1. WASIM AKRAM KHAN.G
Mob: +60173563951
E-mail:- wasim.241@gmail.com
PASSPORT NUMBER: J0670539
Objective:
In quest for a position to sharpen my engineering skills in the construction industry that bids a
professional escalation, while being resourceful, innovative and flexible.
SUMMARY
A highly skilled professional over 5.8 years of in-depth experience with large scale projects,
Hospitals, Industries, high rise buildings and commercial buildings.
Background in the principles and practices of Electrical design and construction.
Capable and re-evaluate engineering plans, specifications, project schedules, design and
estimates for Electrical construction projects
Excellent management experience including setting goals and objectives, project development
planning and organization and cost control.
Flexible for modifications in the design as per client requirement
Communicate effectively and maintain relationships with clients, contractors, vendors and co-workers.
A Team leader with notable analytical proficiency and an ability to grasp new technical
concepts quickly and utilize the same in productive manner.
ACADEMICS
Bachelor of Engineering (EEE) from Sri Krishna Devaraya Engineering College in
Anantapur in 2008.
2. PROFESSIONAL PROFILE
Five year 9 months (5.9) of experience as an Electrical engineer in Construction Field.
Current Project: 1x1000MW Coal fired power Plant Tan Jung bin-4 Power Plant.
Electrical Engineer: Feb25-2014 to Present in SPM Engineering & Constructions
MALAYSIA.
Client: Malakoff Sdn Bhd
Main Contractor: Alstom Power
Significant highlights:
.Ensure that project team is well performed, motivated and working effectively and
efficiently.
.Assisting in the management of either a single, large project or Medium/small scale
projects, by the operations manager.
.May be appointed to manage a medium/small sized project with minimal guidance from a
Project Manager.
.Responsible to the Project Manager for the successful execution of assigned work.
.Control the Manpower on assigned work(s) and shall liaise directly with the Project
manager for manning and de-manning for technical staff.
.Interface with the Client’s Engineer for the project and ensures that all reasonable requests
are met.
.Keep project on schedule.
.Keep control of Man-hours/Overtime.
.Keep track of efficiency/productivity.
.Ensure inputs to weekly and monthly progress reports.
.Monitor extra work and claims and advise P.M.
.Ensuring the Erection Activities are carried out inline the Erection drawings and Contract
Specifications.
.Certification of Sub-Contractor Supply & Erection Bills.
.Maintaining the records for all the supplies made for the project.
.Preparation of Variation Quantities & submission to Client for approval.
.Regulating Site Purchase activities if any.
.Forecasting risks involved while executing the job, Schedule & Cost Constraints,
Resource requirement and suggest solution to overcome the same.
INSTALLATION:
Installation of 33KV HT & LT Panels, HT & LT Power Cables, Battery &
Battery Chargers, UPS, Power Transformer, Cable Trays, Earthing pit /Grid Earthing, Bus duct
sandwich type, MV & LV switchgears, Installation of 11KV HT & LT Panels, HT & LT Power
Cables, Outdoor Power Transformer.
3. Safety Awareness:
Attended Safety Training program CIDB in Malaysia.
Attended Safety Leadership Training in Malaysia.
Electrical Engineer: Sep-2011-Nov 2013, ETA Ascon Group of Companies (M&E)
Division, Abu-Dhabi.
Project# 1. Cleveland Clinic Abu Dhabi (CCAD)
Project Worth: MEP Value - 1.6 billion AED.
Significant highlights:
Generally responsible for implementations and monitoring of all Electrical and ELV
related works at site.
Estimates prepares and assigns the resources such as manpower, materials, consumables,
equipment and tools etc., required for all electrical and related works prior to execution.
Plans and analyses all possible construction methodologies and recommends the best
options to the Project Manager for approval prior to execution at site.
Interprets construction drawings and studies the contract documents and applicable
standards or specifications prior to execution of any jobs.
Manages directly and provide engineering and technical supports to all the electrical
work groups at site. Plans the execution of all electrical related works and coordinates the
works to mechanical and civil groups.
Coordinates with Client / Consultant’s representatives for any site instructions and
inspection of works. Assign targets for accomplishments and ensure targets are met on
daily basis for all electrical groups at site.
Submits site daily reports, inspection requests, estimates and all applicable monitoring
reports on regular basis or as required. Supports the Project Manager in accomplishing all
the goals and targets for the electrical groups at site.
Ensures that all the works done are in accordance with the approved construction
drawings, contract documents, project specifications, and all applicable standards
whether local, national or international standards.
Directly responsible for the safety of all electrical groups’ personnel of the project by
ensuring that the project execution will be done according to all applicable health, safety,
sanitary and environmental standards.
Preparing advance programming schedule incorporating with client’s program of work,
daily progress report and attending weekly coordination meeting. Scheduling meetings
with consultant, client and contractors
Sending RFI, RFC and MIR as per the site requirements and providing method
statements. Quality planning for different stage of installation.
Performs other related duties as may be required by the Project Manager.
4. Project# 2: Grasim Industries ltd (Ultra-tech cements), Shankarpally village, Hyderabad.
Electrical Engineer: June-2010 to August 2011, BLUE STAR LTD, Hyderabad.
Significant highlights:
. Erection HT & LT transmission line (33KV).
. To co-ordinate with Electrical Contractor for Electrification, Execution, Erection &
Commissioning.
. To provide the entire electrical solutions as per requirement.
. To maintain the DPR.
. To check the entire work as according to approved drawings.
. Experience in installation of Electrical Panels, Cabling, Lighting & wiring in High
rise buildings, commercial complexes, corporate offices, Industrial plant.
. Quality planning for different stage of installation.
. Study the drawings, tender and specifications and administer the project based on same.
Project# 3: Real Page software Solutions, Kondapur @Hyderabad &
Quinn Caparo Hi-tech City @ Hyderabad& Siesta Hospitality Services
Kondapur
Electrical Engineer: May2008-2010 April, Shahi Electricals Ltd, Hyderabad.
Significant highlights:
. Experience in installation of Electrical Panels, Cabling, Lighting & wiring in High..
Rise buildings, commercial complexes, corporate offices, Industrial plant.
. Meeting Reports if Client/Architects/Consultant etc.
. Material organization for Site.
. Quality Planning for different stage of installation.
ACHEIVEMENTS
. Mostly achieving targets.
. Minimize wastage of construction material.
PERSONAL VITAE
Marital Status : Married
Date of Birth : 28 June 1986
Passport number : J0670539
Availability : 4 weeks