SlideShare a Scribd company logo
1 of 10
Download to read offline
Grüner Strom-Label
Criteria List 2015, V1.2
Grüner Strom Label e.V. Vorstand: Rosa Hemmers (EUROSOLAR)
Schumannstraße 35 • 53113 Bonn Dr. Werner Neumann (BUND)
Tel/Fax: (0228) 926 67 13 / -12 Dietmar Oeliger (NABU)
info@gruenerstromlabel.de Leiter der
www.gruenerstromlabel.de Geschäftsstelle: Daniel Craffonara
1
These replace the last valid criteria list of 2012 because of developments on the market for green electricity and developments of the
renewable energy sources act since then.
1 PURPOSE OF THE GRÜNER STROM LABEL CERTIFICATION
1.1 The goal of Grüner Strom Label e.V. (The “Green Electricity Label registered association”) (Here-
inafter “GSL“) is to create transparency for the consumers by certifying recommendable Green
Electricity offered on the market for green electricity in accordance with the criteria following
hereinafter. 1
Certified are Electricity Products delivered to customers entirely produced from
renewable energy and for which, in addition to the foregoing, a fixed amount per kilowatt-hour
(kWh) is invested in the ecologically sustainable development of renewable energy. They provide
impulses and spur the increased use of renewable energy resources, which meet highest envi-
ronmental standards.
To GSL, financial contributions and financing are essential and the most efficient ways to pro-
mote facilities, installations and plants (hereinafter ”facilities”), which generate electricity from
renewable energy. In addition, innovative measures in support of the necessary infrastructure will
be promoted, which move the energy transformation towards 100 % renewable energy supply.
1.2 GSL Certified Green Electricity Products are intended to advance market penetration of electrici-
ty primarily sourced from renewable energy (REN power). They are so intended in addition to
and supplementing state-funded or other measures – in particular the statutory feed-in tariffs
pursuant to the Erneuerbare Energien Gesetz (The German Renewable Energy Sources Act,
“EEG”).
The material goal of the certification is to obligate providers of Green Electricity Products herein-
after (“Providers”) to promote REN power generating facilities and other measures to further the
transformation of the energy system by making contributions to investments or granting loans
and help realize them in this way. Usually, such measures may not be implemented before Pro-
viders draw on the funds.
The funds put up by the customers should be applied as effectively as possible for market pene-
tration of REN power (as an additional spur). Otherwise achievable revenues for facilities, which
receive funding, are taken into account in the process (statutory feed-in tariffs pursuant to the
EEG, self-consumption, sales and distribution to customers directly).
2 ELECTRICITY PRODUCT REQUIREMENTS
2.1 Prerequisite for an award of the label is entering into a labeling agreement with GSL. After the grant of
the label there will be a review of the continued fulfillment of these obligations, annually and/or every
two years.
Grüner Strom-Label Criteria List 2015, V1.2
2
2.2 Electricity Products are certified for which a fixed amount per kWh is charged and used by Pro-
viders either for funding the construction and operation of REN and/or CHP facilities, or for
measures aimed to promote the energy transformation pursuant to the principles set out in Art.
3.1 - Article 3.2.2. The funding amount coming from the Grüner Strom Certified Green Electricity
delivered to the customers (GS Green Electricity) must, after the deduction of administrative ex-
penses and other additional costs, in particular for the purchase of electricity from REN facilities,
- amount to a minimum of 0.5 euro cent (hereinafter ‘cent’ or ‘ct’) per kWh (net).
- In the case of customers with annual consumption of between 10,000 kWh and 100,000
kWh the minimum amount charged must be 0.4 ct/kWh (net).
- In the case of customers with annual consumption of between 100,000 and 3,000,000
kWh the minimum amount charged must be 0.2 ct/kWh (net).
- In the case of customers with consumption exceeding 3,000,000 kWh/year the minimum
amount charged must be 0.1 ct/kWh (net).
These minimum funding amounts are attested by GSL. Providers can request from GSL to attest
higher funding amounts.
For customers with various places of consumption the aggregate of the annual total consumption
of all individual units of consumption may be used to measure the minimum funding amount
charged.
The referenced funding amount applies to the portion of GS Green Electricity. In case a diverse
mix of fuels is used to generate electricity, the name of the Electricity Product and the Product
information must clearly indicate how much the GS Green Electricity accounts for of the total
electricity mix.
2.2.1 Upon prior approval by GSL, providers may offer sales campaigns to customers with annual con-
sumption up to 100,000 kWh. The minimum funding amount according to annual consumption
may be reduced by 50 percent for new customers acquired by such campaigns for the first con-
tract period. After the expiry of this period, minimum funding amounts must be raised to normal
levels as laid down in Art. 2.2.
2.3 Moreover, the electricity delivered in terms of Green Electricity must be designated as produced
from renewable energy pursuant to the Energiewirtschaftsgesetz (the German “energy economy
law” (EnWG). Guarantees of origin must be used which specify the source of the renewable elec-
tricity generation. These are issued by the “Guarantees of Origin Registry” of the Umweltbun-
desamt, the German Federal Environmental Agency, where they have to be submitted for can-
cellation. In derogation of the statutory regulations the following restrictions apply with the Grüner
Strom label:
- The guarantee of origin alone is not sufficient evidence to qualify electricity for recogni-
tion as Green Electricity. It must be presented linked to the amount of electricity on which
it is based. This needs either be documented in the guarantee of origin or must be sup-
ported by way of other reasonable evidence.
- Electricity from biomass will be recognized only in terms of the limits defined in the Bio-
masseverordnung, the German biomass electricity sustainability regulation.
- Electricity from sewage gas and electricity from combustion plants, which run on a mix of
fuels, will not be accepted.
Grüner Strom-Label Criteria List 2015, V1.2
3
2
Available in German and can be downloaded from http://www.gruenerstromlabel.de/gruener-strom/kriterienkatalog/
2.4 Additionally, a label user can request from GSL to attest attributes associated with the delivery of
renewable electricity and to specify from the following options that
A defined percentage of the electricity delivered to customers under the Certified Product comes
from
- German power stations
- regional power stations
- facilities of the label user, or facilities in which the label user or a subsidiary is directly
involved or
- sales and distribution direct and supplied from facilities deemed eligible for the EEG
pursuant to Art. 3.1.6.
The label user has to provide reasonable evidence to support one or more of these attributes in
accordance with the provisions set out in Article III of the Guide to the Grüner Strom label Criteria
List 2015 (hereinafter the “Criteria Guide“) 2
.
3 CONDITIONS FOR USE OF FUNDS
3.1 APPROVED OPTIONS
The funding amounts as laid down in Art. 2.2 may be used to promote renewable electricity gen-
eration facilities pursuant to Art. 3.1.1 - Art. 3.1.3 and Art. I.b. in the Criteria Guide
- future projects, new technologies pursuant to Art. 3.1.4 and Art. I.c. in the Criteria Guide
- energy efficiency measures and measures to reduce environmental impact pursuant to
Art. 3.1.5 and Art. I.d. in the Criteria Guide
- direct supply of green electricity pursuant to Art. 3.1.6 and Art I.e. in the Criteria Guide
- other measures of support (citizen energy projects, communication, education and
training, micro projects) pursuant to Art. 3.1.7 and Art I.f. in the Criteria Guide
- development cooperation pursuant to Art. 3.1.8 and Art. I.g. in the Criteria Guide.
Funding put towards such measures requires prior authorization by GSL, unless otherwise
agreed. Moreover, the additional provisions must be met as defined by GSL in the Criteria Guide.
3.1.1 Renewable electricity generation facilities
Roof-mounted and facade-mounted PV as well as onshore wind funding (new build and
refitting / re-powering) does not require prior authorization by GSL when the provisions of Arti-
cle I.b. are met as set out in the Criteria Guide.
Furthering of all measures following hereinafter require prior authorization by GSL:
Solar photovoltaics in open spaces
Open space solar PV is eligible for funding only where land areas have been sealed or suffered
damage before or, at the very least only where surfaces have little nature conservation signifi-
cance. The photovoltaic systems are to be outfitted, designed and operated as to have as little
effect as possible on the natural environment.
Onshore wind
Facilities, which receive funding, may receive additional funding to comply with site-specific regu-
Grüner Strom-Label Criteria List 2015, V1.2
4
latory nature conservation requirements and/or for voluntary nature conservation work.
Offshore wind
Offshore wind funding will only be considered for review on presentation of informative project
descriptions including information on grid connection, environmental reviews and the parties to
the project.
Small wind (capacity rating less or equal to 100 kW)
A sensible site plan has to be supported by evidence. The preferable choice is to be projects in
business parks taller than 10 kW.
Biomass plants
Biomass should be generated environmentally friendly in close proximity to the point of energy
use and must be used in cogeneration of heat and power (CHP). For this a sensible plan for use
of the heat including state-of-the-art energy conversion efficiency must be in place (heat rate at
least 60 %). When biogas is used a predominant portion of it must be used to generate electrici-
ty. The use of genetically modified organisms is to be excluded.
- Biogas facilities as well as the option to combine (i) the use of alternative energy crops,
(ii) flexibility in electricity and heat generation and /or (iii) bio methane processing, with
them.
Recycling of biogeneous residues and waste is explicitly encouraged.
Biogas facilities (i) may not exceed a maximum size of 2.5 MW and/or 1,250 m3 of bio-
gas/h (only for renewable raw materials and co-fermentation facilities using a portion of
renewable raw materials exceeding 50 %) and (ii) may not use over 50 % of one single
major arable crop. Substrates of renewable raw materials, manure and residues must
stem from regional origins. Additionally, the suppliers of substrates are asked to make
sure renewable raw materials are grown in environmentally sound ways and no fertilizers
from factory farming are used.
- In Biomass heating plants only regionally grown wood may be used. The wood must be
sourced either (i) from waste wood and/or timber/paper industrial wastes (only in accord-
ance with the “Altholzverordnung“, the German ordinance on the management of waste
wood, category A I), (ii) forestry residues, (iii) small diameter timber resource, (iv) green
waste from landscaping, (v) energy crop plantations or (vi) must be sustainably grown.
- In CHP plants with 100 % biogas/bio methane, a mix of fuel gases, plant oil or gasifica-
tion of wood the biogas/bio methane must meet the biogas facility requirements or re-
spective Green Gas label standard in effect. In the case of CHP systems with plant oil or
gasification of wood regionally grown oil and wood may be used only. The wood must be
sourced either from (i) forestry residues, (ii) small diameter timber resource, (iii) green
waste from landscaping, (iv) energy crop plantations or (v) must be sustainably grown.
- Local heating networks: in connection with biogas facilities, biomass heating plants, CHP
plants or sewage gas facilities eligible for financial support.
Hydropower
Funding put towards reactivation or modernization of closed or existing hydropower facilities is
possible only if evidence testifies to a clear improvement for the freshwater ecosystems. The
construction of new hydropower facilities in natural waters is eligible for funding in exceptional
cases only. The installed electric generation capacity may not exceed 5 MW. Small-scale hydro-
Grüner Strom-Label Criteria List 2015, V1.2
5
power plant funding < 100 kW does not apply.
Deep geothermal power (for electricity generation in CHP)
Use of sewage gas (for electricity generation in CHP)
3.1.2 For facilities which receive funding a base compensation is assumed coming from the statutory feed-
in tariff regulations (EEG, KWKG, the German “cogeneration” law) while at the same time the detailed
criteria for each specific case must be met and additional permits in accordance with the relevant
provisions must be presented.
When facilities are operated outside the EEG and/or to sell and distribute or supply electricity to cus-
tomers directly, otherwise achievable revenues are taken into account. Moreover, the additional pro-
visions in Articles I and II must be met as defined by GSL in the Criteria Guide.
3.1.3 In individual cases and following application it is also possible to support facilities, which are intended
for operation outside the scope of and much similar to the EEG. Making use of the statutory provi-
sions in place regarding the payments for electricity fed into the grid is mandatory.
3.1.4 FUTURE PROJECTS, NEW TECHNOLOGIES
- Combined renewable energy power plants/virtual power plants/intelligently networked
renewable energy facilities so as to optimize electricity supply
- Energy storage technologies, e.g. battery storage or power-to-gas
- Thermal storage in connection with CHP facilities utilizing renewable energy
- Electric vehicle (EV) batteries as a source of energy storage
- Local smart grids
- Use of smart meters with flexible/time-of-the-day electricity pricing
- Load control/demand-side management
- Stability of the distribution network so as to better integrate renewable energy
- Electric car charging points
3.1.5 ENERGY EFFICIENCY MEASURES AND MEASURES TO REDUCE ENVIRONMENTAL IMPACT
- Building technology energy efficiency measures in the category electricity
- Building technology energy efficiency measures in the category electricity for local
communities which purchase GS Green Electricity
- Improvements in energy efficiency and environmental impact of existing REN facilities
3.1.6 DIRECT SUPPLY OF GREEN ELECTRICITY
- Integrated sale and distribution of green electricity as to better incorporate renewable
energy into the energy system in the form of sales and distribution of green electricity
from facilities deemed eligible for the EEG to the consumer directly. A substantial portion
of the electricity delivered is supplied from facilities deemed eligible for the EEG and from
intermittent renewable energy sources.
- Local models for sales and distribution of electricity, e.g. tenant electricity models
3.1.7 OTHER MEASURES OF SUPPORT
- Furthering of citizen energy projects, and citizen-owned organizations
Grüner Strom-Label Criteria List 2015, V1.2
6
- Informational and training events dedicated to energy and energy efficiency
- Materials for associated pedagogical efforts in renewable energy
- Training materials
- Displays for REN facilities
- Contributions to micro projects
3.1.8 DEVELOPMENT COOPERATION
The primary geographic focus where to support projects should be on Germany. Eligible for fi-
nancial support are also individual projects outside the EU in developing countries – provided
they have been favorably assessed following an in-depth assessment by GSL and can be carried
out in cooperation with experienced and reliable local partners. The projects are to advance the
supply of basic energy needs of the population from renewable sources. They should be like pilot
projects, have multiplier effects and provide impulses to set and keep improvement of local
framework conditions in motion.
Eligible for financial support are for example:
- renewable electricity generation facilities
- renewable energy feasibility studies
- support of education and training in the field of renewable energy
- energy efficiency measures.
3.2 INVESTING OPTIONS
3.2.1 Typically eligible for financial support are new facilities and other measures pursuant to the crite-
ria laid down in Article 3.1 - Article 3.1.8. Financial support can be given in the form of
- Grüner Strom payment (GS payment): contribution to investments for their own projects
or a non-repayable contribution to investments for projects of third parties, which will be
made available once in the year of beginning of operations (cash value)
- Grüner Strom loan (GS funded loan): funds used for their own profitable plants or loans
to third party operators of profitable plants, both including repayment plus interest to the
respective internal support funds of the label user within ten years.
- Transfer of proceeds to the fund of GSL (GSL fund). In keeping with the Articles of
Association, GSL will use these proceeds to support the construction of REN facilities
and other measures based on the present criteria list in a timely fashion.
- Additional financing plans are possible in consensus with the GSL Secretariat.
The provisions defined in Articles I and II of the Criteria Guide apply to GS payments, GS funded
loans and the GS fund. It is possible to combine GS payments and GS loans.
3.2.2 Taking the electricity feed-in tariffs pursuant to the EEG and/or the KWKG or other revenues into
account, GS payments are to be limited to an amount necessary to attain acceptable profitability
(pursuant to Art. II.b. in the Criteria Guide). If requested, this must be reasonably documented by
way of a funds evaluation scheme made available by GSL or a comparable profitability analysis
in consensus with the GSL Secretariat.
Depending on the type of facility, the maximum interest rate permitted for the project as defined
in Art. I.b. of the Criteria Guide apply in the calculation and evaluation of funds for renewable
Grüner Strom-Label Criteria List 2015, V1.2
7
3
The practical implementation of the certification process will always be monitored by an external institute.
electricity generation facilities. GS payments for all other investments will be made either after
individual case review or in flat rates specific to the measure, applicable when they comply with a
defined framework.
Financial contributions to compensate for disadvantages of location come into question only in
the case of well-founded exceptions.
Primarily, GS payments are to be put towards new facilities which are built and operated either
by the Providers themselves, or by non-profit organizations, public institutions and charities as
well as citizen-owned operating companies and cooperatives. Third parties, who receive financial
contributions or loans, are to purchase high quality green electricity as well. Financial
contributions to individuals must be made in a transparent way.
4 ENERGY PROVIDER REQUIREMENTS
4.1 The Grüner Strom label is not granted to companies acting negatively towards the generation
and use of REN and CHP power. The Grüner Strom label will not be granted to companies di-
rectly involved in nuclear power plants, i.e. operators of nuclear companies or companies with
ownership interests/capital stock in nuclear operating companies.
Moreover, the label is not granted to companies directly involved in existing or new coal-fired
power plants, i.e. operators of coal-fired power plants or companies with ownership inter-
ests/capital stock in coal-fired power plants, purchased after this criteria list has taken effect (for
new label users from January 1, 2015, for label users prior to this date from January 1, 2016).
Obligations resulting from agreements entered into with other parties before the criteria list took
effect will be assessed by GSL by individual case.
4.2 For the activities in conjunction with the GS Green Electricity offered, label users are obligated to
set up an accounting system separate from their other activities. They commit to transparent and
public disclosure of the annual total revenues from the fixed funding amount charged per kWh
and their use. In particular they must
- gather detailed and clear records which demonstrate the fulfillment of their obligations
and which are attested and confirmed by their auditors and/or tax advisors or
alternatively, are verified through an on-site inspection by GSL or the institute in charge
of certification3
,
- also obligate the operators of REN facilities for which the funds were made available and
other recipients of proceeds to meet such requirements,
- provide the necessary data and proof to the institute in charge of certification (certifier)
and/or to GSL and give access to the documents as well as the generation facilities
supported under the certification and other measures, if requested.
4.3 Label users should present the information on the Certified Product in transparent, clear and
understandable ways to their customers. They should use best efforts to market it, and in doing
so, must show the logo of the Grüner Strom label pursuant to Article 6.1.
The Product information must specify the composition of the electricity delivered by fuel type and
the funding amount per kWh (net). Additionally, label users are obligated to public disclosure of
Grüner Strom-Label Criteria List 2015, V1.2
8
the following data about the REN facilities:
- sites
- times of beginning of operation
- data on capacity and generation.
Equivalent information is to be publicly disclosed on the funding of other measures.
Moreover, the investment obligation, which results from the fixed funding amount charged and
the use of funds during the calendar year, should be disclosed on the Internet.
4.4 Label users must provide up to date and comprehensive tips on ways to save energy to custom-
ers, e.g. over the Internet or at their customer service centers. Moreover, they are required to
offer individual energy saving advice to their customers (in person, over the phone, or in writing)
or advise them on institutions where they can obtain such information (pursuant to §4 “Ener-
giewirtschaftsgesetz”, (4) of the German „energy services“ law).
4.5 There will be a review of fulfillment of obligations with respect to the uses of the proceeds for
each calendar year. The supporting evidence attested and confirmed by the auditors and/or tax
advisors or alternatively, by GSL or the institute in charge of certification must be furnished by
June 30th of the following calendar year. GSL must be notified of preliminary data by January
31st respectively.
4.6 The financial obligation to support new facilities which results from the fixed amount of funding
per kWh sold as well as from repayment of investments in profitable plants during the calendar
year, has to be met by the end of the second year following thereafter. Funds, which have not
been applied by then in accordance with the present criteria list, must be transferred to GSL. In
keeping with the Articles of Association, GSL will use these funds to support the construction of
REN facilities based on the present criteria list in a timely fashion.
4.7 Grüner Strom label certification of an Electricity Product is to be imbedded into corporate sus-
tainability policies in the ecological, economic and social senses. The focus is on a set of guiding
principles:
- Providers actively advocate energy supplied ecologically from renewable energy and
energy efficient practices in their companies and to their customers.
- Providers conduct business in a responsible and environmentally sustainable fashion and
advance the energy transformation at the local and regional levels.
- Providers show fair treatment towards their customers and act responsibly towards their
employees.
Label users should inform their customers and GSL about the above and related actions and, if
possible, provide supporting evidence regarding for example
- concrete targets for protecting the climate and RE expansion
- sustainability reporting
- their own purchase and generation of green electricity and energy efficiency measures
- environmental performance and management reviews under schemes like EMAS or ISO
14001
- independent rating and assessment of their customer service quality
Grüner Strom-Label Criteria List 2015, V1.2
9
4
This version was last adapted on December 16, 2016 in Art. 2.2, 2.2.1 (modification of minimum funding amounts), 4.2 and
4.5 (adjustment of the process of evidence testing).
- fair contract provisions for customer
- personal advice offers on renewable energy use for their customers.
GSL will publish such voluntarily disclosed information by Providers on the Internet.
5 AWARD AND WITHDRAWAL OF THE LABEL
5.1 The GSL label is typically granted for two (2) years. In case of material breach of the labeling
agreement and/or the requirements contained in the present criteria list the GSL label will be
withdrawn with immediate effect. A breach is material among other things
- in general in the case of misuse, in particular in the case of manipulation of data
- when the obligations under Art. 4.1 are not met
- when the obligation under Art. 4.6 is not met in three consecutive years.
The withdrawal will be publicly disclosed.
5.2 In the case of resignation or termination of the labeling agreement GSL and the label user have
entered into, or withdrawal of the label in accordance with Art. 5.1 the fixed amounts of funding
as defined under Art. 2.2 not used are to be paid out to GSL at the time the termination takes
effect. GSL is to use them in accordance with Art. 4.6. Future repayments to be expected from
funds used for profitable plants in accordance with Art. 3.2.1 are also to be paid out to GSL,
based on assessment reporting by an auditor and following a schedule agreed between the label
user and GSL. GSL is to use them in accordance with Art. 4.6.
6 USE OF THE LABEL AND DISTRIBUTION TO CUSTOMERS
6.1 Label users may mention and show the Grüner Strom label in their Product information clearly
linked to the Certified Product only. When they display the label the names of the supporting
associations behind GSL may also be mentioned. No license to the supporting organizations’
logos is granted to them. The most recent terms of use made available by GSL supplement and
apply to the use of the logo.
6.2 Label users are authorized to grant the Grüner Strom label to customers of their Certified Product
for one year, or for as long as the term of the respective power supply contract.
7 THE CRITERIA LIST IN FORCE AND TRANSITIONAL ARRANGEMENT
7.1 This version of the criteria list is in effect until it is replaced by a new version4
.
7.2 All references to overarching statutory regulations (such as the EEG, the “Biomasseverordnung“
or the German “energy services“ law) are made to the versions of them in force respectively
when the present criteria list was issued (January 1, 2015).
Grüner Strom-Label Criteria List 2015, V1.2
10
As of January 1, 2017
Translation by Silvia Strauch
7.3 In case of changes to these statutory regulations, which are of relevance to the present criteria
list GSL reserves the right to adapt the criteria, list in the articles concerned accordingly.
7.4 A transitional period ending December 31, 2015 applies to label users who entered into a label-
ing agreement before January 1, 2015 based on former criteria lists to meet such newer criteria
list.

More Related Content

What's hot

The Proposed new EU Renewables Directive
The Proposed new EU Renewables DirectiveThe Proposed new EU Renewables Directive
The Proposed new EU Renewables DirectiveLeonardo ENERGY
 
Presentation Maksym Sysoiev_Biogas
Presentation Maksym Sysoiev_BiogasPresentation Maksym Sysoiev_Biogas
Presentation Maksym Sysoiev_BiogasIrina Koroleva
 
PG&E Demand Response Programs
PG&E Demand Response ProgramsPG&E Demand Response Programs
PG&E Demand Response Programsmichaeljmack
 
International energy partnership program manuscript instructions: case Bulgaria
International energy partnership program manuscript instructions: case BulgariaInternational energy partnership program manuscript instructions: case Bulgaria
International energy partnership program manuscript instructions: case BulgariaSimeon Arnaudov
 
Agreements for Net metering, Net accounting, Net plus
Agreements for Net metering, Net accounting, Net plusAgreements for Net metering, Net accounting, Net plus
Agreements for Net metering, Net accounting, Net plusPrivate Consultants
 
Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013Spark Network
 
THE HARMFUL PRIVATIZATION OF ELETROBRAS TO BRAZIL
THE HARMFUL PRIVATIZATION OF ELETROBRAS TO BRAZILTHE HARMFUL PRIVATIZATION OF ELETROBRAS TO BRAZIL
THE HARMFUL PRIVATIZATION OF ELETROBRAS TO BRAZILFernando Alcoforado
 
Ch 2 energy conservation act and its features
Ch 2 energy conservation act and its featuresCh 2 energy conservation act and its features
Ch 2 energy conservation act and its featuresKartik Mahajan
 
Introduction to the Renewable Energy Certificate (REC) Mechanism
Introduction to the Renewable Energy Certificate (REC) MechanismIntroduction to the Renewable Energy Certificate (REC) Mechanism
Introduction to the Renewable Energy Certificate (REC) MechanismSpark Network
 
Scope of solar generation in West Bengal (an Indian State)
Scope of solar generation in West Bengal (an Indian State)Scope of solar generation in West Bengal (an Indian State)
Scope of solar generation in West Bengal (an Indian State)Amitava Nag
 
Renewable Energy Certificate
Renewable Energy CertificateRenewable Energy Certificate
Renewable Energy CertificateJaspal Bhatia
 
Towards a more sustainable energy economy
Towards a more sustainable energy economyTowards a more sustainable energy economy
Towards a more sustainable energy economyRCREEE
 
Framework assessment for_the_photovoltaic_opportunities_in_brazil
Framework assessment for_the_photovoltaic_opportunities_in_brazilFramework assessment for_the_photovoltaic_opportunities_in_brazil
Framework assessment for_the_photovoltaic_opportunities_in_brazilPeter Krenz
 
Net energy metering manual for three schemes
Net energy metering manual for three schemesNet energy metering manual for three schemes
Net energy metering manual for three schemesPrivate Consultants
 
Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India sanjeev jain
 

What's hot (20)

The Proposed new EU Renewables Directive
The Proposed new EU Renewables DirectiveThe Proposed new EU Renewables Directive
The Proposed new EU Renewables Directive
 
Presentation Maksym Sysoiev_Biogas
Presentation Maksym Sysoiev_BiogasPresentation Maksym Sysoiev_Biogas
Presentation Maksym Sysoiev_Biogas
 
Draft Feed-In Tariffs
Draft Feed-In TariffsDraft Feed-In Tariffs
Draft Feed-In Tariffs
 
PG&E Demand Response Programs
PG&E Demand Response ProgramsPG&E Demand Response Programs
PG&E Demand Response Programs
 
International energy partnership program manuscript instructions: case Bulgaria
International energy partnership program manuscript instructions: case BulgariaInternational energy partnership program manuscript instructions: case Bulgaria
International energy partnership program manuscript instructions: case Bulgaria
 
Agreements for Net metering, Net accounting, Net plus
Agreements for Net metering, Net accounting, Net plusAgreements for Net metering, Net accounting, Net plus
Agreements for Net metering, Net accounting, Net plus
 
Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013
 
Fuel Cells Residential Workshop
Fuel Cells Residential WorkshopFuel Cells Residential Workshop
Fuel Cells Residential Workshop
 
THE HARMFUL PRIVATIZATION OF ELETROBRAS TO BRAZIL
THE HARMFUL PRIVATIZATION OF ELETROBRAS TO BRAZILTHE HARMFUL PRIVATIZATION OF ELETROBRAS TO BRAZIL
THE HARMFUL PRIVATIZATION OF ELETROBRAS TO BRAZIL
 
Ch 2 energy conservation act and its features
Ch 2 energy conservation act and its featuresCh 2 energy conservation act and its features
Ch 2 energy conservation act and its features
 
Introduction to the Renewable Energy Certificate (REC) Mechanism
Introduction to the Renewable Energy Certificate (REC) MechanismIntroduction to the Renewable Energy Certificate (REC) Mechanism
Introduction to the Renewable Energy Certificate (REC) Mechanism
 
Scope of solar generation in West Bengal (an Indian State)
Scope of solar generation in West Bengal (an Indian State)Scope of solar generation in West Bengal (an Indian State)
Scope of solar generation in West Bengal (an Indian State)
 
T04404121128
T04404121128T04404121128
T04404121128
 
Renewable Energy Certificate
Renewable Energy CertificateRenewable Energy Certificate
Renewable Energy Certificate
 
Towards a more sustainable energy economy
Towards a more sustainable energy economyTowards a more sustainable energy economy
Towards a more sustainable energy economy
 
Demand Response in the US
Demand Response in the US Demand Response in the US
Demand Response in the US
 
Framework assessment for_the_photovoltaic_opportunities_in_brazil
Framework assessment for_the_photovoltaic_opportunities_in_brazilFramework assessment for_the_photovoltaic_opportunities_in_brazil
Framework assessment for_the_photovoltaic_opportunities_in_brazil
 
Net energy metering manual for three schemes
Net energy metering manual for three schemesNet energy metering manual for three schemes
Net energy metering manual for three schemes
 
DE SANTIAGO BIPV
DE SANTIAGO BIPVDE SANTIAGO BIPV
DE SANTIAGO BIPV
 
Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India
 

Similar to Grüner Strom Label criteria and funding options

2012-10-01 Decision - Minnesota Department of Commerce - Division of Energy R...
2012-10-01 Decision - Minnesota Department of Commerce - Division of Energy R...2012-10-01 Decision - Minnesota Department of Commerce - Division of Energy R...
2012-10-01 Decision - Minnesota Department of Commerce - Division of Energy R...Silicon Energy
 
Energy Conservation By Mehfooz Qazi
Energy Conservation By Mehfooz QaziEnergy Conservation By Mehfooz Qazi
Energy Conservation By Mehfooz QaziIEEEP Karachi
 
Anre president
Anre   presidentAnre   president
Anre presidentA
 
LEAKED: Energy Saving Trust FIT review fact sheet
LEAKED: Energy Saving Trust FIT review fact sheetLEAKED: Energy Saving Trust FIT review fact sheet
LEAKED: Energy Saving Trust FIT review fact sheetwjafrazer
 
Transitioning to a clean energy economy (slide deck revised)
Transitioning to a clean energy economy (slide deck revised)Transitioning to a clean energy economy (slide deck revised)
Transitioning to a clean energy economy (slide deck revised)CGC CGC
 
High Efficiency - A Green Revolution In Dc Power
High Efficiency - A Green Revolution In Dc PowerHigh Efficiency - A Green Revolution In Dc Power
High Efficiency - A Green Revolution In Dc PowerEltek
 
Principles of Power Systems V.K Mehta Complete Book - Chapter 5
Principles of Power Systems V.K Mehta Complete Book - Chapter 5Principles of Power Systems V.K Mehta Complete Book - Chapter 5
Principles of Power Systems V.K Mehta Complete Book - Chapter 5Power System Operation
 
Energy Policy & Enonomics.
Energy Policy & Enonomics.Energy Policy & Enonomics.
Energy Policy & Enonomics.Paul Derwin
 
Energy Manager_MRV article pdf
Energy Manager_MRV article pdfEnergy Manager_MRV article pdf
Energy Manager_MRV article pdfAvijit Choudhury
 
NanoGrids for Home Application in a Power Cloud Framework
NanoGrids for Home Application in a Power Cloud Framework NanoGrids for Home Application in a Power Cloud Framework
NanoGrids for Home Application in a Power Cloud Framework Alessandro Burgio
 
VIETNAM – DIRECT POWER PURCHASE AGREEMENT MECHANISM IS UNDERWAY
VIETNAM – DIRECT POWER PURCHASE AGREEMENT MECHANISM IS UNDERWAYVIETNAM – DIRECT POWER PURCHASE AGREEMENT MECHANISM IS UNDERWAY
VIETNAM – DIRECT POWER PURCHASE AGREEMENT MECHANISM IS UNDERWAYDr. Oliver Massmann
 
Unit 5
Unit 5Unit 5
Unit 5umrez
 
White Paper Smart grids
White Paper Smart gridsWhite Paper Smart grids
White Paper Smart gridsGimélec
 
The EU State aid law hot spot in the Energy sector from a German perspective
The EU State aid law hot spot in the Energy sector from a German perspectiveThe EU State aid law hot spot in the Energy sector from a German perspective
The EU State aid law hot spot in the Energy sector from a German perspectiveFlorence Shool of Regulation
 
Renewables will shape Argentina’s new energy matrix
Renewables will shape Argentina’s new	energy matrixRenewables will shape Argentina’s new	energy matrix
Renewables will shape Argentina’s new energy matrixDoris Capurro
 

Similar to Grüner Strom Label criteria and funding options (20)

CAPSTONE FINAL VERSION
CAPSTONE FINAL VERSIONCAPSTONE FINAL VERSION
CAPSTONE FINAL VERSION
 
2012-10-01 Decision - Minnesota Department of Commerce - Division of Energy R...
2012-10-01 Decision - Minnesota Department of Commerce - Division of Energy R...2012-10-01 Decision - Minnesota Department of Commerce - Division of Energy R...
2012-10-01 Decision - Minnesota Department of Commerce - Division of Energy R...
 
Energy Conservation By Mehfooz Qazi
Energy Conservation By Mehfooz QaziEnergy Conservation By Mehfooz Qazi
Energy Conservation By Mehfooz Qazi
 
6 MW DG Power Plant
6 MW DG Power Plant6 MW DG Power Plant
6 MW DG Power Plant
 
Anre president
Anre   presidentAnre   president
Anre president
 
LEAKED: Energy Saving Trust FIT review fact sheet
LEAKED: Energy Saving Trust FIT review fact sheetLEAKED: Energy Saving Trust FIT review fact sheet
LEAKED: Energy Saving Trust FIT review fact sheet
 
Final project jrrm
Final project jrrm Final project jrrm
Final project jrrm
 
Transitioning to a clean energy economy (slide deck revised)
Transitioning to a clean energy economy (slide deck revised)Transitioning to a clean energy economy (slide deck revised)
Transitioning to a clean energy economy (slide deck revised)
 
High Efficiency - A Green Revolution In Dc Power
High Efficiency - A Green Revolution In Dc PowerHigh Efficiency - A Green Revolution In Dc Power
High Efficiency - A Green Revolution In Dc Power
 
Principles of Power Systems V.K Mehta Complete Book - Chapter 5
Principles of Power Systems V.K Mehta Complete Book - Chapter 5Principles of Power Systems V.K Mehta Complete Book - Chapter 5
Principles of Power Systems V.K Mehta Complete Book - Chapter 5
 
Energy Policy & Enonomics.
Energy Policy & Enonomics.Energy Policy & Enonomics.
Energy Policy & Enonomics.
 
Energy Manager_MRV article pdf
Energy Manager_MRV article pdfEnergy Manager_MRV article pdf
Energy Manager_MRV article pdf
 
NanoGrids for Home Application in a Power Cloud Framework
NanoGrids for Home Application in a Power Cloud Framework NanoGrids for Home Application in a Power Cloud Framework
NanoGrids for Home Application in a Power Cloud Framework
 
VIETNAM – DIRECT POWER PURCHASE AGREEMENT MECHANISM IS UNDERWAY
VIETNAM – DIRECT POWER PURCHASE AGREEMENT MECHANISM IS UNDERWAYVIETNAM – DIRECT POWER PURCHASE AGREEMENT MECHANISM IS UNDERWAY
VIETNAM – DIRECT POWER PURCHASE AGREEMENT MECHANISM IS UNDERWAY
 
Energy consumption and measures to save power in facilities operated by ACUAM...
Energy consumption and measures to save power in facilities operated by ACUAM...Energy consumption and measures to save power in facilities operated by ACUAM...
Energy consumption and measures to save power in facilities operated by ACUAM...
 
GE Challenge Energive 1st Runner Up 2014
GE Challenge Energive 1st Runner Up 2014GE Challenge Energive 1st Runner Up 2014
GE Challenge Energive 1st Runner Up 2014
 
Unit 5
Unit 5Unit 5
Unit 5
 
White Paper Smart grids
White Paper Smart gridsWhite Paper Smart grids
White Paper Smart grids
 
The EU State aid law hot spot in the Energy sector from a German perspective
The EU State aid law hot spot in the Energy sector from a German perspectiveThe EU State aid law hot spot in the Energy sector from a German perspective
The EU State aid law hot spot in the Energy sector from a German perspective
 
Renewables will shape Argentina’s new energy matrix
Renewables will shape Argentina’s new	energy matrixRenewables will shape Argentina’s new	energy matrix
Renewables will shape Argentina’s new energy matrix
 

Recently uploaded

Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abrahamssuserbb03ff
 
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 
Spiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnidsSpiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnidsprasan26
 
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service BikanerLow Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service BikanerSuhani Kapoor
 
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...Suhani Kapoor
 
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...OECD Environment
 
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...Delhi Escorts
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...Cluster TWEED
 
VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...Suhani Kapoor
 
Call Girls Mumbai Gayatri 8617697112 Independent Escort Service Mumbai
Call Girls Mumbai Gayatri 8617697112 Independent Escort Service MumbaiCall Girls Mumbai Gayatri 8617697112 Independent Escort Service Mumbai
Call Girls Mumbai Gayatri 8617697112 Independent Escort Service MumbaiCall girls in Ahmedabad High profile
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashikranjana rawat
 
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...Suhani Kapoor
 
VIP Call Girls Service Tolichowki Hyderabad Call +91-8250192130
VIP Call Girls Service Tolichowki Hyderabad Call +91-8250192130VIP Call Girls Service Tolichowki Hyderabad Call +91-8250192130
VIP Call Girls Service Tolichowki Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurVIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurSuhani Kapoor
 

Recently uploaded (20)

Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abraham
 
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
Spiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnidsSpiders by Slidesgo - an introduction to arachnids
Spiders by Slidesgo - an introduction to arachnids
 
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service BikanerLow Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
 
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
 
Sustainable Packaging
Sustainable PackagingSustainable Packaging
Sustainable Packaging
 
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
 
Green Banking
Green Banking Green Banking
Green Banking
 
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
 
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
 
VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Ramanthapur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
 
Call Girls Mumbai Gayatri 8617697112 Independent Escort Service Mumbai
Call Girls Mumbai Gayatri 8617697112 Independent Escort Service MumbaiCall Girls Mumbai Gayatri 8617697112 Independent Escort Service Mumbai
Call Girls Mumbai Gayatri 8617697112 Independent Escort Service Mumbai
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
 
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls ServicesGandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
 
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
 
VIP Call Girls Service Tolichowki Hyderabad Call +91-8250192130
VIP Call Girls Service Tolichowki Hyderabad Call +91-8250192130VIP Call Girls Service Tolichowki Hyderabad Call +91-8250192130
VIP Call Girls Service Tolichowki Hyderabad Call +91-8250192130
 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurVIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
 

Grüner Strom Label criteria and funding options

  • 1. Grüner Strom-Label Criteria List 2015, V1.2 Grüner Strom Label e.V. Vorstand: Rosa Hemmers (EUROSOLAR) Schumannstraße 35 • 53113 Bonn Dr. Werner Neumann (BUND) Tel/Fax: (0228) 926 67 13 / -12 Dietmar Oeliger (NABU) info@gruenerstromlabel.de Leiter der www.gruenerstromlabel.de Geschäftsstelle: Daniel Craffonara 1 These replace the last valid criteria list of 2012 because of developments on the market for green electricity and developments of the renewable energy sources act since then. 1 PURPOSE OF THE GRÜNER STROM LABEL CERTIFICATION 1.1 The goal of Grüner Strom Label e.V. (The “Green Electricity Label registered association”) (Here- inafter “GSL“) is to create transparency for the consumers by certifying recommendable Green Electricity offered on the market for green electricity in accordance with the criteria following hereinafter. 1 Certified are Electricity Products delivered to customers entirely produced from renewable energy and for which, in addition to the foregoing, a fixed amount per kilowatt-hour (kWh) is invested in the ecologically sustainable development of renewable energy. They provide impulses and spur the increased use of renewable energy resources, which meet highest envi- ronmental standards. To GSL, financial contributions and financing are essential and the most efficient ways to pro- mote facilities, installations and plants (hereinafter ”facilities”), which generate electricity from renewable energy. In addition, innovative measures in support of the necessary infrastructure will be promoted, which move the energy transformation towards 100 % renewable energy supply. 1.2 GSL Certified Green Electricity Products are intended to advance market penetration of electrici- ty primarily sourced from renewable energy (REN power). They are so intended in addition to and supplementing state-funded or other measures – in particular the statutory feed-in tariffs pursuant to the Erneuerbare Energien Gesetz (The German Renewable Energy Sources Act, “EEG”). The material goal of the certification is to obligate providers of Green Electricity Products herein- after (“Providers”) to promote REN power generating facilities and other measures to further the transformation of the energy system by making contributions to investments or granting loans and help realize them in this way. Usually, such measures may not be implemented before Pro- viders draw on the funds. The funds put up by the customers should be applied as effectively as possible for market pene- tration of REN power (as an additional spur). Otherwise achievable revenues for facilities, which receive funding, are taken into account in the process (statutory feed-in tariffs pursuant to the EEG, self-consumption, sales and distribution to customers directly). 2 ELECTRICITY PRODUCT REQUIREMENTS 2.1 Prerequisite for an award of the label is entering into a labeling agreement with GSL. After the grant of the label there will be a review of the continued fulfillment of these obligations, annually and/or every two years.
  • 2. Grüner Strom-Label Criteria List 2015, V1.2 2 2.2 Electricity Products are certified for which a fixed amount per kWh is charged and used by Pro- viders either for funding the construction and operation of REN and/or CHP facilities, or for measures aimed to promote the energy transformation pursuant to the principles set out in Art. 3.1 - Article 3.2.2. The funding amount coming from the Grüner Strom Certified Green Electricity delivered to the customers (GS Green Electricity) must, after the deduction of administrative ex- penses and other additional costs, in particular for the purchase of electricity from REN facilities, - amount to a minimum of 0.5 euro cent (hereinafter ‘cent’ or ‘ct’) per kWh (net). - In the case of customers with annual consumption of between 10,000 kWh and 100,000 kWh the minimum amount charged must be 0.4 ct/kWh (net). - In the case of customers with annual consumption of between 100,000 and 3,000,000 kWh the minimum amount charged must be 0.2 ct/kWh (net). - In the case of customers with consumption exceeding 3,000,000 kWh/year the minimum amount charged must be 0.1 ct/kWh (net). These minimum funding amounts are attested by GSL. Providers can request from GSL to attest higher funding amounts. For customers with various places of consumption the aggregate of the annual total consumption of all individual units of consumption may be used to measure the minimum funding amount charged. The referenced funding amount applies to the portion of GS Green Electricity. In case a diverse mix of fuels is used to generate electricity, the name of the Electricity Product and the Product information must clearly indicate how much the GS Green Electricity accounts for of the total electricity mix. 2.2.1 Upon prior approval by GSL, providers may offer sales campaigns to customers with annual con- sumption up to 100,000 kWh. The minimum funding amount according to annual consumption may be reduced by 50 percent for new customers acquired by such campaigns for the first con- tract period. After the expiry of this period, minimum funding amounts must be raised to normal levels as laid down in Art. 2.2. 2.3 Moreover, the electricity delivered in terms of Green Electricity must be designated as produced from renewable energy pursuant to the Energiewirtschaftsgesetz (the German “energy economy law” (EnWG). Guarantees of origin must be used which specify the source of the renewable elec- tricity generation. These are issued by the “Guarantees of Origin Registry” of the Umweltbun- desamt, the German Federal Environmental Agency, where they have to be submitted for can- cellation. In derogation of the statutory regulations the following restrictions apply with the Grüner Strom label: - The guarantee of origin alone is not sufficient evidence to qualify electricity for recogni- tion as Green Electricity. It must be presented linked to the amount of electricity on which it is based. This needs either be documented in the guarantee of origin or must be sup- ported by way of other reasonable evidence. - Electricity from biomass will be recognized only in terms of the limits defined in the Bio- masseverordnung, the German biomass electricity sustainability regulation. - Electricity from sewage gas and electricity from combustion plants, which run on a mix of fuels, will not be accepted.
  • 3. Grüner Strom-Label Criteria List 2015, V1.2 3 2 Available in German and can be downloaded from http://www.gruenerstromlabel.de/gruener-strom/kriterienkatalog/ 2.4 Additionally, a label user can request from GSL to attest attributes associated with the delivery of renewable electricity and to specify from the following options that A defined percentage of the electricity delivered to customers under the Certified Product comes from - German power stations - regional power stations - facilities of the label user, or facilities in which the label user or a subsidiary is directly involved or - sales and distribution direct and supplied from facilities deemed eligible for the EEG pursuant to Art. 3.1.6. The label user has to provide reasonable evidence to support one or more of these attributes in accordance with the provisions set out in Article III of the Guide to the Grüner Strom label Criteria List 2015 (hereinafter the “Criteria Guide“) 2 . 3 CONDITIONS FOR USE OF FUNDS 3.1 APPROVED OPTIONS The funding amounts as laid down in Art. 2.2 may be used to promote renewable electricity gen- eration facilities pursuant to Art. 3.1.1 - Art. 3.1.3 and Art. I.b. in the Criteria Guide - future projects, new technologies pursuant to Art. 3.1.4 and Art. I.c. in the Criteria Guide - energy efficiency measures and measures to reduce environmental impact pursuant to Art. 3.1.5 and Art. I.d. in the Criteria Guide - direct supply of green electricity pursuant to Art. 3.1.6 and Art I.e. in the Criteria Guide - other measures of support (citizen energy projects, communication, education and training, micro projects) pursuant to Art. 3.1.7 and Art I.f. in the Criteria Guide - development cooperation pursuant to Art. 3.1.8 and Art. I.g. in the Criteria Guide. Funding put towards such measures requires prior authorization by GSL, unless otherwise agreed. Moreover, the additional provisions must be met as defined by GSL in the Criteria Guide. 3.1.1 Renewable electricity generation facilities Roof-mounted and facade-mounted PV as well as onshore wind funding (new build and refitting / re-powering) does not require prior authorization by GSL when the provisions of Arti- cle I.b. are met as set out in the Criteria Guide. Furthering of all measures following hereinafter require prior authorization by GSL: Solar photovoltaics in open spaces Open space solar PV is eligible for funding only where land areas have been sealed or suffered damage before or, at the very least only where surfaces have little nature conservation signifi- cance. The photovoltaic systems are to be outfitted, designed and operated as to have as little effect as possible on the natural environment. Onshore wind Facilities, which receive funding, may receive additional funding to comply with site-specific regu-
  • 4. Grüner Strom-Label Criteria List 2015, V1.2 4 latory nature conservation requirements and/or for voluntary nature conservation work. Offshore wind Offshore wind funding will only be considered for review on presentation of informative project descriptions including information on grid connection, environmental reviews and the parties to the project. Small wind (capacity rating less or equal to 100 kW) A sensible site plan has to be supported by evidence. The preferable choice is to be projects in business parks taller than 10 kW. Biomass plants Biomass should be generated environmentally friendly in close proximity to the point of energy use and must be used in cogeneration of heat and power (CHP). For this a sensible plan for use of the heat including state-of-the-art energy conversion efficiency must be in place (heat rate at least 60 %). When biogas is used a predominant portion of it must be used to generate electrici- ty. The use of genetically modified organisms is to be excluded. - Biogas facilities as well as the option to combine (i) the use of alternative energy crops, (ii) flexibility in electricity and heat generation and /or (iii) bio methane processing, with them. Recycling of biogeneous residues and waste is explicitly encouraged. Biogas facilities (i) may not exceed a maximum size of 2.5 MW and/or 1,250 m3 of bio- gas/h (only for renewable raw materials and co-fermentation facilities using a portion of renewable raw materials exceeding 50 %) and (ii) may not use over 50 % of one single major arable crop. Substrates of renewable raw materials, manure and residues must stem from regional origins. Additionally, the suppliers of substrates are asked to make sure renewable raw materials are grown in environmentally sound ways and no fertilizers from factory farming are used. - In Biomass heating plants only regionally grown wood may be used. The wood must be sourced either (i) from waste wood and/or timber/paper industrial wastes (only in accord- ance with the “Altholzverordnung“, the German ordinance on the management of waste wood, category A I), (ii) forestry residues, (iii) small diameter timber resource, (iv) green waste from landscaping, (v) energy crop plantations or (vi) must be sustainably grown. - In CHP plants with 100 % biogas/bio methane, a mix of fuel gases, plant oil or gasifica- tion of wood the biogas/bio methane must meet the biogas facility requirements or re- spective Green Gas label standard in effect. In the case of CHP systems with plant oil or gasification of wood regionally grown oil and wood may be used only. The wood must be sourced either from (i) forestry residues, (ii) small diameter timber resource, (iii) green waste from landscaping, (iv) energy crop plantations or (v) must be sustainably grown. - Local heating networks: in connection with biogas facilities, biomass heating plants, CHP plants or sewage gas facilities eligible for financial support. Hydropower Funding put towards reactivation or modernization of closed or existing hydropower facilities is possible only if evidence testifies to a clear improvement for the freshwater ecosystems. The construction of new hydropower facilities in natural waters is eligible for funding in exceptional cases only. The installed electric generation capacity may not exceed 5 MW. Small-scale hydro-
  • 5. Grüner Strom-Label Criteria List 2015, V1.2 5 power plant funding < 100 kW does not apply. Deep geothermal power (for electricity generation in CHP) Use of sewage gas (for electricity generation in CHP) 3.1.2 For facilities which receive funding a base compensation is assumed coming from the statutory feed- in tariff regulations (EEG, KWKG, the German “cogeneration” law) while at the same time the detailed criteria for each specific case must be met and additional permits in accordance with the relevant provisions must be presented. When facilities are operated outside the EEG and/or to sell and distribute or supply electricity to cus- tomers directly, otherwise achievable revenues are taken into account. Moreover, the additional pro- visions in Articles I and II must be met as defined by GSL in the Criteria Guide. 3.1.3 In individual cases and following application it is also possible to support facilities, which are intended for operation outside the scope of and much similar to the EEG. Making use of the statutory provi- sions in place regarding the payments for electricity fed into the grid is mandatory. 3.1.4 FUTURE PROJECTS, NEW TECHNOLOGIES - Combined renewable energy power plants/virtual power plants/intelligently networked renewable energy facilities so as to optimize electricity supply - Energy storage technologies, e.g. battery storage or power-to-gas - Thermal storage in connection with CHP facilities utilizing renewable energy - Electric vehicle (EV) batteries as a source of energy storage - Local smart grids - Use of smart meters with flexible/time-of-the-day electricity pricing - Load control/demand-side management - Stability of the distribution network so as to better integrate renewable energy - Electric car charging points 3.1.5 ENERGY EFFICIENCY MEASURES AND MEASURES TO REDUCE ENVIRONMENTAL IMPACT - Building technology energy efficiency measures in the category electricity - Building technology energy efficiency measures in the category electricity for local communities which purchase GS Green Electricity - Improvements in energy efficiency and environmental impact of existing REN facilities 3.1.6 DIRECT SUPPLY OF GREEN ELECTRICITY - Integrated sale and distribution of green electricity as to better incorporate renewable energy into the energy system in the form of sales and distribution of green electricity from facilities deemed eligible for the EEG to the consumer directly. A substantial portion of the electricity delivered is supplied from facilities deemed eligible for the EEG and from intermittent renewable energy sources. - Local models for sales and distribution of electricity, e.g. tenant electricity models 3.1.7 OTHER MEASURES OF SUPPORT - Furthering of citizen energy projects, and citizen-owned organizations
  • 6. Grüner Strom-Label Criteria List 2015, V1.2 6 - Informational and training events dedicated to energy and energy efficiency - Materials for associated pedagogical efforts in renewable energy - Training materials - Displays for REN facilities - Contributions to micro projects 3.1.8 DEVELOPMENT COOPERATION The primary geographic focus where to support projects should be on Germany. Eligible for fi- nancial support are also individual projects outside the EU in developing countries – provided they have been favorably assessed following an in-depth assessment by GSL and can be carried out in cooperation with experienced and reliable local partners. The projects are to advance the supply of basic energy needs of the population from renewable sources. They should be like pilot projects, have multiplier effects and provide impulses to set and keep improvement of local framework conditions in motion. Eligible for financial support are for example: - renewable electricity generation facilities - renewable energy feasibility studies - support of education and training in the field of renewable energy - energy efficiency measures. 3.2 INVESTING OPTIONS 3.2.1 Typically eligible for financial support are new facilities and other measures pursuant to the crite- ria laid down in Article 3.1 - Article 3.1.8. Financial support can be given in the form of - Grüner Strom payment (GS payment): contribution to investments for their own projects or a non-repayable contribution to investments for projects of third parties, which will be made available once in the year of beginning of operations (cash value) - Grüner Strom loan (GS funded loan): funds used for their own profitable plants or loans to third party operators of profitable plants, both including repayment plus interest to the respective internal support funds of the label user within ten years. - Transfer of proceeds to the fund of GSL (GSL fund). In keeping with the Articles of Association, GSL will use these proceeds to support the construction of REN facilities and other measures based on the present criteria list in a timely fashion. - Additional financing plans are possible in consensus with the GSL Secretariat. The provisions defined in Articles I and II of the Criteria Guide apply to GS payments, GS funded loans and the GS fund. It is possible to combine GS payments and GS loans. 3.2.2 Taking the electricity feed-in tariffs pursuant to the EEG and/or the KWKG or other revenues into account, GS payments are to be limited to an amount necessary to attain acceptable profitability (pursuant to Art. II.b. in the Criteria Guide). If requested, this must be reasonably documented by way of a funds evaluation scheme made available by GSL or a comparable profitability analysis in consensus with the GSL Secretariat. Depending on the type of facility, the maximum interest rate permitted for the project as defined in Art. I.b. of the Criteria Guide apply in the calculation and evaluation of funds for renewable
  • 7. Grüner Strom-Label Criteria List 2015, V1.2 7 3 The practical implementation of the certification process will always be monitored by an external institute. electricity generation facilities. GS payments for all other investments will be made either after individual case review or in flat rates specific to the measure, applicable when they comply with a defined framework. Financial contributions to compensate for disadvantages of location come into question only in the case of well-founded exceptions. Primarily, GS payments are to be put towards new facilities which are built and operated either by the Providers themselves, or by non-profit organizations, public institutions and charities as well as citizen-owned operating companies and cooperatives. Third parties, who receive financial contributions or loans, are to purchase high quality green electricity as well. Financial contributions to individuals must be made in a transparent way. 4 ENERGY PROVIDER REQUIREMENTS 4.1 The Grüner Strom label is not granted to companies acting negatively towards the generation and use of REN and CHP power. The Grüner Strom label will not be granted to companies di- rectly involved in nuclear power plants, i.e. operators of nuclear companies or companies with ownership interests/capital stock in nuclear operating companies. Moreover, the label is not granted to companies directly involved in existing or new coal-fired power plants, i.e. operators of coal-fired power plants or companies with ownership inter- ests/capital stock in coal-fired power plants, purchased after this criteria list has taken effect (for new label users from January 1, 2015, for label users prior to this date from January 1, 2016). Obligations resulting from agreements entered into with other parties before the criteria list took effect will be assessed by GSL by individual case. 4.2 For the activities in conjunction with the GS Green Electricity offered, label users are obligated to set up an accounting system separate from their other activities. They commit to transparent and public disclosure of the annual total revenues from the fixed funding amount charged per kWh and their use. In particular they must - gather detailed and clear records which demonstrate the fulfillment of their obligations and which are attested and confirmed by their auditors and/or tax advisors or alternatively, are verified through an on-site inspection by GSL or the institute in charge of certification3 , - also obligate the operators of REN facilities for which the funds were made available and other recipients of proceeds to meet such requirements, - provide the necessary data and proof to the institute in charge of certification (certifier) and/or to GSL and give access to the documents as well as the generation facilities supported under the certification and other measures, if requested. 4.3 Label users should present the information on the Certified Product in transparent, clear and understandable ways to their customers. They should use best efforts to market it, and in doing so, must show the logo of the Grüner Strom label pursuant to Article 6.1. The Product information must specify the composition of the electricity delivered by fuel type and the funding amount per kWh (net). Additionally, label users are obligated to public disclosure of
  • 8. Grüner Strom-Label Criteria List 2015, V1.2 8 the following data about the REN facilities: - sites - times of beginning of operation - data on capacity and generation. Equivalent information is to be publicly disclosed on the funding of other measures. Moreover, the investment obligation, which results from the fixed funding amount charged and the use of funds during the calendar year, should be disclosed on the Internet. 4.4 Label users must provide up to date and comprehensive tips on ways to save energy to custom- ers, e.g. over the Internet or at their customer service centers. Moreover, they are required to offer individual energy saving advice to their customers (in person, over the phone, or in writing) or advise them on institutions where they can obtain such information (pursuant to §4 “Ener- giewirtschaftsgesetz”, (4) of the German „energy services“ law). 4.5 There will be a review of fulfillment of obligations with respect to the uses of the proceeds for each calendar year. The supporting evidence attested and confirmed by the auditors and/or tax advisors or alternatively, by GSL or the institute in charge of certification must be furnished by June 30th of the following calendar year. GSL must be notified of preliminary data by January 31st respectively. 4.6 The financial obligation to support new facilities which results from the fixed amount of funding per kWh sold as well as from repayment of investments in profitable plants during the calendar year, has to be met by the end of the second year following thereafter. Funds, which have not been applied by then in accordance with the present criteria list, must be transferred to GSL. In keeping with the Articles of Association, GSL will use these funds to support the construction of REN facilities based on the present criteria list in a timely fashion. 4.7 Grüner Strom label certification of an Electricity Product is to be imbedded into corporate sus- tainability policies in the ecological, economic and social senses. The focus is on a set of guiding principles: - Providers actively advocate energy supplied ecologically from renewable energy and energy efficient practices in their companies and to their customers. - Providers conduct business in a responsible and environmentally sustainable fashion and advance the energy transformation at the local and regional levels. - Providers show fair treatment towards their customers and act responsibly towards their employees. Label users should inform their customers and GSL about the above and related actions and, if possible, provide supporting evidence regarding for example - concrete targets for protecting the climate and RE expansion - sustainability reporting - their own purchase and generation of green electricity and energy efficiency measures - environmental performance and management reviews under schemes like EMAS or ISO 14001 - independent rating and assessment of their customer service quality
  • 9. Grüner Strom-Label Criteria List 2015, V1.2 9 4 This version was last adapted on December 16, 2016 in Art. 2.2, 2.2.1 (modification of minimum funding amounts), 4.2 and 4.5 (adjustment of the process of evidence testing). - fair contract provisions for customer - personal advice offers on renewable energy use for their customers. GSL will publish such voluntarily disclosed information by Providers on the Internet. 5 AWARD AND WITHDRAWAL OF THE LABEL 5.1 The GSL label is typically granted for two (2) years. In case of material breach of the labeling agreement and/or the requirements contained in the present criteria list the GSL label will be withdrawn with immediate effect. A breach is material among other things - in general in the case of misuse, in particular in the case of manipulation of data - when the obligations under Art. 4.1 are not met - when the obligation under Art. 4.6 is not met in three consecutive years. The withdrawal will be publicly disclosed. 5.2 In the case of resignation or termination of the labeling agreement GSL and the label user have entered into, or withdrawal of the label in accordance with Art. 5.1 the fixed amounts of funding as defined under Art. 2.2 not used are to be paid out to GSL at the time the termination takes effect. GSL is to use them in accordance with Art. 4.6. Future repayments to be expected from funds used for profitable plants in accordance with Art. 3.2.1 are also to be paid out to GSL, based on assessment reporting by an auditor and following a schedule agreed between the label user and GSL. GSL is to use them in accordance with Art. 4.6. 6 USE OF THE LABEL AND DISTRIBUTION TO CUSTOMERS 6.1 Label users may mention and show the Grüner Strom label in their Product information clearly linked to the Certified Product only. When they display the label the names of the supporting associations behind GSL may also be mentioned. No license to the supporting organizations’ logos is granted to them. The most recent terms of use made available by GSL supplement and apply to the use of the logo. 6.2 Label users are authorized to grant the Grüner Strom label to customers of their Certified Product for one year, or for as long as the term of the respective power supply contract. 7 THE CRITERIA LIST IN FORCE AND TRANSITIONAL ARRANGEMENT 7.1 This version of the criteria list is in effect until it is replaced by a new version4 . 7.2 All references to overarching statutory regulations (such as the EEG, the “Biomasseverordnung“ or the German “energy services“ law) are made to the versions of them in force respectively when the present criteria list was issued (January 1, 2015).
  • 10. Grüner Strom-Label Criteria List 2015, V1.2 10 As of January 1, 2017 Translation by Silvia Strauch 7.3 In case of changes to these statutory regulations, which are of relevance to the present criteria list GSL reserves the right to adapt the criteria, list in the articles concerned accordingly. 7.4 A transitional period ending December 31, 2015 applies to label users who entered into a label- ing agreement before January 1, 2015 based on former criteria lists to meet such newer criteria list.