SlideShare a Scribd company logo
Cabs Branding
DELHI METRO TRAINS {A BOON FOR ALL}
Advertise inside the Swank Passenger Cabins
through Inside Panels & Handle Bars
From :- Tips & Targets Portfolios Pvt. Ltd
(Delhi Metro Trains on Line I, Line III & IV)
INDEX
► Why to advertise inside Delhi Metro Trains
► Metro Route Map
► Line 1 (Dilshad Garden To Rithala): Available Media & Rate
► Line 3 & 4: (Dwarka to Noida City Centre/ Vaishali): Available Media & Rate
► Rate Card for Lines 1 and Line 3 & 4
► Contact us
A Metro Ride
Advertise inside the Swank Passenger Cabins
ALL IN ONE
 TIME SAVING
 AC COMFORT
 SAFE
 MODERN AND TRENDY
 USER FRIENDLY
 ECONOMICAL
Back to Index
 One of the few Legal Media’s in Delhi
 Reaches consumers on the move
 Captured audience
 Prominent size - easily noticeable
 Clutter free
 Impact full environment
 Mass appeal - convenient medium for all
 Very economical
 In underground - no outside view
 Higher frequency - higher retention
 Excellent support medium (reinforcing)
WHY TO ADVERTISE IN METRO ?
Back to Index
Dwarka Sec 8
Dwarka Sec 21
Back to Index
Covers East , Central, North & North
West Delhi with
29 Rotem Trains (4 Boggies)
running across 21 stations
(5.18 Lacs Commuters Travel Per Day)
LINE – 1 (Red Line) 1. Dilshad Garden
2. Jhilmil
3. Mansarovar Park
4. Shahdara
5. Welcome
6. Seelampur
7. Shastri Park
8. Kashmere Gate
9. Tis Hazari
10. Pul Bangash
11. Pratap Nagar
12. Shastri Nagar
13. Inder Lok
14. Kanhiya Nagar
15. Keshav Puram
16. Netaji Subhash Place
17. Kohat Enclave
18. Pitam Pura
19. Rohini East
20. Rohini West
21. Rithala
DILSHAD GARDEN TO RITHALA
Back to Index
Total number of Trains (4 Boggies) : 29 { 2 motorized (First and last ) and 2 trailers }
Reserved Boggies for Ladies : Every 1st boggie (First & Last)
Seating Capacity per boggie : 60 Passengers
Standing capacity per boggie : 325 Passengers
Average Commuters per day : 5.18 lac
 Total route length : 25.15 Km
 Total number of Stations : 21
Travel time : 45 minutes
 Average trips per Train per day : 19-20 Times (one way)
 Frequency : 2-3 minutes in peak time
IMPORTANT FACTS for Line 1 ( Dilshad Garden To Rithala)
Back to Index
PANELS OPPORTUNITY IN ROTEM TRAINS ON
LINE 1 ( Dilshad Garden To Rithala)
AD Panels on inside walls of Metro Boggies
NO. OF PANELS in 4 Boggies Train:
54 panels in each train with 4 Boggies
2 Boggies with 13 Panels each (First & Last boggie)
2 Boggies with 14 Panels each (Middle boggie)
Taxes extra as applicable
PANELS DETAIL INSIDE ROTEM DELHI METRO TRAINS
Size of Panel
No of
Trains
No. of
Boggies
Per Train
Total
Boggies
Total
Panels
Best Rate
(Per Panel
Per Month)
Best Rate
(Per Boggie
Per Month)
Best Rate
(Per Train
Per Month)
514mm x 204mm 29 4 116 1566
Back to Index
TO VAISHALI
1. Laxmi Nagar
2. Nirman Vihar
3. Preet Vihar
4. Karkarduma
5. Anand Vihar ISBT
6. Kaushambi
7. Vaishali
LINE – 3 & 4 (Blue Line)
(DWARKA TO NOIDA
CITY CENTRE/ VAISHALI)
Covers West, Central, Heart
of the City (C.P), East Delhi
& Noida with
27 Rotem Trains (4 Boggies)
4 Rotem Trains (6 Boggies)
40 Bombardier Trains (6 Boggies)
running across 51 stations
(13.16 Lacs Commuters Travel Per Day)
1. Dwarka Sec-21
2. Dwarka Sec-08
3. Dwarka Sec-09
4. Dwarka Sec-10
5. Dwarka Sec-11
6. Dwarka Sec-12
7. Dwarka Sec-13
8. Dwarka Sec-14
9. Dwarka
10. Dwarka More
11. Nawada
12. Uttam Nagar West
13. Uttam Nagar East
14. Janakpuri West
15. Janakpuri East
16. Tilak Nagar
17. Subhash Nagar
18. Tagore Garden
19. Rajouri Garden
20. Ramesh Nagar
21. Moti Nagar
22. Kirti Nagar
23. Shadipur
24. Patel Nagar
25. Rajendra Place
26. Karol Bagh
27. Jhandewalan
28. R.K. Ashram Marg
29. Rajiv Chowk
30. Barakhamba Road
31. Mandi House
32. Pragati Maidan
33. Indraprastha
34. Yamuna Bank
TO NOIDA CITY CENTRE
1. Akshardam Temple
2. Mayur Vihar – I
3. Mayur Vihar Ext.
4. New Ashok Nagar
5. Noida Sec-15
6. Noida Sec-16
7. Noida Sec-18
8. Botanical Garden
9. Golf Course
10. Noida City Centre (Sec 32)
Back to Index
Total number of Trains (4 Boggies) Rotem : 27 { 2 motorized (First and last ) and 2 trailers }
Total number of Trains (6 Boggies) Rotem : 4 { 2 motorized (First and last ) and 4 trailers }
Total number of Trains (6 Boggies) Bombardier : 40 { 2 motorized (First and last ) and 4 trailers }
Reserved Boggies for Ladies : Every 1st boggie (First & Last)
Seating Capacity per boggie : 60 Passengers
Standing capacity per boggie : 325 Passengers
Average Commuters per day : 13.16 lac
 Total route length : 58.67 km
 Total number of Stations : 51
Travel time : 90/80 Minutes
 Average trips per Train per day : 10-11 Times (one way)
 Frequency : 2-3 minutes in peak time
IMPORTANT FACTS for Line 3 & 4 ( Dwarka to Noida City Centre/ Vaishali)
Back to Index
PANELS OPPORTUNITY IN ROTEM TRAINS ON
LINE 3 & 4 ( Dwarka To Noida City Centre/ Vaishali)
AD Panels on inside walls of Metro Boggies
NO. OF PANELS:
54 panels in each train with 4 boggies
2 boggies with 13 Panels each (First & Last boggie)
2 boggies with 14 Panels each (Middle boggies)
82 panels in each train with 6 boggies
2 boggies with 13 Panels each (First & Last boggie)
4 boggies with 14 Panels each (Middle boggies)
SIZE: 514mm(width) x 204mm(height)
(Not back-lit but sufficiently bright interiors)
Taxes extra as applicable
PANELS DETAIL INSIDE ROTEM DELHI METRO TRAINS
Size of Panel
No of
Trains
No. of
Boggies
Per Train
Total
Boggies
Total
Panels
Best Rate
(Per Panel
Per Month)
Best Rate
(Per Boggie
Per Month)
Best Rate
(Per Train
Per Month)
514mm x 204mm 27 4 108 1458
514mm x 204mm 4 6 24 328
Total 31 132 1786
Back to Index
HANDLE BAR OPPORTUNITY IN ROTEM TRAINS ON
LINE 3 & 4 ( Dwarka To Noida City Centre/ Vaishali)
Triangle Shaped Box fixed with the Handle Bar inside Metro Trains
SIZE: 111mm(width) x 56mm(height) x 3 Sides
Detail of HANDLE BAR in 4 Boggies Train:
Total Handle Bar to be used for branding:
86 Handle Bars (Every Alternative Handle Bars)
2 Boggies with 21 Handle Bars each (First & Last boggie)
2 Boggies with 22 Handle Bars each (Middle boggies)
Detail of HANDLE BAR in 6 Boggies Train:
Total Handle Bar to be used for branding:
130 Handle Bars (Every Alternative Handle Bars)
2 Boggies with 21 Handle Bars each (First & Last boggie)
4 Boggies with 22 Handle Bars each (Middle boggies)
Taxes extra as applicable
HANDLE BARS DETAIL INSIDE ROTEM DELHI METRO TRAINS
Size
No of
Trains
No. of
Boggies
Per Train
Total
Boggies
No. of Handle
Bar Per Boggie
Best Rate
(Per Boggie
Per Month)
Best Rate
(Per Train
Per Month)
111mm x 56mm x 3 Sides 27 4 108 21/22
111mm x 56mm x 3 Sides 4 6 24 21/22
31 132
Back to Index
PANELS OPPORTUNITY IN BOMBARDIER TRAINS ON
LINE – 3 & 4 ( Dwarka To Noida City Centre/ Vaishali)
AD Panels on inside walls of Metro boggies
NO. OF UPPER PANEL in a Train
98 panels in each train with 6 boggies
SIZE: 767mm(width) x 109mm(height
NO. OF LOWER PANEL in each Train
74 panels in each train with 6 boggies
SIZE: 417 mm (width) x 592 mm (height)
(Not back-lit but sufficiently bright interiors)
Taxes extra as applicable
Division of Panels in SETS* :
36 Sets* + 2 Single Lower + 8 Single Upper Panels
in each train with 6 boggies
* (1 Set contains:- 2 Lower Panels + 2 or 3 Upper Panels)
SETS* OF PANELS DETAIL INSIDE BOMBARDIER DELHI METRO TRAINS
Size
(W x H)
No of
Trains
No. of
Boggies
Per
Train
Total
Boggies
No. of Set* Per
Boggie Total
Set* of
Panels
Best Rate
(Per Set*
Per Month)
Best Rate
(Per Boggie
Per Month)I & Last
Each
Middle
Each
767mm x 109mm
Upper Panel
40 6 240
6 Sets*
+ 1
Single
Lower
Panel
6 Sets*
+ 2
Single
Upper
Panel
1480
417mm x 592mm
Lower Panel
*One Set Contains : 2 Lower Panels + 2/3 Upper Panels
Back to Index
HANDLE BAR OPPORTUNITY IN BOMBARDIER TRAINS ON
LINE – 3 & 4 ( Dwarka To Noida City Centre/ Vaishali)
Triangle Shaped Box fixed with the Handle Bar inside Metro Trains
SIZE: 111mm(width) x 56mm(height) x 3 Sides
Detail of HANDLE BAR in 6 Boggies Train:
Total Handle Bar to be used for branding:
212 Handle Bars (Every Alternative Handle Bars)
2 Boggies with 34 Handle Bars each (First & Last boggie)
4 Boggies with 36 Handle Bars each (Middle boggies)
Taxes extra as applicable
HANDLE BARS DETAIL INSIDE BOMBARDIER DELHI METRO TRAINS
Size No of Trains
No. of Boggies
Per Train
Total
Boggies
No. of Handle Bar
Per Boggie
Best Rate
(Per Boggie
Per Month)
111mm x 56mm x 3 Sides 40 6 240 34/36
Back to Index
PANELS LAYOUT INSIDE BOMBARIDER TRAIN’S BOGGIES
Back to Index
(Layout of Middle Boggies)
(Layouts of First & Last Boggies)
Back to Index
Back to Index
Back to Index
Back to Index
Metro Data Analysis
Back to Index
Average Per Day Movement
Total No.
of Train
Entry
per line
Entry
per line %
Total Commuters'
per line
Total
Commuters'
per line %
Commuters'
entry & exit on
same line
Commuters'
entry & exit on
same line %
Line-1 29 329447 15 518685 23 156852 7
Line-2 62 800782 35 1287972 57 341368 15
Line-3/4 71 896325 39 1316315 58 647486 29
Line-5 19 79220 3 138549 6 20117 1
Line-6 29 163479 7 259734 11 69355 3
Total 210 2269253 100 3521255 155 1235178 54
Back to Index
54% passengers using one line and 46%passengers using two & more lines
81% Passengers using Line 1,3&4
Transit Media

More Related Content

Similar to Transit Media

Delhi Metro Train Blue Line Media - Shrii Ganness Advt Outdoor Advertising A...
Delhi Metro Train Blue Line Media -  Shrii Ganness Advt Outdoor Advertising A...Delhi Metro Train Blue Line Media -  Shrii Ganness Advt Outdoor Advertising A...
Delhi Metro Train Blue Line Media - Shrii Ganness Advt Outdoor Advertising A...
Suraj Partaap Singh
 
Presentation on Train Wraps & Inside Train Branding latest
Presentation on Train Wraps & Inside Train Branding latestPresentation on Train Wraps & Inside Train Branding latest
Presentation on Train Wraps & Inside Train Branding latest
Adit Kohli
 
DELHI-METRO-ADVERTISING-METRO-TRAINS-7-15
DELHI-METRO-ADVERTISING-METRO-TRAINS-7-15DELHI-METRO-ADVERTISING-METRO-TRAINS-7-15
DELHI-METRO-ADVERTISING-METRO-TRAINS-7-15
Manish Kumar
 
media-kit-Delhi+Metro.ppt
media-kit-Delhi+Metro.pptmedia-kit-Delhi+Metro.ppt
media-kit-Delhi+Metro.ppt
ssuserd6838c
 
Delhi Metro Advertising
Delhi Metro AdvertisingDelhi Metro Advertising
Delhi Metro Advertising
charuarora41
 
Webinar: Bus rapid transit system: metro on surface or high performance bus s...
Webinar: Bus rapid transit system: metro on surface or high performance bus s...Webinar: Bus rapid transit system: metro on surface or high performance bus s...
Webinar: Bus rapid transit system: metro on surface or high performance bus s...
BRTCoE
 
Brts
BrtsBrts
Brts
Aj Reddy
 
Metro Rail in Dhaka City
Metro Rail in Dhaka CityMetro Rail in Dhaka City
Metro Rail in Dhaka City
Zunayet Shibly
 
Bus Rapid Transit in Asia: From Quantity to Quality
Bus Rapid Transit in Asia: From Quantity to QualityBus Rapid Transit in Asia: From Quantity to Quality
Bus Rapid Transit in Asia: From Quantity to Quality
WRI Ross Center for Sustainable Cities
 
BRTS
BRTSBRTS
Delhi Local Train Advertising - Advertising on the EMU Train across Delhi Sub...
Delhi Local Train Advertising - Advertising on the EMU Train across Delhi Sub...Delhi Local Train Advertising - Advertising on the EMU Train across Delhi Sub...
Delhi Local Train Advertising - Advertising on the EMU Train across Delhi Sub...
Organized Outdoor
 
Theme 6 BRT vs. LRT moving beyond emotional bias
Theme 6 BRT vs. LRT moving beyond emotional biasTheme 6 BRT vs. LRT moving beyond emotional bias
Theme 6 BRT vs. LRT moving beyond emotional bias
BRTCoE
 
Metro Rail final.pptx
Metro Rail final.pptxMetro Rail final.pptx
Metro Rail final.pptx
Niloy Kundu Bijoy
 
DIESEL LOCO SHED AND CARRIAGE WAGON DEPOT, KANPUR
DIESEL LOCO SHED  AND CARRIAGE WAGON DEPOT, KANPUR DIESEL LOCO SHED  AND CARRIAGE WAGON DEPOT, KANPUR
DIESEL LOCO SHED AND CARRIAGE WAGON DEPOT, KANPUR
Abhishek dayal
 
China’s brt development in the last decade
China’s brt development in the last decadeChina’s brt development in the last decade
China’s brt development in the last decade
BRTCoE
 

Similar to Transit Media (15)

Delhi Metro Train Blue Line Media - Shrii Ganness Advt Outdoor Advertising A...
Delhi Metro Train Blue Line Media -  Shrii Ganness Advt Outdoor Advertising A...Delhi Metro Train Blue Line Media -  Shrii Ganness Advt Outdoor Advertising A...
Delhi Metro Train Blue Line Media - Shrii Ganness Advt Outdoor Advertising A...
 
Presentation on Train Wraps & Inside Train Branding latest
Presentation on Train Wraps & Inside Train Branding latestPresentation on Train Wraps & Inside Train Branding latest
Presentation on Train Wraps & Inside Train Branding latest
 
DELHI-METRO-ADVERTISING-METRO-TRAINS-7-15
DELHI-METRO-ADVERTISING-METRO-TRAINS-7-15DELHI-METRO-ADVERTISING-METRO-TRAINS-7-15
DELHI-METRO-ADVERTISING-METRO-TRAINS-7-15
 
media-kit-Delhi+Metro.ppt
media-kit-Delhi+Metro.pptmedia-kit-Delhi+Metro.ppt
media-kit-Delhi+Metro.ppt
 
Delhi Metro Advertising
Delhi Metro AdvertisingDelhi Metro Advertising
Delhi Metro Advertising
 
Webinar: Bus rapid transit system: metro on surface or high performance bus s...
Webinar: Bus rapid transit system: metro on surface or high performance bus s...Webinar: Bus rapid transit system: metro on surface or high performance bus s...
Webinar: Bus rapid transit system: metro on surface or high performance bus s...
 
Brts
BrtsBrts
Brts
 
Metro Rail in Dhaka City
Metro Rail in Dhaka CityMetro Rail in Dhaka City
Metro Rail in Dhaka City
 
Bus Rapid Transit in Asia: From Quantity to Quality
Bus Rapid Transit in Asia: From Quantity to QualityBus Rapid Transit in Asia: From Quantity to Quality
Bus Rapid Transit in Asia: From Quantity to Quality
 
BRTS
BRTSBRTS
BRTS
 
Delhi Local Train Advertising - Advertising on the EMU Train across Delhi Sub...
Delhi Local Train Advertising - Advertising on the EMU Train across Delhi Sub...Delhi Local Train Advertising - Advertising on the EMU Train across Delhi Sub...
Delhi Local Train Advertising - Advertising on the EMU Train across Delhi Sub...
 
Theme 6 BRT vs. LRT moving beyond emotional bias
Theme 6 BRT vs. LRT moving beyond emotional biasTheme 6 BRT vs. LRT moving beyond emotional bias
Theme 6 BRT vs. LRT moving beyond emotional bias
 
Metro Rail final.pptx
Metro Rail final.pptxMetro Rail final.pptx
Metro Rail final.pptx
 
DIESEL LOCO SHED AND CARRIAGE WAGON DEPOT, KANPUR
DIESEL LOCO SHED  AND CARRIAGE WAGON DEPOT, KANPUR DIESEL LOCO SHED  AND CARRIAGE WAGON DEPOT, KANPUR
DIESEL LOCO SHED AND CARRIAGE WAGON DEPOT, KANPUR
 
China’s brt development in the last decade
China’s brt development in the last decadeChina’s brt development in the last decade
China’s brt development in the last decade
 

Recently uploaded

Enhance Your Home with Professional Painting Services
Enhance Your Home with Professional Painting ServicesEnhance Your Home with Professional Painting Services
Enhance Your Home with Professional Painting Services
Perfect Industrial
 
eBrand Promotion Full Service Digital Agency Company Profile
eBrand Promotion Full Service Digital Agency Company ProfileeBrand Promotion Full Service Digital Agency Company Profile
eBrand Promotion Full Service Digital Agency Company Profile
ChimaOrjiOkpi
 
Biomass Briquettes A Sustainable Solution for Energy and Waste Management..pptx
Biomass Briquettes A Sustainable Solution for Energy and Waste Management..pptxBiomass Briquettes A Sustainable Solution for Energy and Waste Management..pptx
Biomass Briquettes A Sustainable Solution for Energy and Waste Management..pptx
ECOSTAN Biofuel Pvt Ltd
 
Siddhivinayak temple timings Houston, TX
Siddhivinayak temple timings Houston, TXSiddhivinayak temple timings Houston, TX
Siddhivinayak temple timings Houston, TX
gaurisiddhivinayakte
 
3 Examples of new capital gains taxes in Canada
3 Examples of new capital gains taxes in Canada3 Examples of new capital gains taxes in Canada
3 Examples of new capital gains taxes in Canada
Lakshay Gandhi
 
The best Social Media Spy Apps for Catching Your Unfaithful Wife.pdf
The best Social Media Spy Apps for Catching Your Unfaithful Wife.pdfThe best Social Media Spy Apps for Catching Your Unfaithful Wife.pdf
The best Social Media Spy Apps for Catching Your Unfaithful Wife.pdf
tonytkelly6
 
Emmanuel Katto Uganda - A Philanthropist
Emmanuel Katto Uganda - A PhilanthropistEmmanuel Katto Uganda - A Philanthropist
Emmanuel Katto Uganda - A Philanthropist
Marina Costa
 
WORK PERMIT IN NORWAY | WORK VISA SERVICE
WORK  PERMIT  IN  NORWAY | WORK VISA SERVICEWORK  PERMIT  IN  NORWAY | WORK VISA SERVICE
WORK PERMIT IN NORWAY | WORK VISA SERVICE
RKIMT
 
x ray baggage scanner manufacturers in India
x ray baggage scanner manufacturers in Indiax ray baggage scanner manufacturers in India
x ray baggage scanner manufacturers in India
Gujar Industries India Pvt. Ltd
 
Copy Trading Forex Brokers 2024 ptx
Copy Trading Forex Brokers 2024      ptxCopy Trading Forex Brokers 2024      ptx
Copy Trading Forex Brokers 2024 ptx
Brokerreviewfx
 
The study compares AMUSE's FDM and MJF 3D printing technologies.pptx
The study compares AMUSE's FDM and MJF 3D printing technologies.pptxThe study compares AMUSE's FDM and MJF 3D printing technologies.pptx
The study compares AMUSE's FDM and MJF 3D printing technologies.pptx
Amuse
 
Understanding Love Compatibility or Synastry: Why It Matters
Understanding Love Compatibility or Synastry: Why It MattersUnderstanding Love Compatibility or Synastry: Why It Matters
Understanding Love Compatibility or Synastry: Why It Matters
AstroForYou
 
Best Immigration Consultants in Amritsar- SAGA Studies
Best Immigration Consultants in Amritsar- SAGA StudiesBest Immigration Consultants in Amritsar- SAGA Studies
Best Immigration Consultants in Amritsar- SAGA Studies
SAGA Studies
 
DOJO Training room | Training DOJO PPT
DOJO Training room | Training DOJO   PPTDOJO Training room | Training DOJO   PPT
DOJO Training room | Training DOJO PPT
Himanshu
 
Electrical Testing Lab Services in Dubai.pdf
Electrical Testing Lab Services in Dubai.pdfElectrical Testing Lab Services in Dubai.pdf
Electrical Testing Lab Services in Dubai.pdf
sandeepmetsuae
 
Electrical Testing Lab Services in Dubai.pptx
Electrical Testing Lab Services in Dubai.pptxElectrical Testing Lab Services in Dubai.pptx
Electrical Testing Lab Services in Dubai.pptx
sandeepmetsuae
 
Top Challenges Faced by High-Risk Merchants and How to Overcome Them.pptx
Top Challenges Faced by High-Risk Merchants and How to Overcome Them.pptxTop Challenges Faced by High-Risk Merchants and How to Overcome Them.pptx
Top Challenges Faced by High-Risk Merchants and How to Overcome Them.pptx
Merchantech - Payment Processing Services
 
Best Web Development Frameworks in 2024
Best Web Development Frameworks in 2024Best Web Development Frameworks in 2024
Best Web Development Frameworks in 2024
growthgrids
 
Bridging the Language Gap The Power of Simultaneous Interpretation in Rwanda
Bridging the Language Gap The Power of Simultaneous Interpretation in RwandaBridging the Language Gap The Power of Simultaneous Interpretation in Rwanda
Bridging the Language Gap The Power of Simultaneous Interpretation in Rwanda
Kasuku Translation Ltd
 
Expert Tips for Pruning Your Plants.pdf.
Expert Tips for Pruning Your Plants.pdf.Expert Tips for Pruning Your Plants.pdf.
Expert Tips for Pruning Your Plants.pdf.
Local Gardeners
 

Recently uploaded (20)

Enhance Your Home with Professional Painting Services
Enhance Your Home with Professional Painting ServicesEnhance Your Home with Professional Painting Services
Enhance Your Home with Professional Painting Services
 
eBrand Promotion Full Service Digital Agency Company Profile
eBrand Promotion Full Service Digital Agency Company ProfileeBrand Promotion Full Service Digital Agency Company Profile
eBrand Promotion Full Service Digital Agency Company Profile
 
Biomass Briquettes A Sustainable Solution for Energy and Waste Management..pptx
Biomass Briquettes A Sustainable Solution for Energy and Waste Management..pptxBiomass Briquettes A Sustainable Solution for Energy and Waste Management..pptx
Biomass Briquettes A Sustainable Solution for Energy and Waste Management..pptx
 
Siddhivinayak temple timings Houston, TX
Siddhivinayak temple timings Houston, TXSiddhivinayak temple timings Houston, TX
Siddhivinayak temple timings Houston, TX
 
3 Examples of new capital gains taxes in Canada
3 Examples of new capital gains taxes in Canada3 Examples of new capital gains taxes in Canada
3 Examples of new capital gains taxes in Canada
 
The best Social Media Spy Apps for Catching Your Unfaithful Wife.pdf
The best Social Media Spy Apps for Catching Your Unfaithful Wife.pdfThe best Social Media Spy Apps for Catching Your Unfaithful Wife.pdf
The best Social Media Spy Apps for Catching Your Unfaithful Wife.pdf
 
Emmanuel Katto Uganda - A Philanthropist
Emmanuel Katto Uganda - A PhilanthropistEmmanuel Katto Uganda - A Philanthropist
Emmanuel Katto Uganda - A Philanthropist
 
WORK PERMIT IN NORWAY | WORK VISA SERVICE
WORK  PERMIT  IN  NORWAY | WORK VISA SERVICEWORK  PERMIT  IN  NORWAY | WORK VISA SERVICE
WORK PERMIT IN NORWAY | WORK VISA SERVICE
 
x ray baggage scanner manufacturers in India
x ray baggage scanner manufacturers in Indiax ray baggage scanner manufacturers in India
x ray baggage scanner manufacturers in India
 
Copy Trading Forex Brokers 2024 ptx
Copy Trading Forex Brokers 2024      ptxCopy Trading Forex Brokers 2024      ptx
Copy Trading Forex Brokers 2024 ptx
 
The study compares AMUSE's FDM and MJF 3D printing technologies.pptx
The study compares AMUSE's FDM and MJF 3D printing technologies.pptxThe study compares AMUSE's FDM and MJF 3D printing technologies.pptx
The study compares AMUSE's FDM and MJF 3D printing technologies.pptx
 
Understanding Love Compatibility or Synastry: Why It Matters
Understanding Love Compatibility or Synastry: Why It MattersUnderstanding Love Compatibility or Synastry: Why It Matters
Understanding Love Compatibility or Synastry: Why It Matters
 
Best Immigration Consultants in Amritsar- SAGA Studies
Best Immigration Consultants in Amritsar- SAGA StudiesBest Immigration Consultants in Amritsar- SAGA Studies
Best Immigration Consultants in Amritsar- SAGA Studies
 
DOJO Training room | Training DOJO PPT
DOJO Training room | Training DOJO   PPTDOJO Training room | Training DOJO   PPT
DOJO Training room | Training DOJO PPT
 
Electrical Testing Lab Services in Dubai.pdf
Electrical Testing Lab Services in Dubai.pdfElectrical Testing Lab Services in Dubai.pdf
Electrical Testing Lab Services in Dubai.pdf
 
Electrical Testing Lab Services in Dubai.pptx
Electrical Testing Lab Services in Dubai.pptxElectrical Testing Lab Services in Dubai.pptx
Electrical Testing Lab Services in Dubai.pptx
 
Top Challenges Faced by High-Risk Merchants and How to Overcome Them.pptx
Top Challenges Faced by High-Risk Merchants and How to Overcome Them.pptxTop Challenges Faced by High-Risk Merchants and How to Overcome Them.pptx
Top Challenges Faced by High-Risk Merchants and How to Overcome Them.pptx
 
Best Web Development Frameworks in 2024
Best Web Development Frameworks in 2024Best Web Development Frameworks in 2024
Best Web Development Frameworks in 2024
 
Bridging the Language Gap The Power of Simultaneous Interpretation in Rwanda
Bridging the Language Gap The Power of Simultaneous Interpretation in RwandaBridging the Language Gap The Power of Simultaneous Interpretation in Rwanda
Bridging the Language Gap The Power of Simultaneous Interpretation in Rwanda
 
Expert Tips for Pruning Your Plants.pdf.
Expert Tips for Pruning Your Plants.pdf.Expert Tips for Pruning Your Plants.pdf.
Expert Tips for Pruning Your Plants.pdf.
 

Transit Media

  • 1.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8. DELHI METRO TRAINS {A BOON FOR ALL} Advertise inside the Swank Passenger Cabins through Inside Panels & Handle Bars From :- Tips & Targets Portfolios Pvt. Ltd (Delhi Metro Trains on Line I, Line III & IV)
  • 9. INDEX ► Why to advertise inside Delhi Metro Trains ► Metro Route Map ► Line 1 (Dilshad Garden To Rithala): Available Media & Rate ► Line 3 & 4: (Dwarka to Noida City Centre/ Vaishali): Available Media & Rate ► Rate Card for Lines 1 and Line 3 & 4 ► Contact us
  • 10. A Metro Ride Advertise inside the Swank Passenger Cabins ALL IN ONE  TIME SAVING  AC COMFORT  SAFE  MODERN AND TRENDY  USER FRIENDLY  ECONOMICAL Back to Index
  • 11.  One of the few Legal Media’s in Delhi  Reaches consumers on the move  Captured audience  Prominent size - easily noticeable  Clutter free  Impact full environment  Mass appeal - convenient medium for all  Very economical  In underground - no outside view  Higher frequency - higher retention  Excellent support medium (reinforcing) WHY TO ADVERTISE IN METRO ? Back to Index
  • 12. Dwarka Sec 8 Dwarka Sec 21 Back to Index
  • 13. Covers East , Central, North & North West Delhi with 29 Rotem Trains (4 Boggies) running across 21 stations (5.18 Lacs Commuters Travel Per Day) LINE – 1 (Red Line) 1. Dilshad Garden 2. Jhilmil 3. Mansarovar Park 4. Shahdara 5. Welcome 6. Seelampur 7. Shastri Park 8. Kashmere Gate 9. Tis Hazari 10. Pul Bangash 11. Pratap Nagar 12. Shastri Nagar 13. Inder Lok 14. Kanhiya Nagar 15. Keshav Puram 16. Netaji Subhash Place 17. Kohat Enclave 18. Pitam Pura 19. Rohini East 20. Rohini West 21. Rithala DILSHAD GARDEN TO RITHALA Back to Index
  • 14. Total number of Trains (4 Boggies) : 29 { 2 motorized (First and last ) and 2 trailers } Reserved Boggies for Ladies : Every 1st boggie (First & Last) Seating Capacity per boggie : 60 Passengers Standing capacity per boggie : 325 Passengers Average Commuters per day : 5.18 lac  Total route length : 25.15 Km  Total number of Stations : 21 Travel time : 45 minutes  Average trips per Train per day : 19-20 Times (one way)  Frequency : 2-3 minutes in peak time IMPORTANT FACTS for Line 1 ( Dilshad Garden To Rithala) Back to Index
  • 15. PANELS OPPORTUNITY IN ROTEM TRAINS ON LINE 1 ( Dilshad Garden To Rithala) AD Panels on inside walls of Metro Boggies NO. OF PANELS in 4 Boggies Train: 54 panels in each train with 4 Boggies 2 Boggies with 13 Panels each (First & Last boggie) 2 Boggies with 14 Panels each (Middle boggie) Taxes extra as applicable PANELS DETAIL INSIDE ROTEM DELHI METRO TRAINS Size of Panel No of Trains No. of Boggies Per Train Total Boggies Total Panels Best Rate (Per Panel Per Month) Best Rate (Per Boggie Per Month) Best Rate (Per Train Per Month) 514mm x 204mm 29 4 116 1566 Back to Index
  • 16. TO VAISHALI 1. Laxmi Nagar 2. Nirman Vihar 3. Preet Vihar 4. Karkarduma 5. Anand Vihar ISBT 6. Kaushambi 7. Vaishali LINE – 3 & 4 (Blue Line) (DWARKA TO NOIDA CITY CENTRE/ VAISHALI) Covers West, Central, Heart of the City (C.P), East Delhi & Noida with 27 Rotem Trains (4 Boggies) 4 Rotem Trains (6 Boggies) 40 Bombardier Trains (6 Boggies) running across 51 stations (13.16 Lacs Commuters Travel Per Day) 1. Dwarka Sec-21 2. Dwarka Sec-08 3. Dwarka Sec-09 4. Dwarka Sec-10 5. Dwarka Sec-11 6. Dwarka Sec-12 7. Dwarka Sec-13 8. Dwarka Sec-14 9. Dwarka 10. Dwarka More 11. Nawada 12. Uttam Nagar West 13. Uttam Nagar East 14. Janakpuri West 15. Janakpuri East 16. Tilak Nagar 17. Subhash Nagar 18. Tagore Garden 19. Rajouri Garden 20. Ramesh Nagar 21. Moti Nagar 22. Kirti Nagar 23. Shadipur 24. Patel Nagar 25. Rajendra Place 26. Karol Bagh 27. Jhandewalan 28. R.K. Ashram Marg 29. Rajiv Chowk 30. Barakhamba Road 31. Mandi House 32. Pragati Maidan 33. Indraprastha 34. Yamuna Bank TO NOIDA CITY CENTRE 1. Akshardam Temple 2. Mayur Vihar – I 3. Mayur Vihar Ext. 4. New Ashok Nagar 5. Noida Sec-15 6. Noida Sec-16 7. Noida Sec-18 8. Botanical Garden 9. Golf Course 10. Noida City Centre (Sec 32) Back to Index
  • 17. Total number of Trains (4 Boggies) Rotem : 27 { 2 motorized (First and last ) and 2 trailers } Total number of Trains (6 Boggies) Rotem : 4 { 2 motorized (First and last ) and 4 trailers } Total number of Trains (6 Boggies) Bombardier : 40 { 2 motorized (First and last ) and 4 trailers } Reserved Boggies for Ladies : Every 1st boggie (First & Last) Seating Capacity per boggie : 60 Passengers Standing capacity per boggie : 325 Passengers Average Commuters per day : 13.16 lac  Total route length : 58.67 km  Total number of Stations : 51 Travel time : 90/80 Minutes  Average trips per Train per day : 10-11 Times (one way)  Frequency : 2-3 minutes in peak time IMPORTANT FACTS for Line 3 & 4 ( Dwarka to Noida City Centre/ Vaishali) Back to Index
  • 18. PANELS OPPORTUNITY IN ROTEM TRAINS ON LINE 3 & 4 ( Dwarka To Noida City Centre/ Vaishali) AD Panels on inside walls of Metro Boggies NO. OF PANELS: 54 panels in each train with 4 boggies 2 boggies with 13 Panels each (First & Last boggie) 2 boggies with 14 Panels each (Middle boggies) 82 panels in each train with 6 boggies 2 boggies with 13 Panels each (First & Last boggie) 4 boggies with 14 Panels each (Middle boggies) SIZE: 514mm(width) x 204mm(height) (Not back-lit but sufficiently bright interiors) Taxes extra as applicable PANELS DETAIL INSIDE ROTEM DELHI METRO TRAINS Size of Panel No of Trains No. of Boggies Per Train Total Boggies Total Panels Best Rate (Per Panel Per Month) Best Rate (Per Boggie Per Month) Best Rate (Per Train Per Month) 514mm x 204mm 27 4 108 1458 514mm x 204mm 4 6 24 328 Total 31 132 1786 Back to Index
  • 19. HANDLE BAR OPPORTUNITY IN ROTEM TRAINS ON LINE 3 & 4 ( Dwarka To Noida City Centre/ Vaishali) Triangle Shaped Box fixed with the Handle Bar inside Metro Trains SIZE: 111mm(width) x 56mm(height) x 3 Sides Detail of HANDLE BAR in 4 Boggies Train: Total Handle Bar to be used for branding: 86 Handle Bars (Every Alternative Handle Bars) 2 Boggies with 21 Handle Bars each (First & Last boggie) 2 Boggies with 22 Handle Bars each (Middle boggies) Detail of HANDLE BAR in 6 Boggies Train: Total Handle Bar to be used for branding: 130 Handle Bars (Every Alternative Handle Bars) 2 Boggies with 21 Handle Bars each (First & Last boggie) 4 Boggies with 22 Handle Bars each (Middle boggies) Taxes extra as applicable HANDLE BARS DETAIL INSIDE ROTEM DELHI METRO TRAINS Size No of Trains No. of Boggies Per Train Total Boggies No. of Handle Bar Per Boggie Best Rate (Per Boggie Per Month) Best Rate (Per Train Per Month) 111mm x 56mm x 3 Sides 27 4 108 21/22 111mm x 56mm x 3 Sides 4 6 24 21/22 31 132 Back to Index
  • 20. PANELS OPPORTUNITY IN BOMBARDIER TRAINS ON LINE – 3 & 4 ( Dwarka To Noida City Centre/ Vaishali) AD Panels on inside walls of Metro boggies NO. OF UPPER PANEL in a Train 98 panels in each train with 6 boggies SIZE: 767mm(width) x 109mm(height NO. OF LOWER PANEL in each Train 74 panels in each train with 6 boggies SIZE: 417 mm (width) x 592 mm (height) (Not back-lit but sufficiently bright interiors) Taxes extra as applicable Division of Panels in SETS* : 36 Sets* + 2 Single Lower + 8 Single Upper Panels in each train with 6 boggies * (1 Set contains:- 2 Lower Panels + 2 or 3 Upper Panels) SETS* OF PANELS DETAIL INSIDE BOMBARDIER DELHI METRO TRAINS Size (W x H) No of Trains No. of Boggies Per Train Total Boggies No. of Set* Per Boggie Total Set* of Panels Best Rate (Per Set* Per Month) Best Rate (Per Boggie Per Month)I & Last Each Middle Each 767mm x 109mm Upper Panel 40 6 240 6 Sets* + 1 Single Lower Panel 6 Sets* + 2 Single Upper Panel 1480 417mm x 592mm Lower Panel *One Set Contains : 2 Lower Panels + 2/3 Upper Panels Back to Index
  • 21. HANDLE BAR OPPORTUNITY IN BOMBARDIER TRAINS ON LINE – 3 & 4 ( Dwarka To Noida City Centre/ Vaishali) Triangle Shaped Box fixed with the Handle Bar inside Metro Trains SIZE: 111mm(width) x 56mm(height) x 3 Sides Detail of HANDLE BAR in 6 Boggies Train: Total Handle Bar to be used for branding: 212 Handle Bars (Every Alternative Handle Bars) 2 Boggies with 34 Handle Bars each (First & Last boggie) 4 Boggies with 36 Handle Bars each (Middle boggies) Taxes extra as applicable HANDLE BARS DETAIL INSIDE BOMBARDIER DELHI METRO TRAINS Size No of Trains No. of Boggies Per Train Total Boggies No. of Handle Bar Per Boggie Best Rate (Per Boggie Per Month) 111mm x 56mm x 3 Sides 40 6 240 34/36 Back to Index
  • 22. PANELS LAYOUT INSIDE BOMBARIDER TRAIN’S BOGGIES Back to Index (Layout of Middle Boggies) (Layouts of First & Last Boggies)
  • 28. Average Per Day Movement Total No. of Train Entry per line Entry per line % Total Commuters' per line Total Commuters' per line % Commuters' entry & exit on same line Commuters' entry & exit on same line % Line-1 29 329447 15 518685 23 156852 7 Line-2 62 800782 35 1287972 57 341368 15 Line-3/4 71 896325 39 1316315 58 647486 29 Line-5 19 79220 3 138549 6 20117 1 Line-6 29 163479 7 259734 11 69355 3 Total 210 2269253 100 3521255 155 1235178 54 Back to Index 54% passengers using one line and 46%passengers using two & more lines 81% Passengers using Line 1,3&4