1. CASE STUDY - CASE STUDY - CASE STUDY - CASE STUDY
Turnberry Hotel
Client: Turnberry Hotel (Leisure Corp)
Scope: First phase refurbishment on a Listed Building
Duration: 13 weeks
Value: £14M
Interserve Project Services Ltd successfully undertook the first phase
refurbishment of this iconic Scottish hotel, working to an extremely
tight and immovable 13 week deadline.
The company’s specialist interior fit-out division, Interserve Retail &
Interiors, completed a total refurbishment of 40 bedrooms
(including 4 suites), a number of which were reconfigured to face
the ocean, which involved removing the ‘central’ corridor and
relocating it to the back of the hotel. The ground floor was totally
remodelled and refurbished, with 3 new (main) public areas being
created: the Sports Bar called “Duel in the Sun”, the Grand Tea
Room and the Ailsa Bar & Lounge. The kitchens were also totally Interserve Retail & Interiors is a
reconfigured and re-equipped. specialist fit-out and joinery
fabrication business working with
Comfort and safety were improved through the replacement of some of the leading names in the
mechanical and electrical services, the installation of a new leisure and hospitality industries. We
sprinkler system throughout the hotel and a fully-vented ceiling
have the capabilities to undertake
incorporating fire suppressant systems.
works ranging from small – scale
Externally, the company’s Regional Building division (Livingston) refurbishments through to complete
installed bespoke double-glazed windows and terrace doors, and renovations.
introduced new external lighting. A new Porte Cochère was installed
in the courtyard to replicate the original, the entire building was Having completed a vast number of
repainted and the courtyard and full frontage were both completely projects within this sector we have an
re-landscaped and re-planted. inherent understanding of the goals
and requirements of the people
The company worked closely with Historic Scotland throughout the leading these industries.
duration of the project, to ensure that both internal and external
renovations were in keeping with their requirements.
Proficient working within fully
operational environments, we can
maximise the potential of your
establishment, whilst minimising
disruption to you, your staff and your
customers, and thus your revenue. In
cases where it is not possible for your
business to remain fully operational,
we will work to carefully planned,
and phased, programmes to ensure
the same results.