THE MALT COMPANY (INDIA) PVT. LTD
(KHANDSA PLANT)
On the 3rd day of my training, we have visited Khandsa plant at Gurgaon on 29/4/2013.
We have met with Mr. Naresh kumar. He has given me details about Raw material section
i.e. Barely intake, batch making, barely analysis and GIF. The details of visit are as follows –
Barely Intake –
In Barely Intake section we have gained knowledge about the different test which are used to
decide the quality of barely, these are as follows –
1. Visual Inspection – In visual inspection quality of Barley is checked for mould
growth in gunny bags or defective or damaged gunny bags and fungus growth. It is
also checked for other infections related to Barley grains.
2. TCW (Thousand Corn weight) – For the counting of TCW, 100 gm grains are
taken as a sample. From that 100 gm quality grains are selected and 20 gm is grains
are weighted. The no. Of grains in that 20 gm are calculated (x). Then 20000/x will
be the TCW. Minimum TCW count should be 40%.
3. Moisture % - The moisture % of the grains are calculated in the laboratory. The
moisture % should be in between 9.2 to 10.4 %.
4. The other test related to barely like Infested grains, broken grains, Foreign
material are also checked during the process od barely intake.
Batch Making –
According to the customer’s need, batch of different sizes are prepared. Different customers
have different needs, like if one customer want batch of 28 tonne with 40 % TCW, according
to that batch will be provided to that customer.
GIF (Goods Inward Form) -
GIF is the Goods Inward form which contains the information like Truck no., Date, Order
no. It also contains the other details related to the grains like TCW, broken grains, IG,
Foreign material etc.
This all information we have gained in Raw Material section.
LAB SECTION (KHANDSA PLANT) –
The different kind of tests which are used to check the quality of barely are done in
laboratory. The tests are done at three different levels i.e. Raw material testing, In process
and Finished product testing. The different tests involved in these levels are as follows –
Raw Material –
Following tests are done for the testing of Raw material
• TCW
• Foreign Material
• Broken Grains
• Infested Grains
• Moisture%
In process –
During the process of barley malt preparation, following test are done to check the quality of
malt –
• Mean Acrospiral length
• Moisture %
Finished Product –
To check the quality of finished product following tests are conducted in the laboratory –
• Conversion time
• Clarity
• Turbidity
• Extract % on fine crushing
• Filtration rate of first 100ml fine
• Diastic power
• PH of wort
• Friability
• Total nitrogen etc.
These are some of important tests used to check the quality of final finished product.
The Malt Company Lab Testing Process

More Related Content

What's hot

Fabric Testing and quality control
Fabric Testing and quality controlFabric Testing and quality control
Fabric Testing and quality controllutuf Ullah
 
Commodity Market - Module II
Commodity Market - Module IICommodity Market - Module II
Commodity Market - Module IISwaminath Sam
 
What is gpt and fpt
What is gpt and fptWhat is gpt and fpt
What is gpt and fptAbdul Mabud
 
Presentation on Garments Quality Lab
Presentation on Garments Quality LabPresentation on Garments Quality Lab
Presentation on Garments Quality LabAmanuzzaman Aman
 
Textile dyeing and finshing productivity improvements guidlines
Textile dyeing and finshing productivity improvements guidlines Textile dyeing and finshing productivity improvements guidlines
Textile dyeing and finshing productivity improvements guidlines Muhammad Mushtaq Mangat
 
Product innovation & value addition
Product innovation & value additionProduct innovation & value addition
Product innovation & value additionChandran Kani
 
Testing/Manufacture/Laundro meter
Testing/Manufacture/Laundro meterTesting/Manufacture/Laundro meter
Testing/Manufacture/Laundro meterfec2020
 
Testing/Manufacture/Laundro Meter
Testing/Manufacture/Laundro MeterTesting/Manufacture/Laundro Meter
Testing/Manufacture/Laundro Meterfec2020
 
Rota Dyer Machine, Textile Testing Equipment like Hank Dyeing, Cotton Testing
Rota Dyer Machine, Textile Testing Equipment like Hank Dyeing, Cotton TestingRota Dyer Machine, Textile Testing Equipment like Hank Dyeing, Cotton Testing
Rota Dyer Machine, Textile Testing Equipment like Hank Dyeing, Cotton TestingVinayak InfoSoft
 
Drive Away Competition With Quality Assurance
Drive Away Competition With Quality AssuranceDrive Away Competition With Quality Assurance
Drive Away Competition With Quality AssuranceJaye Brown
 
Apparel Quality Control & Quality Assurance
Apparel Quality Control & Quality AssuranceApparel Quality Control & Quality Assurance
Apparel Quality Control & Quality AssuranceSAMultimedia
 
Quality control and testing in wet Processing
Quality control and testing in wet ProcessingQuality control and testing in wet Processing
Quality control and testing in wet ProcessingGhulamullah Khaskheli
 

What's hot (15)

Fabric Testing and quality control
Fabric Testing and quality controlFabric Testing and quality control
Fabric Testing and quality control
 
Commodity Market - Module II
Commodity Market - Module IICommodity Market - Module II
Commodity Market - Module II
 
What is gpt and fpt
What is gpt and fptWhat is gpt and fpt
What is gpt and fpt
 
Presentation on Garments Quality Lab
Presentation on Garments Quality LabPresentation on Garments Quality Lab
Presentation on Garments Quality Lab
 
Textile dyeing and finshing productivity improvements guidlines
Textile dyeing and finshing productivity improvements guidlines Textile dyeing and finshing productivity improvements guidlines
Textile dyeing and finshing productivity improvements guidlines
 
Product innovation & value addition
Product innovation & value additionProduct innovation & value addition
Product innovation & value addition
 
Dyeing Quality control
Dyeing Quality controlDyeing Quality control
Dyeing Quality control
 
Testing/Manufacture/Laundro meter
Testing/Manufacture/Laundro meterTesting/Manufacture/Laundro meter
Testing/Manufacture/Laundro meter
 
Testing/Manufacture/Laundro Meter
Testing/Manufacture/Laundro MeterTesting/Manufacture/Laundro Meter
Testing/Manufacture/Laundro Meter
 
quality assurance
 quality assurance quality assurance
quality assurance
 
Rota Dyer Machine, Textile Testing Equipment like Hank Dyeing, Cotton Testing
Rota Dyer Machine, Textile Testing Equipment like Hank Dyeing, Cotton TestingRota Dyer Machine, Textile Testing Equipment like Hank Dyeing, Cotton Testing
Rota Dyer Machine, Textile Testing Equipment like Hank Dyeing, Cotton Testing
 
Drive Away Competition With Quality Assurance
Drive Away Competition With Quality AssuranceDrive Away Competition With Quality Assurance
Drive Away Competition With Quality Assurance
 
Apparel Quality Control & Quality Assurance
Apparel Quality Control & Quality AssuranceApparel Quality Control & Quality Assurance
Apparel Quality Control & Quality Assurance
 
Final inspection
Final inspectionFinal inspection
Final inspection
 
Quality control and testing in wet Processing
Quality control and testing in wet ProcessingQuality control and testing in wet Processing
Quality control and testing in wet Processing
 

Viewers also liked

Training report nbc bearing
Training report nbc bearingTraining report nbc bearing
Training report nbc bearingkishankky
 
FINAL REPORT:My training as an English Teacher
FINAL REPORT:My training as an English TeacherFINAL REPORT:My training as an English Teacher
FINAL REPORT:My training as an English TeacherEscuela Publica
 
SIWES TECHNICAL REPORT BY OLADEJI ADEOLA
SIWES TECHNICAL REPORT BY OLADEJI ADEOLASIWES TECHNICAL REPORT BY OLADEJI ADEOLA
SIWES TECHNICAL REPORT BY OLADEJI ADEOLAG_ade
 
Internship Report on Building Construction
Internship Report on Building ConstructionInternship Report on Building Construction
Internship Report on Building ConstructionEsmael Aragaw
 

Viewers also liked (6)

Training report nbc bearing
Training report nbc bearingTraining report nbc bearing
Training report nbc bearing
 
FINAL REPORT:My training as an English Teacher
FINAL REPORT:My training as an English TeacherFINAL REPORT:My training as an English Teacher
FINAL REPORT:My training as an English Teacher
 
INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)
INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)
INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)
 
SIWES TECHNICAL REPORT BY OLADEJI ADEOLA
SIWES TECHNICAL REPORT BY OLADEJI ADEOLASIWES TECHNICAL REPORT BY OLADEJI ADEOLA
SIWES TECHNICAL REPORT BY OLADEJI ADEOLA
 
internship report
internship reportinternship report
internship report
 
Internship Report on Building Construction
Internship Report on Building ConstructionInternship Report on Building Construction
Internship Report on Building Construction
 

Similar to The Malt Company Lab Testing Process

Quality control in poultry feed manufacturing
Quality control in poultry feed manufacturingQuality control in poultry feed manufacturing
Quality control in poultry feed manufacturingDr. MAYUR VISPUTE
 
Seed quality testing
Seed quality testing Seed quality testing
Seed quality testing Shweta Tiwari
 
Seed quality assurance and control
Seed quality assurance and controlSeed quality assurance and control
Seed quality assurance and controlAbhisek Tripathy
 
plant breeding and seed technology presentation.pptx
plant breeding and seed technology presentation.pptxplant breeding and seed technology presentation.pptx
plant breeding and seed technology presentation.pptxRajeshYadav476602
 
TRAINING MANUAL FOR PRINTING, JUNE,2021.pptx
TRAINING MANUAL FOR PRINTING, JUNE,2021.pptxTRAINING MANUAL FOR PRINTING, JUNE,2021.pptx
TRAINING MANUAL FOR PRINTING, JUNE,2021.pptxEDWARD355152
 
Quality of raw material for processing of fruits and vegetable
Quality of raw material for processing of fruits and vegetableQuality of raw material for processing of fruits and vegetable
Quality of raw material for processing of fruits and vegetableSharayuNigade
 

Similar to The Malt Company Lab Testing Process (6)

Quality control in poultry feed manufacturing
Quality control in poultry feed manufacturingQuality control in poultry feed manufacturing
Quality control in poultry feed manufacturing
 
Seed quality testing
Seed quality testing Seed quality testing
Seed quality testing
 
Seed quality assurance and control
Seed quality assurance and controlSeed quality assurance and control
Seed quality assurance and control
 
plant breeding and seed technology presentation.pptx
plant breeding and seed technology presentation.pptxplant breeding and seed technology presentation.pptx
plant breeding and seed technology presentation.pptx
 
TRAINING MANUAL FOR PRINTING, JUNE,2021.pptx
TRAINING MANUAL FOR PRINTING, JUNE,2021.pptxTRAINING MANUAL FOR PRINTING, JUNE,2021.pptx
TRAINING MANUAL FOR PRINTING, JUNE,2021.pptx
 
Quality of raw material for processing of fruits and vegetable
Quality of raw material for processing of fruits and vegetableQuality of raw material for processing of fruits and vegetable
Quality of raw material for processing of fruits and vegetable
 

The Malt Company Lab Testing Process

  • 1. THE MALT COMPANY (INDIA) PVT. LTD (KHANDSA PLANT) On the 3rd day of my training, we have visited Khandsa plant at Gurgaon on 29/4/2013. We have met with Mr. Naresh kumar. He has given me details about Raw material section i.e. Barely intake, batch making, barely analysis and GIF. The details of visit are as follows – Barely Intake – In Barely Intake section we have gained knowledge about the different test which are used to decide the quality of barely, these are as follows – 1. Visual Inspection – In visual inspection quality of Barley is checked for mould growth in gunny bags or defective or damaged gunny bags and fungus growth. It is also checked for other infections related to Barley grains. 2. TCW (Thousand Corn weight) – For the counting of TCW, 100 gm grains are taken as a sample. From that 100 gm quality grains are selected and 20 gm is grains are weighted. The no. Of grains in that 20 gm are calculated (x). Then 20000/x will be the TCW. Minimum TCW count should be 40%. 3. Moisture % - The moisture % of the grains are calculated in the laboratory. The moisture % should be in between 9.2 to 10.4 %. 4. The other test related to barely like Infested grains, broken grains, Foreign material are also checked during the process od barely intake. Batch Making – According to the customer’s need, batch of different sizes are prepared. Different customers have different needs, like if one customer want batch of 28 tonne with 40 % TCW, according to that batch will be provided to that customer. GIF (Goods Inward Form) - GIF is the Goods Inward form which contains the information like Truck no., Date, Order no. It also contains the other details related to the grains like TCW, broken grains, IG, Foreign material etc. This all information we have gained in Raw Material section.
  • 2. LAB SECTION (KHANDSA PLANT) – The different kind of tests which are used to check the quality of barely are done in laboratory. The tests are done at three different levels i.e. Raw material testing, In process and Finished product testing. The different tests involved in these levels are as follows – Raw Material – Following tests are done for the testing of Raw material • TCW • Foreign Material • Broken Grains • Infested Grains • Moisture% In process – During the process of barley malt preparation, following test are done to check the quality of malt – • Mean Acrospiral length • Moisture % Finished Product – To check the quality of finished product following tests are conducted in the laboratory – • Conversion time • Clarity • Turbidity • Extract % on fine crushing • Filtration rate of first 100ml fine • Diastic power • PH of wort • Friability • Total nitrogen etc. These are some of important tests used to check the quality of final finished product.