BUILDING QUÉBEC’S FIRST DIAMOND MINE
Annual General Meeting of Shareholders, Montreal, October 23rd 2013

Matt Manson

Patrick Godin

President, CEO & Director

COO & Director
2

Forward-Looking Information
This presentation contains "forward-looking information" within the meaning of Canadian securities legislation and “forward-looking statements” within the
meaning of the United States Private Securities Litigation Reform Act of 1995. This information and these statements, referred to herein as “forwardlooking statements”, are made as of the date of this presentation and the Company does not intend, and does not assume any obligation, to update these
forward-looking statements, except as required by law.
Forward-looking statements relate to future events or future performance and reflect current expectations or beliefs regarding future events and include,
but are not limited to, statements with respect to: (i) the amount of mineral resources and exploration targets; (ii) the amount of future production over any
period; (iii) net present value and internal rates of return of the mining operation; (iv) assumptions relating to recovered grade, average ore recovery,
internal dilution, mining dilution and other mining parameters set out in the Feasibility Study or Optimization Study; (v) assumptions relating to gross
revenues, operating cash flow and other revenue metrics set out in the Feasibility Study or Optimization Study; (vi) mine expansion potential and expected
mine life; (vii) expected time frames for completion of permitting and regulatory approvals and making a production decision; (viii) future exploration plans;
(ix) future market prices for rough diamonds; and (x) sources of and anticipated financing requirements. Any statements that express or involve
discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not
always, using words or phrases such as “expects”, “anticipates”, “plans”, “projects”, “estimates”, “assumes”, “intends”, “strategy”, “goals”, “objectives” or
variations thereof or stating that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative of
any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements.
Forward-looking statements are made based upon certain assumptions and other important factors that, if untrue, could cause the actual results,
performances or achievements of Stornoway to be materially different from future results, performances or achievements expressed or implied by such
statements. Such statements and information are based on numerous assumptions regarding present and future business strategies and the environment
in which Stornoway will operate in the future, including the price of diamonds, anticipated costs and Stornoway’s ability to achieve its goals. Certain
important factors that could cause actual results, performances or achievements to differ materially from those in the forward-looking statements include,
but are not limited to: (i) required capital investment and estimated workforce requirements; (ii) estimates of net present value and internal rates of return;
(iii) receipt of regulatory approvals on acceptable terms within commonly experienced time frames; (iv) the assumption that a production decision will be
made, and that decision will be positive; (v) anticipated timelines for the commencement of mine production; (vi) market prices for rough diamonds and the
potential impact on the Renard Project’s value; and (vii) future exploration plans and objectives. Additional risks are described in Stornoway's most recently
filed Annual Information Form, annual and interim MD&As, and other disclosure documents available under the Company’s profile at: www.sedar.com.
When relying on our forward-looking statements to make decisions with respect to Stornoway, investors and others should carefully consider the foregoing
factors and other uncertainties and potential events. Stornoway does not undertake to update any forward-looking statement, whether written or oral, that
may be made from time to time by Stornoway or on our behalf, except as required by law.

Robin Hopkins, a Qualified Person and the Company’s VP Exploration, has reviewed the technical information contained herein. Readers are referred to
the technical report dated December 29th, 2011 in respect of the November 2011 Feasibility Study for the Renard Diamond Project, the technical report
dated February 28th, 2013 in respect of the January 2013 Optimization Study, and the press release dated July 23rd 2013 in respect of the July 2013
Mineral Resource estimate for further details and assumptions relating to the project. These techncial reports and this press release list the names of the
Qualified Persons in respect of these studies.
3

Your Board and Management Team
Executive Officers
Head Office: Longueuil, Québec
Exploration Office: North Vancouver, BC
Matt Manson
President, CEO
& Director

Pat Godin
COO & Director

Community Offices: Mistissini & Chibougamau Québec

Zara Boldt
CFO and VP
Finance

Non-Executive Directors

Ebe Scherkus
Independent/
Board Chairman

Michel Blouin
Independent/
IQ Designate

Yves Harvey
Independent

Hume Kyle
Independent

John LeBoutillier
Independent/
IQ Designate

Monique Mercier
Independent/
IQ Designate

Peter Nixon
Independent

Serge Vézina
Independent

Key Managers

Ghislain
Poirier
VP Public Affairs

Yves Perron
VP Engineering
& Construction

Robin
Hopkins
VP Exploration

Martin Boucher

Brian Glover

Guy Bourque

VP Sustainable
Development

VP Asset
Protection

Chief Mining
Engineer

Helene
Robitaille

Mario
Courchesne

Orin
Baranowsky

Jean-Charles
Dumont

Freddie
Mianscum

Director, HR

Construct. Manager

Director, IR

Corporate Controller

IBA Implem. Officer
4

From the 2012 AGM…
5

Comments on Stornoway’s Project Financing
The Renard Project is Ready to Build
Final Project Financing is the Last Remaining
Challenge Before Construction can Begin

Despite very difficult market conditions, in the past 18
months Stornoway has successfully arranged up to
$144m of financing ($124m debt, $20m equity) for road
and airport construction, permitting, design optimization
work, engineering and financing costs.
The timely completion of final mine project financing,
and its impact on project schedule, is the principal risk
Stornoway currently faces.
Project financing discussions with lenders and
prospective investors are ongoing and progressing well.

Stornoway is Fully Focused on the Timely
Completion of Final Project Financing
6

Why does the Renard Project Stand Out from the Pack?
What Other Mining Project Offers all of these
Advantages to Investors?
Renard will have a high margin with high
cash flow: it is a major new project.
Renard has strong social acceptability.

Renard is in one of the world’s safest
jurisdictions for mining investment (still).
Renard will be the first Canadian
diamond mine with an all-season road.
Renard has enough resource upside for
potentially decades of mining.
Renard is owned 100% by Stornoway:
our partners are our shareholders and in
our communities.

Diamonds are an essential part of our
culture, and very difficult to find.
7

Renard: Québec’s First Diamond Mine
8

Renard Kimberlite Bodies
0

1

2

Kilometers

N
60

0

60

120

Kilometers

Laforge 2
Laforge 1

R10
LG2

R7
Hibou

LG3

Foxtrot Property

R1
Wemindji

Eleonore

R65
R4

Renard

Western Troy

Eastmain Mine
Strateco

R8

R9
R2

Brisay

LG4

Troilus Mine

R3

Temiscamie
Mistissini

Lynx

Matagami

Kimberlite Bodies with
Probable Reserves
Kimberlite Bodies with
Inferred Resources

Kimberlite Bodies with
Resource Potential

Chibougamau

Legend
LEGEND:
Stornoway Properties
Hydro-Québec Facility
Renard Kimberlites
Kimberlitic Dyke
Regional Kimberlites

Hydro-Québec
Powerlines
Route 167 Extension/
Renard Mine Road

Road
Exploration/ Mining
Projects
9

Key Project Parameters
Reserve Based Mine Plan
(Feasibility Study Nov. 2011, Optimization Jan. 2013)

Mine Life
Mineral Reserve
Initial Cap-ex
Operating Cost
Operating Margin
Operating Cash Flow
Average Diamond Price

Average Diamond Production
After Tax NPV (7%; Jan 1 2013)
After Tax IRR
Production Startup

Renard 65
29/24cpht

0m

11 years
17.9 mcarats

100m

$752m

200m

$58/t ($76/carat)
67%

300m

$2.7B

Renard 3
103/112cpht

400m

$180/carat

1.6 mcarats/yr
$391m
16.3%
December 2015

*Key Assumptions: C$1=US$1, Oil US$95/barrel, 2.5% real terms diamond price growth
Q311-Q425, 82.9% ore recovery, 23.8% mining and internal dilution, 0cpht dilution grade,
January 1 2013 effective date for NPV and IRR calculation.

Long Term Plan
(Basis of Mine Permitting)
Includes the mining of the 17mcarat Inferred
Resources within the scope of the Feasibility Study
mine infrastructure: Extended mine life, increased
annual production, increased project valuation

500m

600m
700m

Renard 4
60/50cpht

Renard 9
53cpht

Renard 2
104/119cpht

27 mcarat Indicated Mineral Resource
17 mcarat Inferred Mineral Resource
26-48 mcarat Exploration Upside

Notes: Grades illustrated are for Indicated and Inferred Mineral Resources respectively at a +1DTC sieve size cut-off. Reserve and Resource categories are compliant with the "CIM Definition
Standards on Mineral Resources and Reserves". Mineral resources that are not mineral reserves do not have demonstrated economic viability. The potential quantity and grade of any Exploration
Target (previously referred to as a “Potential Mineral Deposit”) is conceptual in nature, and it is uncertain if further exploration will result in the target being delineated as a mineral resource. Mineral
reserves are not a sub-set of mineral resources.
Renard’s Resource Upside

10

A Project with a Long Resource Tail and Very Long Mine Life Potential

0m

Renard 65
29/24cpht

Renard 3
103/112cpht

Millions
of Tonnes
140

Exploration Target High Range
Exploration Target Low Range

100m

Inferred Resource

120

200m

Probable Reserve

300m

100
400m

80

500m

The Vision: Deposit still
Open

600m

60
700m

40

Renard 4
60/50cpht
Renard 9
53cpht

Renard 2
104/119cpht

The resource upside at depth at Renard is world class.
Although highly accretive, the project’s Inferred Mineral
Resources are not included in the Feasibility Study
economic analysis in accordance with NI 43-101.

20

Permitting and Long
Term Business Plan

The Feasibility: 11
years of mining

0
Notes: Reserve and Resource categories are compliant with the "CIM Definition
Standards on Mineral Resources and Reserves". Mineral resources that are not
mineral reserves do not have demonstrated economic viability. The potential quantity
and grade of any Exploration Target is conceptual in nature, and it is uncertain if
further exploration will result in the target being delineated as a mineral resource.
Mineral reserves are not a sub-set of mineral resources.
11

General Project Arrangement
Small Project Footprint of 3.1km2, Modest Environmental Impact

Processed Kimberlite
Containment (PKC)

R65

Waste Rock
R2-R3
Plant

Ore Stockpile

Camp

Road from Chibougamau

Overburden
Stockpile
12

Mine Plan
A Combined Open Pit and Underground Mine
Renard 65

Open Pit Mining
(years 1-2).
Underground Mining
(years 3-11).
Underground method: Blast Hole
Shrinkage, Panel Retreat with waste
backfill from pits.

Renard 3

Ramp access 610 meter level.
6,000 tpd plant capacity (2.2Mtonnes/year)
expandable to 7,000 tpd (2.5Mtonnes/year).

Renard 4

Pit at Renard 65 (initially) as a borrow-pit
and waste water sump, pending resource
conversion.

Renard 2

View looking Northeast

Renard 2

Renard 3
13

Mine Plan Production Schedule and Cash Flow
(Mineral Reserves Only)
Open Pit & Underground Mining

Ore Tonnage (t)

2,500,000
2,000,000
1,500,000
1,000,000
500,000

R2 Pit

R3 Pit

R2 UG

Diamond Production

2027

R4 UG

Gross Revenue (Real Terms)

500,000
Revenue (k C$)

600,000

2,000,000

2026

2025

R3 UG

2,500,000

1,500,000
1,000,000
500,000

400,000
300,000
200,000
100,000

-

R2

R3

R4

R2

R3

R4

2027

2026

2025

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2027

2026

2025

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

Diamonds (carats)

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

-
14

Stornoway will be a Significant Diamond Producer
Current and Future Diamond Producers

2012 World Diamond Production Data/
Forecast Future Production
1

De Beers (Anglo/Botswana)

$6,100m

2

Alrosa (Russia)

$4,610m

3

BHPB/Dominion Diamond (TSX: DDC)

$894m

4

Rio Tinto (ASE: RIO)

$741m

5

Petra

$403m

6

Stornoway

7

Mountain Province (note 3; TSX: MPV)

$273m

8

Gem (L: GEMD)

$202m

9

Lucara (note 4; TSX: LUC)

$118m

10

Others

$2,200m

Total

$15,817m

(note 1; L: PDL)
(note 2; TSX: SWY)

Alrosa
29%
BHPB/
Dominion
6%
RioTinto
5%

$306m
DeBeers
38%

Petra
2%
Others
14%
LUC
1%

GEM
1%

SWY
2%
MPV
2%

Notes:
1.

Petra 12 month results for period ending June 30, 2013

2.

Renard estimated at FS average annual diamond production of 1.7 million carats, and WWW April 2011 weighted diamond price of $180/ct, un-escalated

3.

Gahcho Kue estimated at 50% of FS average annual production of 4.5 million carats, and WWW April 2011 weighted diamond price of $121/ct, un-escalated

4.

Karowe estimated as per Lucara FY2013 Operating Guidance.
Source: Kimberly process and Company Reports
15

12 Months of Progress
12 Months of Progress
What has been Achieved since September 2012?

1.
2.
3.
4.

The Road is Open
Permitting Authorizations are in Place
The Resource has Continued to Grow
The Project has been Optimized

16
17

The Route 167 Extension and the Renard Mine Road
The First Canadian Diamond Mine with Road Access
Construction of an all-season access road
connecting Renard to the Québec highway network
began in February 2012.

Under the terms of a November 2012 agreement
between Stornoway and Québec, segments A & B
(143 km) are being constructed by the Ministry of
Transport as the 2-lane “Route 167 Extension” and
segments C & D (97 km) are being constructed by
Stornoway as the single lane “Renard Mine Road”.

Renard
Km240

Segments C & D
Stornoway
97km of Mine
Road (50km/hr)

Stornoway forecasts the cost to complete the Renard
Mine Road at $70 million, approximately 10% below
base budget.

Lac Hecla

Km195

Eastmain
WesternTroy

Abitex

Km143
Strateco

Under the terms of a December 2012 financing
agreement, Québec has provided Stornoway
financing facilities of up to $85m to complete its work,
repayable upon commercial production at Renard.
On September 3rd 2013 Stornoway announced that
all 4 segments have been connected and the road
had opened to construction traffic, 2 months ahead of
schedule.

Lac
Naococane

Km82

Segments A & B
Min. of Transport
143km of Regional
Highway (70km/hr)
Legend

Lac
Km 0
Mistassini
Lac
Albanel

Renard Project
Explor./Mining Projects
Stornoway Properties
Albanel-TémiscamieOtish Par

Mistissini

50 km

Segment A: 0-82km
Segment B: 82-143km
Segment C: 143-195km
Segment D: 195-240km
18

Road Construction Steps

Tree clearing and earthworks

Culvert installation

Infrastructure preparation

Bridge installation

Gravel works

Last step is a topcoat
gravel finish
19

Views of the Road
KM 210

KM 155

KM 237
20

Views of the Road
KM 236

KM 215

KM 228
21

Bridges
Stornoway is constructing 16 bridges on the Renard
Mine Road.
Temporary bridges were first installed on all river
crossings by April 2013. As of October 2013, 12 of 16
permanent bridges have been installed.
All bridges are fabricated from locally harvested,
engineered wood and supplied by Nordic Structures
Bois, a wholly-owned subsidiary of Chantiers
Chibougamau Ltée.
All Road Segments Connected on September 1st, 2013
Two Months Ahead of Schedule and 10% Below Budget

Stornoway acknowledges
the professionalism and
performance of its
contractors on the Renard
Mine Road:

The Eskan Company

Eenatuk Forestry Corp.

Swallow-Fournier inc.

Kiskinchiish Corp.

Nordic Structures Bois

Petronor

Jos Ste-Croix & Fils Ltée

22
23

Construction to Commence on Renard Aerodrome
The Renard Aerodrome will be located 8 km south
of the project site.
The airstrip will be certified by Transport Canada
to receive Dash 8-300 turboprop and Hercules
aircraft.
Design criteria (3C-NP):
Gravel surface
30m wide by 1,494m long
Taxiway and 100mx100m apron
Equipped with assisted landing capability
Traffic will be 3 to 5 flights per week for 48
workers per flight.
The Renard Mine Aerodrome will be available for
public use, enhancing air transport in the Monts
Otish region of Québec.

Renard Project Site

On October 10th Stornoway announced an
agreement with Québec to commence
construction of the Renard Mine Aerodrome
immediately, utilizing the residual amount of
financing available within the Renard Mine
Road credit facility.
Shoulder

Runway

Taxi way

Apron
24

Aerodrome Progress
October 2013

Tree Cutting
Area

Runway
Centerline
25

Site Progress
October 2013

Renard Mine Road
Bulk Sample
DMS Plant
Tree Clearing
R9

R2

R4
Construction Camp
R65

R65 Borrow Pit
Permitting and Social Acceptability
Strong Regulatory and Public Support for Québec’s First Diamond Mine
Social Licence
March 2012: Impact and Benefits Agreement (“IBA” or the
“Mecheshoo Agreement”) with the Cree Nation of Mistissini
and the Grand Council of the Crees (EI).
July 2012: Partnership Agreements Signed with
Chibougamau and Chapais.
Permitting
Oct. 2012: Québec Mining Lease issued.
Dec. 2012: Québec Certificate of Authorization issued.
Dec. 2012: Closure Plan accepted by regulators.
May. 2013: Renard Mine Road Permit issued.
July 2013: Positive Federal Environmental Assessment
decision issued.

All Community Agreements and Regulatory
Authorizations Required to Proceed to
Construction are in Place.

26
27

Regulatory and Fiscal Regime in Québec Settled
The last 12 months has seen proposed changes to the Québec’s system of mining
taxes and royalties, and mine closure bonds.
Stornoway participated in the Government of Québec’s consultation process and,
although impacted by these changes, welcomes the balanced approach that has
been taken.

Québec remains a leading destination for mining investment, and we look forward to
developing Renard at a time of regulatory and fiscal certainty.
For mine planning, Stornoway assumes the new hybrid fiscal regime, being the
greater of the “Minimum Mining Tax” or “Progressive Mining Tax”
Stornoway does not anticipate a major impact on the Renard Project from the new
Mining Act still under assessment in the Québec National Assembly.
Québec remains one of the world’s leading mining
jurisdictions offering :
• Regulatory Stability
• Institutional Support
• Expertise
• Infrastructure
28

The Renard Optimization Study
Released January 2013
Since the release of the Renard Feasiblity
Study in November 2011, Stornoway has
sought improvements in the project’s cost and
operating parameters.
The Renard Optimization Study was released
in January 2013, and included:
• A reduced initial capital cost, principally
through deferral of the shaft.
• Increased project NPV and IRR.
• Maintained high operating margin.
• A refined underground mining sequence
and draw point design.

Accommodation Complex

Additional design optimization and engineering
work is ongoing in partnership with a joint
venture made up of SNC-Lavalin Inc. and
AMEC Americas Ltd. under an interim
agreement pending completion of the project’s
EPCM contract at time of project financing.
Process and Power Plants
Liquefied Natural Gas Power Plant
Feasibility Study Released October 2013
With a view to project optimization,
Stornoway has been investigating more
cost efficient alternatives for on-site power
supply than traditional diesel fuelled gensets.
A Hydro-Quebec powerline has been ruled
out in the short term due to high cap-ex
cost.
On October 21st Stornoway announced it
will proceed with an LNG fuelled gen-set
option, made possible by the ability to
receive regular cryogenic LNG shipments
on the Renard Mine Road.
The Renard LNG plant will comprise seven
2.1MW rated gas gen-sets, providing
sufficient power generation capacity for the
project’s normal operating specification of
9.5MW.

29
30

Liquefied Natural Gas Power Plant
Feasibility Study Released October 2013
An LNG fuelled powerplant for Renard offers many advantages over diesel:
• Greatly reduced annual operating costs of $8m to $10m per year, for a small incremental capital cost
of $2.6m.
• Up to 43% less greenhouse gas emissions.
• Long term, stable supply market utilizing existing commercial distribution network within Quebec.
• Elimination of on-site propane, as LNG will be used for building and underground mine heating.

Diesel will continue to be used for the mobile mining fleet and construction activities
Cost Improvements with LNG
Unit Power Cost (C$/kWh) 1

Jan 2013
Optimization Study
with Diesel

Jan 2013
Optimization Study
with LNG

Unit Operating Cost (C$/tonne) 1,2

$0.299
$57.63

$0.188
$53.84

(-37%)
(-7%)

Initial Capital Cost (C$m) 1

$752.1

$754.0

(+0.3%)

Life of Mine Capital Cost (C$m) 1,3

$1,013

$1,010

(-0.3%)

27.5

5.9

(-79%)

n/a
3.5

41.7
n/a

Annual Diesel Consumption (million litres)
Annual LNG Consumption (thousand m3/annum)
Annual Propane Consumption (thousand m3/annum)
Notes

Key Assumptions

1.

January 2013 Optimization Study costs expressed in October 2012 terms.

2.

Excludes capitalized preproduction costs.

Based on the 11 year reserve-based mine life (17.9 mcarats) contained within the
January 2013 Optimization Study, with a normal operating load of 9.49MW,
C$1=US$1, Oil US$95/barrel

3.

Includes all initial, sustaining and deferred capital, contingencies and escalation
Renard’s Resource is Continuing to Grow

31

Revised Mineral Resource Statement Release July 2013
Renard 65
Renard 3

In July 2013 Stornoway release the results of a revised
Mineral Resource Statement with a 14% increase in
contained carats within the Indicated Resource category.
This followed the successful completion of a 5,000 tonne
bulk sample at Renard 65 in 2012 and the recovery of 997
carats of diamonds for valuation.
The Renard 65 bulk sample returned the highest value
diamonds to date at the Renard Project, with a March
2013 valuation of US$250/ct, giving a base model of
US$180/ct (sensitivities of $203 & $169).
Upon conversion to a Mineral Reserve, this material may
be incorporated into the mine plan in two ways:
1. add 1 year to the LOM and increase the production
rate to 2.5Mt/a or
2. add 3 years to the LOM as a reserve tail at a
production rate of 2.1Mt/a
The cost of developing a 75m deep pit at Renard 65 is
already contained within the Feasibility Study.
Notes: Reserve and Resource categories are compliant with the "CIM Definition
Standards on Mineral Resources and Reserves". Mineral resources that are not
mineral reserves do not have demonstrated economic viability. The potential quantity
and grade of any Exploration Target is conceptual in nature, and it is uncertain if
further exploration will result in the target being delineated as a mineral resource.
Mineral reserves are not a sub-set of mineral resources.

Renard 4

Renard 9
Renard 2

Three Renard 65 diamonds: 9.78 ct and 6.41 ct
diamonds recovered from the 2012 bulk
sample and a 4 carat stone discovered in
drillcore in 2003
Renard’s Resource is Continuing to Grow

32

Resource Expansion in 2013, and Beyond
Renard 4

Renard 3

Renard 2

490 m
asl

Renard 65

Renard 9

0 m

1
2

3
790 m

-275 m
asl

1.

27 mcarat Indicated Mineral Resource

Conversion of Renard 65 Inferred Resources to Indicated
to 150m depth (July 2013: Completed)

2.

Addition of Renard 2 Country Rock Breccia to both
Indicated and Inferred Resources (July 2013: Completed)

3.

6.2 mcarats in 5.23 Mtonnes (at 119 cpht) in Renard 2
Inferred Resources between 610m and 700m depth: 4.2 to
7.3 Mcarats TFFE between 700m and 770m depth. Open
below 770m. (Target for Future Exploration)

17 mcarat Inferred Mineral Resource
26-48 mcarat Exploration Upside
33

Renard Resource Upside
Inferred Resources and TFFE Not in Reserve Case Mine Plan

Renard’s Inferred Resources and
TFFE represent a potential increase
over the current Indicated Resource
of 160% to 240%.

0m

100m

2.7 mcarats

1.2
mcarats
200m

Each kimberlite remains open at
770m depth

300m

2.4
mcarats

0.6 mcarats

1.2
mcarats

400m

500m

0.8 to 2.8
mcarats

6.2
mcarats

600m

700m

27 mcarat Indicated Mineral Resource
7.3 to 13.5
mcarats
5.6 to 11.8
mcarats

17 mcarat Inferred Mineral Resource
2.0 to 4.3
mcarats

4.2 to 7.3
mcarats

26-48 mcarat Exploration Upside

Notes: Reserve and Resource categories are compliant with the "CIM Definition Standards on Mineral Resources and Reserves". Mineral resources that are not mineral reserves do not have
demonstrated economic viability. The potential quantity and grade of any Exploration Target (previously referred to as a “Potential Mineral Deposit”) is conceptual in nature, and it is uncertain if
further exploration will result in the target being delineated as a mineral resource. Mineral reserves are not a sub-set of mineral resources.
Renard’s Diamonds

34

Recent Valuation Conducted by WWW International Diamond Consultants Ltd. March 2013
The Renard kimberlite pipes have similar, but marginally different diamond populations
exhibiting coarse size distributions and with high proportions of large white gems.
99% by weight gem/near-gem quality. 1% industrial quality boart.
Significant value upside in large gems. Diamonds larger than 10.8ct, “Specials”) estimated at three to
six 50-100ct stones and one to two +100ct stones every 100,000 carats (two weeks). Not accounted for
in the revenue model.
Stornoway most recently valued the Renard diamond samples with WWW International Diamond
Consultants Ltd. in March 2013.
Size of
Valuation
Sample

WWW March
2013 Sample
Price

(carats)

(US$/carat)1

Renard 2

1,580

$180

Renard 3

2,753

$173

Renard 4

2,674

Renard 65

997

Kimberlite
Body

WWW March
2013 Base
Case Price
Model

Renard 3 Bulk Sample Stones larger
than 2 carats. “Run of Mine”
Sensitivities
(Minimum to High)

(US$/carat)1

$171 to $214

$100

$190
$151
$104 ($150)2

$250

$180

$169 to $203

$141 to $185
$98 to $168

Notes
1.

All prices in US$/carat. Samples utilizing a +1 DTC sieve size cut-off.

2.

Should the Renard 4 diamond population prove to have a diamond population with a size distribution
equal to the average of Renard 2 and 3, WWW have estimated that a base case diamond price model of

$150 per carat based on March 2013 pricing.
Rough Diamond Price Movements
The Diamond Market, January 2010 to September 2013

May 2011 Valuation
utilized in the FS based
on the average of 5
diamantaires c.10%
below the WWW rough
index price

A tracking of the diamond market since the publication of the November 2011 FS indicates rough diamond
prices have generally remained within the bounds of sensitivities contained within the FS financial model
(May 2011 spot prices and a 2.5% real terms annual price escalator).

35
36

Renard’s Legacy
37

Renard’s Legacy
Value Creation for our Shareholders
An Example of Constructive Partnership with Local People
• Stornoway’s relationship with the Crees of Eeyou Istchee
• Stornoway’s relationship with Chibougamau and Chapais
Québec Institutional Equity Ownership
• Stornoway’s Largest Shareholder is Investissement Québec, at 35% (fully diluted).
An Economic Engine in the James Bay Region of Québec
• Long Term Direct and Indirect Employment
• Long Term Local Contracting and Purchasing
A Catalyst for Public Infrastructure Development
• The Route 167 Extension/Renard Mine Road
• A New Aerodrome in the Otish Mountains
An Important Government Revenue Base
• Federal and Québec Income Tax
• Québec Mining Duty
• Personal Income Taxes and Sales Taxes

10.15 carat gem
quality
octahedron
Renard’s Legacy

38

Mines are Wealth Generators
Over the First 11 Years Alone:

$907m of tax payments, royalty payments, and
Public infrastructure support payments.
Payments associated with the project’s Long
Term Business Plan are substantially higher still.

DIAQUEM
Royalty $94
Québec Mining
Duties $372

Québec Income
Tax $163
Notes: As estimated by Stornoway based on the Renard Feasibility Study Optimization dated January 2013,
and existing tax regimes. In nominal terms. Québec Mining Duties subject to certain refundable credits

Contribution to
the Renard
Mine Road and
Aerodrome $77
Maintenance
Contribution to
the Renard
Federal Income Mine Road $13
Tax $188
Renard’s Legacy

39

Mines Employ People
Construction Employment Breakdown

Around 7,000 person years of
employment created during
construction (2013-2016).

Induced
Employment
43%
Indirect
Employment
with Suppliers
36%

Annual average of 482 direct jobs
(Stornoway and contractors)
created during operations (20162027).
405 Stornoway employees with
an average salary of $115 000/y
(including benefits).

700

Stornoway
Direct
Employment
21%

Direct Renard Employment

An estimated of 740 jobs
maintained or supported at
suppliers and local merchants.
Annual operating expenditures on
Québec goods and services of
$90m (73% of total).

Construction

500
Manpower

600

Contractors

400

Process Plant

300

Underground

200
100
0

Notes: As estimated by Stornoway based on the Renard Feasibility Study Optimization dated January 2013

Open Pit
G&A
40

What to Expect
41

Project Schedule
2011
2H

2013

2012
1H

2H

1H

2H

2014
1H

2H

2016

2015
1H

2H

1H

2H

BFS (Complete)
ESIA (Complete)
Community Hearings (Complete)

Reg. Authorizations (Complete)
Specific Operating Permits (50)
Detailed Engineering
Project Financing
Road Construction

First Vehicle Access

Site Construction
Commissioning and Ramp-up
Commercial Production

With first vehicle access achieved on the Renard Mine Road, the timely completion
of mine project financing is the now principal driver on project schedule
42

Québec’s First Diamond Mine is Ready to Build

Project Green-lighted: Authorizations Issued
Community Agreements in Place
Stornoway Operating Team in Place
Access Road Opened
Resource Growing
Project Design Fully Optimized
Favourable Cost Environment

Stornoway is Fully Focused on the
Timely Completion of Final Project
Financing

More Related Content

What's hot

Stornoway q1 2017 earnings results presentation final 11.30pm monday 8 may 2017
Stornoway q1 2017 earnings results presentation final 11.30pm monday 8 may 2017Stornoway q1 2017 earnings results presentation final 11.30pm monday 8 may 2017
Stornoway q1 2017 earnings results presentation final 11.30pm monday 8 may 2017Stornoway Diamonds
 
Agm may 12 2017 final
Agm may 12 2017 finalAgm may 12 2017 final
Agm may 12 2017 finalPretiumR
 
Corporate Update, January 2015
Corporate Update, January 2015Corporate Update, January 2015
Corporate Update, January 2015StornowayDiamonds
 
Stornoway Corporate Update Presentation January 22, 2015
Stornoway Corporate Update Presentation January 22, 2015Stornoway Corporate Update Presentation January 22, 2015
Stornoway Corporate Update Presentation January 22, 2015Stornoway Diamonds
 
Swy td conference 2019 presentation
Swy td conference 2019 presentationSwy td conference 2019 presentation
Swy td conference 2019 presentationStornoway Diamonds
 
Q3-2016 Financials & Project Update
Q3-2016 Financials & Project UpdateQ3-2016 Financials & Project Update
Q3-2016 Financials & Project UpdateNOVAGOLD
 
Stornoway Updated Mine Plan Support Materials March 30, 2016
Stornoway Updated Mine Plan Support Materials March 30, 2016Stornoway Updated Mine Plan Support Materials March 30, 2016
Stornoway Updated Mine Plan Support Materials March 30, 2016Stornoway Diamonds
 
European Gold Forum Presentation
European Gold Forum PresentationEuropean Gold Forum Presentation
European Gold Forum PresentationStornoway Diamonds
 
Denver Gold Forum Presentation Sep 25 2017
Denver Gold Forum Presentation Sep 25 2017Denver Gold Forum Presentation Sep 25 2017
Denver Gold Forum Presentation Sep 25 2017Stornoway Diamonds
 
Technical session presentation toronto
Technical session presentation torontoTechnical session presentation toronto
Technical session presentation torontoPretiumR
 
Stornoway Diamond Corporation Q2 2017 Earnings Release Supplemental Materials
Stornoway Diamond Corporation Q2 2017 Earnings Release Supplemental MaterialsStornoway Diamond Corporation Q2 2017 Earnings Release Supplemental Materials
Stornoway Diamond Corporation Q2 2017 Earnings Release Supplemental MaterialsStornoway Diamonds
 
Blue Moon Zinc Corporate Presentation
Blue Moon Zinc Corporate PresentationBlue Moon Zinc Corporate Presentation
Blue Moon Zinc Corporate PresentationMomentumPR
 
Stornoway AGM Presentation MAy 16 2016
Stornoway AGM Presentation MAy 16 2016Stornoway AGM Presentation MAy 16 2016
Stornoway AGM Presentation MAy 16 2016Stornoway Diamonds
 
Red Cloud Mining Annual Fall Showcase Presentation October 8, 2015
Red Cloud Mining Annual Fall Showcase Presentation October 8, 2015Red Cloud Mining Annual Fall Showcase Presentation October 8, 2015
Red Cloud Mining Annual Fall Showcase Presentation October 8, 2015Stornoway Diamonds
 
BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceBMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferencePretiumR
 
New gold presentation march 2017 v website
New gold presentation march 2017 v websiteNew gold presentation march 2017 v website
New gold presentation march 2017 v websitenewgold2011
 
Klondike Silver Corporate Brochure
Klondike Silver Corporate BrochureKlondike Silver Corporate Brochure
Klondike Silver Corporate BrochureMomentumPR
 
Stornoway Corporate Update Presentation June 16 2016
Stornoway Corporate Update Presentation June 16 2016Stornoway Corporate Update Presentation June 16 2016
Stornoway Corporate Update Presentation June 16 2016Stornoway Diamonds
 
Lundin Gold Scotiabank Mining Conference November 30 - December 1, 2021
Lundin Gold Scotiabank Mining Conference November 30 - December 1, 2021Lundin Gold Scotiabank Mining Conference November 30 - December 1, 2021
Lundin Gold Scotiabank Mining Conference November 30 - December 1, 2021Adnet Communications
 
Stornoway Diamonds Corporate Update September 19, 2016
Stornoway Diamonds Corporate Update September 19, 2016Stornoway Diamonds Corporate Update September 19, 2016
Stornoway Diamonds Corporate Update September 19, 2016Stornoway Diamonds
 

What's hot (20)

Stornoway q1 2017 earnings results presentation final 11.30pm monday 8 may 2017
Stornoway q1 2017 earnings results presentation final 11.30pm monday 8 may 2017Stornoway q1 2017 earnings results presentation final 11.30pm monday 8 may 2017
Stornoway q1 2017 earnings results presentation final 11.30pm monday 8 may 2017
 
Agm may 12 2017 final
Agm may 12 2017 finalAgm may 12 2017 final
Agm may 12 2017 final
 
Corporate Update, January 2015
Corporate Update, January 2015Corporate Update, January 2015
Corporate Update, January 2015
 
Stornoway Corporate Update Presentation January 22, 2015
Stornoway Corporate Update Presentation January 22, 2015Stornoway Corporate Update Presentation January 22, 2015
Stornoway Corporate Update Presentation January 22, 2015
 
Swy td conference 2019 presentation
Swy td conference 2019 presentationSwy td conference 2019 presentation
Swy td conference 2019 presentation
 
Q3-2016 Financials & Project Update
Q3-2016 Financials & Project UpdateQ3-2016 Financials & Project Update
Q3-2016 Financials & Project Update
 
Stornoway Updated Mine Plan Support Materials March 30, 2016
Stornoway Updated Mine Plan Support Materials March 30, 2016Stornoway Updated Mine Plan Support Materials March 30, 2016
Stornoway Updated Mine Plan Support Materials March 30, 2016
 
European Gold Forum Presentation
European Gold Forum PresentationEuropean Gold Forum Presentation
European Gold Forum Presentation
 
Denver Gold Forum Presentation Sep 25 2017
Denver Gold Forum Presentation Sep 25 2017Denver Gold Forum Presentation Sep 25 2017
Denver Gold Forum Presentation Sep 25 2017
 
Technical session presentation toronto
Technical session presentation torontoTechnical session presentation toronto
Technical session presentation toronto
 
Stornoway Diamond Corporation Q2 2017 Earnings Release Supplemental Materials
Stornoway Diamond Corporation Q2 2017 Earnings Release Supplemental MaterialsStornoway Diamond Corporation Q2 2017 Earnings Release Supplemental Materials
Stornoway Diamond Corporation Q2 2017 Earnings Release Supplemental Materials
 
Blue Moon Zinc Corporate Presentation
Blue Moon Zinc Corporate PresentationBlue Moon Zinc Corporate Presentation
Blue Moon Zinc Corporate Presentation
 
Stornoway AGM Presentation MAy 16 2016
Stornoway AGM Presentation MAy 16 2016Stornoway AGM Presentation MAy 16 2016
Stornoway AGM Presentation MAy 16 2016
 
Red Cloud Mining Annual Fall Showcase Presentation October 8, 2015
Red Cloud Mining Annual Fall Showcase Presentation October 8, 2015Red Cloud Mining Annual Fall Showcase Presentation October 8, 2015
Red Cloud Mining Annual Fall Showcase Presentation October 8, 2015
 
BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceBMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining Conference
 
New gold presentation march 2017 v website
New gold presentation march 2017 v websiteNew gold presentation march 2017 v website
New gold presentation march 2017 v website
 
Klondike Silver Corporate Brochure
Klondike Silver Corporate BrochureKlondike Silver Corporate Brochure
Klondike Silver Corporate Brochure
 
Stornoway Corporate Update Presentation June 16 2016
Stornoway Corporate Update Presentation June 16 2016Stornoway Corporate Update Presentation June 16 2016
Stornoway Corporate Update Presentation June 16 2016
 
Lundin Gold Scotiabank Mining Conference November 30 - December 1, 2021
Lundin Gold Scotiabank Mining Conference November 30 - December 1, 2021Lundin Gold Scotiabank Mining Conference November 30 - December 1, 2021
Lundin Gold Scotiabank Mining Conference November 30 - December 1, 2021
 
Stornoway Diamonds Corporate Update September 19, 2016
Stornoway Diamonds Corporate Update September 19, 2016Stornoway Diamonds Corporate Update September 19, 2016
Stornoway Diamonds Corporate Update September 19, 2016
 

Similar to Swy 2013 AGM Presentation

Stornoway 2014 English AGM Presentation
Stornoway 2014 English AGM PresentationStornoway 2014 English AGM Presentation
Stornoway 2014 English AGM PresentationStornoway Diamonds
 
Stornoway 2015 Annual General Meeting Presentation
Stornoway 2015 Annual General Meeting PresentationStornoway 2015 Annual General Meeting Presentation
Stornoway 2015 Annual General Meeting PresentationStornoway Diamonds
 
Renard Diamond Mine Financing Presentation
Renard Diamond Mine Financing PresentationRenard Diamond Mine Financing Presentation
Renard Diamond Mine Financing PresentationStornoway Diamonds
 
Stornoway Corporate Presentation December 2015
Stornoway Corporate Presentation December 2015Stornoway Corporate Presentation December 2015
Stornoway Corporate Presentation December 2015Stornoway Diamonds
 
Stornoway Diamond Presentation at the Precious Metals Summit Beaver Creek, CO...
Stornoway Diamond Presentation at the Precious Metals Summit Beaver Creek, CO...Stornoway Diamond Presentation at the Precious Metals Summit Beaver Creek, CO...
Stornoway Diamond Presentation at the Precious Metals Summit Beaver Creek, CO...Stornoway Diamonds
 
Stornoway Corporate Presentation August 2014
Stornoway Corporate Presentation August 2014Stornoway Corporate Presentation August 2014
Stornoway Corporate Presentation August 2014Stornoway Diamonds
 
Stornoway Corporate Update November 12, 2014
Stornoway Corporate Update November 12, 2014Stornoway Corporate Update November 12, 2014
Stornoway Corporate Update November 12, 2014Stornoway Diamonds
 
Stornoway Corporate and Renard Project Update for May 28, 2013
Stornoway Corporate and Renard Project Update for May 28, 2013Stornoway Corporate and Renard Project Update for May 28, 2013
Stornoway Corporate and Renard Project Update for May 28, 2013Stornoway Diamonds
 
Presentation at the TD Securities Mining Conference
Presentation at the TD Securities Mining ConferencePresentation at the TD Securities Mining Conference
Presentation at the TD Securities Mining ConferenceStornoway Diamonds
 
Swy corporate presentation bmo feb 25 28 2018
Swy corporate presentation bmo feb 25 28 2018Swy corporate presentation bmo feb 25 28 2018
Swy corporate presentation bmo feb 25 28 2018Stornoway Diamonds
 
A Dive into the International World of Diamonds
A Dive into the International World of DiamondsA Dive into the International World of Diamonds
A Dive into the International World of DiamondsStornoway Diamonds
 
Swy corporate presentation pdac investor exchange march 5 2018
Swy corporate presentation pdac investor exchange march 5 2018Swy corporate presentation pdac investor exchange march 5 2018
Swy corporate presentation pdac investor exchange march 5 2018Stornoway Diamonds
 
Stornoway Q3 2017 Earnings Results
Stornoway Q3 2017 Earnings Results Stornoway Q3 2017 Earnings Results
Stornoway Q3 2017 Earnings Results Stornoway Diamonds
 
Swy corporate presentation td securities mining conference jan 18 2017
Swy corporate presentation td securities mining conference jan 18 2017Swy corporate presentation td securities mining conference jan 18 2017
Swy corporate presentation td securities mining conference jan 18 2017Stornoway Diamonds
 
Stornoway Corporate Presentation July 13 2017
Stornoway Corporate Presentation July 13 2017Stornoway Corporate Presentation July 13 2017
Stornoway Corporate Presentation July 13 2017Stornoway Diamonds
 
Stornoway q1 2018 earnings results presentation final
Stornoway q1 2018 earnings results presentation finalStornoway q1 2018 earnings results presentation final
Stornoway q1 2018 earnings results presentation finalStornoway Diamonds
 

Similar to Swy 2013 AGM Presentation (20)

Stornoway 2014 English AGM Presentation
Stornoway 2014 English AGM PresentationStornoway 2014 English AGM Presentation
Stornoway 2014 English AGM Presentation
 
Stornoway 2015 Annual General Meeting Presentation
Stornoway 2015 Annual General Meeting PresentationStornoway 2015 Annual General Meeting Presentation
Stornoway 2015 Annual General Meeting Presentation
 
Renard Diamond Mine Financing Presentation
Renard Diamond Mine Financing PresentationRenard Diamond Mine Financing Presentation
Renard Diamond Mine Financing Presentation
 
Stornoway Corporate Presentation December 2015
Stornoway Corporate Presentation December 2015Stornoway Corporate Presentation December 2015
Stornoway Corporate Presentation December 2015
 
Stornoway Diamond Presentation at the Precious Metals Summit Beaver Creek, CO...
Stornoway Diamond Presentation at the Precious Metals Summit Beaver Creek, CO...Stornoway Diamond Presentation at the Precious Metals Summit Beaver Creek, CO...
Stornoway Diamond Presentation at the Precious Metals Summit Beaver Creek, CO...
 
Stornoway Corporate Presentation August 2014
Stornoway Corporate Presentation August 2014Stornoway Corporate Presentation August 2014
Stornoway Corporate Presentation August 2014
 
Stornoway Corporate Update November 12, 2014
Stornoway Corporate Update November 12, 2014Stornoway Corporate Update November 12, 2014
Stornoway Corporate Update November 12, 2014
 
Swy may 28th update
Swy may 28th updateSwy may 28th update
Swy may 28th update
 
Stornoway Corporate and Renard Project Update for May 28, 2013
Stornoway Corporate and Renard Project Update for May 28, 2013Stornoway Corporate and Renard Project Update for May 28, 2013
Stornoway Corporate and Renard Project Update for May 28, 2013
 
Presentation at the TD Securities Mining Conference
Presentation at the TD Securities Mining ConferencePresentation at the TD Securities Mining Conference
Presentation at the TD Securities Mining Conference
 
Swy corporate presentation bmo feb 25 28 2018
Swy corporate presentation bmo feb 25 28 2018Swy corporate presentation bmo feb 25 28 2018
Swy corporate presentation bmo feb 25 28 2018
 
A Dive into the International World of Diamonds
A Dive into the International World of DiamondsA Dive into the International World of Diamonds
A Dive into the International World of Diamonds
 
Swy corporate presentation pdac investor exchange march 5 2018
Swy corporate presentation pdac investor exchange march 5 2018Swy corporate presentation pdac investor exchange march 5 2018
Swy corporate presentation pdac investor exchange march 5 2018
 
Stornoway AGM 2018
Stornoway AGM 2018 Stornoway AGM 2018
Stornoway AGM 2018
 
Stornoway AGA 2018
Stornoway AGA 2018 Stornoway AGA 2018
Stornoway AGA 2018
 
Stornoway Q3 2017 Earnings Results
Stornoway Q3 2017 Earnings Results Stornoway Q3 2017 Earnings Results
Stornoway Q3 2017 Earnings Results
 
Swy corporate presentation td securities mining conference jan 18 2017
Swy corporate presentation td securities mining conference jan 18 2017Swy corporate presentation td securities mining conference jan 18 2017
Swy corporate presentation td securities mining conference jan 18 2017
 
Stornoway Corporate Presentation July 13 2017
Stornoway Corporate Presentation July 13 2017Stornoway Corporate Presentation July 13 2017
Stornoway Corporate Presentation July 13 2017
 
AGM 2017 Presentation
AGM 2017 PresentationAGM 2017 Presentation
AGM 2017 Presentation
 
Stornoway q1 2018 earnings results presentation final
Stornoway q1 2018 earnings results presentation finalStornoway q1 2018 earnings results presentation final
Stornoway q1 2018 earnings results presentation final
 

More from Stornoway Diamonds

Stornoway Second Quarter 2018 Earnings Results Presentation
Stornoway Second Quarter 2018 Earnings Results PresentationStornoway Second Quarter 2018 Earnings Results Presentation
Stornoway Second Quarter 2018 Earnings Results PresentationStornoway Diamonds
 
Stornoway Denver Gold Forum 2018 Presentation
Stornoway Denver Gold Forum 2018 PresentationStornoway Denver Gold Forum 2018 Presentation
Stornoway Denver Gold Forum 2018 PresentationStornoway Diamonds
 
Stornoway Diamond Corporation Q1 2018 Earnings Release Supplemental Materials
Stornoway Diamond Corporation Q1 2018 Earnings Release Supplemental MaterialsStornoway Diamond Corporation Q1 2018 Earnings Release Supplemental Materials
Stornoway Diamond Corporation Q1 2018 Earnings Release Supplemental MaterialsStornoway Diamonds
 
Stornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation finalStornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation finalStornoway Diamonds
 
Stornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation finalStornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation finalStornoway Diamonds
 
Stornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation finalStornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation finalStornoway Diamonds
 
Matériel d'appui à la mise à jour du plan minier de mars 2016 - 30 mars 2016
Matériel d'appui à la mise à jour du plan minier de mars 2016 - 30 mars 2016Matériel d'appui à la mise à jour du plan minier de mars 2016 - 30 mars 2016
Matériel d'appui à la mise à jour du plan minier de mars 2016 - 30 mars 2016Stornoway Diamonds
 
Corporate Presentation PDAC March 2017
Corporate Presentation PDAC March 2017Corporate Presentation PDAC March 2017
Corporate Presentation PDAC March 2017Stornoway Diamonds
 
Corporate Presentation Feb 2017
Corporate Presentation Feb 2017Corporate Presentation Feb 2017
Corporate Presentation Feb 2017Stornoway Diamonds
 
Stornoway 2106 Production Results and 2017 Guidance
Stornoway 2106 Production Results and 2017 GuidanceStornoway 2106 Production Results and 2017 Guidance
Stornoway 2106 Production Results and 2017 GuidanceStornoway Diamonds
 
AGA Presentation pour Stornoway mai 2016
AGA Presentation pour Stornoway mai 2016AGA Presentation pour Stornoway mai 2016
AGA Presentation pour Stornoway mai 2016Stornoway Diamonds
 

More from Stornoway Diamonds (13)

Stornoway Second Quarter 2018 Earnings Results Presentation
Stornoway Second Quarter 2018 Earnings Results PresentationStornoway Second Quarter 2018 Earnings Results Presentation
Stornoway Second Quarter 2018 Earnings Results Presentation
 
Stornoway Denver Gold Forum 2018 Presentation
Stornoway Denver Gold Forum 2018 PresentationStornoway Denver Gold Forum 2018 Presentation
Stornoway Denver Gold Forum 2018 Presentation
 
Stornoway Diamond Corporation Q1 2018 Earnings Release Supplemental Materials
Stornoway Diamond Corporation Q1 2018 Earnings Release Supplemental MaterialsStornoway Diamond Corporation Q1 2018 Earnings Release Supplemental Materials
Stornoway Diamond Corporation Q1 2018 Earnings Release Supplemental Materials
 
Stornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation finalStornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation final
 
Stornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation finalStornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation final
 
Stornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation finalStornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation final
 
Matériel d'appui à la mise à jour du plan minier de mars 2016 - 30 mars 2016
Matériel d'appui à la mise à jour du plan minier de mars 2016 - 30 mars 2016Matériel d'appui à la mise à jour du plan minier de mars 2016 - 30 mars 2016
Matériel d'appui à la mise à jour du plan minier de mars 2016 - 30 mars 2016
 
AGA 2017 Presentation
AGA 2017 PresentationAGA 2017 Presentation
AGA 2017 Presentation
 
Swy pdac-2017
Swy pdac-2017Swy pdac-2017
Swy pdac-2017
 
Corporate Presentation PDAC March 2017
Corporate Presentation PDAC March 2017Corporate Presentation PDAC March 2017
Corporate Presentation PDAC March 2017
 
Corporate Presentation Feb 2017
Corporate Presentation Feb 2017Corporate Presentation Feb 2017
Corporate Presentation Feb 2017
 
Stornoway 2106 Production Results and 2017 Guidance
Stornoway 2106 Production Results and 2017 GuidanceStornoway 2106 Production Results and 2017 Guidance
Stornoway 2106 Production Results and 2017 Guidance
 
AGA Presentation pour Stornoway mai 2016
AGA Presentation pour Stornoway mai 2016AGA Presentation pour Stornoway mai 2016
AGA Presentation pour Stornoway mai 2016
 

Recently uploaded

Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxgeorgebrinton95
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCRsoniya singh
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfmuskan1121w
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneCall girls in Ahmedabad High profile
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...lizamodels9
 

Recently uploaded (20)

Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdf
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
 

Swy 2013 AGM Presentation

  • 1. BUILDING QUÉBEC’S FIRST DIAMOND MINE Annual General Meeting of Shareholders, Montreal, October 23rd 2013 Matt Manson Patrick Godin President, CEO & Director COO & Director
  • 2. 2 Forward-Looking Information This presentation contains "forward-looking information" within the meaning of Canadian securities legislation and “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995. This information and these statements, referred to herein as “forwardlooking statements”, are made as of the date of this presentation and the Company does not intend, and does not assume any obligation, to update these forward-looking statements, except as required by law. Forward-looking statements relate to future events or future performance and reflect current expectations or beliefs regarding future events and include, but are not limited to, statements with respect to: (i) the amount of mineral resources and exploration targets; (ii) the amount of future production over any period; (iii) net present value and internal rates of return of the mining operation; (iv) assumptions relating to recovered grade, average ore recovery, internal dilution, mining dilution and other mining parameters set out in the Feasibility Study or Optimization Study; (v) assumptions relating to gross revenues, operating cash flow and other revenue metrics set out in the Feasibility Study or Optimization Study; (vi) mine expansion potential and expected mine life; (vii) expected time frames for completion of permitting and regulatory approvals and making a production decision; (viii) future exploration plans; (ix) future market prices for rough diamonds; and (x) sources of and anticipated financing requirements. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as “expects”, “anticipates”, “plans”, “projects”, “estimates”, “assumes”, “intends”, “strategy”, “goals”, “objectives” or variations thereof or stating that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements. Forward-looking statements are made based upon certain assumptions and other important factors that, if untrue, could cause the actual results, performances or achievements of Stornoway to be materially different from future results, performances or achievements expressed or implied by such statements. Such statements and information are based on numerous assumptions regarding present and future business strategies and the environment in which Stornoway will operate in the future, including the price of diamonds, anticipated costs and Stornoway’s ability to achieve its goals. Certain important factors that could cause actual results, performances or achievements to differ materially from those in the forward-looking statements include, but are not limited to: (i) required capital investment and estimated workforce requirements; (ii) estimates of net present value and internal rates of return; (iii) receipt of regulatory approvals on acceptable terms within commonly experienced time frames; (iv) the assumption that a production decision will be made, and that decision will be positive; (v) anticipated timelines for the commencement of mine production; (vi) market prices for rough diamonds and the potential impact on the Renard Project’s value; and (vii) future exploration plans and objectives. Additional risks are described in Stornoway's most recently filed Annual Information Form, annual and interim MD&As, and other disclosure documents available under the Company’s profile at: www.sedar.com. When relying on our forward-looking statements to make decisions with respect to Stornoway, investors and others should carefully consider the foregoing factors and other uncertainties and potential events. Stornoway does not undertake to update any forward-looking statement, whether written or oral, that may be made from time to time by Stornoway or on our behalf, except as required by law. Robin Hopkins, a Qualified Person and the Company’s VP Exploration, has reviewed the technical information contained herein. Readers are referred to the technical report dated December 29th, 2011 in respect of the November 2011 Feasibility Study for the Renard Diamond Project, the technical report dated February 28th, 2013 in respect of the January 2013 Optimization Study, and the press release dated July 23rd 2013 in respect of the July 2013 Mineral Resource estimate for further details and assumptions relating to the project. These techncial reports and this press release list the names of the Qualified Persons in respect of these studies.
  • 3. 3 Your Board and Management Team Executive Officers Head Office: Longueuil, Québec Exploration Office: North Vancouver, BC Matt Manson President, CEO & Director Pat Godin COO & Director Community Offices: Mistissini & Chibougamau Québec Zara Boldt CFO and VP Finance Non-Executive Directors Ebe Scherkus Independent/ Board Chairman Michel Blouin Independent/ IQ Designate Yves Harvey Independent Hume Kyle Independent John LeBoutillier Independent/ IQ Designate Monique Mercier Independent/ IQ Designate Peter Nixon Independent Serge Vézina Independent Key Managers Ghislain Poirier VP Public Affairs Yves Perron VP Engineering & Construction Robin Hopkins VP Exploration Martin Boucher Brian Glover Guy Bourque VP Sustainable Development VP Asset Protection Chief Mining Engineer Helene Robitaille Mario Courchesne Orin Baranowsky Jean-Charles Dumont Freddie Mianscum Director, HR Construct. Manager Director, IR Corporate Controller IBA Implem. Officer
  • 5. 5 Comments on Stornoway’s Project Financing The Renard Project is Ready to Build Final Project Financing is the Last Remaining Challenge Before Construction can Begin Despite very difficult market conditions, in the past 18 months Stornoway has successfully arranged up to $144m of financing ($124m debt, $20m equity) for road and airport construction, permitting, design optimization work, engineering and financing costs. The timely completion of final mine project financing, and its impact on project schedule, is the principal risk Stornoway currently faces. Project financing discussions with lenders and prospective investors are ongoing and progressing well. Stornoway is Fully Focused on the Timely Completion of Final Project Financing
  • 6. 6 Why does the Renard Project Stand Out from the Pack? What Other Mining Project Offers all of these Advantages to Investors? Renard will have a high margin with high cash flow: it is a major new project. Renard has strong social acceptability. Renard is in one of the world’s safest jurisdictions for mining investment (still). Renard will be the first Canadian diamond mine with an all-season road. Renard has enough resource upside for potentially decades of mining. Renard is owned 100% by Stornoway: our partners are our shareholders and in our communities. Diamonds are an essential part of our culture, and very difficult to find.
  • 8. 8 Renard Kimberlite Bodies 0 1 2 Kilometers N 60 0 60 120 Kilometers Laforge 2 Laforge 1 R10 LG2 R7 Hibou LG3 Foxtrot Property R1 Wemindji Eleonore R65 R4 Renard Western Troy Eastmain Mine Strateco R8 R9 R2 Brisay LG4 Troilus Mine R3 Temiscamie Mistissini Lynx Matagami Kimberlite Bodies with Probable Reserves Kimberlite Bodies with Inferred Resources Kimberlite Bodies with Resource Potential Chibougamau Legend LEGEND: Stornoway Properties Hydro-Québec Facility Renard Kimberlites Kimberlitic Dyke Regional Kimberlites Hydro-Québec Powerlines Route 167 Extension/ Renard Mine Road Road Exploration/ Mining Projects
  • 9. 9 Key Project Parameters Reserve Based Mine Plan (Feasibility Study Nov. 2011, Optimization Jan. 2013) Mine Life Mineral Reserve Initial Cap-ex Operating Cost Operating Margin Operating Cash Flow Average Diamond Price Average Diamond Production After Tax NPV (7%; Jan 1 2013) After Tax IRR Production Startup Renard 65 29/24cpht 0m 11 years 17.9 mcarats 100m $752m 200m $58/t ($76/carat) 67% 300m $2.7B Renard 3 103/112cpht 400m $180/carat 1.6 mcarats/yr $391m 16.3% December 2015 *Key Assumptions: C$1=US$1, Oil US$95/barrel, 2.5% real terms diamond price growth Q311-Q425, 82.9% ore recovery, 23.8% mining and internal dilution, 0cpht dilution grade, January 1 2013 effective date for NPV and IRR calculation. Long Term Plan (Basis of Mine Permitting) Includes the mining of the 17mcarat Inferred Resources within the scope of the Feasibility Study mine infrastructure: Extended mine life, increased annual production, increased project valuation 500m 600m 700m Renard 4 60/50cpht Renard 9 53cpht Renard 2 104/119cpht 27 mcarat Indicated Mineral Resource 17 mcarat Inferred Mineral Resource 26-48 mcarat Exploration Upside Notes: Grades illustrated are for Indicated and Inferred Mineral Resources respectively at a +1DTC sieve size cut-off. Reserve and Resource categories are compliant with the "CIM Definition Standards on Mineral Resources and Reserves". Mineral resources that are not mineral reserves do not have demonstrated economic viability. The potential quantity and grade of any Exploration Target (previously referred to as a “Potential Mineral Deposit”) is conceptual in nature, and it is uncertain if further exploration will result in the target being delineated as a mineral resource. Mineral reserves are not a sub-set of mineral resources.
  • 10. Renard’s Resource Upside 10 A Project with a Long Resource Tail and Very Long Mine Life Potential 0m Renard 65 29/24cpht Renard 3 103/112cpht Millions of Tonnes 140 Exploration Target High Range Exploration Target Low Range 100m Inferred Resource 120 200m Probable Reserve 300m 100 400m 80 500m The Vision: Deposit still Open 600m 60 700m 40 Renard 4 60/50cpht Renard 9 53cpht Renard 2 104/119cpht The resource upside at depth at Renard is world class. Although highly accretive, the project’s Inferred Mineral Resources are not included in the Feasibility Study economic analysis in accordance with NI 43-101. 20 Permitting and Long Term Business Plan The Feasibility: 11 years of mining 0 Notes: Reserve and Resource categories are compliant with the "CIM Definition Standards on Mineral Resources and Reserves". Mineral resources that are not mineral reserves do not have demonstrated economic viability. The potential quantity and grade of any Exploration Target is conceptual in nature, and it is uncertain if further exploration will result in the target being delineated as a mineral resource. Mineral reserves are not a sub-set of mineral resources.
  • 11. 11 General Project Arrangement Small Project Footprint of 3.1km2, Modest Environmental Impact Processed Kimberlite Containment (PKC) R65 Waste Rock R2-R3 Plant Ore Stockpile Camp Road from Chibougamau Overburden Stockpile
  • 12. 12 Mine Plan A Combined Open Pit and Underground Mine Renard 65 Open Pit Mining (years 1-2). Underground Mining (years 3-11). Underground method: Blast Hole Shrinkage, Panel Retreat with waste backfill from pits. Renard 3 Ramp access 610 meter level. 6,000 tpd plant capacity (2.2Mtonnes/year) expandable to 7,000 tpd (2.5Mtonnes/year). Renard 4 Pit at Renard 65 (initially) as a borrow-pit and waste water sump, pending resource conversion. Renard 2 View looking Northeast Renard 2 Renard 3
  • 13. 13 Mine Plan Production Schedule and Cash Flow (Mineral Reserves Only) Open Pit & Underground Mining Ore Tonnage (t) 2,500,000 2,000,000 1,500,000 1,000,000 500,000 R2 Pit R3 Pit R2 UG Diamond Production 2027 R4 UG Gross Revenue (Real Terms) 500,000 Revenue (k C$) 600,000 2,000,000 2026 2025 R3 UG 2,500,000 1,500,000 1,000,000 500,000 400,000 300,000 200,000 100,000 - R2 R3 R4 R2 R3 R4 2027 2026 2025 2024 2023 2022 2021 2020 2019 2018 2017 2016 2015 2014 2013 2027 2026 2025 2024 2023 2022 2021 2020 2019 2018 2017 2016 2015 2014 2013 Diamonds (carats) 2024 2023 2022 2021 2020 2019 2018 2017 2016 2015 2014 2013 -
  • 14. 14 Stornoway will be a Significant Diamond Producer Current and Future Diamond Producers 2012 World Diamond Production Data/ Forecast Future Production 1 De Beers (Anglo/Botswana) $6,100m 2 Alrosa (Russia) $4,610m 3 BHPB/Dominion Diamond (TSX: DDC) $894m 4 Rio Tinto (ASE: RIO) $741m 5 Petra $403m 6 Stornoway 7 Mountain Province (note 3; TSX: MPV) $273m 8 Gem (L: GEMD) $202m 9 Lucara (note 4; TSX: LUC) $118m 10 Others $2,200m Total $15,817m (note 1; L: PDL) (note 2; TSX: SWY) Alrosa 29% BHPB/ Dominion 6% RioTinto 5% $306m DeBeers 38% Petra 2% Others 14% LUC 1% GEM 1% SWY 2% MPV 2% Notes: 1. Petra 12 month results for period ending June 30, 2013 2. Renard estimated at FS average annual diamond production of 1.7 million carats, and WWW April 2011 weighted diamond price of $180/ct, un-escalated 3. Gahcho Kue estimated at 50% of FS average annual production of 4.5 million carats, and WWW April 2011 weighted diamond price of $121/ct, un-escalated 4. Karowe estimated as per Lucara FY2013 Operating Guidance. Source: Kimberly process and Company Reports
  • 15. 15 12 Months of Progress
  • 16. 12 Months of Progress What has been Achieved since September 2012? 1. 2. 3. 4. The Road is Open Permitting Authorizations are in Place The Resource has Continued to Grow The Project has been Optimized 16
  • 17. 17 The Route 167 Extension and the Renard Mine Road The First Canadian Diamond Mine with Road Access Construction of an all-season access road connecting Renard to the Québec highway network began in February 2012. Under the terms of a November 2012 agreement between Stornoway and Québec, segments A & B (143 km) are being constructed by the Ministry of Transport as the 2-lane “Route 167 Extension” and segments C & D (97 km) are being constructed by Stornoway as the single lane “Renard Mine Road”. Renard Km240 Segments C & D Stornoway 97km of Mine Road (50km/hr) Stornoway forecasts the cost to complete the Renard Mine Road at $70 million, approximately 10% below base budget. Lac Hecla Km195 Eastmain WesternTroy Abitex Km143 Strateco Under the terms of a December 2012 financing agreement, Québec has provided Stornoway financing facilities of up to $85m to complete its work, repayable upon commercial production at Renard. On September 3rd 2013 Stornoway announced that all 4 segments have been connected and the road had opened to construction traffic, 2 months ahead of schedule. Lac Naococane Km82 Segments A & B Min. of Transport 143km of Regional Highway (70km/hr) Legend Lac Km 0 Mistassini Lac Albanel Renard Project Explor./Mining Projects Stornoway Properties Albanel-TémiscamieOtish Par Mistissini 50 km Segment A: 0-82km Segment B: 82-143km Segment C: 143-195km Segment D: 195-240km
  • 18. 18 Road Construction Steps Tree clearing and earthworks Culvert installation Infrastructure preparation Bridge installation Gravel works Last step is a topcoat gravel finish
  • 19. 19 Views of the Road KM 210 KM 155 KM 237
  • 20. 20 Views of the Road KM 236 KM 215 KM 228
  • 21. 21 Bridges Stornoway is constructing 16 bridges on the Renard Mine Road. Temporary bridges were first installed on all river crossings by April 2013. As of October 2013, 12 of 16 permanent bridges have been installed. All bridges are fabricated from locally harvested, engineered wood and supplied by Nordic Structures Bois, a wholly-owned subsidiary of Chantiers Chibougamau Ltée.
  • 22. All Road Segments Connected on September 1st, 2013 Two Months Ahead of Schedule and 10% Below Budget Stornoway acknowledges the professionalism and performance of its contractors on the Renard Mine Road: The Eskan Company Eenatuk Forestry Corp. Swallow-Fournier inc. Kiskinchiish Corp. Nordic Structures Bois Petronor Jos Ste-Croix & Fils Ltée 22
  • 23. 23 Construction to Commence on Renard Aerodrome The Renard Aerodrome will be located 8 km south of the project site. The airstrip will be certified by Transport Canada to receive Dash 8-300 turboprop and Hercules aircraft. Design criteria (3C-NP): Gravel surface 30m wide by 1,494m long Taxiway and 100mx100m apron Equipped with assisted landing capability Traffic will be 3 to 5 flights per week for 48 workers per flight. The Renard Mine Aerodrome will be available for public use, enhancing air transport in the Monts Otish region of Québec. Renard Project Site On October 10th Stornoway announced an agreement with Québec to commence construction of the Renard Mine Aerodrome immediately, utilizing the residual amount of financing available within the Renard Mine Road credit facility. Shoulder Runway Taxi way Apron
  • 24. 24 Aerodrome Progress October 2013 Tree Cutting Area Runway Centerline
  • 25. 25 Site Progress October 2013 Renard Mine Road Bulk Sample DMS Plant Tree Clearing R9 R2 R4 Construction Camp R65 R65 Borrow Pit
  • 26. Permitting and Social Acceptability Strong Regulatory and Public Support for Québec’s First Diamond Mine Social Licence March 2012: Impact and Benefits Agreement (“IBA” or the “Mecheshoo Agreement”) with the Cree Nation of Mistissini and the Grand Council of the Crees (EI). July 2012: Partnership Agreements Signed with Chibougamau and Chapais. Permitting Oct. 2012: Québec Mining Lease issued. Dec. 2012: Québec Certificate of Authorization issued. Dec. 2012: Closure Plan accepted by regulators. May. 2013: Renard Mine Road Permit issued. July 2013: Positive Federal Environmental Assessment decision issued. All Community Agreements and Regulatory Authorizations Required to Proceed to Construction are in Place. 26
  • 27. 27 Regulatory and Fiscal Regime in Québec Settled The last 12 months has seen proposed changes to the Québec’s system of mining taxes and royalties, and mine closure bonds. Stornoway participated in the Government of Québec’s consultation process and, although impacted by these changes, welcomes the balanced approach that has been taken. Québec remains a leading destination for mining investment, and we look forward to developing Renard at a time of regulatory and fiscal certainty. For mine planning, Stornoway assumes the new hybrid fiscal regime, being the greater of the “Minimum Mining Tax” or “Progressive Mining Tax” Stornoway does not anticipate a major impact on the Renard Project from the new Mining Act still under assessment in the Québec National Assembly. Québec remains one of the world’s leading mining jurisdictions offering : • Regulatory Stability • Institutional Support • Expertise • Infrastructure
  • 28. 28 The Renard Optimization Study Released January 2013 Since the release of the Renard Feasiblity Study in November 2011, Stornoway has sought improvements in the project’s cost and operating parameters. The Renard Optimization Study was released in January 2013, and included: • A reduced initial capital cost, principally through deferral of the shaft. • Increased project NPV and IRR. • Maintained high operating margin. • A refined underground mining sequence and draw point design. Accommodation Complex Additional design optimization and engineering work is ongoing in partnership with a joint venture made up of SNC-Lavalin Inc. and AMEC Americas Ltd. under an interim agreement pending completion of the project’s EPCM contract at time of project financing. Process and Power Plants
  • 29. Liquefied Natural Gas Power Plant Feasibility Study Released October 2013 With a view to project optimization, Stornoway has been investigating more cost efficient alternatives for on-site power supply than traditional diesel fuelled gensets. A Hydro-Quebec powerline has been ruled out in the short term due to high cap-ex cost. On October 21st Stornoway announced it will proceed with an LNG fuelled gen-set option, made possible by the ability to receive regular cryogenic LNG shipments on the Renard Mine Road. The Renard LNG plant will comprise seven 2.1MW rated gas gen-sets, providing sufficient power generation capacity for the project’s normal operating specification of 9.5MW. 29
  • 30. 30 Liquefied Natural Gas Power Plant Feasibility Study Released October 2013 An LNG fuelled powerplant for Renard offers many advantages over diesel: • Greatly reduced annual operating costs of $8m to $10m per year, for a small incremental capital cost of $2.6m. • Up to 43% less greenhouse gas emissions. • Long term, stable supply market utilizing existing commercial distribution network within Quebec. • Elimination of on-site propane, as LNG will be used for building and underground mine heating. Diesel will continue to be used for the mobile mining fleet and construction activities Cost Improvements with LNG Unit Power Cost (C$/kWh) 1 Jan 2013 Optimization Study with Diesel Jan 2013 Optimization Study with LNG Unit Operating Cost (C$/tonne) 1,2 $0.299 $57.63 $0.188 $53.84 (-37%) (-7%) Initial Capital Cost (C$m) 1 $752.1 $754.0 (+0.3%) Life of Mine Capital Cost (C$m) 1,3 $1,013 $1,010 (-0.3%) 27.5 5.9 (-79%) n/a 3.5 41.7 n/a Annual Diesel Consumption (million litres) Annual LNG Consumption (thousand m3/annum) Annual Propane Consumption (thousand m3/annum) Notes Key Assumptions 1. January 2013 Optimization Study costs expressed in October 2012 terms. 2. Excludes capitalized preproduction costs. Based on the 11 year reserve-based mine life (17.9 mcarats) contained within the January 2013 Optimization Study, with a normal operating load of 9.49MW, C$1=US$1, Oil US$95/barrel 3. Includes all initial, sustaining and deferred capital, contingencies and escalation
  • 31. Renard’s Resource is Continuing to Grow 31 Revised Mineral Resource Statement Release July 2013 Renard 65 Renard 3 In July 2013 Stornoway release the results of a revised Mineral Resource Statement with a 14% increase in contained carats within the Indicated Resource category. This followed the successful completion of a 5,000 tonne bulk sample at Renard 65 in 2012 and the recovery of 997 carats of diamonds for valuation. The Renard 65 bulk sample returned the highest value diamonds to date at the Renard Project, with a March 2013 valuation of US$250/ct, giving a base model of US$180/ct (sensitivities of $203 & $169). Upon conversion to a Mineral Reserve, this material may be incorporated into the mine plan in two ways: 1. add 1 year to the LOM and increase the production rate to 2.5Mt/a or 2. add 3 years to the LOM as a reserve tail at a production rate of 2.1Mt/a The cost of developing a 75m deep pit at Renard 65 is already contained within the Feasibility Study. Notes: Reserve and Resource categories are compliant with the "CIM Definition Standards on Mineral Resources and Reserves". Mineral resources that are not mineral reserves do not have demonstrated economic viability. The potential quantity and grade of any Exploration Target is conceptual in nature, and it is uncertain if further exploration will result in the target being delineated as a mineral resource. Mineral reserves are not a sub-set of mineral resources. Renard 4 Renard 9 Renard 2 Three Renard 65 diamonds: 9.78 ct and 6.41 ct diamonds recovered from the 2012 bulk sample and a 4 carat stone discovered in drillcore in 2003
  • 32. Renard’s Resource is Continuing to Grow 32 Resource Expansion in 2013, and Beyond Renard 4 Renard 3 Renard 2 490 m asl Renard 65 Renard 9 0 m 1 2 3 790 m -275 m asl 1. 27 mcarat Indicated Mineral Resource Conversion of Renard 65 Inferred Resources to Indicated to 150m depth (July 2013: Completed) 2. Addition of Renard 2 Country Rock Breccia to both Indicated and Inferred Resources (July 2013: Completed) 3. 6.2 mcarats in 5.23 Mtonnes (at 119 cpht) in Renard 2 Inferred Resources between 610m and 700m depth: 4.2 to 7.3 Mcarats TFFE between 700m and 770m depth. Open below 770m. (Target for Future Exploration) 17 mcarat Inferred Mineral Resource 26-48 mcarat Exploration Upside
  • 33. 33 Renard Resource Upside Inferred Resources and TFFE Not in Reserve Case Mine Plan Renard’s Inferred Resources and TFFE represent a potential increase over the current Indicated Resource of 160% to 240%. 0m 100m 2.7 mcarats 1.2 mcarats 200m Each kimberlite remains open at 770m depth 300m 2.4 mcarats 0.6 mcarats 1.2 mcarats 400m 500m 0.8 to 2.8 mcarats 6.2 mcarats 600m 700m 27 mcarat Indicated Mineral Resource 7.3 to 13.5 mcarats 5.6 to 11.8 mcarats 17 mcarat Inferred Mineral Resource 2.0 to 4.3 mcarats 4.2 to 7.3 mcarats 26-48 mcarat Exploration Upside Notes: Reserve and Resource categories are compliant with the "CIM Definition Standards on Mineral Resources and Reserves". Mineral resources that are not mineral reserves do not have demonstrated economic viability. The potential quantity and grade of any Exploration Target (previously referred to as a “Potential Mineral Deposit”) is conceptual in nature, and it is uncertain if further exploration will result in the target being delineated as a mineral resource. Mineral reserves are not a sub-set of mineral resources.
  • 34. Renard’s Diamonds 34 Recent Valuation Conducted by WWW International Diamond Consultants Ltd. March 2013 The Renard kimberlite pipes have similar, but marginally different diamond populations exhibiting coarse size distributions and with high proportions of large white gems. 99% by weight gem/near-gem quality. 1% industrial quality boart. Significant value upside in large gems. Diamonds larger than 10.8ct, “Specials”) estimated at three to six 50-100ct stones and one to two +100ct stones every 100,000 carats (two weeks). Not accounted for in the revenue model. Stornoway most recently valued the Renard diamond samples with WWW International Diamond Consultants Ltd. in March 2013. Size of Valuation Sample WWW March 2013 Sample Price (carats) (US$/carat)1 Renard 2 1,580 $180 Renard 3 2,753 $173 Renard 4 2,674 Renard 65 997 Kimberlite Body WWW March 2013 Base Case Price Model Renard 3 Bulk Sample Stones larger than 2 carats. “Run of Mine” Sensitivities (Minimum to High) (US$/carat)1 $171 to $214 $100 $190 $151 $104 ($150)2 $250 $180 $169 to $203 $141 to $185 $98 to $168 Notes 1. All prices in US$/carat. Samples utilizing a +1 DTC sieve size cut-off. 2. Should the Renard 4 diamond population prove to have a diamond population with a size distribution equal to the average of Renard 2 and 3, WWW have estimated that a base case diamond price model of $150 per carat based on March 2013 pricing.
  • 35. Rough Diamond Price Movements The Diamond Market, January 2010 to September 2013 May 2011 Valuation utilized in the FS based on the average of 5 diamantaires c.10% below the WWW rough index price A tracking of the diamond market since the publication of the November 2011 FS indicates rough diamond prices have generally remained within the bounds of sensitivities contained within the FS financial model (May 2011 spot prices and a 2.5% real terms annual price escalator). 35
  • 37. 37 Renard’s Legacy Value Creation for our Shareholders An Example of Constructive Partnership with Local People • Stornoway’s relationship with the Crees of Eeyou Istchee • Stornoway’s relationship with Chibougamau and Chapais Québec Institutional Equity Ownership • Stornoway’s Largest Shareholder is Investissement Québec, at 35% (fully diluted). An Economic Engine in the James Bay Region of Québec • Long Term Direct and Indirect Employment • Long Term Local Contracting and Purchasing A Catalyst for Public Infrastructure Development • The Route 167 Extension/Renard Mine Road • A New Aerodrome in the Otish Mountains An Important Government Revenue Base • Federal and Québec Income Tax • Québec Mining Duty • Personal Income Taxes and Sales Taxes 10.15 carat gem quality octahedron
  • 38. Renard’s Legacy 38 Mines are Wealth Generators Over the First 11 Years Alone: $907m of tax payments, royalty payments, and Public infrastructure support payments. Payments associated with the project’s Long Term Business Plan are substantially higher still. DIAQUEM Royalty $94 Québec Mining Duties $372 Québec Income Tax $163 Notes: As estimated by Stornoway based on the Renard Feasibility Study Optimization dated January 2013, and existing tax regimes. In nominal terms. Québec Mining Duties subject to certain refundable credits Contribution to the Renard Mine Road and Aerodrome $77 Maintenance Contribution to the Renard Federal Income Mine Road $13 Tax $188
  • 39. Renard’s Legacy 39 Mines Employ People Construction Employment Breakdown Around 7,000 person years of employment created during construction (2013-2016). Induced Employment 43% Indirect Employment with Suppliers 36% Annual average of 482 direct jobs (Stornoway and contractors) created during operations (20162027). 405 Stornoway employees with an average salary of $115 000/y (including benefits). 700 Stornoway Direct Employment 21% Direct Renard Employment An estimated of 740 jobs maintained or supported at suppliers and local merchants. Annual operating expenditures on Québec goods and services of $90m (73% of total). Construction 500 Manpower 600 Contractors 400 Process Plant 300 Underground 200 100 0 Notes: As estimated by Stornoway based on the Renard Feasibility Study Optimization dated January 2013 Open Pit G&A
  • 41. 41 Project Schedule 2011 2H 2013 2012 1H 2H 1H 2H 2014 1H 2H 2016 2015 1H 2H 1H 2H BFS (Complete) ESIA (Complete) Community Hearings (Complete) Reg. Authorizations (Complete) Specific Operating Permits (50) Detailed Engineering Project Financing Road Construction First Vehicle Access Site Construction Commissioning and Ramp-up Commercial Production With first vehicle access achieved on the Renard Mine Road, the timely completion of mine project financing is the now principal driver on project schedule
  • 42. 42 Québec’s First Diamond Mine is Ready to Build Project Green-lighted: Authorizations Issued Community Agreements in Place Stornoway Operating Team in Place Access Road Opened Resource Growing Project Design Fully Optimized Favourable Cost Environment Stornoway is Fully Focused on the Timely Completion of Final Project Financing