SlideShare a Scribd company logo
1 of 9
Download to read offline
Whitepaper
Selecting ERP
for Performance-
Based Logistics
Contracting
CONTENT
DoD’s Preferred Approach..................................................................................... 1
Requirements of PBL............................................................................................... 3
Basic functionality required................................................................................ 4
How to prepare........................................................................................................ 5
PBL Wisdom............................................................................................................... 5
1
Selecting ERP for Performance-Based Logistics Contracting
Selecting ERP for Performance-
Based Logistics Contracting
By Dan Norrish
Vice President
IFS North America
Major suppliers and systems integrators working within the military are already
getting involved in performance-based logistics (PBL) contracts. Performance-based
logistics is a different way of doing business. It is a logistics support solution that
shifts traditional DoD inventory, supply chain, asset sustainment, and technical
support functions to the supplier for a guaranteed level of performance at the same
or reduced cost. Even middle-market and smaller suppliers are beginning to address
PBL contracting as the military accelerates its move toward this innovative and
efficient way of systems acquisition and sustainment.
These contracts will increase the involvement of suppliers in services delivered
after the sale, placing new demands on business systems that were not designed for
this type of business model. Suppliers will need to invest in new technology designed
to help them profitably meet the requirements of PBL contracts.
DoD’s Preferred Approach
The PBL business model is the government’s preferred approach for implementing
product support. The overall goal of PBLs is to optimize system readiness. The
supplier is required to meet support goals for a weapon system by establishing a
support structure based on performance metrics with clear lines of authority and
responsibility. The supplier performs logistics functions that have been historically
performed by government personnel while implementing commercial best practices.
PBL contracts augment the support of weapon systems by employing the purchase
of system support as an integrated performance package.
In other words, when the Air Force buys a fighter jet from a supplier, it doesn’t
simply pay for the physical product. Instead, the Air Force has a performance-based
contract with the supplier. This contract’s bottom line is that the Air Force reimburse-
ment to the supplier is contingent on the jet’s performance; how often the jet is able
to fly.
PBL is a support strategy that helps the military quantify and plan for costs by
contracting with vendors not just for purchased assets, but replenishment or even
maintenance, repair and operations of those purchased assets. PBL is a support
strategy that covers a spectrum of support services that a branch of the military may
contract from a supplier in order to optimize support for the asset.
2
Selecting ERP for Performance-Based Logistics Contracting
What this means to military vendors and contractors is that an asset or asset
component supplier may contract to take on some of the maintenance or support
roles traditionally handled directly by military personnel. In some cases, military
staff and civilian contractors may work side-by-side within a depot to support that
craft. In other cases, support may be provided entirely by the supplier. The supplier
might be paid on a performance-based contract for scheduled or non-scheduled
maintenance on an aircraft engine or other components or a whole craft, while
keeping performance readiness at a determined level.
PBL represents a change from the traditional approach, under which the military
was primarily concerned with what to buy, to a new paradigm where the focus is on
who to buy from – what kind of services are required to get the most value out of
what is purchased. For each program, the military is asking itself “what are the
performance goals for this contract? Should we be buying material and support of
that material, support, service for inventory – or complete asset sustainment from
the supplier?”
In the past, this support and maintenance work was done directly by military
personnel, and cost-cutting was done organically through Base Realignment and
Closure of military depots and facilities. But as the potential to realize actual
savings from further closings diminished, the military began to seek new efficiencies
and cost reductions; PBL is being recognized as one such solution.
The number of PBLs has increased over the last five to ten years and will continue
to increase in the future. The military is still learning from existing PBL contracts
how to best use this tool, and contractors are also learning how to better support
PBL contracts.
PBL contracts can be simple or complex, but all require ongoing involvement by
a supplier. A PBL contract could be as simple as involving the supplier in managing
inventory. Others might extend to contractor logistics support (CLS), where the
supplier takes more responsibility for inventory and offers some additional level of
sustainment.
Some PBLs go so far as to include total system program responsibility, with a
supplier taking over entire sustainment process from inventory to asset management.
Suppliers may not need to install an entirely new enterprise resources planning
(ERP) system, particularly if their ERP backbone is modern enough to easily inte-
grate with third-party functionality designed to facilitate PBL-related processes.
Remember that PBL contracts represent a full spectrum of involvement that can be as
limited as direct vendor delivery management. This means that the supplier is main-
taining the inventory on the manufacturing floor, and supplying raw components or
materials on the depot site. In this case, all that may be needed is an inventory
management costing module and some type of scorecard to record the metrics. But
to support ongoing PBL contracts, suppliers should make sure that their ERP func-
tionality can be augmented and expanded as their role changes and grows over time.
3
Selecting ERP for Performance-Based Logistics Contracting
Requirements of PBL
Already, tier one or tier two military suppliers are getting involved in PBL contracts,
earning not only a margin for the sale of the asset but for services performed over
the life of the asset that might extend five, 10, 20, 30 or even 40 years. They are able
to take their knowledge of the asset and its configuration, and the fact that they
have access to parts and other supplies, and turn it into recurring revenue under the
PBL.
But before suppliers serving the military can realize this new revenue, they will
have to assess whether their internal manufacturing or maintenance processes and
systems can support the external services required for PBL. Suppliers may find they
need a separate system from the rest of the operation for data integrity and security.
Systems required to profitably deliver on a PBL contract also require advanced
functionality for predictive maintenance, risk management and service management.
Addressing the need for this new technology is difficult because the defense
supplier industry is, by nature, very conservative. They tend to replace their infor-
mation systems less frequently than companies in other commercial marketplaces.
So even with the promise of additional revenue from PBL contracts, many execu-
tives in this industry will be reticent to either replace their legacy IT systems with
technology flexible enough to integrate with additional PBL-based tools, or aug-
ment existing ERP systems with specialized software tools. Those that try to use an
information system designed for a manufacturing environment to manage ongoing
sustainment, particularly in the areas of maintenance or asset management, risk
either losing money on those PBL contracts or finding that they are not equipped to
deliver as promised.
When trying to force a manufacturing business system to support PBL, one
common problem spot is the bill of materials. A manufacturing bill of materials is
very different from a maintenance bill of materials. The manufacturing bill of
materials looks like a pyramid, and is used in essence to build things up to the pre-
defined end point of the manufacturing process. A maintenance bill of materials has
to be more dynamic, with multiple bills of materials and multiple options depending
on the defect and the maintenance plan. That is a significant difference that can
hamstring efforts to deliver on PBL contracts.
Two other issues that can prevent a manufacturer with an older legacy system not
designed for PBL from succeeding in this space are the need to isolate government
data from internal processes, and a lack of deep maintenance functionality down to
the component level. There are specific requirements regarding data security and
privacy that the military puts forward, along with the requirement that inventory
used on government contracts be kept separate from other inventory, even if it is
identical. Powerful maintenance functionality is required as suppliers get involved
in sustaining equipment over time. because they need to develop predictive mainte-
nance programs not only for the asset as sold, but for the various components they
4
Selecting ERP for Performance-Based Logistics Contracting
may have purchased from external suppliers or subcontractors. All of the work
necessary to sustain the asset needs to be costed during contract negotiations and
managed on an ongoing basis over the life of the contract.
Basic functionality required
When it comes to the technology used to support a PBL contract, the ability to
handle change over time is critical, not only for the PBL-related software function-
ality but for the manufacturing software functionality with which it is integrated.
PBL contracts tend to change and become complex over time, moving from lim-
ited toward deeper vendor involvement. Moreover, change in the PBL environment,
as is the case across the aerospace and defense market, is driven by the customer
rather than by the vendor companies. This means that suppliers working in a PBL
environment can expect to be asked by their government agency customers to make
changes to their business practices, and ought to have a plan for how the technology
underpinning these practices can keep up.
But perhaps the most challenging element of PBL for most suppliers will be the
challenge of predicting the total cost of the PBL contract from a risk management
standpoint. Larger system integrators and defense suppliers do a good job of assessing
total cost and risk involved in PBLs. One lesson to take from their early experience
is that the better engineering information captured on the asset and its projected
reliability and maintenance costs, the better data there will be to work with when
undertaking that analysis. Suppliers engaging in PBLs will not only need asset life-
cycle data on their own contribution to their finished products, but for all of the
purchased components that are part of their product. And they will not only be
called on to service parts they can get to by opening a panel, but other parts that
require a separate teardown by a subcontractor and supplier. Only by collecting
detailed information on reliability, engineering and the level of effort involved in
sustaining the entirety of the asset can the supplier define the risk of sustaining that
asset and what PBL should be a part of cost negotiations with the military.
This means that as part of their ERP and PBL systems, suppliers will need
strong configuration management tool so they can track the lifing and maintenance
parameters of any part in that asset. Suppliers must further be able to predict main-
tenance costs given the environment the asset is operated in, whether that environ-
ment is a desert, a Midwest winter, or an aircraft carrier, given a certain number of
hours, cycles, thrust and other parameters.
If a supplier underestimates the level of effort required under a PBL contract,
they certainly will lose money. But suppliers that do capture the required asset
sustainment information can make a better margin and meet their PBL metrics.
Moreover, data from one PBL can be replicated and used to enhance and improve
pricing and performance in negotiations for subsequent contracts.
5
Selecting ERP for Performance-Based Logistics Contracting
How to prepare
Supplier’s intent on getting involved with PBL will first need to audit their existing
technology infrastructures. It is entirely possible that, if their existing ERP environ-
ment is relatively new and facilitates integration through a modern service oriented
architecture (SOA) that third-party PBL-specific functionality can be integrated
with their existing systems. If the supplier is relying on a patchwork or point
solutions, or is running a dated enterprise-wide system, complete system replace-
ment may be unavoidable.
Suppliers in a position to simply add-on PBL functionality can get up and running
rapidly because they will not have to disrupt their existing systems and processes to
implement this technology. Since they had not likely been undertaking PBL work
before, they are spared the disruption that comes with replacing one way of doing
things with another. But with few exceptions, even very elaborate ERP solutions
like those from SAP and Oracle will need to be augmented with additional PBL
technology. PBL add-ons may be able to leverage supply chain and perhaps even
maintenance functionality within an existing ERP, although in many cases this
functionality is better handled by a PBL-specific software tool. In almost all cases,
PBL-specific functionality will be necessary to capture correct metrics so the
supplier can get paid under the terms of the PBL. Under the PBL contract, a supplier
agrees to support an asset or inventory environment or other service to the military
at a certain level of performance or metric, and that means it is necessary to capture
performance data to illustrate that terms of the contract have been met.
For instance, a supplier contracting to support an aircraft engine may need to
capture labor and material costs and turnaround and make sure they are meeting the
terms of their contract. Not only is this necessary to demonstrate contract compliance,
but it allows the supplier to visualize their margins to ensure profitable performance.
Regardless of whether an existing legacy ERP needs to be replaced, suppliers
implementing PBL-oriented technologies ought to look for solutions based on non-
proprietary technology. In a world where systems need to work and play well with
each other, and the nature of integrations between systems of a supplier and its
government customer change rapidly, closed, proprietary technology stacks will
serve as a barrier to effective PBL management. Different PBL contracts may require
different processes and applications. Adapting to different processes mandated by
the government customer will be an ongoing process, so reducing barriers to change
is of the utmost importance.
PBL Wisdom
If this whitepaper leaves you with only a few key take-aways, here are some concepts
that may be valuable.
6
Selecting ERP for Performance-Based Logistics Contracting
•	 Don’t try to make a manufacturing system work in a PBL environment. It may
work if the PBL requires only simple vendor-managed inventory, but even in this
situation, there is valuable data that you will not be collecting – data that can
help you ensure profitability on this and subsequent PBL contracts. There are
certain supply chain pieces that a typical manufacturing system will not support.
Manufacturing and sustainment are made up of different sets of processes and
capabilities.
•	 Separate your PBL data from internal data. Under the terms of PBL contracts,
you can not share this government-related information with internal or external
parties. Before you buy any systems or infrastructure to support PBL, you’ll
want to identify a formal process for segregating this data, and for other ele-
ments of contract fulfillment. Once this process is defined and outlined, you can
use that outline to drive comparison of various PBL-related solutions. But also
keep in mind that each PBL contract will be different, and you will want a
technology infrastructure that is flexible enough to change and add capabilities
over time.
•	 Make sure you have open architecture. SOA is very important if you are going
to integrate your PBL solution with your enterprise system or with external
military systems. You may also want to consider new military-oriented RFID
technology to track inventory or assets. This RFID technology also requires an
open architecture in order to be implemented in a cost-effective way.
Dan Norrish is Vice President with IFS North America, the global enterprise applications
company. Prior to taking on his current role, he held leadership positions with IFS North
America Aerospace & Defense division. Norrish has been in enterprise software field for
17 years, and previously had spent 10 years in manufacturing management.
En2322-1Production:IFSCorporateMarketing,April2009.
About IFS
IFS is a public company (OMX STO: IFS) founded in 1983 that
develops, supplies, and implements IFS Applications™
, a component-
based extended ERP suite built on SOA technology. IFS focuses on
agile businesses where any of four core processes are strategic:
service & asset management, manufacturing, supply chain and
projects. The company has 2,000 customers and is present in more
than 50 countries with 2,700 employees in total. Net revenue in
2009 was SKr 2.6 billion.
More details can be found at www.IFSWORLD.com.
For further information, e-mail to info@ifsworld.com
www.ifsworld.com
This document may contain statements of possible future functionality for IFS’ software prod-
ucts and technology. Such statements of future functionalit y are for information purposes
only and should not be interpreted as any commitment or representation. IFS and all IFS prod -
uct names are trademarks of IFS. The names of actual companies and products mentioned
herein may be the trademarks of their respective owners.
IFS AB©2010
Americas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  +1 888 437 4968
Argentina, Brazil, Canada, Mexico, United States
Asia Pacific . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . +65 63 33 33 00
Australia, Indonesia, Japan, Malaysia, new Zealand, Philippines, 
PR China, Singapore, Thailand
Europe east and central asia . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . +48 22 577 45 00
BALKANS, Czech Republic, GEORGIA, Hungary, Israel, KAZAKHSTAN,
Poland, RUSSIA and cis, Slovakia, Turkey, UKRAINE
Europe Central . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  +49 9131 77 340
AUSTRIA, Belgium, GERMANY, ITALY, netherlands, SWITZERLAND
Europe West . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . +44 1494 428 900
France, Portugal, Spain, United Kingdom
Middle East and africa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .+9714 390 0888
India, South Africa, Sri Lanka, United Arab Emirates
Nordic . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . +46 13 460 4000
Denmark, Norway, Sweden
Finland and the Baltic area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . +358 102 17 9300
Estonia, Finland, Latvia, Lithuania

More Related Content

Similar to White papers selecting erp for performance based logistics contracting

Tightening The Chain – Supply Chain Cost Cutting Strategies
Tightening The Chain – Supply Chain Cost Cutting StrategiesTightening The Chain – Supply Chain Cost Cutting Strategies
Tightening The Chain – Supply Chain Cost Cutting Strategies
Zubin Poonawalla
 
Selecting ERP for Oil and Gas industry contractors and vendors
Selecting ERP for Oil and Gas industry contractors and vendorsSelecting ERP for Oil and Gas industry contractors and vendors
Selecting ERP for Oil and Gas industry contractors and vendors
cthomassen
 
Inventory Management At Telcon
Inventory Management At TelconInventory Management At Telcon
Inventory Management At Telcon
Ritesh choudhary
 
Procurement in hghgfhghinternational operations
Procurement in hghgfhghinternational operationsProcurement in hghgfhghinternational operations
Procurement in hghgfhghinternational operations
nishantnishu4u
 
Wholesale distribution White Paper
Wholesale distribution White PaperWholesale distribution White Paper
Wholesale distribution White Paper
Garima Sinha
 
Apbm1120 scheduling agreementproceduretrainingdocument
Apbm1120 scheduling agreementproceduretrainingdocumentApbm1120 scheduling agreementproceduretrainingdocument
Apbm1120 scheduling agreementproceduretrainingdocument
helderquec
 
Best Practices for Preparing a Request for Proposalby Be.docx
Best Practices for Preparing a Request for Proposalby Be.docxBest Practices for Preparing a Request for Proposalby Be.docx
Best Practices for Preparing a Request for Proposalby Be.docx
ikirkton
 

Similar to White papers selecting erp for performance based logistics contracting (20)

Electrical India- Procurement Strategies for Utilities
Electrical India- Procurement Strategies for UtilitiesElectrical India- Procurement Strategies for Utilities
Electrical India- Procurement Strategies for Utilities
 
Tightening The Chain – Supply Chain Cost Cutting Strategies
Tightening The Chain – Supply Chain Cost Cutting StrategiesTightening The Chain – Supply Chain Cost Cutting Strategies
Tightening The Chain – Supply Chain Cost Cutting Strategies
 
Selecting ERP for Oil and Gas industry contractors and vendors
Selecting ERP for Oil and Gas industry contractors and vendorsSelecting ERP for Oil and Gas industry contractors and vendors
Selecting ERP for Oil and Gas industry contractors and vendors
 
Leasing Accounting
Leasing AccountingLeasing Accounting
Leasing Accounting
 
Inventory Management At Telcon
Inventory Management At TelconInventory Management At Telcon
Inventory Management At Telcon
 
Procurement in hghgfhghinternational operations
Procurement in hghgfhghinternational operationsProcurement in hghgfhghinternational operations
Procurement in hghgfhghinternational operations
 
Five ways to develop a successful outsourcing contract
Five ways to develop a successful outsourcing contractFive ways to develop a successful outsourcing contract
Five ways to develop a successful outsourcing contract
 
Lessons learned
Lessons learnedLessons learned
Lessons learned
 
Wholesale distribution White Paper
Wholesale distribution White PaperWholesale distribution White Paper
Wholesale distribution White Paper
 
Apbm1120 scheduling agreementproceduretrainingdocument
Apbm1120 scheduling agreementproceduretrainingdocumentApbm1120 scheduling agreementproceduretrainingdocument
Apbm1120 scheduling agreementproceduretrainingdocument
 
Ware housing contract
Ware housing contractWare housing contract
Ware housing contract
 
White papers selecting erp for oil and gas industry contractors and vendors
White papers selecting erp for oil and gas industry contractors and vendorsWhite papers selecting erp for oil and gas industry contractors and vendors
White papers selecting erp for oil and gas industry contractors and vendors
 
White papers selecting erp for oil and gas industry contractors and vendors
White papers selecting erp for oil and gas industry contractors and vendorsWhite papers selecting erp for oil and gas industry contractors and vendors
White papers selecting erp for oil and gas industry contractors and vendors
 
Cloud computing - the impact on revenue recognition
Cloud computing - the impact on revenue recognitionCloud computing - the impact on revenue recognition
Cloud computing - the impact on revenue recognition
 
Best Practices for Preparing a Request for Proposalby Be.docx
Best Practices for Preparing a Request for Proposalby Be.docxBest Practices for Preparing a Request for Proposalby Be.docx
Best Practices for Preparing a Request for Proposalby Be.docx
 
Multi-supplier governance
Multi-supplier governance Multi-supplier governance
Multi-supplier governance
 
Purchasing proce
Purchasing procePurchasing proce
Purchasing proce
 
Beyond Contract Renegotiation: Keys to Managing the Sourcing Continuum
Beyond Contract Renegotiation: Keys to Managing the Sourcing ContinuumBeyond Contract Renegotiation: Keys to Managing the Sourcing Continuum
Beyond Contract Renegotiation: Keys to Managing the Sourcing Continuum
 
Wp reverse logistics
Wp reverse logisticsWp reverse logistics
Wp reverse logistics
 
Business Case
Business CaseBusiness Case
Business Case
 

More from Kaizenlogcom

More from Kaizenlogcom (20)

Announcements june 12, 2018
Announcements   june 12, 2018Announcements   june 12, 2018
Announcements june 12, 2018
 
4 best practices_using finance applications for better process efficiencies
4  best practices_using finance applications for better process efficiencies4  best practices_using finance applications for better process efficiencies
4 best practices_using finance applications for better process efficiencies
 
Infor cloud suite_corporate_ebrochure_english
Infor cloud suite_corporate_ebrochure_englishInfor cloud suite_corporate_ebrochure_english
Infor cloud suite_corporate_ebrochure_english
 
White papers why and how to achieve global erp
White papers why and how to achieve global erpWhite papers why and how to achieve global erp
White papers why and how to achieve global erp
 
White papers selecting erp for performance based logistics contracting
White papers selecting erp for performance based logistics contractingWhite papers selecting erp for performance based logistics contracting
White papers selecting erp for performance based logistics contracting
 
You gov case study
You gov case studyYou gov case study
You gov case study
 
Cloud vs on premise guide
Cloud vs on premise guideCloud vs on premise guide
Cloud vs on premise guide
 
Cloud investment buyers guide
Cloud investment buyers guideCloud investment buyers guide
Cloud investment buyers guide
 
A real time comprehensive view of your business
A real time comprehensive view of your businessA real time comprehensive view of your business
A real time comprehensive view of your business
 
Spc03570 usen
Spc03570 usenSpc03570 usen
Spc03570 usen
 
Pow03190 usen
Pow03190 usenPow03190 usen
Pow03190 usen
 
Pol03262 usen
Pol03262 usenPol03262 usen
Pol03262 usen
 
Spc03595 usen
Spc03595 usenSpc03595 usen
Spc03595 usen
 
Gbc03182 usen
Gbc03182 usenGbc03182 usen
Gbc03182 usen
 
Spc03563 usen
Spc03563 usenSpc03563 usen
Spc03563 usen
 
Whatsnew in-my sql-primary
Whatsnew in-my sql-primaryWhatsnew in-my sql-primary
Whatsnew in-my sql-primary
 
Mysql wp cluster_evalguide
Mysql wp cluster_evalguideMysql wp cluster_evalguide
Mysql wp cluster_evalguide
 
Pos03154 usen
Pos03154 usenPos03154 usen
Pos03154 usen
 
Idc analyst report a new breed of servers for digital transformation
Idc analyst report a new breed of servers for digital transformationIdc analyst report a new breed of servers for digital transformation
Idc analyst report a new breed of servers for digital transformation
 
Four ways-a-wms-delivers-greater-roi sc-execution-warehouse-mgmt
Four ways-a-wms-delivers-greater-roi sc-execution-warehouse-mgmtFour ways-a-wms-delivers-greater-roi sc-execution-warehouse-mgmt
Four ways-a-wms-delivers-greater-roi sc-execution-warehouse-mgmt
 

Recently uploaded

如何办理(UPenn毕业证书)宾夕法尼亚大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(UPenn毕业证书)宾夕法尼亚大学毕业证成绩单本科硕士学位证留信学历认证如何办理(UPenn毕业证书)宾夕法尼亚大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(UPenn毕业证书)宾夕法尼亚大学毕业证成绩单本科硕士学位证留信学历认证
acoha1
 
Huawei Ransomware Protection Storage Solution Technical Overview Presentation...
Huawei Ransomware Protection Storage Solution Technical Overview Presentation...Huawei Ransomware Protection Storage Solution Technical Overview Presentation...
Huawei Ransomware Protection Storage Solution Technical Overview Presentation...
LuisMiguelPaz5
 
Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...
Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...
Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...
mikehavy0
 
如何办理(Dalhousie毕业证书)达尔豪斯大学毕业证成绩单留信学历认证
如何办理(Dalhousie毕业证书)达尔豪斯大学毕业证成绩单留信学历认证如何办理(Dalhousie毕业证书)达尔豪斯大学毕业证成绩单留信学历认证
如何办理(Dalhousie毕业证书)达尔豪斯大学毕业证成绩单留信学历认证
zifhagzkk
 
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi ArabiaIn Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
ahmedjiabur940
 
sourabh vyas1222222222222222222244444444
sourabh vyas1222222222222222222244444444sourabh vyas1222222222222222222244444444
sourabh vyas1222222222222222222244444444
saurabvyas476
 
如何办理英国诺森比亚大学毕业证(NU毕业证书)成绩单原件一模一样
如何办理英国诺森比亚大学毕业证(NU毕业证书)成绩单原件一模一样如何办理英国诺森比亚大学毕业证(NU毕业证书)成绩单原件一模一样
如何办理英国诺森比亚大学毕业证(NU毕业证书)成绩单原件一模一样
wsppdmt
 
如何办理(UCLA毕业证书)加州大学洛杉矶分校毕业证成绩单学位证留信学历认证原件一样
如何办理(UCLA毕业证书)加州大学洛杉矶分校毕业证成绩单学位证留信学历认证原件一样如何办理(UCLA毕业证书)加州大学洛杉矶分校毕业证成绩单学位证留信学历认证原件一样
如何办理(UCLA毕业证书)加州大学洛杉矶分校毕业证成绩单学位证留信学历认证原件一样
jk0tkvfv
 
Simplify hybrid data integration at an enterprise scale. Integrate all your d...
Simplify hybrid data integration at an enterprise scale. Integrate all your d...Simplify hybrid data integration at an enterprise scale. Integrate all your d...
Simplify hybrid data integration at an enterprise scale. Integrate all your d...
varanasisatyanvesh
 

Recently uploaded (20)

DBMS UNIT 5 46 CONTAINS NOTES FOR THE STUDENTS
DBMS UNIT 5 46 CONTAINS NOTES FOR THE STUDENTSDBMS UNIT 5 46 CONTAINS NOTES FOR THE STUDENTS
DBMS UNIT 5 46 CONTAINS NOTES FOR THE STUDENTS
 
如何办理(UPenn毕业证书)宾夕法尼亚大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(UPenn毕业证书)宾夕法尼亚大学毕业证成绩单本科硕士学位证留信学历认证如何办理(UPenn毕业证书)宾夕法尼亚大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(UPenn毕业证书)宾夕法尼亚大学毕业证成绩单本科硕士学位证留信学历认证
 
Huawei Ransomware Protection Storage Solution Technical Overview Presentation...
Huawei Ransomware Protection Storage Solution Technical Overview Presentation...Huawei Ransomware Protection Storage Solution Technical Overview Presentation...
Huawei Ransomware Protection Storage Solution Technical Overview Presentation...
 
Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...
Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...
Abortion Clinic in Kempton Park +27791653574 WhatsApp Abortion Clinic Service...
 
如何办理(Dalhousie毕业证书)达尔豪斯大学毕业证成绩单留信学历认证
如何办理(Dalhousie毕业证书)达尔豪斯大学毕业证成绩单留信学历认证如何办理(Dalhousie毕业证书)达尔豪斯大学毕业证成绩单留信学历认证
如何办理(Dalhousie毕业证书)达尔豪斯大学毕业证成绩单留信学历认证
 
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi ArabiaIn Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
 
sourabh vyas1222222222222222222244444444
sourabh vyas1222222222222222222244444444sourabh vyas1222222222222222222244444444
sourabh vyas1222222222222222222244444444
 
SCI8-Q4-MOD11.pdfwrwujrrjfaajerjrajrrarj
SCI8-Q4-MOD11.pdfwrwujrrjfaajerjrajrrarjSCI8-Q4-MOD11.pdfwrwujrrjfaajerjrajrrarj
SCI8-Q4-MOD11.pdfwrwujrrjfaajerjrajrrarj
 
Bios of leading Astrologers & Researchers
Bios of leading Astrologers & ResearchersBios of leading Astrologers & Researchers
Bios of leading Astrologers & Researchers
 
Seven tools of quality control.slideshare
Seven tools of quality control.slideshareSeven tools of quality control.slideshare
Seven tools of quality control.slideshare
 
Northern New England Tableau User Group (TUG) May 2024
Northern New England Tableau User Group (TUG) May 2024Northern New England Tableau User Group (TUG) May 2024
Northern New England Tableau User Group (TUG) May 2024
 
Ranking and Scoring Exercises for Research
Ranking and Scoring Exercises for ResearchRanking and Scoring Exercises for Research
Ranking and Scoring Exercises for Research
 
如何办理英国诺森比亚大学毕业证(NU毕业证书)成绩单原件一模一样
如何办理英国诺森比亚大学毕业证(NU毕业证书)成绩单原件一模一样如何办理英国诺森比亚大学毕业证(NU毕业证书)成绩单原件一模一样
如何办理英国诺森比亚大学毕业证(NU毕业证书)成绩单原件一模一样
 
Introduction to Statistics Presentation.pptx
Introduction to Statistics Presentation.pptxIntroduction to Statistics Presentation.pptx
Introduction to Statistics Presentation.pptx
 
Harnessing the Power of GenAI for BI and Reporting.pptx
Harnessing the Power of GenAI for BI and Reporting.pptxHarnessing the Power of GenAI for BI and Reporting.pptx
Harnessing the Power of GenAI for BI and Reporting.pptx
 
如何办理(UCLA毕业证书)加州大学洛杉矶分校毕业证成绩单学位证留信学历认证原件一样
如何办理(UCLA毕业证书)加州大学洛杉矶分校毕业证成绩单学位证留信学历认证原件一样如何办理(UCLA毕业证书)加州大学洛杉矶分校毕业证成绩单学位证留信学历认证原件一样
如何办理(UCLA毕业证书)加州大学洛杉矶分校毕业证成绩单学位证留信学历认证原件一样
 
Simplify hybrid data integration at an enterprise scale. Integrate all your d...
Simplify hybrid data integration at an enterprise scale. Integrate all your d...Simplify hybrid data integration at an enterprise scale. Integrate all your d...
Simplify hybrid data integration at an enterprise scale. Integrate all your d...
 
Digital Transformation Playbook by Graham Ware
Digital Transformation Playbook by Graham WareDigital Transformation Playbook by Graham Ware
Digital Transformation Playbook by Graham Ware
 
DS Lecture-1 about discrete structure .ppt
DS Lecture-1 about discrete structure .pptDS Lecture-1 about discrete structure .ppt
DS Lecture-1 about discrete structure .ppt
 
jll-asia-pacific-capital-tracker-1q24.pdf
jll-asia-pacific-capital-tracker-1q24.pdfjll-asia-pacific-capital-tracker-1q24.pdf
jll-asia-pacific-capital-tracker-1q24.pdf
 

White papers selecting erp for performance based logistics contracting

  • 2. CONTENT DoD’s Preferred Approach..................................................................................... 1 Requirements of PBL............................................................................................... 3 Basic functionality required................................................................................ 4 How to prepare........................................................................................................ 5 PBL Wisdom............................................................................................................... 5
  • 3. 1 Selecting ERP for Performance-Based Logistics Contracting Selecting ERP for Performance- Based Logistics Contracting By Dan Norrish Vice President IFS North America Major suppliers and systems integrators working within the military are already getting involved in performance-based logistics (PBL) contracts. Performance-based logistics is a different way of doing business. It is a logistics support solution that shifts traditional DoD inventory, supply chain, asset sustainment, and technical support functions to the supplier for a guaranteed level of performance at the same or reduced cost. Even middle-market and smaller suppliers are beginning to address PBL contracting as the military accelerates its move toward this innovative and efficient way of systems acquisition and sustainment. These contracts will increase the involvement of suppliers in services delivered after the sale, placing new demands on business systems that were not designed for this type of business model. Suppliers will need to invest in new technology designed to help them profitably meet the requirements of PBL contracts. DoD’s Preferred Approach The PBL business model is the government’s preferred approach for implementing product support. The overall goal of PBLs is to optimize system readiness. The supplier is required to meet support goals for a weapon system by establishing a support structure based on performance metrics with clear lines of authority and responsibility. The supplier performs logistics functions that have been historically performed by government personnel while implementing commercial best practices. PBL contracts augment the support of weapon systems by employing the purchase of system support as an integrated performance package. In other words, when the Air Force buys a fighter jet from a supplier, it doesn’t simply pay for the physical product. Instead, the Air Force has a performance-based contract with the supplier. This contract’s bottom line is that the Air Force reimburse- ment to the supplier is contingent on the jet’s performance; how often the jet is able to fly. PBL is a support strategy that helps the military quantify and plan for costs by contracting with vendors not just for purchased assets, but replenishment or even maintenance, repair and operations of those purchased assets. PBL is a support strategy that covers a spectrum of support services that a branch of the military may contract from a supplier in order to optimize support for the asset.
  • 4. 2 Selecting ERP for Performance-Based Logistics Contracting What this means to military vendors and contractors is that an asset or asset component supplier may contract to take on some of the maintenance or support roles traditionally handled directly by military personnel. In some cases, military staff and civilian contractors may work side-by-side within a depot to support that craft. In other cases, support may be provided entirely by the supplier. The supplier might be paid on a performance-based contract for scheduled or non-scheduled maintenance on an aircraft engine or other components or a whole craft, while keeping performance readiness at a determined level. PBL represents a change from the traditional approach, under which the military was primarily concerned with what to buy, to a new paradigm where the focus is on who to buy from – what kind of services are required to get the most value out of what is purchased. For each program, the military is asking itself “what are the performance goals for this contract? Should we be buying material and support of that material, support, service for inventory – or complete asset sustainment from the supplier?” In the past, this support and maintenance work was done directly by military personnel, and cost-cutting was done organically through Base Realignment and Closure of military depots and facilities. But as the potential to realize actual savings from further closings diminished, the military began to seek new efficiencies and cost reductions; PBL is being recognized as one such solution. The number of PBLs has increased over the last five to ten years and will continue to increase in the future. The military is still learning from existing PBL contracts how to best use this tool, and contractors are also learning how to better support PBL contracts. PBL contracts can be simple or complex, but all require ongoing involvement by a supplier. A PBL contract could be as simple as involving the supplier in managing inventory. Others might extend to contractor logistics support (CLS), where the supplier takes more responsibility for inventory and offers some additional level of sustainment. Some PBLs go so far as to include total system program responsibility, with a supplier taking over entire sustainment process from inventory to asset management. Suppliers may not need to install an entirely new enterprise resources planning (ERP) system, particularly if their ERP backbone is modern enough to easily inte- grate with third-party functionality designed to facilitate PBL-related processes. Remember that PBL contracts represent a full spectrum of involvement that can be as limited as direct vendor delivery management. This means that the supplier is main- taining the inventory on the manufacturing floor, and supplying raw components or materials on the depot site. In this case, all that may be needed is an inventory management costing module and some type of scorecard to record the metrics. But to support ongoing PBL contracts, suppliers should make sure that their ERP func- tionality can be augmented and expanded as their role changes and grows over time.
  • 5. 3 Selecting ERP for Performance-Based Logistics Contracting Requirements of PBL Already, tier one or tier two military suppliers are getting involved in PBL contracts, earning not only a margin for the sale of the asset but for services performed over the life of the asset that might extend five, 10, 20, 30 or even 40 years. They are able to take their knowledge of the asset and its configuration, and the fact that they have access to parts and other supplies, and turn it into recurring revenue under the PBL. But before suppliers serving the military can realize this new revenue, they will have to assess whether their internal manufacturing or maintenance processes and systems can support the external services required for PBL. Suppliers may find they need a separate system from the rest of the operation for data integrity and security. Systems required to profitably deliver on a PBL contract also require advanced functionality for predictive maintenance, risk management and service management. Addressing the need for this new technology is difficult because the defense supplier industry is, by nature, very conservative. They tend to replace their infor- mation systems less frequently than companies in other commercial marketplaces. So even with the promise of additional revenue from PBL contracts, many execu- tives in this industry will be reticent to either replace their legacy IT systems with technology flexible enough to integrate with additional PBL-based tools, or aug- ment existing ERP systems with specialized software tools. Those that try to use an information system designed for a manufacturing environment to manage ongoing sustainment, particularly in the areas of maintenance or asset management, risk either losing money on those PBL contracts or finding that they are not equipped to deliver as promised. When trying to force a manufacturing business system to support PBL, one common problem spot is the bill of materials. A manufacturing bill of materials is very different from a maintenance bill of materials. The manufacturing bill of materials looks like a pyramid, and is used in essence to build things up to the pre- defined end point of the manufacturing process. A maintenance bill of materials has to be more dynamic, with multiple bills of materials and multiple options depending on the defect and the maintenance plan. That is a significant difference that can hamstring efforts to deliver on PBL contracts. Two other issues that can prevent a manufacturer with an older legacy system not designed for PBL from succeeding in this space are the need to isolate government data from internal processes, and a lack of deep maintenance functionality down to the component level. There are specific requirements regarding data security and privacy that the military puts forward, along with the requirement that inventory used on government contracts be kept separate from other inventory, even if it is identical. Powerful maintenance functionality is required as suppliers get involved in sustaining equipment over time. because they need to develop predictive mainte- nance programs not only for the asset as sold, but for the various components they
  • 6. 4 Selecting ERP for Performance-Based Logistics Contracting may have purchased from external suppliers or subcontractors. All of the work necessary to sustain the asset needs to be costed during contract negotiations and managed on an ongoing basis over the life of the contract. Basic functionality required When it comes to the technology used to support a PBL contract, the ability to handle change over time is critical, not only for the PBL-related software function- ality but for the manufacturing software functionality with which it is integrated. PBL contracts tend to change and become complex over time, moving from lim- ited toward deeper vendor involvement. Moreover, change in the PBL environment, as is the case across the aerospace and defense market, is driven by the customer rather than by the vendor companies. This means that suppliers working in a PBL environment can expect to be asked by their government agency customers to make changes to their business practices, and ought to have a plan for how the technology underpinning these practices can keep up. But perhaps the most challenging element of PBL for most suppliers will be the challenge of predicting the total cost of the PBL contract from a risk management standpoint. Larger system integrators and defense suppliers do a good job of assessing total cost and risk involved in PBLs. One lesson to take from their early experience is that the better engineering information captured on the asset and its projected reliability and maintenance costs, the better data there will be to work with when undertaking that analysis. Suppliers engaging in PBLs will not only need asset life- cycle data on their own contribution to their finished products, but for all of the purchased components that are part of their product. And they will not only be called on to service parts they can get to by opening a panel, but other parts that require a separate teardown by a subcontractor and supplier. Only by collecting detailed information on reliability, engineering and the level of effort involved in sustaining the entirety of the asset can the supplier define the risk of sustaining that asset and what PBL should be a part of cost negotiations with the military. This means that as part of their ERP and PBL systems, suppliers will need strong configuration management tool so they can track the lifing and maintenance parameters of any part in that asset. Suppliers must further be able to predict main- tenance costs given the environment the asset is operated in, whether that environ- ment is a desert, a Midwest winter, or an aircraft carrier, given a certain number of hours, cycles, thrust and other parameters. If a supplier underestimates the level of effort required under a PBL contract, they certainly will lose money. But suppliers that do capture the required asset sustainment information can make a better margin and meet their PBL metrics. Moreover, data from one PBL can be replicated and used to enhance and improve pricing and performance in negotiations for subsequent contracts.
  • 7. 5 Selecting ERP for Performance-Based Logistics Contracting How to prepare Supplier’s intent on getting involved with PBL will first need to audit their existing technology infrastructures. It is entirely possible that, if their existing ERP environ- ment is relatively new and facilitates integration through a modern service oriented architecture (SOA) that third-party PBL-specific functionality can be integrated with their existing systems. If the supplier is relying on a patchwork or point solutions, or is running a dated enterprise-wide system, complete system replace- ment may be unavoidable. Suppliers in a position to simply add-on PBL functionality can get up and running rapidly because they will not have to disrupt their existing systems and processes to implement this technology. Since they had not likely been undertaking PBL work before, they are spared the disruption that comes with replacing one way of doing things with another. But with few exceptions, even very elaborate ERP solutions like those from SAP and Oracle will need to be augmented with additional PBL technology. PBL add-ons may be able to leverage supply chain and perhaps even maintenance functionality within an existing ERP, although in many cases this functionality is better handled by a PBL-specific software tool. In almost all cases, PBL-specific functionality will be necessary to capture correct metrics so the supplier can get paid under the terms of the PBL. Under the PBL contract, a supplier agrees to support an asset or inventory environment or other service to the military at a certain level of performance or metric, and that means it is necessary to capture performance data to illustrate that terms of the contract have been met. For instance, a supplier contracting to support an aircraft engine may need to capture labor and material costs and turnaround and make sure they are meeting the terms of their contract. Not only is this necessary to demonstrate contract compliance, but it allows the supplier to visualize their margins to ensure profitable performance. Regardless of whether an existing legacy ERP needs to be replaced, suppliers implementing PBL-oriented technologies ought to look for solutions based on non- proprietary technology. In a world where systems need to work and play well with each other, and the nature of integrations between systems of a supplier and its government customer change rapidly, closed, proprietary technology stacks will serve as a barrier to effective PBL management. Different PBL contracts may require different processes and applications. Adapting to different processes mandated by the government customer will be an ongoing process, so reducing barriers to change is of the utmost importance. PBL Wisdom If this whitepaper leaves you with only a few key take-aways, here are some concepts that may be valuable.
  • 8. 6 Selecting ERP for Performance-Based Logistics Contracting • Don’t try to make a manufacturing system work in a PBL environment. It may work if the PBL requires only simple vendor-managed inventory, but even in this situation, there is valuable data that you will not be collecting – data that can help you ensure profitability on this and subsequent PBL contracts. There are certain supply chain pieces that a typical manufacturing system will not support. Manufacturing and sustainment are made up of different sets of processes and capabilities. • Separate your PBL data from internal data. Under the terms of PBL contracts, you can not share this government-related information with internal or external parties. Before you buy any systems or infrastructure to support PBL, you’ll want to identify a formal process for segregating this data, and for other ele- ments of contract fulfillment. Once this process is defined and outlined, you can use that outline to drive comparison of various PBL-related solutions. But also keep in mind that each PBL contract will be different, and you will want a technology infrastructure that is flexible enough to change and add capabilities over time. • Make sure you have open architecture. SOA is very important if you are going to integrate your PBL solution with your enterprise system or with external military systems. You may also want to consider new military-oriented RFID technology to track inventory or assets. This RFID technology also requires an open architecture in order to be implemented in a cost-effective way. Dan Norrish is Vice President with IFS North America, the global enterprise applications company. Prior to taking on his current role, he held leadership positions with IFS North America Aerospace & Defense division. Norrish has been in enterprise software field for 17 years, and previously had spent 10 years in manufacturing management.
  • 9. En2322-1Production:IFSCorporateMarketing,April2009. About IFS IFS is a public company (OMX STO: IFS) founded in 1983 that develops, supplies, and implements IFS Applications™ , a component- based extended ERP suite built on SOA technology. IFS focuses on agile businesses where any of four core processes are strategic: service & asset management, manufacturing, supply chain and projects. The company has 2,000 customers and is present in more than 50 countries with 2,700 employees in total. Net revenue in 2009 was SKr 2.6 billion. More details can be found at www.IFSWORLD.com. For further information, e-mail to info@ifsworld.com www.ifsworld.com This document may contain statements of possible future functionality for IFS’ software prod- ucts and technology. Such statements of future functionalit y are for information purposes only and should not be interpreted as any commitment or representation. IFS and all IFS prod - uct names are trademarks of IFS. The names of actual companies and products mentioned herein may be the trademarks of their respective owners. IFS AB©2010 Americas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . +1 888 437 4968 Argentina, Brazil, Canada, Mexico, United States Asia Pacific . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . +65 63 33 33 00 Australia, Indonesia, Japan, Malaysia, new Zealand, Philippines,  PR China, Singapore, Thailand Europe east and central asia . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . +48 22 577 45 00 BALKANS, Czech Republic, GEORGIA, Hungary, Israel, KAZAKHSTAN, Poland, RUSSIA and cis, Slovakia, Turkey, UKRAINE Europe Central . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . +49 9131 77 340 AUSTRIA, Belgium, GERMANY, ITALY, netherlands, SWITZERLAND Europe West . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . +44 1494 428 900 France, Portugal, Spain, United Kingdom Middle East and africa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .+9714 390 0888 India, South Africa, Sri Lanka, United Arab Emirates Nordic . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . +46 13 460 4000 Denmark, Norway, Sweden Finland and the Baltic area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . +358 102 17 9300 Estonia, Finland, Latvia, Lithuania