Software Engineering Modeling and Design
Unit –III Agile Development
Agile Development: Agile manifesto, agility and cost of change, Agility principles,
myth of planned development.
Extreme Programming: XP values, process, industrial XP
SCRUM: process flow, scrum roles, scrum cycle description, product backlog,
sprint planning meeting, sprint backlog, sprint execution, daily scrum meeting,
maintaining sprint backlog and burn-down chart, sprint review and retrospective.
Agile Practices: test driven development, refactoring, pair programming,
Continuous integration, exploratory testing versus scripted testing.
Introduction to Kanban and its comparison with SCRUM Process.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Agile Development
 Agile software engineering combines a philosophy and a set of development
guidelines
 The philosophy encourages customer satisfaction and early incremental
delivery of software; small, highly motivated project teams; informal methods;
minimal software engineering work products; and overall development
simplicity.
The development guidelines stress delivery over analysis and design, and active
and continuous communication between developers and customers.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
What is an Agile Process?
Any agile software process is characterized in a manner that addresses a number of
key assumptions about the majority of software projects:
It is difficult to predict in advance which software requirements will persist
and which will change. It is equally difficult to predict how customer priorities
will change as the project proceeds.
 For many types of software, design and construction are interleaved. That
is, both activities should be performed in tandem so that design models are
proven as they are created. It is difficult to predict how much design is
necessary before construction is used to prove the design.
Software Engineering Modeling and Design
What is an Agile Process?
Any agile software process is characterized in a manner that addresses a number of
key assumptions about the majority of software projects:
Analysis, design, construction, and testing are not as predictable (from a
planning point of view) as we might like.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
What is Agility?
 Agility in software engineering refers to the ability of a software development
team to respond quickly and effectively to changes in project requirements or
market demands.
 The team works closely with the customer or product owner to prioritize
features and adjust the project scope as needed.
 Twelve Principles
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
The Cost of Change
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Agile Principles
 Our highest priority is to satisfy the customer through early and continuous
delivery of valuable software.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Agile Principles
 Welcome changing requirements, even late in development.Agile processes
harness change for the customer’s competitive advantage.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Agile Principles
 Deliver working software frequently, from a couple of weeks to a couple of
months, with a preference to the shorter timescale.
Software Engineering Modeling and Design
Agile Principles
 Business people and developers must work together daily throughout the
project
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Agile Principles
 Build projects around motivated individuals. Give them the environment and
support they need, and trust them to get the job done.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Agile Principles
 The most efficient and effective method of conveying information to and
within a development team is face-to-face conversation
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Agile Principles
 Working software is the primary measure of progress
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Agile Principles
Agile processes promote sustainable development. The sponsors, developers,
and users should be able to maintain a constant pace indefinitely
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Agile Principles
 Continuous attention to technical excellence and good design enhances
agility.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Agile Principles
 Simplicity—the art of maximizing the amount of work not done—is essential.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Agile Principles
 The best architectures, requirements, and designs emerge from self–organizing
teams.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Agile Principles
 At regular intervals, the team reflects on how to become more effective, then
tunes and adjusts its behavior accordingly.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Agile Manifesto
 Document that identifies four key and twelve principles
 Four core values
 Individuals and interactions over processes and tools
 Working s/w over comprehensive documentation
 Customer collaboration over contract negotiation
 Responding to change over following plan
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
SummaryAgile Development
 Fastest Development Methodology
 No Documentation Overhead
 Focus on Code development
 Frequently Delivery
 Customer satisfaction
 Change accepted
 Face to face conversation
 Customer involved in development
 Self organizing, self motivated and highly experienced
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Human Factors
 Agile development focuses on the talents and skills of individuals, molding the
process to specific people and teams
 Competence - specific software-related skills, and overall knowledge of the
process that the team has chosen to apply
 Common focus - tasks and bring different skills -focused on one goal-to
deliver a working software increment to the customer within the time
promised
 Collaboration – stakeholders, comp s/w & database
 Decision-making ability - allowed the freedom to control its own destiny
 Mutual trust and respect – among all
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Extreme Programming (XP)
 most widely used approach to agile software development.
 XP is lightweight, efficient, low-risk, flexible, predictable and fun way to develop
a software
 Rapidly changing requirements
 XP values - establish a foundation for all work performed as part of XP
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
XPvalues
 Communication
 Effective communication between s/w engg. and stakeholders
 To establish features and functions for the s/w
 Collaboration between customers & developers continuous feedback, avoid f
voluminous documentation a communication Medium.
 Simplicity
 Restricts developers to design only for immediate needs
 Intent is to create a simple design
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
XPvalues
 Feedback
 Implemented s/w itself, the customer and s/w team members
 By designing and implementing an effective testing strategy
 the software provides the agile team with feedback
 Courage
 Abetter word might be discipline
 “designing for tomorrow”
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
XPvalues
 Respect
 Respect among members, between other stakeholders and team members and
indirectly, for the s/w itself.
 As they achieve successful delivery of software increments, the team develops
growing respect for the XP process.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
The XPProcess
Software Engineering Modeling and Design
The XP Process
 Extreme Programming uses an object-oriented approach as its preferred
development paradigm and encompasses a set of rules and practices that
occur within the context of four framework activities: planning, design,
coding, and testing.
 The XP process and notes some of the key ideas and tasks that are
associated with each framework activity.
 Asimple design is always preferred over a more complex representation
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Framework Activities
 Planning
 The planning activity begins with listening, requirements gathering
 creation of a set of “stories” (also called user stories)
 basic commitment (agreement on stories to be included, delivery date, and
other project matters)
 Design
 XP design rigorously follows the keep it simple principle
 Asimple design is always preferred over a more complex representation
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Framework Activities
 Design
 XP design rigorously follows the keep it simple
principle
 Asimple design is always preferred over a more
complex representation
 If a difficult design problem is encountered
as part of the design of a story, XP recommends
the immediate creation of an operational prototype
of that portion of the design. Called a spike
solution, the design prototype is implemented and
evaluated
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Framework Activities
 Coding
 Refactoring
 Pair programming
 Continuous integration
 Testing
 XP acceptance tests, also called customer tests
 Overall features & functionality that are visible& reviewable by the customer.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Industrial XP
 IXP is an organic evolution of XP
 Its expanded role of customers & its upgraded technical practices
 Incorporate six new practices
 Readiness assessment
 an appropriate development environment exists to support IXP
 the team will be populated by the proper set of stakeholders
 the organization has a distinct quality program and supports continuous
improvement
 the broader project community will be populated appropriately
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Industrial XP
 Project community
 Classic XP suggests that the right people be used to populate the agile
team to ensure success
 The implication is that people on the team must be well-trained,
adaptable and skilled, and have the proper temperament to contribute to a
self-organizing team
 Acommunity may have a technologist and customers who are central to
the success of a project as well as many other stakeholders (e.g., legal
staff, quality auditors, manufacturing or sales types)
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Industrial XP
 Project charactering
 Project itself to determine whether an appropriate business justification
for the project exists and the project will further overall goal- objectives
of organization.
 Chartering also examines the context of the project to determine how it
complements, extends, or replaces existing systems or processes.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Industrial XP
 Test Driven Management
 An IXP project requires measurable criteria for assessing the state of the
project and the progress that has been made to date.
 Test-driven management establishes a series of measurable
“destinations” and then defines mechanisms for determining whether or
not these destinations have been reached.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Industrial XP
 Retrospectives
 An IXP team conducts a specialized technical review after a software
increment is delivered. Called a retrospective,
 the review examines “issues, events, and lessons-learned” across a
software increment and/or the entire software release.
 The intent is to improve the IXP process.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Industrial XP
 Continuous Learning
 Because learning is a vital part of continuous process improvement,
members of the XP team are encouraged to learn new methods and
techniques that can lead to a higher quality product.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
OtherAgile Process Models
 The most widely used of all agile process models is Extreme Programming
(XP). But many other agile process models have been proposed and are in
use across the industry.
 Among the most common are:
 Adaptive Software Development (ASD)
 Scrum
 Dynamic Systems Development Method(DSDM)
 Feature Driven Development (FDD)
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Scrum
 Is an agile software development method that was conceived by Jeff
Sutherland and his development team in the early 1990s.
 Scrum principles are consistent with the agile manifesto
 used to guide development activities within a process that incorporates the
following framework activities:
 requirements
 analysis
 design
 Evolution
 delivery
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Scrum
 framework activity, work tasks occur within a process pattern called a
sprint.
 The work conducted within a sprint is adapted to the problem at hand and is
defined and often modified in real time by the Scrum team
 Scrum emphasizes the use of a set of software process patterns that have
 proven effective for projects with tight timelines, changing requirements,
and business criticality.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Scrum
 Each of these process patterns defines a set of development actions:
 Backlog—a prioritized list of project requirements or features that provide
business value for the customer. Items can be added to the backlog at any
time (this is how changes are introduced).
 The product manager assesses the backlog and updates priorities as
required.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Scrum
 Sprints—consist of work units that are required to achieve a requirement
defined in the backlog that must be fit into a predefined time-box.
 Changes are not introduced during the sprint.
 Scrum meetings—are short meetings held daily by the Scrum team.
 Three key questions are asked and answered by all team members :
 What did you do since the last team meeting?
 What obstacles are you encountering?
 What do you plan to accomplish by the next team meeting?
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Scrum
 A team leader, called a Scrum master, leads the meeting and assesses the
responses from each person.
 The Scrum meeting helps the team to uncover potential problems as early as
possible
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Scrum
 Demos—deliver the software increment to the customer so that
functionality that has been implemented can be demonstrated and evaluated
by the customer.
 It is important to note that the demo may not contain all planned
functionality, but rather those functions that can be delivered within the
time-box that was established
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Scrum Role
 AScrum team consists of three roles: the Scrum Master, the product
owner, and the development team.
 While there is only one Scrum Master and one product owner, there are
generally several development team members.
 Scrum teams are small.
 The Scrum Guide recommends 10 or fewer total members to ensure optimal
communication and productivity
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Scrum Master
 AScrum Master is responsible for ensuring a Scrum team is operating as
effectively as possible with Scrum values.
 This means they keep the team on track, plan and lead meetings, and work
out any obstacles the team might face
 Scrum Masters might also work in a larger role within an organization to
help it incorporate Scrum concepts into their work.
 Because they are both a leader and a behind-the-scenes supporter, they are
often described as the “servant leader” of the Scrum team.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Scrum Master
 Scrum can look different from organization to organization and team to team,
making the specific tasks of a Scrum Master varied. Broadly, however, a Scrum Master
might have the following responsibilities:
 Facilitate daily Scrum meetings (also called “daily standups”)
 Lead sprint planning meetings
 Conduct “retrospective” reviews to see what went well and what can be improved
for the following sprint
 Keep a pulse on team members, through individual meetings or other means of
communication.
 Manage obstacles that arise for the team by communicating with stakeholders
outside of the team
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Product Owner
 Aproduct owner ensures the Scrum team aligns with overall product
goals.
 They understand the business needs of the product, like customer
expectations and market trends.
 Because they have to understand how the Scrum team fits into bigger
picture goals,
 product owners usually stay in touch with product managers and other
stakeholders outside the team.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Product Owner
 Product owners might find themselves with the following responsibilities:
 Manage the product backlog by ordering work by priority
 Set the product vision for the team
 Communicate with external stakeholders and translate their needs to
the team
 Make sure the team is focused on hitting product needs through
communication and evaluating progress
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Development Team
 Adevelopment team is composed of professionals who do the hands-on
work of completing the tasks in a Scrum sprint.
 This means development team members can be computer engineers,
designers, writers, data analysts, or any other role needed to reach sprint
goals.
 The development team doesn’t just wait for orders; they usually collaborate
to map out goals and plans for achieving them.
 Not all development team members will always have the same
responsibilities
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Development Team
Development team can be tasked with the following:
 Help in sprint planning and goal setting
 expertise to program, design, or improve products
 Use data to find best practices for development
 Test products and prototypes, plus other forms of quality assurance
 Self-Organized scrums teams
Software Engineering Modeling and Design – Overview Agile Development Process
Software Engineering Modeling and Design
Scrum Cycle Description
A Scrum sprint cycle is a time-boxed period when a team delivers a set
amount of work.
It is typically two to four weeks in duration and each sprint starts the
moment the previous one is completed.
The Scrum sprint cycle is often referred to as a process of continuous
development.
It delivers a consistent work task for product releases and keeps the
project’s momentum going until complete.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Stages of the Scrum sprint cycle
The official Scrum Guide mentions following events that represent the
Scrum sprint cycle
Sprint planning - Kicking off the Sprint and defining what needs to be
completed
Daily Scrum - Developers meet for fifteen minutes every day to share
what they have worked on, any issues blocking them, and what they will
be working on next
Sprint review - Evaluate what was delivered and decide what should be
worked on in the next sprint
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Stages of the Scrum sprint cycle
Sprint retrospective -Areview of the process to improve the next sprint
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Sprint planning
Sprint planning is an event in scrum that defines what can be delivered in
the upcoming sprint and how that work will be achieved.
In scrum, the sprint is a set period of time where all the work is done.
Sprint goal, sprint start-end, sprint agenda
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Burndown Chart in Scrum
Aburn down chart is a graphical representation of work left to do versus
time
It is often used in agile software development methodologies such as
Scrum.
burn down charts can be applied to any project containing measurable
progress over time.
Typically, in a burn down chart, the outstanding work is often on the vertical
axis, with time along the horizontal.
 It is useful for predicting when all of the work will be completed.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Burndown Chart in Scrum
In the Daily Scrum the Development Team updates the Sprint Burn Down
and plots the remaining work of the day. A burndown chart is almost a
“must” have tool for a Scrum team for the following main reasons:
monitoring the project scope
Keeping the team running on schedule
Comparing the planned work against the team progression.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Burndown Chart in Scrum
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Sprint Review?
A sprint review is a key event in the Scrum framework for
agile software development.
It is held at the end of each sprint, which is a time-boxed
period of typically two to four weeks during which a
development team works on a set of prioritized user stories
or tasks.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Sprint Review?
During Review, demonstrates the work they have
completed during the sprint to the product owner,
stakeholders, and other members of the organization.
goal of the review is to assess the progress of the team,
obtain feedback from stakeholders, and plan for the next
sprint
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Sprint Review?
typically involves a presentation of the working
software or product increment that the team has developed
during the sprint.
The team walks through the completed user stories or
tasks, highlighting any challenges or accomplishments that
occurred during the sprint
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Sprint Review?
Stakeholders, including the product owner and other
members of the organization, are invited to provide
feedback on the work completed during the sprint.
They may ask questions or provide suggestions for
improvement. This feedback is then taken into consideration
when planning for the next sprint.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Sprint Review?
The sprint review is a critical event in the Scrum framework
that provides an opportunity for the development team to
showcase their work, obtain feedback, and plan for the
next sprint. It is a valuable tool for ensuring that the team is
on track and delivering value to stakeholders
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Sprint Retrospective?
The development team reflects on the previous Sprint and
examines how they can improve their processes, teamwork,
and collaboration.
The goal of the retrospective is to identify what went well,
what didn't go well, and what changes the team can make
to become more effective in the next Sprint.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Sprint Retrospective?
typically led by the Scrum Master, who facilitates the
discussion and helps the team identify areas for improvement
The team reviews the results of the Sprint, including the
completed user stories or tasks, any issues that arose, and
any feedback received from stakeholders during the Sprint
review.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Sprint Retrospective?
The team then identifies specific action items that they can
take to improve their processes, teamwork, and
collaboration, documented in a Sprint backlog and become
part of the plan for the next Sprint.
Tool for the development team to continuously improve
their processes and become more effective.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Agile Practices - Refactoring
A construction technique that is also a method for design optimization
Refactoring is the process of changing a software system in such a way that
it does not alter the external behavior of the code yet improves the internal
structure.
Refactoring allows a software engineer to improve the internal structure of a
design (or source code) without changing its external functionality or
behavior.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Refactoring
It is a disciplined way to clean up code [and modify/simplify the internal
design] that minimizes the chances of introducing bugs.
In essence, when you refactor you are improving the design of the code after
it has been written.
refactoring can be used to improve the efficiency, readability, or
performance of a design or the code that implements a design.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Pair Programming
XP recommends that two people work together at one computer workstation
to create code for a story.
This provides a mechanism for realtime problem solving (two heads are
often better than one) and real-time quality assurance (the code is reviewed
as it is created).
It also keeps the developers focused on the problem at hand. In practice,
each person takes on a slightly different role
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Pair Programming
For example,
one person might think about the coding details of a particular portion of
the design while the other ensures that coding standards (a required part of
XP) are being followed or that the code for the story will satisfy the unit
test that has been developed to validate the code against the story
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Pair Programming + continuous integration
As pair programmers complete their work, the code they develop is
integrated with the work of others. In some cases this is performed on a
daily basis by an integration team.
 In other cases, the pair programmers have integration responsibility.
This “continuous integration” strategy helps to avoid compatibility and
interfacing problems and provides a “testing” environment that helps to
uncover errors early
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Pair Programming
Pair programming can be characterized as a continuous desk check. Rather
than scheduling a review at some point in time,
pair programming encourages continuous review as a work product (design
or code) is created.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Test-Driven Development
Test Driven Development (TDD) is a software development practice
that focuses on creating unit test cases before developing the
actual code.
It is an iterative approach combining programming, unit test
creation, and refactoring.
The TDD approach originates from the Agile manifesto principles
and Extreme programming.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Test-Driven Development
As the name suggests, the test process drives software development.
Moreover, it’s a structuring practice that enables developers and testers
to obtain optimized code that proves resilient in the long term.
Developers create small test cases for every feature based on their
initial understanding. The primary intention of this technique is to
modify or write new code only if the tests fail. This prevents
duplication of test scripts.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Test-Driven Development
Requirements drive design, and design establishes a foundation
for construction
Requirements for a software component serve as the basis for the creation
of a series of test cases that exercise the interface and attempt to find errors
in the data structures and functionality delivered by the component
TDD is not really a new technology but rather a trend that emphasizes the
design of test cases before the creation of source code.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Test-Driven Development
Calculator Function:
When building a calculator function, a TDD approach would involve writing
a test case for the “add” function and then writing the code for the process to
pass that test.
Once the “add” function is working correctly, additional test cases would be
written for other functions such as “subtract”, “multiply” and “divide”.
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Test-Driven Development
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Agile Development Process Mr. N. L. Shelake Department of Information Technology
Software Engineering Modeling and Design
Agile Development Process Mr. N. L. Shelake Department of Information Technology
SCRIPTED TESTING EXPLORATORY TESTING
The test scripts can be traced back to
the original requirements and
specifications to demonstrate test
coverage.
In this testing no well-documented,
clear, and measurable test coverage.
All test scripts and test cases are
designed and reviewed in advance.
As with scripted testing, in this test
cases cannot be reviewed in advance.
At the end of the testing cycle, testers
can confirm if all the requirements
have been met or not.
As there are no clear and documented
test cases, there is no way to check
and confirm that all the requirements
have been met.
Software Engineering Modeling and Design
Thank You
Agile Development Process Mr. N. L. Shelake Department of Information Technology

SYBTech_2021_Patt_Unit3 Agile Development.pdf

  • 1.
    Software Engineering Modelingand Design Unit –III Agile Development Agile Development: Agile manifesto, agility and cost of change, Agility principles, myth of planned development. Extreme Programming: XP values, process, industrial XP SCRUM: process flow, scrum roles, scrum cycle description, product backlog, sprint planning meeting, sprint backlog, sprint execution, daily scrum meeting, maintaining sprint backlog and burn-down chart, sprint review and retrospective. Agile Practices: test driven development, refactoring, pair programming, Continuous integration, exploratory testing versus scripted testing. Introduction to Kanban and its comparison with SCRUM Process. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 2.
    Software Engineering Modelingand Design Agile Development  Agile software engineering combines a philosophy and a set of development guidelines  The philosophy encourages customer satisfaction and early incremental delivery of software; small, highly motivated project teams; informal methods; minimal software engineering work products; and overall development simplicity. The development guidelines stress delivery over analysis and design, and active and continuous communication between developers and customers. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 3.
    Software Engineering Modelingand Design What is an Agile Process? Any agile software process is characterized in a manner that addresses a number of key assumptions about the majority of software projects: It is difficult to predict in advance which software requirements will persist and which will change. It is equally difficult to predict how customer priorities will change as the project proceeds.  For many types of software, design and construction are interleaved. That is, both activities should be performed in tandem so that design models are proven as they are created. It is difficult to predict how much design is necessary before construction is used to prove the design.
  • 4.
    Software Engineering Modelingand Design What is an Agile Process? Any agile software process is characterized in a manner that addresses a number of key assumptions about the majority of software projects: Analysis, design, construction, and testing are not as predictable (from a planning point of view) as we might like. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 5.
    Software Engineering Modelingand Design What is Agility?  Agility in software engineering refers to the ability of a software development team to respond quickly and effectively to changes in project requirements or market demands.  The team works closely with the customer or product owner to prioritize features and adjust the project scope as needed.  Twelve Principles Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 6.
    Software Engineering Modelingand Design The Cost of Change Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 7.
    Software Engineering Modelingand Design Agile Principles  Our highest priority is to satisfy the customer through early and continuous delivery of valuable software. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 8.
    Software Engineering Modelingand Design Agile Principles  Welcome changing requirements, even late in development.Agile processes harness change for the customer’s competitive advantage. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 9.
    Software Engineering Modelingand Design Agile Principles  Deliver working software frequently, from a couple of weeks to a couple of months, with a preference to the shorter timescale.
  • 10.
    Software Engineering Modelingand Design Agile Principles  Business people and developers must work together daily throughout the project Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 11.
    Software Engineering Modelingand Design Agile Principles  Build projects around motivated individuals. Give them the environment and support they need, and trust them to get the job done. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 12.
    Software Engineering Modelingand Design Agile Principles  The most efficient and effective method of conveying information to and within a development team is face-to-face conversation Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 13.
    Software Engineering Modelingand Design Agile Principles  Working software is the primary measure of progress Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 14.
    Software Engineering Modelingand Design Agile Principles Agile processes promote sustainable development. The sponsors, developers, and users should be able to maintain a constant pace indefinitely Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 15.
    Software Engineering Modelingand Design Agile Principles  Continuous attention to technical excellence and good design enhances agility. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 16.
    Software Engineering Modelingand Design Agile Principles  Simplicity—the art of maximizing the amount of work not done—is essential. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 17.
    Software Engineering Modelingand Design Agile Principles  The best architectures, requirements, and designs emerge from self–organizing teams. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 18.
    Software Engineering Modelingand Design Agile Principles  At regular intervals, the team reflects on how to become more effective, then tunes and adjusts its behavior accordingly. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 19.
    Software Engineering Modelingand Design Agile Manifesto  Document that identifies four key and twelve principles  Four core values  Individuals and interactions over processes and tools  Working s/w over comprehensive documentation  Customer collaboration over contract negotiation  Responding to change over following plan Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 20.
    Software Engineering Modelingand Design SummaryAgile Development  Fastest Development Methodology  No Documentation Overhead  Focus on Code development  Frequently Delivery  Customer satisfaction  Change accepted  Face to face conversation  Customer involved in development  Self organizing, self motivated and highly experienced Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 21.
    Software Engineering Modelingand Design Human Factors  Agile development focuses on the talents and skills of individuals, molding the process to specific people and teams  Competence - specific software-related skills, and overall knowledge of the process that the team has chosen to apply  Common focus - tasks and bring different skills -focused on one goal-to deliver a working software increment to the customer within the time promised  Collaboration – stakeholders, comp s/w & database  Decision-making ability - allowed the freedom to control its own destiny  Mutual trust and respect – among all Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 22.
    Software Engineering Modelingand Design Extreme Programming (XP)  most widely used approach to agile software development.  XP is lightweight, efficient, low-risk, flexible, predictable and fun way to develop a software  Rapidly changing requirements  XP values - establish a foundation for all work performed as part of XP Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 23.
    Software Engineering Modelingand Design XPvalues  Communication  Effective communication between s/w engg. and stakeholders  To establish features and functions for the s/w  Collaboration between customers & developers continuous feedback, avoid f voluminous documentation a communication Medium.  Simplicity  Restricts developers to design only for immediate needs  Intent is to create a simple design Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 24.
    Software Engineering Modelingand Design XPvalues  Feedback  Implemented s/w itself, the customer and s/w team members  By designing and implementing an effective testing strategy  the software provides the agile team with feedback  Courage  Abetter word might be discipline  “designing for tomorrow” Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 25.
    Software Engineering Modelingand Design XPvalues  Respect  Respect among members, between other stakeholders and team members and indirectly, for the s/w itself.  As they achieve successful delivery of software increments, the team develops growing respect for the XP process. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 26.
    Software Engineering Modelingand Design The XPProcess
  • 27.
    Software Engineering Modelingand Design The XP Process  Extreme Programming uses an object-oriented approach as its preferred development paradigm and encompasses a set of rules and practices that occur within the context of four framework activities: planning, design, coding, and testing.  The XP process and notes some of the key ideas and tasks that are associated with each framework activity.  Asimple design is always preferred over a more complex representation Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 28.
    Software Engineering Modelingand Design Framework Activities  Planning  The planning activity begins with listening, requirements gathering  creation of a set of “stories” (also called user stories)  basic commitment (agreement on stories to be included, delivery date, and other project matters)  Design  XP design rigorously follows the keep it simple principle  Asimple design is always preferred over a more complex representation Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 29.
    Software Engineering Modelingand Design Framework Activities  Design  XP design rigorously follows the keep it simple principle  Asimple design is always preferred over a more complex representation  If a difficult design problem is encountered as part of the design of a story, XP recommends the immediate creation of an operational prototype of that portion of the design. Called a spike solution, the design prototype is implemented and evaluated Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 30.
    Software Engineering Modelingand Design Framework Activities  Coding  Refactoring  Pair programming  Continuous integration  Testing  XP acceptance tests, also called customer tests  Overall features & functionality that are visible& reviewable by the customer. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 31.
    Software Engineering Modelingand Design Industrial XP  IXP is an organic evolution of XP  Its expanded role of customers & its upgraded technical practices  Incorporate six new practices  Readiness assessment  an appropriate development environment exists to support IXP  the team will be populated by the proper set of stakeholders  the organization has a distinct quality program and supports continuous improvement  the broader project community will be populated appropriately Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 32.
    Software Engineering Modelingand Design Industrial XP  Project community  Classic XP suggests that the right people be used to populate the agile team to ensure success  The implication is that people on the team must be well-trained, adaptable and skilled, and have the proper temperament to contribute to a self-organizing team  Acommunity may have a technologist and customers who are central to the success of a project as well as many other stakeholders (e.g., legal staff, quality auditors, manufacturing or sales types) Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 33.
    Software Engineering Modelingand Design Industrial XP  Project charactering  Project itself to determine whether an appropriate business justification for the project exists and the project will further overall goal- objectives of organization.  Chartering also examines the context of the project to determine how it complements, extends, or replaces existing systems or processes. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 34.
    Software Engineering Modelingand Design Industrial XP  Test Driven Management  An IXP project requires measurable criteria for assessing the state of the project and the progress that has been made to date.  Test-driven management establishes a series of measurable “destinations” and then defines mechanisms for determining whether or not these destinations have been reached. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 35.
    Software Engineering Modelingand Design Industrial XP  Retrospectives  An IXP team conducts a specialized technical review after a software increment is delivered. Called a retrospective,  the review examines “issues, events, and lessons-learned” across a software increment and/or the entire software release.  The intent is to improve the IXP process. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 36.
    Software Engineering Modelingand Design Industrial XP  Continuous Learning  Because learning is a vital part of continuous process improvement, members of the XP team are encouraged to learn new methods and techniques that can lead to a higher quality product. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 37.
    Software Engineering Modelingand Design OtherAgile Process Models  The most widely used of all agile process models is Extreme Programming (XP). But many other agile process models have been proposed and are in use across the industry.  Among the most common are:  Adaptive Software Development (ASD)  Scrum  Dynamic Systems Development Method(DSDM)  Feature Driven Development (FDD) Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 38.
    Software Engineering Modelingand Design Scrum  Is an agile software development method that was conceived by Jeff Sutherland and his development team in the early 1990s.  Scrum principles are consistent with the agile manifesto  used to guide development activities within a process that incorporates the following framework activities:  requirements  analysis  design  Evolution  delivery Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 39.
    Software Engineering Modelingand Design Scrum  framework activity, work tasks occur within a process pattern called a sprint.  The work conducted within a sprint is adapted to the problem at hand and is defined and often modified in real time by the Scrum team  Scrum emphasizes the use of a set of software process patterns that have  proven effective for projects with tight timelines, changing requirements, and business criticality. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 40.
    Software Engineering Modelingand Design Scrum  Each of these process patterns defines a set of development actions:  Backlog—a prioritized list of project requirements or features that provide business value for the customer. Items can be added to the backlog at any time (this is how changes are introduced).  The product manager assesses the backlog and updates priorities as required. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 41.
    Software Engineering Modelingand Design Scrum  Sprints—consist of work units that are required to achieve a requirement defined in the backlog that must be fit into a predefined time-box.  Changes are not introduced during the sprint.  Scrum meetings—are short meetings held daily by the Scrum team.  Three key questions are asked and answered by all team members :  What did you do since the last team meeting?  What obstacles are you encountering?  What do you plan to accomplish by the next team meeting? Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 42.
    Software Engineering Modelingand Design Scrum  A team leader, called a Scrum master, leads the meeting and assesses the responses from each person.  The Scrum meeting helps the team to uncover potential problems as early as possible Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 43.
    Software Engineering Modelingand Design Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 44.
    Software Engineering Modelingand Design Scrum  Demos—deliver the software increment to the customer so that functionality that has been implemented can be demonstrated and evaluated by the customer.  It is important to note that the demo may not contain all planned functionality, but rather those functions that can be delivered within the time-box that was established Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 45.
    Software Engineering Modelingand Design Scrum Role  AScrum team consists of three roles: the Scrum Master, the product owner, and the development team.  While there is only one Scrum Master and one product owner, there are generally several development team members.  Scrum teams are small.  The Scrum Guide recommends 10 or fewer total members to ensure optimal communication and productivity Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 46.
    Software Engineering Modelingand Design Scrum Master  AScrum Master is responsible for ensuring a Scrum team is operating as effectively as possible with Scrum values.  This means they keep the team on track, plan and lead meetings, and work out any obstacles the team might face  Scrum Masters might also work in a larger role within an organization to help it incorporate Scrum concepts into their work.  Because they are both a leader and a behind-the-scenes supporter, they are often described as the “servant leader” of the Scrum team. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 47.
    Software Engineering Modelingand Design Scrum Master  Scrum can look different from organization to organization and team to team, making the specific tasks of a Scrum Master varied. Broadly, however, a Scrum Master might have the following responsibilities:  Facilitate daily Scrum meetings (also called “daily standups”)  Lead sprint planning meetings  Conduct “retrospective” reviews to see what went well and what can be improved for the following sprint  Keep a pulse on team members, through individual meetings or other means of communication.  Manage obstacles that arise for the team by communicating with stakeholders outside of the team Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 48.
    Software Engineering Modelingand Design Product Owner  Aproduct owner ensures the Scrum team aligns with overall product goals.  They understand the business needs of the product, like customer expectations and market trends.  Because they have to understand how the Scrum team fits into bigger picture goals,  product owners usually stay in touch with product managers and other stakeholders outside the team. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 49.
    Software Engineering Modelingand Design Product Owner  Product owners might find themselves with the following responsibilities:  Manage the product backlog by ordering work by priority  Set the product vision for the team  Communicate with external stakeholders and translate their needs to the team  Make sure the team is focused on hitting product needs through communication and evaluating progress Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 50.
    Software Engineering Modelingand Design Development Team  Adevelopment team is composed of professionals who do the hands-on work of completing the tasks in a Scrum sprint.  This means development team members can be computer engineers, designers, writers, data analysts, or any other role needed to reach sprint goals.  The development team doesn’t just wait for orders; they usually collaborate to map out goals and plans for achieving them.  Not all development team members will always have the same responsibilities Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 51.
    Software Engineering Modelingand Design Development Team Development team can be tasked with the following:  Help in sprint planning and goal setting  expertise to program, design, or improve products  Use data to find best practices for development  Test products and prototypes, plus other forms of quality assurance  Self-Organized scrums teams Software Engineering Modeling and Design – Overview Agile Development Process
  • 52.
    Software Engineering Modelingand Design Scrum Cycle Description A Scrum sprint cycle is a time-boxed period when a team delivers a set amount of work. It is typically two to four weeks in duration and each sprint starts the moment the previous one is completed. The Scrum sprint cycle is often referred to as a process of continuous development. It delivers a consistent work task for product releases and keeps the project’s momentum going until complete. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 53.
    Software Engineering Modelingand Design Stages of the Scrum sprint cycle The official Scrum Guide mentions following events that represent the Scrum sprint cycle Sprint planning - Kicking off the Sprint and defining what needs to be completed Daily Scrum - Developers meet for fifteen minutes every day to share what they have worked on, any issues blocking them, and what they will be working on next Sprint review - Evaluate what was delivered and decide what should be worked on in the next sprint Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 54.
    Software Engineering Modelingand Design Stages of the Scrum sprint cycle Sprint retrospective -Areview of the process to improve the next sprint Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 55.
    Software Engineering Modelingand Design Sprint planning Sprint planning is an event in scrum that defines what can be delivered in the upcoming sprint and how that work will be achieved. In scrum, the sprint is a set period of time where all the work is done. Sprint goal, sprint start-end, sprint agenda Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 56.
    Software Engineering Modelingand Design Burndown Chart in Scrum Aburn down chart is a graphical representation of work left to do versus time It is often used in agile software development methodologies such as Scrum. burn down charts can be applied to any project containing measurable progress over time. Typically, in a burn down chart, the outstanding work is often on the vertical axis, with time along the horizontal.  It is useful for predicting when all of the work will be completed. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 57.
    Software Engineering Modelingand Design Burndown Chart in Scrum In the Daily Scrum the Development Team updates the Sprint Burn Down and plots the remaining work of the day. A burndown chart is almost a “must” have tool for a Scrum team for the following main reasons: monitoring the project scope Keeping the team running on schedule Comparing the planned work against the team progression. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 58.
    Software Engineering Modelingand Design Burndown Chart in Scrum Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 59.
    Software Engineering Modelingand Design Sprint Review? A sprint review is a key event in the Scrum framework for agile software development. It is held at the end of each sprint, which is a time-boxed period of typically two to four weeks during which a development team works on a set of prioritized user stories or tasks. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 60.
    Software Engineering Modelingand Design Sprint Review? During Review, demonstrates the work they have completed during the sprint to the product owner, stakeholders, and other members of the organization. goal of the review is to assess the progress of the team, obtain feedback from stakeholders, and plan for the next sprint Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 61.
    Software Engineering Modelingand Design Sprint Review? typically involves a presentation of the working software or product increment that the team has developed during the sprint. The team walks through the completed user stories or tasks, highlighting any challenges or accomplishments that occurred during the sprint Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 62.
    Software Engineering Modelingand Design Sprint Review? Stakeholders, including the product owner and other members of the organization, are invited to provide feedback on the work completed during the sprint. They may ask questions or provide suggestions for improvement. This feedback is then taken into consideration when planning for the next sprint. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 63.
    Software Engineering Modelingand Design Sprint Review? The sprint review is a critical event in the Scrum framework that provides an opportunity for the development team to showcase their work, obtain feedback, and plan for the next sprint. It is a valuable tool for ensuring that the team is on track and delivering value to stakeholders Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 64.
    Software Engineering Modelingand Design Sprint Retrospective? The development team reflects on the previous Sprint and examines how they can improve their processes, teamwork, and collaboration. The goal of the retrospective is to identify what went well, what didn't go well, and what changes the team can make to become more effective in the next Sprint. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 65.
    Software Engineering Modelingand Design Sprint Retrospective? typically led by the Scrum Master, who facilitates the discussion and helps the team identify areas for improvement The team reviews the results of the Sprint, including the completed user stories or tasks, any issues that arose, and any feedback received from stakeholders during the Sprint review. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 66.
    Software Engineering Modelingand Design Sprint Retrospective? The team then identifies specific action items that they can take to improve their processes, teamwork, and collaboration, documented in a Sprint backlog and become part of the plan for the next Sprint. Tool for the development team to continuously improve their processes and become more effective. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 67.
    Software Engineering Modelingand Design Agile Practices - Refactoring A construction technique that is also a method for design optimization Refactoring is the process of changing a software system in such a way that it does not alter the external behavior of the code yet improves the internal structure. Refactoring allows a software engineer to improve the internal structure of a design (or source code) without changing its external functionality or behavior. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 68.
    Software Engineering Modelingand Design Refactoring It is a disciplined way to clean up code [and modify/simplify the internal design] that minimizes the chances of introducing bugs. In essence, when you refactor you are improving the design of the code after it has been written. refactoring can be used to improve the efficiency, readability, or performance of a design or the code that implements a design. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 69.
    Software Engineering Modelingand Design Pair Programming XP recommends that two people work together at one computer workstation to create code for a story. This provides a mechanism for realtime problem solving (two heads are often better than one) and real-time quality assurance (the code is reviewed as it is created). It also keeps the developers focused on the problem at hand. In practice, each person takes on a slightly different role Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 70.
    Software Engineering Modelingand Design Pair Programming For example, one person might think about the coding details of a particular portion of the design while the other ensures that coding standards (a required part of XP) are being followed or that the code for the story will satisfy the unit test that has been developed to validate the code against the story Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 71.
    Software Engineering Modelingand Design Pair Programming + continuous integration As pair programmers complete their work, the code they develop is integrated with the work of others. In some cases this is performed on a daily basis by an integration team.  In other cases, the pair programmers have integration responsibility. This “continuous integration” strategy helps to avoid compatibility and interfacing problems and provides a “testing” environment that helps to uncover errors early Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 72.
    Software Engineering Modelingand Design Pair Programming Pair programming can be characterized as a continuous desk check. Rather than scheduling a review at some point in time, pair programming encourages continuous review as a work product (design or code) is created. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 73.
    Software Engineering Modelingand Design Test-Driven Development Test Driven Development (TDD) is a software development practice that focuses on creating unit test cases before developing the actual code. It is an iterative approach combining programming, unit test creation, and refactoring. The TDD approach originates from the Agile manifesto principles and Extreme programming. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 74.
    Software Engineering Modelingand Design Test-Driven Development As the name suggests, the test process drives software development. Moreover, it’s a structuring practice that enables developers and testers to obtain optimized code that proves resilient in the long term. Developers create small test cases for every feature based on their initial understanding. The primary intention of this technique is to modify or write new code only if the tests fail. This prevents duplication of test scripts. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 75.
    Software Engineering Modelingand Design Test-Driven Development Requirements drive design, and design establishes a foundation for construction Requirements for a software component serve as the basis for the creation of a series of test cases that exercise the interface and attempt to find errors in the data structures and functionality delivered by the component TDD is not really a new technology but rather a trend that emphasizes the design of test cases before the creation of source code. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 76.
    Software Engineering Modelingand Design Test-Driven Development Calculator Function: When building a calculator function, a TDD approach would involve writing a test case for the “add” function and then writing the code for the process to pass that test. Once the “add” function is working correctly, additional test cases would be written for other functions such as “subtract”, “multiply” and “divide”. Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 77.
    Software Engineering Modelingand Design Test-Driven Development Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 78.
    Software Engineering Modelingand Design Agile Development Process Mr. N. L. Shelake Department of Information Technology
  • 81.
    Software Engineering Modelingand Design Agile Development Process Mr. N. L. Shelake Department of Information Technology SCRIPTED TESTING EXPLORATORY TESTING The test scripts can be traced back to the original requirements and specifications to demonstrate test coverage. In this testing no well-documented, clear, and measurable test coverage. All test scripts and test cases are designed and reviewed in advance. As with scripted testing, in this test cases cannot be reviewed in advance. At the end of the testing cycle, testers can confirm if all the requirements have been met or not. As there are no clear and documented test cases, there is no way to check and confirm that all the requirements have been met.
  • 82.
    Software Engineering Modelingand Design Thank You Agile Development Process Mr. N. L. Shelake Department of Information Technology