For more information please visit http://www.hds.com/products/hitachi-unified-compute-platform/
Hitachi Unified Compute Platform (UCP) is a family of completely integrated and flexible reference solutions. Each UCP solution has been specifically configured for immediate deployment and to run top tier infrastructure applications without over-purchasing or provisioning unnecessary equipment. Each custom-built solution has its entire solution stack certified. No more compatibility issues or accusations by different vendors’ technical support.
Hitachi UCP is a family of the best integrated converged infrastructure platforms. They accelerate the most-used applications in desktop and server virtualization, collaboration, database, data warehousing and business analytics. When so much of your organization’s budget is used to support fixed costs, these solutions offer business efficiencies and business value. You can realize these benefits via immediate deployment and greater workload throughput that improve business velocity and profitability.
2. INFRASTRUCTURE DEPLOYMENT CHALLENGES
IT Infrastructure IT Development
Plan
Support Buy
Deploy Integrate
Test Code
Too many handoffs Too many tools
Too many vendors Too much time
Costs too much
“IT organizations spend 23.3% of staff time and
resources on this type of pre-system deployment”
3. FIRST-GENERATION CONVERGED
INFRASTRUCTURE (CI)
End-to-end stack
Application Vendor tests,
configures, installs,
and supports
Hypervisor
Benefits of CI
Server Cuts deployment time,
cuts cost
Network “40% of larger enterprises are
planning to deploy some manner of
converged system”
Storage
4. TWO CONVERGED INFRASTRUCTURE (CI) MODELS
Integrated Solutions
(Turnkey)
Reference Solutions
(Flexible) App App App
Products App App App
Virtualization
Management
App App App
Unified
Virtualization Mgmt Server
Virtualization Mgmt Server Mgmt Network
Server Mgmt
Value
Network Mgmt Storage
Network Mgmt Storage Mgmt
Preconfigured by
Storage Mgmt vendor plus unified
Pre-validated by vendor management and
Customers test
Buy single SKU or orchestration
Buy elements
flexibility to choose Buy single SKU
individually
elements
Reduced Complexity
More Flexibility
5. MISSION-CRITICAL WORKLOAD REQUIREMENTS
Data Virtual
Analytics Email OLTP
warehouse desktop
Peak Instantaneous Scale 1,000 to Millions or Deploy
performance business 100,000 billions of thousands of
to hundreds of decisions with mailboxes and online virtual
database in-memory support transactions desktops for a
instances analytics mobility from processed variety of
anywhere real-time workers
Strains due to VM sprawl CIO imperatives
• Overprovisioning/overloading • Accelerate business velocity
• Unnecessary upgrades • Increase IT efficiency
• Application performance and • Improve IT economics
data recovery issues stalling • Meet stringent SLAs
migration to virtualization
6. TOP CHALLENGES OF FIRST-GENERATION CONVERGED
INFRASTRUCTURE FOR MISSION-CRITICAL WORKLOADS
Infrastructure Management
limitations gap
• Commodity systems lack • No truly unified
high reliability and high orchestration of physical
availability and virtual infrastructure
• Storage scalability and
performance
• Many vendors do not offer
choice of fully integrated
and flexible reference
solutions
• Long deployment time (4
to 6 weeks)
• Cost
7. NEW-GENERATION CONVERGED
INFRASTRUCTURE
Converged
Infrastructure
vCenter
Simplify
Best-in- Virtual and Choice of Cuts more
Class Physical Integrated or Operating
Infrastructure Management Reference Costs
Converged Infrastructure Solutions for
Mission-Critical Workloads
8. OTHER CI CUSTOMER REQUIREMENTS
One purchase order
Converged
Infrastructure
One solution stack
One orchestration management software
One-source support
99.999% availability
Deployment in as little as 2 days
10. UCP FAMILY PORTFOLIO
Hitachi Hitachi
UCP Pro UCP Select
Hypervisor
Server
Network
Storage
11. UCP PRO: INTEGRATED SOLUTION
‒ Hitachi VSP storage
Ethernet Brocade Best in class
‒ Hitachi CB 500 server
6720-60
‒ VMware vSphere 5.1
FC Brocade 6510
‒ ~1000 VMs per chassis
Brocade FCX 648
‒ Scale up to ~8000 VMs
for Management
Hitachi UCP Hitachi UCP
‒ Deploy in ~two days
Pro Pro
‒ One source for support
Enterprise-Class
VSP Storage
UCP Director: vCenter
integrated management and
orchestration of both
Hitachi Compute
physical and virtual
Blade Server CB environment
500
UCP Director
Software GA October
Management
Server CR 210 2012
12. UCP DIRECTOR: TIGHTLY INTEGRATED
INTO VMWARE VCENTER
"… we need to see the whole
stack and manage it together"
– Major U.S. bank
13. UCP DIRECTOR INCREASES STAFF PRODUCTIVITY
VMware vCenter is great for virtual environment
UCP Director enables vCenter to orchestrate infrastructure as well
UCP Director
Integrated into VMware vCenter
Unified virtual and infrastructure view
Automated infrastructure configuration
One-click infrastructure provisioning
Real-time monitoring and troubleshooting
Integrates UCP with existing management
with RESTful API
Benefits
Cuts time, resources needed for orchestration
Admins can focus on value-added services
14. HITACHI UCP SELECT: REFERENCE SOLUTIONS
‒ Hitachi or Cisco* server options
More flexibility:
‒ Hitachi storage options
Ethernet Switches* –
‒ Brocade or Cisco switch options
Brocade or Cisco
Switches
‒ All element management software
‒ VMware vSphere, Microsoft Hyper-V*
PCIe SSD cards*
Hitachi UCP
Servers* Select
Hitachi CB 2000, CB
500 and CR 220 or bare metal*
Or Cisco UCS Server
‒ Best practices reference architecture
Pre-validated:
‒ Implementation guide
Fibre Channel
‒ Sizing options
Switches* – Brocade
or Cisco
Storage* – Hitachi VSP
Small, medium and large*
‒ Tested and certified with all major
or HUS 130/HUS 150
Storage*
Number of VMs, VDI, mailboxes, etc.
* Individual
solutions will vary mission critical applications
15. UCP SELECT FOR VMWARE VSPHERE
WITH CISCO UCS
‒
Best of breed
‒
Cisco Nexus/MDS VMware vSphere
‒
Switches
Hitachi VSP storage
‒
Cisco UCS servers (not sold by HDS)
‒
UCP Select
Cisco networking
Cisco UCS B Series
Servers Element management software
HDS and Cisco joint reference
solution
‒ Built by approved resellers,
Channel partner enabled
VSP Storage
‒ Hypervisor, app and OS installed and
distributors and SIs
supported by partners
16. UCP SELECT: REFERENCE SOLUTIONS
UCP Select for VMware vSphere
GA Jan.
VIRTUALIZATION
VIRTUALIZATION
v5.1
2013
DESKTOP
UCP Select for VMware View® Jan.
GA
SERVER
UCP Select for VMware vSphere 2013
with Cisco UCS GA Oct. UCP Select for Citrix®
2012
XenDesktop®
UCP Select forMicrosoft® GA Jan.
Private Cloud v2 GA Oct. 2013
2012
UCP Select for Microsoft SQL Sept.
WAREHOUSE
GA
Server® 2008 2012
OLTP
DATA
UCP Select for Oracle Database
GA Oct. UCP Select for Microsoft SQL
2012 GA Oct.
Server 2012 2012
ANALYTICS
BUSINESS
EMAIL
UCP Select for Microsoft® UCP Select for SAP HANA®
Exchange 2010 GA Oct. Scale-Up
2012 GA Sept.
2012
17. I.T. ECONOMICS – OPPORTUNITIES TO CUT COSTS
Benefit area Items impacted by UCP Reduction
Test and • Resources for integration, configuration, test 35-55%
development and support of new systems
• Time and resource for implementation of 18-43%
Deployment
mission-critical workloads
Staff • Ongoing activities such as provisioning, 22-48%
productivity monitoring, troubleshooting of CI
Asset • Overprovisioning and overloading of storage,
23-45%
utilization network and server
Environmental • Savings on power, space and cooling 15-28%
18. HITACHI UNIFIED COMPUTE PLATFORM:
NEW GENERATION OF CONVERGED INFRASTRUCTURE
Hitachi Unified
Compute
Platform
vCenter
vCenter
Simplify
Best-in- Virtual and Choice of Cut more
Class Physical Integrated or Operating
Infrastructure Reference Costs
Management
Converged Infrastructure Solutions for
Mission-Critical Workloads
Converged Infrastructure Solutions for Mission
Critical Workloads
20. VMWARE ADMINISTRATOR CHALLENGES
VMware vCenter is a great tool to manage virtual machines
But VMware vCenter-based infrastructure management is limited
Most CI solutions only offer link and launch management software
Missing bare-metal management
Limited host ecosystem view
Server Image management is time consuming
No real-time hardware updates to vCenter
Limited network view
VLAN and port configuration is tedious
Network No self-healing of switch configuration
No monitoring of physical switch
Limited storage system or SAN view
No storage management capability
Storage Storage provisioning takes manual efforts across silos
No monitoring of storage environment
21. PROVISION END-TO-END CONVERGED STACK
Provision host Provision storage Provision network
Deploy ESXi image to Attach storage to Configure VLAN for
configure host configured host physical network
• Install and configure multiple • VM admin identifies how large a • For a single host
components: PowerCLI snap-in, datastore is needed • Gather VLAN configuration
auto deploy, PXE/TFTP and DHCP • Requests storage administrator from host
• Storage admin identifies where • Determine connected switch
• Find the right image and drivers
to provision the volume (i.e., ports
online
storage ports) • Configure switch port VLANs
• Use PowerShell command-line • Creates HSDs on proper ports for
with PowerCLI to: specified hosts • For a host cluster
• Creates volume of specified size • Find all hosts in cluster and
• Create and test an ESXi image
profile with the correct drivers • Adds volume to HSD gather VLAN info
Configuring end-to-end infrastructure is complex, time- ports
Create an auto deploy rule to
• SAN admin Identifies WWNs for • Determine connected
• hosts for each host
map host profile and image consuming and error-prone • Configure all switch ports
• Identifies array port WWNs
profile • Creates zones in appropriate connected to cluster
• Deploy the ESXi image to a host fabrics
• VM admin mounts new volume • Systems may be configured to
• Creates and formats partition hundreds of ports leading
• Creates and names new complexity in provisioning
datastore networks
22. PROVISION HOST WITH UCP DIRECTOR
Provision host Provision storage Provision network
Select the server you want to
deploy
Click Deploy Images
One step to deployment
23. PROVISION STORAGE WITH UCP DIRECTOR
Provision host Provision storage Provision network
In vCenter, Select the host
Choose Hitachi UCP
Configure Host Storage
Specify new volume details
Process takes minutes instead of days Finish
Click
24. PROVISION NETWORK WITH UCP DIRECTOR
Provision host Provision storage Provision network
(VLAN configuration for physical
switch is automatically updated)
Select the host to configure
network
With UCP Director for VMware vSphere, end-to-end
Apply the VLAN configuration
converged infrastructure orchestration is easy
Click Apply
25. PRIVATE CLOUD WITH VMWARE VIRTUALIZATION
UCP SELECT FOR VMWARE VSPHERE (REFERENCE SOLUTION)
For consolidation applications to a Email Dbase VDI
private cloud Custom OLTP Bus Obj
Flexible options with servers and DW CRM ERP
storage offering
Density of VMs per storage unit Servers
Options
Density of VMs per compute unit
Capacity- and performance-optimized VSP or HUS
virtual infrastructure Storage
Full VMware vSphere support
VAAI, VASA, vCenter, SRM, VAMP, VADP,
PSA
26. PRIVATE CLOUD WITH MICROSOFT SOFTWARE
UCP SELECT FOR MICROSOFT® PRIVATE CLOUD (HYPER-V)
Performance-tuned and scalable Hitachi Compute
Blade 2000
High-density computing and throughput Windows Server 2008 R2
with Hyper-V
High number of VMs per blade Microsoft System Center
Optimized data location through intelligent 2012
storage tiering Brocade FC
Scalable to accommodate up to 10,000 VMs Networking
High reliability and VM availability
Hitachi VSP or HUS Storage
Sophisticated blade failover and Software
Symmetric active-active storage controllers
Virtual machine live migration and workload
balancing
Fast time to value Sizing Options Medium Large
Solution management integrated with CB 2000 1-8 blades 2-16 blades
Microsoft System Center VM Manager
Hitachi Storage HUS 150 VSP
Fast provisioning of VMs
Number of VMs Up to 750 Up to 10,000
27. EMAIL INFRASTRUCTURE
HITACHI SELECT FOR MICROSOFT® EXCHANGE
Ethernet
Brocade
Massive scalability to 96,000 mailboxes in
8,000 increments
Maximize reliability and high availability Hitachi UCP
Select
Microsoft Gold certified platform
‒ Microsoft DAG (Data Availability Group)
Combines Hitachi, Microsoft technologies Hitachi
‒ N+M failover
Compute
Blade Server
‒ Logical partitioning of servers for cost
CB 2000
Brocade FC
optimization
8,000 24,000 48,000 96,000
users users users users HUS 130 /
Server blades 2 6 12 24 HUS 150
Memory/blade 80GB 112GB 144GB 160GB Storage
Storage system 1 x HUS 1 x HUS 150 2 x HUS 150 2 x HUS 150
130
Capacity (raw) 92TB 272TB 568TB 1098TB
28. IN-MEMORY REAL-TIME BUSINESS ANALYTICS
UCP PRO FOR SAP HANA® SCALE-UP
Meet demanding business needs with small,
medium and large configurations
Data availability and performance
HUS 150 is ideal for SAP HANA need for
‒ Highly available disk storage to protect in-memory data
persistent data storage
‒ SAP HANA logs (IOPS intensive), savepoints
against outages and failures
(throughput – MB/sec-intensive), database restarts
CB 2000 servers with SMP and onboard PCIe SSD
drives
Sizing Options Small Medium Large
Blades 1 2 4
Investment protection for future HANA ERP
Sockets/Cores 2 /20 4/40 8/80
releases RAM (GB) 256 512 1,024
PCIe SSD 1 2 4
29. DATA WAREHOUSING
UCP SELECT FOR MICROSOFT® SQL SERVER®
Sizing Options Entry Small Medium Large
Cost-effective, high-performance
High availability No Yes Yes Yes
and scalable Up to Up to
Max. capacity 18TB Up to 1PB
50TB 80TB
Small configuration with FC
Server CR 220 CR 220 CB 500 CB 2000
direct connect
Balanced compute to drive
sequential reads to meet
concurrency requirements
Robust data protection and data
replication options
Full Microsoft support
Support MS SQL 2008 and 2012
Microsoft Fast Track validation
30. ONLINE TRANSACTION PROCESSING (OLTP)
UCP SELECT FOR ORACLE DATABASE
Higher performance and availability
CB 2000 SMP scales to 80 cores
Dedicated PCIe flash drives for acceleration for
Oracle ASM Preferred Mirror Read
HUS 150 with full data protection
High agility and flexibility with open
architecture
Red Hat Linux, Oracle Linux or Windows Server
Oracle 9i, 10g or 11g
Full Oracle integration
Oracle Enterprise Manager plug-in
Recovery Manager adapter
Oracle VM plug-in
31. HITACHI VALUE PROPOSITION TO THE CIO
Mission-Critical Workloads Need
Accelerated Business Velocity = UCP
(Best-in-Class Reliability, Availability, Scalability and Performance)
Increased IT Efficiency
Orchestration = UCP Pro
Flexibility = UCP Select
Superior Economics