Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Weekly report template march21
1. [INC 281 Multidisciplinary workshop weekly report]
March 21, 2012
Name-Surname Mrs. Marin Rattanapapra (You)
Student ID. 53211823
Group Name Habithai
Gangs53211833 Art53211839
EngineeringTeam
Toss 53211841 O53211846
Members
Boon 53211806 Tob53211808
Product Design
P”pete,P”ice,P”pae,P”tuang
Team Members
Weekly Progress
March 15, 2012. In the morning part of engineering, we are confirming about function of
product. By the product we have talk and confirm about function and device for use in mosquito’s
killer machine.
In afternoon we are present the product to teacher. We have got comment about
function of product. By teacher comment about sensor for count number of mosquito may be have
problem because it has small size. And another comment that we should to adjust are screen of
product by product design team would like to show a lot of information on display, so it impossible
because size of display screen and cost of product. After present to teacher we have shared
information and data to try again.
In Engineering Team we think today can’t to do this work done. Because it from
data that we find in these day need to be fixed. And test device for use in product that can work.
Engineering Analysis
Strong Point
- we have work clear
-wetry to find new information and data about device to Product Design Team.
Week Point
-sometime we have discussed between Engineering Team and Product Design Team about function
of product.
Next Week Job
I was leaning about sensor.
Department of Control System and Instrumentation Engineering
KING MONGKUT’s UNIVERSITY OF TECHNOLOGY THONBURI