SlideShare a Scribd company logo
Quote Form
To help us better assist you, please fill in the following information and fax to SNOSTOP toll free
at 866-674-7737 or email to cam@roofersworld.com

Company Name
Contact /Phone/Fax
Project Name
Project Location
(city, or closest major center)
Manufacturer of Metal Roof System
Panel Seam Type
(describe or draw)
Panel Dimensions
(seam height, panel width & panel gauge)
Substructure Description
Projects Designed Snow Load
Each Roof Slope
Panel Length
(distance from eave to peak)
Lineal Feet Required
Color of Roof System

Please read carefully before considering SNOSTOP for your project:

    1) All loads incurred by the SNOSTOP system will be transferred to the sub structure. Therefore,
       proper panel attachment to the structure is necessary to prevent SNOSTOP from sliding under
       snow loads. New and existing structures must be evaluated to insure they can withstand
       retained snow loads. (In instances where there is an overhang at the eave it is imperative to
       make sure the overhang can hold the accumulated loading, otherwise SNOSTOP should be
       secured over the bearing wall.

    2) Designer/Architect, installer, or owner of the project should have knowledge of local snow
        loads, climate conditions, roof slope, roof orientation and roof design prior to the installation
        of SNOSTOP.

    3) After considering the above factors, determine the lineal footage of SNOSTOP required based
       on the length of panels, roof slope, snow loads, and areas which need protection from falling
       snow.

It is the sole responsibility of the Designer/Architect, Installer, or Owner to assess the suitability of
using SNOSTOP based on the above design criteria. SNOSTOP and its distributors are under no liability
if failure occurs from improper installation, improper screw installation, improper panel attachment,
improper roof system installation, improper use of SNOSTOP or under design of the SNOSTOP system.

                                  www.snostop.com

More Related Content

Similar to Using snostop on your project

Technical data sheet alta
Technical data sheet altaTechnical data sheet alta
Technical data sheet alta
Giulio Zanelli
 
Spec u kon fsi 2021
Spec u kon fsi 2021Spec u kon fsi 2021
Spec u kon fsi 2021
Blair Davies, P.Eng., M.B.A.
 
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
Deepak Verma
 
Installation instruction Mineral wool sandwich panels
Installation instruction Mineral wool sandwich panelsInstallation instruction Mineral wool sandwich panels
Installation instruction Mineral wool sandwich panels
Mot panels
 
SolarDock Installation Manual SD2-L-050 v1.0
SolarDock Installation Manual SD2-L-050 v1.0SolarDock Installation Manual SD2-L-050 v1.0
SolarDock Installation Manual SD2-L-050 v1.0
SolarDock
 
Taming The Wind with Engineered Tall Walls
Taming The Wind with Engineered Tall WallsTaming The Wind with Engineered Tall Walls
Taming The Wind with Engineered Tall Walls
donaldsimon
 
EDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTION
EDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTIONEDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTION
EDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTION
Eduardo H. Pare
 
Modulo_&_Scaleo_Brochure_ENG
Modulo_&_Scaleo_Brochure_ENGModulo_&_Scaleo_Brochure_ENG
Modulo_&_Scaleo_Brochure_ENGKevin Barley
 
Stages in Construction
Stages in Construction Stages in Construction
Stages in Construction
Mereia Kali
 
EagleBurgmann FSA Article
EagleBurgmann FSA ArticleEagleBurgmann FSA Article
EagleBurgmann FSA ArticleMatt Long
 
06-Working details-cladding-Marble-by Prof Dr. Ehab Ezzat 2018
06-Working details-cladding-Marble-by Prof Dr. Ehab Ezzat 201806-Working details-cladding-Marble-by Prof Dr. Ehab Ezzat 2018
06-Working details-cladding-Marble-by Prof Dr. Ehab Ezzat 2018
Faculty of fine arts -Cairo. Egypt.
 
Civil Works Site Construction Guidelines for Haris & Co Civil Team.pdf
Civil Works Site Construction Guidelines for  Haris & Co Civil Team.pdfCivil Works Site Construction Guidelines for  Haris & Co Civil Team.pdf
Civil Works Site Construction Guidelines for Haris & Co Civil Team.pdf
usamazahoor159
 
EDUARDO H. PARE CONCEPT DESIGN REPORT INTERNATIONAL AIRPORT
EDUARDO H. PARE CONCEPT DESIGN REPORT INTERNATIONAL AIRPORTEDUARDO H. PARE CONCEPT DESIGN REPORT INTERNATIONAL AIRPORT
EDUARDO H. PARE CONCEPT DESIGN REPORT INTERNATIONAL AIRPORT
Eduardo H. Pare
 
A+SunSystems presents the Solar Tensile Structures
A+SunSystems presents the Solar Tensile StructuresA+SunSystems presents the Solar Tensile Structures
A+SunSystems presents the Solar Tensile Structures
A+ Sun Systems
 
The Design, Construction and Computer –Aided Simulation of a Prototype Roofin...
The Design, Construction and Computer –Aided Simulation of a Prototype Roofin...The Design, Construction and Computer –Aided Simulation of a Prototype Roofin...
The Design, Construction and Computer –Aided Simulation of a Prototype Roofin...
IRJET Journal
 
Linear Systems - Expansion and Movement Joints
Linear Systems - Expansion and Movement JointsLinear Systems - Expansion and Movement Joints
Linear Systems - Expansion and Movement Joints
Ali Asgar Raja
 

Similar to Using snostop on your project (20)

Technical data sheet alta
Technical data sheet altaTechnical data sheet alta
Technical data sheet alta
 
Spec u kon fsi 2021
Spec u kon fsi 2021Spec u kon fsi 2021
Spec u kon fsi 2021
 
SAR JUNE 2014
SAR JUNE 2014SAR JUNE 2014
SAR JUNE 2014
 
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
 
Super123
Super123Super123
Super123
 
Installation instruction Mineral wool sandwich panels
Installation instruction Mineral wool sandwich panelsInstallation instruction Mineral wool sandwich panels
Installation instruction Mineral wool sandwich panels
 
SolarDock Installation Manual SD2-L-050 v1.0
SolarDock Installation Manual SD2-L-050 v1.0SolarDock Installation Manual SD2-L-050 v1.0
SolarDock Installation Manual SD2-L-050 v1.0
 
Mfsc8
Mfsc8Mfsc8
Mfsc8
 
Taming The Wind with Engineered Tall Walls
Taming The Wind with Engineered Tall WallsTaming The Wind with Engineered Tall Walls
Taming The Wind with Engineered Tall Walls
 
EDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTION
EDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTIONEDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTION
EDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTION
 
ASHJACK
ASHJACKASHJACK
ASHJACK
 
Modulo_&_Scaleo_Brochure_ENG
Modulo_&_Scaleo_Brochure_ENGModulo_&_Scaleo_Brochure_ENG
Modulo_&_Scaleo_Brochure_ENG
 
Stages in Construction
Stages in Construction Stages in Construction
Stages in Construction
 
EagleBurgmann FSA Article
EagleBurgmann FSA ArticleEagleBurgmann FSA Article
EagleBurgmann FSA Article
 
06-Working details-cladding-Marble-by Prof Dr. Ehab Ezzat 2018
06-Working details-cladding-Marble-by Prof Dr. Ehab Ezzat 201806-Working details-cladding-Marble-by Prof Dr. Ehab Ezzat 2018
06-Working details-cladding-Marble-by Prof Dr. Ehab Ezzat 2018
 
Civil Works Site Construction Guidelines for Haris & Co Civil Team.pdf
Civil Works Site Construction Guidelines for  Haris & Co Civil Team.pdfCivil Works Site Construction Guidelines for  Haris & Co Civil Team.pdf
Civil Works Site Construction Guidelines for Haris & Co Civil Team.pdf
 
EDUARDO H. PARE CONCEPT DESIGN REPORT INTERNATIONAL AIRPORT
EDUARDO H. PARE CONCEPT DESIGN REPORT INTERNATIONAL AIRPORTEDUARDO H. PARE CONCEPT DESIGN REPORT INTERNATIONAL AIRPORT
EDUARDO H. PARE CONCEPT DESIGN REPORT INTERNATIONAL AIRPORT
 
A+SunSystems presents the Solar Tensile Structures
A+SunSystems presents the Solar Tensile StructuresA+SunSystems presents the Solar Tensile Structures
A+SunSystems presents the Solar Tensile Structures
 
The Design, Construction and Computer –Aided Simulation of a Prototype Roofin...
The Design, Construction and Computer –Aided Simulation of a Prototype Roofin...The Design, Construction and Computer –Aided Simulation of a Prototype Roofin...
The Design, Construction and Computer –Aided Simulation of a Prototype Roofin...
 
Linear Systems - Expansion and Movement Joints
Linear Systems - Expansion and Movement JointsLinear Systems - Expansion and Movement Joints
Linear Systems - Expansion and Movement Joints
 

More from Roofers World

Penetrating snow guard installation
Penetrating snow guard installationPenetrating snow guard installation
Penetrating snow guard installationRoofers World
 
Non penetrating snow guard installation
Non penetrating snow guard installationNon penetrating snow guard installation
Non penetrating snow guard installationRoofers World
 
Rnc anchors warranty
Rnc anchors warrantyRnc anchors warranty
Rnc anchors warrantyRoofers World
 
Fall Protection in 1930
Fall Protection in 1930Fall Protection in 1930
Fall Protection in 1930Roofers World
 
Engineered snow guards
Engineered snow guardsEngineered snow guards
Engineered snow guardsRoofers World
 
Low slope roofing injuries
Low slope roofing injuriesLow slope roofing injuries
Low slope roofing injuriesRoofers World
 
Home improvement costs for 2010
Home improvement costs for 2010Home improvement costs for 2010
Home improvement costs for 2010Roofers World
 
Adapta-Tie Off Sell Sheet
Adapta-Tie Off Sell SheetAdapta-Tie Off Sell Sheet
Adapta-Tie Off Sell Sheet
Roofers World
 
Roofing Knives and Blades
Roofing Knives and BladesRoofing Knives and Blades
Roofing Knives and BladesRoofers World
 
Leak Repair Products
Leak Repair ProductsLeak Repair Products
Leak Repair Products
Roofers World
 
Roofing Repair Tools
Roofing Repair ToolsRoofing Repair Tools
Roofing Repair Tools
Roofers World
 
Magnetic Sweeper Sell Sheet Web
Magnetic Sweeper Sell Sheet WebMagnetic Sweeper Sell Sheet Web
Magnetic Sweeper Sell Sheet WebRoofers World
 
SnoStop Engineered Snow System
SnoStop Engineered Snow SystemSnoStop Engineered Snow System
SnoStop Engineered Snow System
Roofers World
 
SnoStop Plus - Snow Guard Installation
SnoStop Plus - Snow Guard InstallationSnoStop Plus - Snow Guard Installation
SnoStop Plus - Snow Guard Installation
Roofers World
 
ENDURA BRACKET
ENDURA BRACKETENDURA BRACKET
ENDURA BRACKET
Roofers World
 
Roofing Tools in USA
Roofing Tools in USARoofing Tools in USA
Roofing Tools in USA
Roofers World
 
Extreme Adjustable Roof Bracket
Extreme Adjustable Roof BracketExtreme Adjustable Roof Bracket
Extreme Adjustable Roof Bracket
Roofers World
 
Snostop Plus Sell Sheet
Snostop Plus Sell SheetSnostop Plus Sell Sheet
Snostop Plus Sell Sheet
Roofers World
 
Little Red Ripper Sell Sheet
Little Red Ripper Sell SheetLittle Red Ripper Sell Sheet
Little Red Ripper Sell Sheet
Roofers World
 

More from Roofers World (20)

Penetrating snow guard installation
Penetrating snow guard installationPenetrating snow guard installation
Penetrating snow guard installation
 
Non penetrating snow guard installation
Non penetrating snow guard installationNon penetrating snow guard installation
Non penetrating snow guard installation
 
Rnc anchors warranty
Rnc anchors warrantyRnc anchors warranty
Rnc anchors warranty
 
Fall Protection in 1930
Fall Protection in 1930Fall Protection in 1930
Fall Protection in 1930
 
Engineered snow guards
Engineered snow guardsEngineered snow guards
Engineered snow guards
 
Low slope roofing injuries
Low slope roofing injuriesLow slope roofing injuries
Low slope roofing injuries
 
Steep slope roofing
Steep slope roofingSteep slope roofing
Steep slope roofing
 
Home improvement costs for 2010
Home improvement costs for 2010Home improvement costs for 2010
Home improvement costs for 2010
 
Adapta-Tie Off Sell Sheet
Adapta-Tie Off Sell SheetAdapta-Tie Off Sell Sheet
Adapta-Tie Off Sell Sheet
 
Roofing Knives and Blades
Roofing Knives and BladesRoofing Knives and Blades
Roofing Knives and Blades
 
Leak Repair Products
Leak Repair ProductsLeak Repair Products
Leak Repair Products
 
Roofing Repair Tools
Roofing Repair ToolsRoofing Repair Tools
Roofing Repair Tools
 
Magnetic Sweeper Sell Sheet Web
Magnetic Sweeper Sell Sheet WebMagnetic Sweeper Sell Sheet Web
Magnetic Sweeper Sell Sheet Web
 
SnoStop Engineered Snow System
SnoStop Engineered Snow SystemSnoStop Engineered Snow System
SnoStop Engineered Snow System
 
SnoStop Plus - Snow Guard Installation
SnoStop Plus - Snow Guard InstallationSnoStop Plus - Snow Guard Installation
SnoStop Plus - Snow Guard Installation
 
ENDURA BRACKET
ENDURA BRACKETENDURA BRACKET
ENDURA BRACKET
 
Roofing Tools in USA
Roofing Tools in USARoofing Tools in USA
Roofing Tools in USA
 
Extreme Adjustable Roof Bracket
Extreme Adjustable Roof BracketExtreme Adjustable Roof Bracket
Extreme Adjustable Roof Bracket
 
Snostop Plus Sell Sheet
Snostop Plus Sell SheetSnostop Plus Sell Sheet
Snostop Plus Sell Sheet
 
Little Red Ripper Sell Sheet
Little Red Ripper Sell SheetLittle Red Ripper Sell Sheet
Little Red Ripper Sell Sheet
 

Using snostop on your project

  • 1. Quote Form To help us better assist you, please fill in the following information and fax to SNOSTOP toll free at 866-674-7737 or email to cam@roofersworld.com Company Name Contact /Phone/Fax Project Name Project Location (city, or closest major center) Manufacturer of Metal Roof System Panel Seam Type (describe or draw) Panel Dimensions (seam height, panel width & panel gauge) Substructure Description Projects Designed Snow Load Each Roof Slope Panel Length (distance from eave to peak) Lineal Feet Required Color of Roof System Please read carefully before considering SNOSTOP for your project: 1) All loads incurred by the SNOSTOP system will be transferred to the sub structure. Therefore, proper panel attachment to the structure is necessary to prevent SNOSTOP from sliding under snow loads. New and existing structures must be evaluated to insure they can withstand retained snow loads. (In instances where there is an overhang at the eave it is imperative to make sure the overhang can hold the accumulated loading, otherwise SNOSTOP should be secured over the bearing wall. 2) Designer/Architect, installer, or owner of the project should have knowledge of local snow loads, climate conditions, roof slope, roof orientation and roof design prior to the installation of SNOSTOP. 3) After considering the above factors, determine the lineal footage of SNOSTOP required based on the length of panels, roof slope, snow loads, and areas which need protection from falling snow. It is the sole responsibility of the Designer/Architect, Installer, or Owner to assess the suitability of using SNOSTOP based on the above design criteria. SNOSTOP and its distributors are under no liability if failure occurs from improper installation, improper screw installation, improper panel attachment, improper roof system installation, improper use of SNOSTOP or under design of the SNOSTOP system. www.snostop.com