfall SDLC to anAgile methodology
» HowTest-Driven Development impacts when to
automate tests
» How component testing such as: Database testing, Data
Warehouse testing, Web-Service testing or Messaging
testing impacts what tests to automate
15. 15
CaseStudy1: Strugglingwith(against)Mgmt
Excerpts from an Austrian test engineer / manager and his interactions with management
“It Must Be Good, I’ve Already Advertised It”
Management’s intention was to reduce testing time for the
system test.There was no calculation for our investment,
we had to go with it because manual testing was no longer
needed.The goal was to automate 100 % of all test cases.
“Testers Aren’t Programmers”
My manager hired testers not be to programmers so he
did not have more developers in the department. Once
told that some tools require heavy scripting / coding,
the message was relayed that testers need to do
“Advanced Scripting”, rather than “Programming”
“Automate Bugs”
An idea by one manager was to automate bugs we
received from our customer care center.We were told
to read this bug and automate this exact user action.
Not knowing the exact function, we hard-coded the
user data into our automation.We were automating
bugs for versions that were not in the field anymore.
“Impress the Customers (theWrongWay)”
My boss had the habit of installing the untested beta
versions for presentations of the software in front of the
customer. He would install unstable versions and then call
developers at 5:30am to fix immediately. We introduced
automated smoke tests to ensure good builds.
16. 16
TestAutomationAdoptionQuestions
Who
• are the right
people to
create,
maintain test
cases and
object
repository
information?
• may execute
automated
tests instead
creating?
• will be the
dedicated go
to person(s)
for the tool?
What
• is our
organization’s
definition of
automated
testing: what it
is and what it
is not?
• are the test
automation
objectives?
• is the expected
testing
coverage
sought after
with test
automation?
When
• are testing
resources
available for
this initiative?
• can training
happen in
relation to the
procurement?
• are there
project
deadlines that
compete
against test
automation?
Where
• will the test
automation
take place;
dedicated test
environment?
• are the
associates
located?This
will decide
whether a
training should
be remote on
onsite
• will a central
repository
reside?
Why
• start a test
automation
initiative –
what are the
specific issues?
• run a vendor
POC program;
what do we
want from this
assessment?
• start with a
top-down
management
approach?
How
• do our test
automation
objectives
differ from our
overall testing
objectives?
• does manual
testing fit into
a test
automation
framework?
• do existing
tools such as
(CI, CM,TM)
work with the
automation
solution?
Aligned into categories for questions that may not have been answered…or asked
17. 17
TestAutomationAdoptionFailures
Reviewing some not so best practices and assumptions around test automation adoption
• ManualTest Cases may not have been written for automation
with entry points, data and exit criteria
• Error handling is not considered as part of manual testing;
separate from defect detection
• Modularity is not a key consideration for manual test case
planning, as it is for test automation
Test
Automation
automates
manual test
cases
• Testers should just go through all of the entire regression test
library and strive to have that all automated
• New application changes should just be added to the automation
library of tests as it is complete
• This full automation run should happen overnight and any
discrepancy should be logged as an application defect
Test
Automation
must cover
100% of the
application
• Replace the time required for manual testing to do automated
testing the first time and each subsequent run will be shorter
• Every manual tester we have can automate their own tests, they
have the testing knowledge to do so
• This does not have to be a separate initiative, there is ample time
during each project release
Testers can
automate
their tests
during a
release
19. 19
CaseStudy2: ChoosingtheWrongTool
• The goal was to automate the testing of major functionality
for web development tools at a large internet software
development company
Background for the Case
Study
• Most of the functional tests were executed manually.There
were some unmaintained automation scripts that could
potentially serve useful if restored
Pre-existingAutomation
• The GUI had gone through major changes for the application.
The automation tool had to be flexible enough to automate
the changes and be easy to maintain
NewTool or Major
Maintenance Effort?
• The consensus was that the tool and coding required was
difficult for manual testers to maintain. Additionally, the type
of object recognition provided did not work
Moving Forward with
existing tool?
• Clearly understand how automated tools use objects and
realize that identification by image was not adequate.
Research was done to find the best tool to identify objects
What was done after the
tool was replaced?
• Closely examine the tools that work best with the controls in
your environments.Topics like maintainability and error-
handling/debugging should be critical
Conclusion
20. 20
TestAutomationImplementationFailures
What could go wrong when trying to use the purchased solution
• The application(s) under test uses technologies that do not work
well with the test automation tool
• When I attempt to playback the test I just recorded, the recording
doesn’t playback at all
• I have to use one test automation solution for one technology
(Web), another for Mobile, yet another for legacy desktop apps
The test
automation
tool won’t
work on my
application
• The automated test case(s) needs to be re-recorded in most
times of any GUI changes, causing heavy maintenance
• It’s not worth automating newer applications; automation is
really only for regression testing of legacy applications
• It’s said that automation is key with Agile Development, but
automation can’t work when deployed in increments
Screens &
Objects in
the AUT are
changing;
automate?
• We don’t have time to work with the test automation solution
with overly aggressive project schedules and over-allocation
• TestAutomation software is primarily marketed to testers with a
programming and development skillset / background
• This initiative doesn’t have the cross-department support that it
should to be effective
Automation
tools are too
complex for
manual
testers
22. 22
TestAutomationAdoptionCorrections
Changing the mindset concerning test automation
• AutomatedTest Cases are separate from manual test cases with
entry points, data and exit criteria
• Error handling is an essential part of automated test cases;
separate from defect detection
• Modularity is the approach on how automated test cases are
developed, to ensure reusability for each automated test step
Test
Automation
automates
manual test
cases
• Testers start automation with a regression test library, but focus
on tests that are time-consuming and have a high ROI
• Applications changes need to be planned for in a MasterTest Plan
and automated during a maintenance window
• Any automation failure needs to be analyzed whether the defect
is in the automated test case or the system under test
Test
Automation
must cover
100% of the
application
• The initial cycle of creating and executing automated tests will be
longer than manual tests, with each cycle runtime reduced
• Manual testers will require training on the test automation tool,
approach and best practices
• Test automation should be a separate initiative, defined with its
own goals and objectives - apart from an application release
Testers can
automate
their tests
during a
release
Test
Automation
objectives
aim for the
highest ROI
Test Plan
includes
automated
and manual
test cases
Separate
goals &
timelines for
Test
Automation
23. 23
CaseStudy3:DevelopaMulti-SolutionStrategy
Current Testing Activities
• Three distinct test phases:
Evaluation (done by end-user),
Integration and System
• Integration and System was
done manually and consumed
38 person-weeks of effort for
every software release on every
platform
Proposed Solution
• Evaluate and decide between
purchasing a solution or
building in-house
• Hire an outside consultant to
validate the tool selection prior
to purchase, then train testing
staff on selected tool
• An in-house solution was built
Integration
test
automation
•Completed automation in
just under a year
•First trial: 2-person weeks
manual; automated: 1-
person week – but not
everything could be
automated
•Without automation,
manual: 10 person-weeks
on every platform;
automate: 3 person-weeks
System test
automation
•Automate in two phases:
breadth and depth
•Manual testing took 8
person-weeks per
platform; automation took
4 person-weeks
•Total tests automated was
approximately 79%
Test
Automation
Key Benefits
Software Test Automation: Effective use of test execution tools – Fewster & Graham
Background for
the Case Study
A leading electronic design automation company had a family of products
that was comprised of over 120 programs.This was GUI-based and ported to
all leading industry workstation hardware platforms
Test effort per platform cut in half
Consistent regression testing
Less dependent on application SME’s
Better use of testing resources
24. 24
TestAutomationImplementationCorrections
• Develop a set of criteria that matches your portfolio of
applications to automate and request the vendors for a POC
• Start to request the object names from development as they turn
over new builds.Very important for test automation
• Investigate software packages that contain everything in one;
vendor management and procurement will thank you!
The test
automation
tool won’t
work on my
application
• Find a tool that you don’t have to re-record. If a new control was
added, you wouldn’t rewrite your manual test case
• Consider starting your testing with automated tests to start.
The chances of these tests staying current is much higher
• Test automation should be a key element in sprint planning; for
new functionality and existing maintenance
Screens &
Objects in
the AUT are
changing;
automate?
• Schedule a just-in-time training session with the tool shortly after
procurement, with staff not allocated to a critical project
• Layout the resource plan on how every tester contributes.
Plenty of roles are needed for this initiative than just coding
• Testing management should work with the IT leaders to discuss
the time required from a PM, BA, Dev and DBA
Automation
tools are too
complex for
manual
testers
Develop a
resource
plan for all
required
associates
Understand
the object
landscape
and prepare
the test plan
Successful
POC will
prove the
tools works
on all apps
Changing the approach to putting test automation into practice
25. 25
CaseStudy3:DevelopaMulti-SolutionStrategy
Background for
the Case Study
The goal was to speed up the Department of Defense (DoD), software
delivery to the field. It was leading-edge technology, but lengthy testing and
certification processes were in place before software could be released
Experiences of Test Automation – Case Studies of Software Test Automation: Graham & Fewster
•The tool has to be independent of the System Under Test; no modules should be added
Can’t Be Intrusive to System UnderTest (SUT)
•The solution(s), had to go across Windows, Linux, Solaris, Mac, etc.
Must Be OS Independent
•The tool needed to support all languages that the applications were written in
Must Be Independent of the GUI
•The system should be able to handle operations through the GUI and backend processes
Must AutomateTests for Both Display & Non-Display Interfaces
•The tool needs to test a system of systems: multiple servers, monitors and displays
interconnected to form one SUT
Must Work in a Networked Multicomputer Environment
•One of the main requirements from the DoD. Testers were SME’s in the application, but not
software developers writing scripts.
•The steps should be action driven: Projects – Test Cases – Test Steps - Actions
Non-Developers Should Be Able to Use theTool
•Needed a framework that could allow for test management activities, including documenting a
test case in the Automated Test and Re-Test (ATRT) solution, along with a hierarchical
breakdown of test cases into test steps and sub-steps
Must Support an Automated RequirementsTraceability Matrix
TestAutomation ROI
• Solutions selected
spanned across
technologies
• Reduced some test
cycles from 5 testers to 1
• After initial resistance,
testing department now
worked on automated
test cases, both
development and
execution
• Additional processes for
Continuous Integration
andTest Management
were now enabled
27. 27
SessionRecap
» TheTest Automation industry focused on desktop,
but is driving to multi-technology stacks to cover a
large amount of platforms
» Primary skillset for those working in test automation
was Programming or Scripting, but solutions are
available for those without these skills
» Common perceptions and myths will exist, review
the list of questions to be asked and use that to drive
your strategy
28. 28
SessionRecap
» Present some of the real-life case studies forward to
management, to ensure this does not occur during
your research and implementation
» Review some common failures in the theory and
implementation and compare if any of those are
problematic at your organization
» Make the corrective action for each failure step