CASE STUDY - HVAC
For more than a century, The University of Queensland
(UQ) has maintained a global reputation for delivering
knowledge leadership for a better world. The most
prestigious and widely recognised rankings of world
universities consistently place UQ among the world’s top
50 universities.
UQ has also won more national teaching awards than any
other Australian university. This commitment to quality
teaching empowers their 53,600 current students, who
study across UQ’s three campuses, to create positive
change for society.
UQ’s research has global impact, delivered by an
interdisciplinary research community of more than 1,500
researchers at their six faculties, eight research institutes
and more than 100 research centres.
“The technology presented to us by MOVUS is 100% useful. It provides our maintenance team a
cost-effective solution that monitors our equipment and alerts us to possible abnormalities that could result in
downtime and additional cost.”
Robert Dore, Client Facility Manager, Property & Facilities Division - UQ
ABOUT UQ
The University of Queensland had a failure in one of
their critical assets, so the maintenance team procured
a cost-effective condition monitoring solution to avoid
similar situations in the future. UQ maintains several chiller
stations which are responsible for delivering chilled water
for 24x7 air-conditioning to the majority of buildings in
their St. Lucia campus.
MOVUS deployed FitMachines® on 22 critical chillers
- including centrifugal and screw type chillers - ranging
from 450kW to 1,500kW. Due to their wide temperature
variations, the maintenance team needed visibility into
their performance across different seasons throughout the
year and times of day. One of the screw-type chillers was
retrofitted with a variable frequency drive (VFD) prototype
aimed at reducing the chiller capacity to cater for low load
periods during colder winter months.
THE SCENARIO
MOVUS FitMachine detected abnormal behaviour in the vibration signature from the screw-type chiller with VFD
prototype implementation during the first cold nights of the winter season, between 10pm and 4am (outside standard
working hours).
Upon further investigation, the maintenance team at UQ found that the vibration signature (RMS) and temperature
signature from the data graph of the building management system also started to change from the same date that the
vibration anomaly was detected by the FitMachine. It was discovered that two components within the chiller control
system required further fine-tuning to accommodate for the lower load conditions.
FITMACHINE® IN ACTION
OUTCOMES FOR UQ
“Now my team is all across the FitMachines dashboard and
emails. Personally, I check the FitMachine Daily Snapshot
emails every morning to make sure everything is right, and
also check the number of restarts as avoiding these are
critical to extend the lifetime of the chillers.”
Glenn Vickery, Maintenance Manager - Contracts, UQ
FAST START YOUR INDUSTRY 4.0 TRANSFORMATION AT WWW.MOVUS.COM.AU
COST SAVINGS WITH REPAIRS AND MAINTENANCE 135% RETURN ON INVESTMENT
EXTENDED ASSET LIFE EXPECTANCY
ACCESS TO REAL-TIME ASSET PERFORMANCE DATA
Implementation of the FitMachine sensors onto UQ’s chillers
has saved the university up to $100,000 in repair costs by
discovering and preventing machine failure ahead of time. In
drastic circumstances where a chiller would have to be rebuilt,
the cost incurred could exceed $150,000.
Based on the avoided repair cost alone, UQ realised 135%
return on their FitMachine investment.
The early warnings from the FitMachine
sensors allowed the maintenance team at
UQ to further investigate the reason behind
the variation in vibration signature and take
the necessary steps to rectify the impact
of the VFD prototype implementation on
screw-type chillers.
The end-to-end FitMachine solution delivers real-time asset
data to the maintenance team at UQ, providing them with
24x7 machine condition monitoring and alerts, as well as
assisting with identifying the fault.
If the FitMachine solution wasn’t deployed on that specific
chiller, it would have taken longer to discover the issue or it
could have led to failure during maximum cooling demand.

More Related Content

Similar to University of qld continuous condition monitoring case study

Yokogawa's Vigilant Plant | Success Stories | Power industry
Yokogawa's Vigilant Plant | Success Stories | Power industryYokogawa's Vigilant Plant | Success Stories | Power industry
Yokogawa's Vigilant Plant | Success Stories | Power industry
Yokogawa
 
Amplus VPU Presentation
Amplus VPU PresentationAmplus VPU Presentation
Amplus VPU PresentationThomas Jeannin
 
Data Centers - Pipe Joining Solutions
Data Centers - Pipe Joining SolutionsData Centers - Pipe Joining Solutions
Data Centers - Pipe Joining Solutions
Graeme Simmers
 
IRJET - Study and Design of Conveyorised Oven System Used for Moisture Re...
IRJET -  	  Study and Design of Conveyorised Oven System Used for Moisture Re...IRJET -  	  Study and Design of Conveyorised Oven System Used for Moisture Re...
IRJET - Study and Design of Conveyorised Oven System Used for Moisture Re...
IRJET Journal
 
Yokogawa's Vigilant Plant | Success Stories | Oil & Gas Industry
Yokogawa's Vigilant Plant | Success Stories | Oil & Gas IndustryYokogawa's Vigilant Plant | Success Stories | Oil & Gas Industry
Yokogawa's Vigilant Plant | Success Stories | Oil & Gas Industry
Yokogawa
 
Australian Water Utility
Australian Water UtilityAustralian Water Utility
Australian Water Utility
MOVUS Australia Pty Ltd
 
Condition-Monitoring_Air-Gap_Vibro-Meter_v2.0
Condition-Monitoring_Air-Gap_Vibro-Meter_v2.0Condition-Monitoring_Air-Gap_Vibro-Meter_v2.0
Condition-Monitoring_Air-Gap_Vibro-Meter_v2.0Pascal Maeder
 
Offshore Wind Farm Training
Offshore Wind Farm TrainingOffshore Wind Farm Training
Offshore Wind Farm Training
Tonex
 
The 5th Aslla Symposium
The 5th Aslla SymposiumThe 5th Aslla Symposium
The 5th Aslla Symposium
Wesley De Neve
 
3 TRENDS IN UNDERGROUND VENTILATION
3 TRENDS IN UNDERGROUND VENTILATION3 TRENDS IN UNDERGROUND VENTILATION
3 TRENDS IN UNDERGROUND VENTILATION
MINETEK
 
BUILDING ENERGY MANAGEMENT SERVICES IN HOSPITALS
BUILDING ENERGY MANAGEMENT SERVICES IN HOSPITALSBUILDING ENERGY MANAGEMENT SERVICES IN HOSPITALS
BUILDING ENERGY MANAGEMENT SERVICES IN HOSPITALS
Lakshmi Ravi Chandu Kolusu
 
EirGrid NATIONAL CONTROL CENTRE
EirGrid NATIONAL CONTROL CENTREEirGrid NATIONAL CONTROL CENTRE
EirGrid NATIONAL CONTROL CENTRE
Power System Operation
 
Electrical Component Overhaul Capability Statement
Electrical Component Overhaul Capability StatementElectrical Component Overhaul Capability Statement
Electrical Component Overhaul Capability StatementJohn O'Malley
 
Yokogawa's Vigilant Plant | Success Stories | (petro)chemical industry
Yokogawa's Vigilant Plant | Success Stories | (petro)chemical industryYokogawa's Vigilant Plant | Success Stories | (petro)chemical industry
Yokogawa's Vigilant Plant | Success Stories | (petro)chemical industry
Yokogawa
 
Winter Newsletter 1.12.16
Winter Newsletter 1.12.16Winter Newsletter 1.12.16
Winter Newsletter 1.12.16fidge72
 
Wind farm re-powering, life extension and decommissioning
Wind farm re-powering, life extension and decommissioningWind farm re-powering, life extension and decommissioning
Wind farm re-powering, life extension and decommissioning
Advisian
 

Similar to University of qld continuous condition monitoring case study (20)

Yokogawa's Vigilant Plant | Success Stories | Power industry
Yokogawa's Vigilant Plant | Success Stories | Power industryYokogawa's Vigilant Plant | Success Stories | Power industry
Yokogawa's Vigilant Plant | Success Stories | Power industry
 
Amplus VPU Presentation
Amplus VPU PresentationAmplus VPU Presentation
Amplus VPU Presentation
 
Data Centers - Pipe Joining Solutions
Data Centers - Pipe Joining SolutionsData Centers - Pipe Joining Solutions
Data Centers - Pipe Joining Solutions
 
IRJET - Study and Design of Conveyorised Oven System Used for Moisture Re...
IRJET -  	  Study and Design of Conveyorised Oven System Used for Moisture Re...IRJET -  	  Study and Design of Conveyorised Oven System Used for Moisture Re...
IRJET - Study and Design of Conveyorised Oven System Used for Moisture Re...
 
Yokogawa's Vigilant Plant | Success Stories | Oil & Gas Industry
Yokogawa's Vigilant Plant | Success Stories | Oil & Gas IndustryYokogawa's Vigilant Plant | Success Stories | Oil & Gas Industry
Yokogawa's Vigilant Plant | Success Stories | Oil & Gas Industry
 
CS003
CS003CS003
CS003
 
1. Kooltrak EndoCube
1. Kooltrak EndoCube1. Kooltrak EndoCube
1. Kooltrak EndoCube
 
Australian Water Utility
Australian Water UtilityAustralian Water Utility
Australian Water Utility
 
e15007
e15007e15007
e15007
 
Condition-Monitoring_Air-Gap_Vibro-Meter_v2.0
Condition-Monitoring_Air-Gap_Vibro-Meter_v2.0Condition-Monitoring_Air-Gap_Vibro-Meter_v2.0
Condition-Monitoring_Air-Gap_Vibro-Meter_v2.0
 
Offshore Wind Farm Training
Offshore Wind Farm TrainingOffshore Wind Farm Training
Offshore Wind Farm Training
 
The 5th Aslla Symposium
The 5th Aslla SymposiumThe 5th Aslla Symposium
The 5th Aslla Symposium
 
3 TRENDS IN UNDERGROUND VENTILATION
3 TRENDS IN UNDERGROUND VENTILATION3 TRENDS IN UNDERGROUND VENTILATION
3 TRENDS IN UNDERGROUND VENTILATION
 
BUILDING ENERGY MANAGEMENT SERVICES IN HOSPITALS
BUILDING ENERGY MANAGEMENT SERVICES IN HOSPITALSBUILDING ENERGY MANAGEMENT SERVICES IN HOSPITALS
BUILDING ENERGY MANAGEMENT SERVICES IN HOSPITALS
 
EirGrid NATIONAL CONTROL CENTRE
EirGrid NATIONAL CONTROL CENTREEirGrid NATIONAL CONTROL CENTRE
EirGrid NATIONAL CONTROL CENTRE
 
Electrical Component Overhaul Capability Statement
Electrical Component Overhaul Capability StatementElectrical Component Overhaul Capability Statement
Electrical Component Overhaul Capability Statement
 
Yokogawa's Vigilant Plant | Success Stories | (petro)chemical industry
Yokogawa's Vigilant Plant | Success Stories | (petro)chemical industryYokogawa's Vigilant Plant | Success Stories | (petro)chemical industry
Yokogawa's Vigilant Plant | Success Stories | (petro)chemical industry
 
iab-suc-prosafe-en
iab-suc-prosafe-eniab-suc-prosafe-en
iab-suc-prosafe-en
 
Winter Newsletter 1.12.16
Winter Newsletter 1.12.16Winter Newsletter 1.12.16
Winter Newsletter 1.12.16
 
Wind farm re-powering, life extension and decommissioning
Wind farm re-powering, life extension and decommissioningWind farm re-powering, life extension and decommissioning
Wind farm re-powering, life extension and decommissioning
 

Recently uploaded

web-tech-lab-manual-final-abhas.pdf. Jer
web-tech-lab-manual-final-abhas.pdf. Jerweb-tech-lab-manual-final-abhas.pdf. Jer
web-tech-lab-manual-final-abhas.pdf. Jer
freshgammer09
 
Building a Raspberry Pi Robot with Dot NET 8, Blazor and SignalR - Slides Onl...
Building a Raspberry Pi Robot with Dot NET 8, Blazor and SignalR - Slides Onl...Building a Raspberry Pi Robot with Dot NET 8, Blazor and SignalR - Slides Onl...
Building a Raspberry Pi Robot with Dot NET 8, Blazor and SignalR - Slides Onl...
Peter Gallagher
 
一比一原版(UCSB毕业证)圣塔芭芭拉社区大学毕业证如何办理
一比一原版(UCSB毕业证)圣塔芭芭拉社区大学毕业证如何办理一比一原版(UCSB毕业证)圣塔芭芭拉社区大学毕业证如何办理
一比一原版(UCSB毕业证)圣塔芭芭拉社区大学毕业证如何办理
aozcue
 
欧洲杯冠军-欧洲杯冠军网站-欧洲杯冠军|【​网址​🎉ac123.net🎉​】领先全球的买球投注平台
欧洲杯冠军-欧洲杯冠军网站-欧洲杯冠军|【​网址​🎉ac123.net🎉​】领先全球的买球投注平台欧洲杯冠军-欧洲杯冠军网站-欧洲杯冠军|【​网址​🎉ac123.net🎉​】领先全球的买球投注平台
欧洲杯冠军-欧洲杯冠军网站-欧洲杯冠军|【​网址​🎉ac123.net🎉​】领先全球的买球投注平台
andreassenrolf537
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证如何办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证如何办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证如何办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证如何办理
aozcue
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理
peuce
 
MATHEMATICS BRIDGE COURSE (TEN DAYS PLANNER) (FOR CLASS XI STUDENTS GOING TO ...
MATHEMATICS BRIDGE COURSE (TEN DAYS PLANNER) (FOR CLASS XI STUDENTS GOING TO ...MATHEMATICS BRIDGE COURSE (TEN DAYS PLANNER) (FOR CLASS XI STUDENTS GOING TO ...
MATHEMATICS BRIDGE COURSE (TEN DAYS PLANNER) (FOR CLASS XI STUDENTS GOING TO ...
PinkySharma900491
 

Recently uploaded (7)

web-tech-lab-manual-final-abhas.pdf. Jer
web-tech-lab-manual-final-abhas.pdf. Jerweb-tech-lab-manual-final-abhas.pdf. Jer
web-tech-lab-manual-final-abhas.pdf. Jer
 
Building a Raspberry Pi Robot with Dot NET 8, Blazor and SignalR - Slides Onl...
Building a Raspberry Pi Robot with Dot NET 8, Blazor and SignalR - Slides Onl...Building a Raspberry Pi Robot with Dot NET 8, Blazor and SignalR - Slides Onl...
Building a Raspberry Pi Robot with Dot NET 8, Blazor and SignalR - Slides Onl...
 
一比一原版(UCSB毕业证)圣塔芭芭拉社区大学毕业证如何办理
一比一原版(UCSB毕业证)圣塔芭芭拉社区大学毕业证如何办理一比一原版(UCSB毕业证)圣塔芭芭拉社区大学毕业证如何办理
一比一原版(UCSB毕业证)圣塔芭芭拉社区大学毕业证如何办理
 
欧洲杯冠军-欧洲杯冠军网站-欧洲杯冠军|【​网址​🎉ac123.net🎉​】领先全球的买球投注平台
欧洲杯冠军-欧洲杯冠军网站-欧洲杯冠军|【​网址​🎉ac123.net🎉​】领先全球的买球投注平台欧洲杯冠军-欧洲杯冠军网站-欧洲杯冠军|【​网址​🎉ac123.net🎉​】领先全球的买球投注平台
欧洲杯冠军-欧洲杯冠军网站-欧洲杯冠军|【​网址​🎉ac123.net🎉​】领先全球的买球投注平台
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证如何办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证如何办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证如何办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证如何办理
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理
 
MATHEMATICS BRIDGE COURSE (TEN DAYS PLANNER) (FOR CLASS XI STUDENTS GOING TO ...
MATHEMATICS BRIDGE COURSE (TEN DAYS PLANNER) (FOR CLASS XI STUDENTS GOING TO ...MATHEMATICS BRIDGE COURSE (TEN DAYS PLANNER) (FOR CLASS XI STUDENTS GOING TO ...
MATHEMATICS BRIDGE COURSE (TEN DAYS PLANNER) (FOR CLASS XI STUDENTS GOING TO ...
 

University of qld continuous condition monitoring case study

  • 1. CASE STUDY - HVAC For more than a century, The University of Queensland (UQ) has maintained a global reputation for delivering knowledge leadership for a better world. The most prestigious and widely recognised rankings of world universities consistently place UQ among the world’s top 50 universities. UQ has also won more national teaching awards than any other Australian university. This commitment to quality teaching empowers their 53,600 current students, who study across UQ’s three campuses, to create positive change for society. UQ’s research has global impact, delivered by an interdisciplinary research community of more than 1,500 researchers at their six faculties, eight research institutes and more than 100 research centres. “The technology presented to us by MOVUS is 100% useful. It provides our maintenance team a cost-effective solution that monitors our equipment and alerts us to possible abnormalities that could result in downtime and additional cost.” Robert Dore, Client Facility Manager, Property & Facilities Division - UQ ABOUT UQ The University of Queensland had a failure in one of their critical assets, so the maintenance team procured a cost-effective condition monitoring solution to avoid similar situations in the future. UQ maintains several chiller stations which are responsible for delivering chilled water for 24x7 air-conditioning to the majority of buildings in their St. Lucia campus. MOVUS deployed FitMachines® on 22 critical chillers - including centrifugal and screw type chillers - ranging from 450kW to 1,500kW. Due to their wide temperature variations, the maintenance team needed visibility into their performance across different seasons throughout the year and times of day. One of the screw-type chillers was retrofitted with a variable frequency drive (VFD) prototype aimed at reducing the chiller capacity to cater for low load periods during colder winter months. THE SCENARIO MOVUS FitMachine detected abnormal behaviour in the vibration signature from the screw-type chiller with VFD prototype implementation during the first cold nights of the winter season, between 10pm and 4am (outside standard working hours). Upon further investigation, the maintenance team at UQ found that the vibration signature (RMS) and temperature signature from the data graph of the building management system also started to change from the same date that the vibration anomaly was detected by the FitMachine. It was discovered that two components within the chiller control system required further fine-tuning to accommodate for the lower load conditions. FITMACHINE® IN ACTION OUTCOMES FOR UQ “Now my team is all across the FitMachines dashboard and emails. Personally, I check the FitMachine Daily Snapshot emails every morning to make sure everything is right, and also check the number of restarts as avoiding these are critical to extend the lifetime of the chillers.” Glenn Vickery, Maintenance Manager - Contracts, UQ FAST START YOUR INDUSTRY 4.0 TRANSFORMATION AT WWW.MOVUS.COM.AU COST SAVINGS WITH REPAIRS AND MAINTENANCE 135% RETURN ON INVESTMENT EXTENDED ASSET LIFE EXPECTANCY ACCESS TO REAL-TIME ASSET PERFORMANCE DATA Implementation of the FitMachine sensors onto UQ’s chillers has saved the university up to $100,000 in repair costs by discovering and preventing machine failure ahead of time. In drastic circumstances where a chiller would have to be rebuilt, the cost incurred could exceed $150,000. Based on the avoided repair cost alone, UQ realised 135% return on their FitMachine investment. The early warnings from the FitMachine sensors allowed the maintenance team at UQ to further investigate the reason behind the variation in vibration signature and take the necessary steps to rectify the impact of the VFD prototype implementation on screw-type chillers. The end-to-end FitMachine solution delivers real-time asset data to the maintenance team at UQ, providing them with 24x7 machine condition monitoring and alerts, as well as assisting with identifying the fault. If the FitMachine solution wasn’t deployed on that specific chiller, it would have taken longer to discover the issue or it could have led to failure during maximum cooling demand.