Seal of Good Local Governance (SGLG) 2024Final.pptx
system development life cycle(SDLC) (1).pptx
1. System Development Life Cycle(SDLC)
ITM
II Jai Sri GurudevII
Department of MBA
Sri Adichunchanagiri Shikshana Trust
SJB INSTITUTE OF TECHNOLOGY
(An Autonomous Institute under Visvesvaraya Technological University, Belagavi
Approved by AICTE, New Delhi, Recognized by UGC, New Delhi with 2(f) and 12 (B).
Accredited by NAAC with ‘A+’ Grade, Accredited by National Board of Accreditation)
No. 67, BGS Health & Education City, Dr Vishnuvardhan Road , Kengeri, Bengaluru-560060
Submitted to:
BHARATH TS
ASST PROFESSOR
MBA DEPARTMENT
Presentation by
YASHWANTH KUMAR
LJ
1JB22BA115
2. INTRODUCTION TO SDLC
SDLC Stands for System Development Life Cycle.
The system development life cycle (SDLC) is
a framework defining tasks performed at each step in
the software development process.
It consists of a detailed plan describing how
to develop, maintain and replace specific system.
3. OBJECTIVE OF SDLC
SDLC has Three primary objectives:
Ensure the delivery of high quality systems.
Provide strong management control.
Maximize productivity.
5. Determine if a new system is needed
Three primary tasks:
Define the problem.
Suggest alternative solutions.
Prepare a short report.
Phase 1: Planning
6. Phase 2: System Analysis
In depth study of the existing system to
determine what the new system should do.
In addition to observation and interviews,
examine:
Formal lines of authority (org chart)
Standard operating procedures
How information flows
Reasons for any inefficiencies
7. Phase 3: System Design
It takes the initial input
For each requirements design elements will be
produced
It describes the software features and includes
hierarchy diagrams , screen layout diagrams
The output of the stage describe the new
system as a collection of modules or
subsystems.
8. Phase 4: System Development
Build the system to the design specifications
Develop the software
Acquire the hardware
Create manuals for users and operators
9. PHASE 5: SYSTEM TESTING
Test the new system
Module (unit) test - tests each part of
system
Integration testing - tests system as one
unit
10. Phase 6: System Implementation
Convert from old system to new system.
Train users
Compile final documentation
Evaluate the new system
User Training
11. Phase 7: System Maintenance
Physical repair of the system.
Correction of new bugs found.
System adjustments to environmental changes.
Adjustments for users’ changing needs
(adaptive).
Changes to user better techniques when they
become available (perfective).