TD Securities Mining Conference
Toronto, January 16th-17th, 2019
Forward Looking Information
2
This document contains forward-looking information (as defined in National Instrument 51 102 – Continuous Disclosure Obligations) and forward-looking statements within the meaning of Canadian securities legislation and the
United States Private Securities Litigation Reform Act of 1995 (collectively referred to herein as “forward-looking information” or “forward-looking statements”). These forward-looking statements are made as of the date of this
document and, the Corporation does not intend, and does not assume any obligation, to update these forward-looking statements, except as required by law.
These forward-looking statements relate to future events or future performance and include, among others, statements with respect to Stornoway’s objectives for the ensuing year, our medium and long-term goals, and
strategies to achieve those objectives and goals, as well as statements with respect to our management’s beliefs, plans, objectives, expectations, estimates, intentions and future outlook and anticipated events or results. Although
management considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect.
Forward-looking statements reflect current expectations or beliefs regarding future events and include, but are not limited to, statements with respect to: (i) the amount of Mineral Reserves, Mineral Resources and exploration
targets; (ii) the estimated amount of future production over any period; (iii) net present value and internal rates of return of the mining operation; (iv) expectations and targets relating to recovered grade, size distribution and
quality of diamonds, average ore recovery, carats recovered, carats sold, internal dilution, mining dilution and other mining parameters set out in the 2016 Technical Report as well as levels of diamond breakage; (v) expectations,
targets and forecasts relating to gross revenues, operating cash flows and other revenue metrics set out in the 2016 Technical Report, growth in diamond sales, cost of goods sold, cash cost of production, gross margins estimates,
planned and projected diamond sales, mix of diamonds sold, and capital expenditures, liquidity and working capital requirements; (vi) mine and resource expansion potential, expected mine life, and estimated incremental ore
recovery, revenue and other mining parameters from potential additional mine life extension; (vii) expected time frames for completion of permitting and regulatory approvals related to ongoing construction activities at the
Renard Diamond Mine; (viii) the expected time frames for the completion of the open pit and underground mine at the Renard Diamond Mine; (ix) the expected financial obligations or costs incurred by Stornoway in connection
with the ongoing development of the Renard Diamond Mine; (x) mining, development, production, processing and exploration rates, progress and plans, as compared to schedule and budget, and planned optimization, expansion
opportunities, timing thereof and anticipated benefits therefrom; (xi) future exploration plans and potential upside from targets identified for further exploratio; (xii) expectations concerning outlook and trends in the diamond
industry, rough diamond production, rough diamond market demand and supply, and future market prices for rough diamonds and the potential impact of the foregoing on various Renard financial metrics and diamond
production; (xiii) the economic benefits of using liquefied natural gas rather than diesel for power generation; (xiv) requirements for and sources of, and access to, financing and uses of funds; (xv) the ability to meet Subject
Diamonds Interest delivery obligations under the Purchase and Sale Agreement; (xvi) the foreign exchange rate between the US dollar and the Canadian dollar; and (xvii) the anticipated benefits from recently approved plant
modification measures and the anticipated timeframe and expected capital cost thereof. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives,
assumptions or future events or performance (often, but not always, using words or phrases such as “expects”, “anticipates”, “plans”, “projects”, “estimates”, “assumes”, “intends”, “strategy”, “goals”, “objectives”, “schedule” or
variations thereof or stating that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of
historical fact and may be forward-looking statements.
Forward-looking statements are made based upon certain assumptions by Stornoway or its consultants and other important factors that, if untrue, could cause the actual results, performances or achievements of Stornoway to be
materially different from future results, performances or achievements expressed or implied by such statements. Such statements and information are based on numerous assumptions regarding present and future business
prospects and strategies and the environment in which Stornoway will operate in the future, including the recovered grade, size distribution and quality of diamonds, average ore recovery, internal dilution, and levels of diamond
breakage, the price of diamonds, anticipated costs and Stornoway’s ability to achieve its goals, anticipated financial performance, regulatory developments, development plans, exploration, development and mining activities and
commitments, access to financing, and the foreign exchange rate between the US and Canadian dollars. Although management considers its assumptions on such matters to be reasonable based on information currently available
to it, they may prove to be incorrect. Certain important assumptions by Stornoway or its consultants in making forward-looking statements include, but are not limited to: (i) the accuracy of our estimates regarding capital and
estimated workforce requirements; (ii) estimates of net present value and internal rates of return; (iii) recovered grade, size distribution and quality of diamonds, average ore recovery, carats recovered, carats sold, internal
dilution, mining dilution and other mining parameters set out in the 2016 Technical Report as well as levels of diamond breakage; (iv) the expected mix of diamonds sold, and successful mitigation of ongoing issues of diamond
breakage in the Renard Diamond Mine process plant and realization of the anticipated benefits from plant modification measures within the anticipated timeframe and expected capital cost; (v) the stabilization of the Indian
currency market and full recovery of prices; (vi) receipt of regulatory approvals on acceptable terms within commonly experienced time frames and absence of adverse regulatory developments; (vii) anticipated timelines for the
Forward Looking Information (continued)
3
development of an open pit and underground mine at the Renard Diamond Mine; (viii) anticipated geological formations; (ix) continued market acceptance of the Renard diamond production, conservative forecasting of future
market prices for rough diamonds and impact of the foregoing on various Renard financial metrics and diamond production; (x) the timeline, progress and costs of future exploration, development, production and mining activities,
plans, commitments and objectives; (xi) the availability of existing credit facilities and any required future financing on favourable terms and the satisfaction of all covenants and conditions precedent relating to future funding
commitments; (xii) the ability to meet Subject Diamonds Interest delivery obligations under the Purchase and Sale Agreement; (xiii) Stornoway’s interpretation of the geological drill data collected and its potential impact on stated
Mineral Resources and mine life; (xiv) the continued strength of the US dollar against the Canadian dollar and absence of significant variability in interest rates; (xv) improvement of long-term diamond industry fundamentals and
absence of material deterioration in general business and economic conditions; and absence of significant variability in interest rates; (xvi) increasing carat recoveries with progressively increasing grade in LOM plan; (xvii)
estimated incremental ore recovery, revenue and other mining parameters from potential additional mine life extension with minimal capital expenditures; (xviii) availability of skilled employees and maintenance of key
relationships with financing partners, local communities and other stakeholders; (xix) long-term positive demand trends and rough diamond demand meaningfully exceeding supply; (xx) high depletion rates from existing diamond
mines; (xxi) global rough diamond production remaining stable; (xxii) modest capital requirements post-2018 with significant resource expansion available at marginal cost; (xxiii) substantial resource upside within scope of mine
plan; (xxiv) opportunities for high grade ore acceleration and processing expansion and realization of anticipated benefits therefrom; (xxv) significant potential upside from targets identified for further exploration; and (xxvi) limited
cash income taxes payable over the medium term.
By their very nature, forward-looking statements involve inherent risks and uncertainties. We caution readers not to place undue reliance on these forward- looking statements as a number of important risk factors could cause the
actual outcomes to differ materially from the beliefs, plans, objectives, expectations, anticipations, estimates, assumptions and intentions expressed in such forward-looking statements. The operating results and financial condition
of the Corporation are subject to a number of inherent risks and uncertainties associated with its business activities, which include the financing, exploration, development, construction and operation of its mine and processing
facility. The operating results and financial condition are also subject to numerous external factors, which include economic, regulatory, legal, tax and market risks impacting, among other things, supply of materials and demand for
rough diamonds, rough diamond prices, foreign exchange rates, inflation and the availability and cost of capital to fund the capital requirements of the business. Each of these risks could have a material adverse effect on the
Corporation’s future business, financial condition, prospects, results of operations or cash flow, and could cause actual results to differ materially from those described in any forward-looking statements contained in this
document. There can be no assurance that the Corporation has been or will be successful in identifying all risks or that any risk-mitigating strategies adopted to reduce or eliminate risk will be successful. These risks should be
considered when evaluating the Corporation and its guidance. With the exception of the going concern risk, which is described in the Corporation’s most recently filed MD&A, a comprehensive discussion of the risks faced by the
Corporation can be found in the Corporation’s 2017 Annual MD&A and most recently filed AIF, which are available on SEDAR at www.sedar.com under the Corporation’s profile.
Qualified Persons
The Qualified Persons that prepared the technical reports and press releases that form the basis for the presentation are listed in the Company’s AIF dated March 29, 2018. Disclosure of a scientific or technical nature in this
presentation was prepared under the supervision of Mr. Patrick Godin, P.Eng. (Québec), President and Chief Executive Officer and Mr. Robin Hopkins, P.Geol. (NT/NU), Vice President, Exploration, both “qualified persons” under
National Instrument (“NI”) 43-101.
Non-IFRS Financial Measures
This document refers to certain financial measures, such as Adjusted Net Loss, Adjusted Revenues, Adjusted EBITDA, Adjusted EBITDA Margin, Average Diamond Pricing Achieved, Cash Operating Cost per Tonne Processed, Cash
Operating Cost per Carat Recovered and Capital Expenditures, which are not measures recognized under IFRS and do not have a standardized meaning prescribed by IFRS. As a result, these measures may not be comparable to
similar measures reported by other corporations. Each of these measures have been derived from the Corporation’s financial statements and have been defined and calculated based on management’s reasonable judgement.
These measures are used by management and by investors to assist in assessing the Corporation’s performance. The measures are intended to provide additional information to the user and should not be considered in isolation
or as a substitute for measures prepared in accordance with IFRS. Refer to the “Non-IFRS Financial Measures” section of the Corporation’s Management Discussion and Analysis as at and for the quarter ended September 30, 2018
for further discussion of these items, including reconciliations to IFRS measures.
100% Owned Renard Diamond Mine – Québec’s First Diamond Mine
The only Canadian Diamond Mine Connected by Permanent Road Access
4
2017: First Full Operating Year
$85m Adjusted EBITDA1 in FY2017 at 43% Adjusted EBITDA margin1. Lower
pricing than expected. Good resource reconciliation. Cost targets achieved.
2018: Mining and Processing Transition
Ramped up UG mine. Implemented ore waste sorting. Improved diamond
recoveries and pricing. Steady state operations achieved late August 2018.
2019: Steady-state Underground Operations, Upside Evaluation
Production from existing R2 290m level. Introduction of higher-grade R3 ore
into feed. Evaluation of R4-R9 open pit. Drilling of R7 kimberlite pipe.
Low Cost, Long Life Asset with Strong Sector Fundamentals
Lowest cost diamond producer in Canada; Life of Mine Plan to FY2030; Upside
on mine life, processing capacity and market pricing.
Strong Social License and Institutional Support
Partnered with the Crees of Eeyou Istchee; Investissement Québec, CDPQ,
Orion and Osisko as investors, lenders and/or streamers.
1. See Note on “Non-IFRS Financial Measures”
160L
240L
290L
2018: First underground mining panels in Renard 2
(Blasted and/or mucked ore)
R9
R4
R65
R2
R3
2016-2017: Renard 2-3 open pit mining 2017-2018: Renard 65 open pit mining
Q2 2019: First Renard 3 underground
production planned
2019: development
of second Renard 2
underground mining
horizon
2018: Transitioning to Underground Mining
UG to be principal source of production ore 2018-
2030.
First production blast December 2017; production
ramp-up completed August 2018.
Ramp access; 6,000 tpd ore design capacity;
surpassed this target in each month of Q4 2018.
First Experiences
More competent country rock and less competent
kimberlite than expected.
Migration to assisted block caving as principal
mining method: long term benefits in production
costs and dilution.
First production panels developed at the north
pipe margin of the 290m level in highly dilute, low
grade kimberlite.
Grade has significantly increased as mining has
progressed to the center of R2; recovered grade of
80 cpht in Q4 2018.
6
1,445
1,982
4,172
3,585
3,848
5,801 5,587
6,218
7,128 7,046
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18
AverageDailyTonnage(tonnesperday)
Underground Production - Ore Tonnes Hauled to Surface
UG Mine Design Capacity = 6,000 tpd
5 Quarter Processing and Sales
At December 31, 2018. All quoted figures in CAD$ unless noted
7
Processing
Carat Sales1,2,3
ROM Sales: Gross Proceeds and Pricing4,5
1. Q1 FY18 includes 127,616 carats that were sold in the first quarter
for which revenue was realized in the second quarter.
4. See note on “Non-IFRS Financial Measures”
5. Before Stream and royalty
2. “ROM” Carats represent all diamonds larger than +1 DTC sieve
size. “Supplemental” carats represent additional diamonds smaller
than the 7 DTC sieve size that have been recovered in excess of
that expected in the Renard Mineral Resource statement.
3. Q1 to Q4 2018 supplemental sales were 42,663 carats sold for gross proceeds
of $1.0M (US$18.50/ct), 41,979 carats sold for gross proceeds of $1.0M
(US$18.50/ct), 21,367 carats sold for gross proceeds of $0.4M (US$13/ct), and
58,313 carats sold from gross proceeds of $1.1M (US$14/ct).
$49.1
$56.6
$28.6 $24.7
$30.6
$86
$112 $109 $103
$92
$108
$142 $142
$134
$122
$0
$20
$40
$60
$80
$100
$120
$0
$50
$100
$150
Q4 FY17 Q1 FY18 Q2 FY18 Q3 FY18 Q4 FY18
Millionsdollars
PriceperCarat
Gross
Proceeds
US$/ct
$/ct
519
563 562 598 606
398
286
223
329
486
77
51
40
55
80
0
200
400
600
800
1,000
Q4 FY17 Q1 FY18 Q2 FY18 Q3 FY18 Q4 FY18
ThousandTonnes/Carats
Tonnes
Carats
Grade (cpht)
454
399
201 185 25443 42 21 58
0
200
400
600
Q4 FY17 Q1 FY18 Q2 FY18 Q3 FY18 Q4 FY18
Thousand
Tonnes/Carats
ROM Carats
Supplemental Carats
1314151617181920212223 Looking West12
Underground Mine Ore Supply
Assisted Block Cave and Horizontal Panels
17
Nov-2018
Dec-2018
Pre Nov-2018
Caving/Mucking
Sequence
290L
160L
240L
270LPost 2018
R2R3
Steady State Operations Achieved
Mining
Ramp-up in the underground mine achieved late August 2018
Underground mining rates: 3,641 tpd in July, 6,168 tpd in
August, 5,707 tpd in September, 6,100 tpd in October, 7,037
tpd in November, 6,564 tpd in December
Transition to assisted block cave mining completed. 22 draw
points open as of end October 2018
Breakthrough to the R2-R3 open pit achieved October 11,
2018
Processing
Steady state processing with ore-sorting (“OSP”) fully
operational
Processing rates: 5,712 tpd in July, 6,971 tpd in August, 6,820
tpd in September, 7,053 tpd in October, 6,332 tpd in
November, 6,366 tpd in December
Diamond recoveries since OSP introduction have exhibited
lower levels of breakage than previously observed with
comparable feed composition, ongoing efforts to improve
process plant front-end throughput (rockbreaker availability,
steam-heated ore bins)
9
6-Month Processing Performance, July to December 2018
UG Mine Design
Capacity Achieved
Production halted for
3 days in July due to
forest fire
177
216 205
219
190 197
77
123 130
161 165 160
43
57
63
74
87
81
0
50
100
150
200
250
300
350
400
Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18
ThousandTonnes/Carats
Tonnes
Carats
Grade (cpht)
FY2019 Guidance
Provided January 16, 2019
All quoted figures in CAD$ unless noted
10
MINING AND PROCESSING
Carats Recovered1 (million) 1.80 to 2.10
Grade1 (cpht) 71 to 87
Tonnes Processed (million) 2.40 to 2.55
SELLING AND MARKETING
Carats Sold1 (million) 1.80 to 2.10
Average Diamond Pricing1 (US$/ct) US$ 80-105
COST
Capital Expenditures2 (million) C$ 70-80
Cash Operating Cost per Tonne Processed2 ($/t) C$ 47-54
Cash Operating Cost per Carat Recovered2 ($/ct) C$ 57-72
1. Inclusive of both run-of-mine and supplemental diamond production
2. See note on “Non-IFRS Financial Measures”
Diamond Market
11
SWY Real Price Index vs WWW’s Rough Price Index2, Real Terms1
1. Sale by sale basis, normalized for variations in quality and size distribution
2. Roughprices.com
Stornoway sells its production by tender through the Antwerp offices of its
sales agent Bonas-Couzyn.
In real terms (excluding changes in mix) pricing for Renard diamonds
increased 27% between the first sale in November 2016 and June 20181.
Market weakness is being shown principally in smaller and lower quality
items.
Underlying polished diamond demand remains strong, particularly in the US
market. Rough market weakness is being affected by currency weakness in
the emerging markets and cutting centers amidst global trade concerns, and
market uncertainty on the impact of synthetic diamonds in small diamond
categories.
100
101 102
95
98
100 101
98
96
93 94
95
97 97 98
100
102
100 100 101
102
100
112
110
114
115
119 119
110 111
114
120 119 120
125
127
123
118
113 114
90
95
100
105
110
115
120
125
130
Nov-16
Dec-16
Jan-17
Feb-17
Mar-17
Apr-17
May-17
Jun-17
Jul-17
Aug-17
Sep-17
Oct-17
Nov-17
Dec-17
Jan-18
Feb-18
Mar-18
Apr-18
May-18
Jun-18
Jul-18
Aug-18
Sep-18
Oct-18
Nov-18
WWW SWY
Renard Resource Development
12
7
9
10
11
R3 OPEN PIT
R2 OPEN PITR65 OPEN PIT
RETURN AIR
RAISE FRESH AIR
RAISE
PORTAL
BACKFILL RAISES IN
CROWN PILLAR
410L
270L
710L
590L
470L
290L
400L
250L
860L
VENTILATION
RAISE
5
1
4
2
3
8
6
RENARD 65
RENARD 4
RENARD 9
RENARD 2
RENARD 3
Reserve and Resource categories conform to "CIM Definition
Standards on Mineral Resources and Reserves". Mineral resources
that are not mineral reserves do not have demonstrated economic
viability. The potential quantity and grade of any Exploration Target
(previously referred to as a “Potential Mineral Deposit”) is conceptual
in nature, and it is uncertain if further exploration will result in the
target being delineated as a mineral resource.
Renard Mine Plan, Including Inferred
Mineral Resources, March 30, 2016 Indicated Mineral Resources
Inferred Mineral Resources
Target for Further Exploration
Renard 4
13,546 tonne sample excavated from surface at R4 to evaluate
potential future open pit at Renard 4 and Renard 9 in area of Mineral
Resources currently outside the Renard Mine Plan
Surface sample results to date (evaluation ongoing as of Jan 11, 2019)
Unit “4a” sample (2018) 2,444 carats from 10,359t at 24 cpht
Unit “4b” sample (2018) 574 carats from 1,287t at 45 cpht
Unit “4d” sample (2007) 2,722 carats from 2,104t at 129 cpht
R4A and R4B samples also processed in Renard bulk sample plant for
QA/QC purposes
Three “special” stones recovered: 14.9ct, 12.4ct and 11.1ct
Initial indications suggests grade, size distribution and quality of the
new recoveries are consistent with previous sampling.
2018-2019 drilling and sampling aimed at accelerating the
mining of R3 and R4 in the Renard mine plan. Renard 3
5,345m delineation drilling
completed to 315m depth
Confirmed widths and
location of R3, and
presence of high grade 3dg
and 3h units
R3 ore above the 290m
mining level included in
the 2019 production
schedule, several years
earlier than expected
Exploration drilling
planned at depth in 2019
to expand resource base
12.4 ct 14.9 ct
Renard 9
To be tested with sustaining drilling from
existing underground workings in 2019
Renard 2
Exploration drilling
planned at depth to
expand resource base
Victor De Beers
Komsomolskaya ALROSA
Argyle2 Rio Tinto
Voorspoed De Beers
Koffiefontein Petra
Diavik Rio Tinto /
Washington
Corp
Sable, Pigeon, Lynx,
Misery Main, Koala (Ekati)
Washington
Corp
30
25
20
15
0
35
2016 2017F 2018F 2019F 2020F 2021F
10
5
2022F 2023F 2024F 2025F
The supply outlook, driven by the depletion of existing
mines and handicapped to “likely production”, shows a
downward trending CAGR of -1% to -2% to 2030
Rough-Diamond Supply, Mct, Base Scenario
2010 2014 2018F 2022F 2026F 2030F
120
90
60
30
0
180
150
Existing
mines
CAGR
(2016-2030)
9%
-3%
-
-1 – -2%
New mines/
projects
Additional
production
Forecast
Diamond Supply Outlook1
Decrease in mine supply from 2018
Source: Bain & Company “The Global Diamond Industry 2017: The Enduring Story in a Changing World”
1. Additional resources include tailings retreatment, which could be viable in older mines as run-of-mine is depleted, early-stage projects and projects currently marginal, which may become viable as rough prices increases
2. Argyle production profile based on SWY management estimates
13
Argyle Mine, Australia Diavik Mine, Canada
Ekati Mine, Canada
Rough-Diamond Depletion Curve, Mct
14
Head Office:
1111 Rue St. Charles Ouest,
Longueuil, Québec J4K 4G4
Tel: +1 (450) 616-5555
Investor Relations Contact:
Alex Burelle, Manager – IR and Business Development
aburelle@stornowaydiamonds.com
Tel: +1 (450) 616-5555 x2264
www.stornowaydiamonds.com
Info@stornowaydiamonds.com
Stornoway Diamond Corporation TSX:SWY, TSX:SWY.DB.U

More Related Content

What's hot

Corporate Presentation Feb 2017
Corporate Presentation Feb 2017Corporate Presentation Feb 2017
Corporate Presentation Feb 2017Stornoway Diamonds
 
Stornoway Corporate Update Presentation June 16 2016
Stornoway Corporate Update Presentation June 16 2016Stornoway Corporate Update Presentation June 16 2016
Stornoway Corporate Update Presentation June 16 2016Stornoway Diamonds
 
Corporate Presentation PDAC March 2017
Corporate Presentation PDAC March 2017Corporate Presentation PDAC March 2017
Corporate Presentation PDAC March 2017Stornoway Diamonds
 
Stornoway Diamonds Corporate Update September 19, 2016
Stornoway Diamonds Corporate Update September 19, 2016Stornoway Diamonds Corporate Update September 19, 2016
Stornoway Diamonds Corporate Update September 19, 2016Stornoway Diamonds
 
Lundin Gold Scotiabank Mining Conference November 30 - December 1, 2021
Lundin Gold Scotiabank Mining Conference November 30 - December 1, 2021Lundin Gold Scotiabank Mining Conference November 30 - December 1, 2021
Lundin Gold Scotiabank Mining Conference November 30 - December 1, 2021Adnet Communications
 
Stornoway Corporate Presentation July 13 2017
Stornoway Corporate Presentation July 13 2017Stornoway Corporate Presentation July 13 2017
Stornoway Corporate Presentation July 13 2017Stornoway Diamonds
 
Stornoway Company Update November 19, 2012
Stornoway Company Update November 19, 2012Stornoway Company Update November 19, 2012
Stornoway Company Update November 19, 2012Stornoway Diamonds
 
Impact silver corp-pres-july2021
Impact silver corp-pres-july2021Impact silver corp-pres-july2021
Impact silver corp-pres-july2021AdnetNew
 
Stornoway 2106 Production Results and 2017 Guidance
Stornoway 2106 Production Results and 2017 GuidanceStornoway 2106 Production Results and 2017 Guidance
Stornoway 2106 Production Results and 2017 GuidanceStornoway Diamonds
 
2021.08.03 probe corporate presentation final
2021.08.03 probe corporate presentation final2021.08.03 probe corporate presentation final
2021.08.03 probe corporate presentation finalProbe Gold
 
Corporate Presentation - Dec 16, 2016
Corporate Presentation - Dec 16, 2016Corporate Presentation - Dec 16, 2016
Corporate Presentation - Dec 16, 2016PretiumR
 
Stornoway Corporate Presentation PDAC 2015
Stornoway Corporate Presentation PDAC 2015Stornoway Corporate Presentation PDAC 2015
Stornoway Corporate Presentation PDAC 2015Stornoway Diamonds
 
Stornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation finalStornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation finalStornoway Diamonds
 
Q3-2016 Financials & Project Update
Q3-2016 Financials & Project UpdateQ3-2016 Financials & Project Update
Q3-2016 Financials & Project UpdateNOVAGOLD
 
SSR Mining Corporate Presentation 071317
SSR Mining Corporate Presentation   071317SSR Mining Corporate Presentation   071317
SSR Mining Corporate Presentation 071317SilverStandard
 
Lug corporate presentation november 2021 pms
Lug corporate presentation november 2021 pmsLug corporate presentation november 2021 pms
Lug corporate presentation november 2021 pmsAdnet Communications
 
New gold presentation march 2017 v website
New gold presentation march 2017 v websiteNew gold presentation march 2017 v website
New gold presentation march 2017 v websitenewgold2011
 
Stornoway Q3 2017 Earnings Results
Stornoway Q3 2017 Earnings Results Stornoway Q3 2017 Earnings Results
Stornoway Q3 2017 Earnings Results Stornoway Diamonds
 

What's hot (20)

Corporate Presentation Feb 2017
Corporate Presentation Feb 2017Corporate Presentation Feb 2017
Corporate Presentation Feb 2017
 
Stornoway Corporate Update Presentation June 16 2016
Stornoway Corporate Update Presentation June 16 2016Stornoway Corporate Update Presentation June 16 2016
Stornoway Corporate Update Presentation June 16 2016
 
Corporate Presentation PDAC March 2017
Corporate Presentation PDAC March 2017Corporate Presentation PDAC March 2017
Corporate Presentation PDAC March 2017
 
Stornoway Diamonds Corporate Update September 19, 2016
Stornoway Diamonds Corporate Update September 19, 2016Stornoway Diamonds Corporate Update September 19, 2016
Stornoway Diamonds Corporate Update September 19, 2016
 
Swy pdac-2017
Swy pdac-2017Swy pdac-2017
Swy pdac-2017
 
Lundin Gold Scotiabank Mining Conference November 30 - December 1, 2021
Lundin Gold Scotiabank Mining Conference November 30 - December 1, 2021Lundin Gold Scotiabank Mining Conference November 30 - December 1, 2021
Lundin Gold Scotiabank Mining Conference November 30 - December 1, 2021
 
Stornoway Corporate Presentation July 13 2017
Stornoway Corporate Presentation July 13 2017Stornoway Corporate Presentation July 13 2017
Stornoway Corporate Presentation July 13 2017
 
Stornoway Company Update November 19, 2012
Stornoway Company Update November 19, 2012Stornoway Company Update November 19, 2012
Stornoway Company Update November 19, 2012
 
Impact silver corp-pres-july2021
Impact silver corp-pres-july2021Impact silver corp-pres-july2021
Impact silver corp-pres-july2021
 
Stornoway 2106 Production Results and 2017 Guidance
Stornoway 2106 Production Results and 2017 GuidanceStornoway 2106 Production Results and 2017 Guidance
Stornoway 2106 Production Results and 2017 Guidance
 
2021.08.03 probe corporate presentation final
2021.08.03 probe corporate presentation final2021.08.03 probe corporate presentation final
2021.08.03 probe corporate presentation final
 
Corporate Presentation - Dec 16, 2016
Corporate Presentation - Dec 16, 2016Corporate Presentation - Dec 16, 2016
Corporate Presentation - Dec 16, 2016
 
Stornoway Corporate Presentation PDAC 2015
Stornoway Corporate Presentation PDAC 2015Stornoway Corporate Presentation PDAC 2015
Stornoway Corporate Presentation PDAC 2015
 
Stornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation finalStornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation final
 
July 2021 mnd ir ppt
July 2021 mnd ir pptJuly 2021 mnd ir ppt
July 2021 mnd ir ppt
 
Q3-2016 Financials & Project Update
Q3-2016 Financials & Project UpdateQ3-2016 Financials & Project Update
Q3-2016 Financials & Project Update
 
SSR Mining Corporate Presentation 071317
SSR Mining Corporate Presentation   071317SSR Mining Corporate Presentation   071317
SSR Mining Corporate Presentation 071317
 
Lug corporate presentation november 2021 pms
Lug corporate presentation november 2021 pmsLug corporate presentation november 2021 pms
Lug corporate presentation november 2021 pms
 
New gold presentation march 2017 v website
New gold presentation march 2017 v websiteNew gold presentation march 2017 v website
New gold presentation march 2017 v website
 
Stornoway Q3 2017 Earnings Results
Stornoway Q3 2017 Earnings Results Stornoway Q3 2017 Earnings Results
Stornoway Q3 2017 Earnings Results
 

Similar to Swy td conference 2019 presentation

Stornoway Denver Gold Forum 2018 Presentation
Stornoway Denver Gold Forum 2018 PresentationStornoway Denver Gold Forum 2018 Presentation
Stornoway Denver Gold Forum 2018 PresentationStornoway Diamonds
 
Stornoway Second Quarter 2018 Earnings Results Presentation
Stornoway Second Quarter 2018 Earnings Results PresentationStornoway Second Quarter 2018 Earnings Results Presentation
Stornoway Second Quarter 2018 Earnings Results PresentationStornoway Diamonds
 
Swy corporate presentation td securities mining conference jan 18 2017
Swy corporate presentation td securities mining conference jan 18 2017Swy corporate presentation td securities mining conference jan 18 2017
Swy corporate presentation td securities mining conference jan 18 2017Stornoway Diamonds
 
Stornoway q1 2018 earnings results presentation final
Stornoway q1 2018 earnings results presentation finalStornoway q1 2018 earnings results presentation final
Stornoway q1 2018 earnings results presentation finalStornoway Diamonds
 
Stornoway Diamond Corporation Q1 2018 Earnings Release Supplemental Materials
Stornoway Diamond Corporation Q1 2018 Earnings Release Supplemental MaterialsStornoway Diamond Corporation Q1 2018 Earnings Release Supplemental Materials
Stornoway Diamond Corporation Q1 2018 Earnings Release Supplemental MaterialsStornoway Diamonds
 
Swy corporate presentation bmo feb 25 28 2018
Swy corporate presentation bmo feb 25 28 2018Swy corporate presentation bmo feb 25 28 2018
Swy corporate presentation bmo feb 25 28 2018Stornoway Diamonds
 
A Dive into the International World of Diamonds
A Dive into the International World of DiamondsA Dive into the International World of Diamonds
A Dive into the International World of DiamondsStornoway Diamonds
 
Swy corporate presentation pdac investor exchange march 5 2018
Swy corporate presentation pdac investor exchange march 5 2018Swy corporate presentation pdac investor exchange march 5 2018
Swy corporate presentation pdac investor exchange march 5 2018Stornoway Diamonds
 
Stornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation finalStornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation finalStornoway Diamonds
 
Stornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation finalStornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation finalStornoway Diamonds
 
Stornoway 2015 Annual General Meeting Presentation
Stornoway 2015 Annual General Meeting PresentationStornoway 2015 Annual General Meeting Presentation
Stornoway 2015 Annual General Meeting PresentationStornoway Diamonds
 
Renard Diamond Mine Financing Presentation
Renard Diamond Mine Financing PresentationRenard Diamond Mine Financing Presentation
Renard Diamond Mine Financing PresentationStornoway Diamonds
 
Stornoway Presentation at PDAC 2014
Stornoway Presentation at PDAC 2014Stornoway Presentation at PDAC 2014
Stornoway Presentation at PDAC 2014Stornoway Diamonds
 
Ssr mining corp. pres. 180531 - june presentation final
Ssr mining corp. pres.   180531 - june presentation finalSsr mining corp. pres.   180531 - june presentation final
Ssr mining corp. pres. 180531 - june presentation finalSilverStandard
 
Ssr mining corp. pres. 180712 - july presentation-final
Ssr mining corp. pres.   180712 - july presentation-finalSsr mining corp. pres.   180712 - july presentation-final
Ssr mining corp. pres. 180712 - july presentation-finalSilverStandard
 
Corporate presentation january 2017 v final
Corporate presentation   january 2017 v finalCorporate presentation   january 2017 v final
Corporate presentation january 2017 v finalnewgold2011
 
Corporate presentation january 2017 v final
Corporate presentation   january 2017 v finalCorporate presentation   january 2017 v final
Corporate presentation january 2017 v finalnewgold2011
 
Stornoway Diamond Presentation at the Precious Metals Summit Beaver Creek, CO...
Stornoway Diamond Presentation at the Precious Metals Summit Beaver Creek, CO...Stornoway Diamond Presentation at the Precious Metals Summit Beaver Creek, CO...
Stornoway Diamond Presentation at the Precious Metals Summit Beaver Creek, CO...Stornoway Diamonds
 

Similar to Swy td conference 2019 presentation (20)

Stornoway Denver Gold Forum 2018 Presentation
Stornoway Denver Gold Forum 2018 PresentationStornoway Denver Gold Forum 2018 Presentation
Stornoway Denver Gold Forum 2018 Presentation
 
Stornoway Second Quarter 2018 Earnings Results Presentation
Stornoway Second Quarter 2018 Earnings Results PresentationStornoway Second Quarter 2018 Earnings Results Presentation
Stornoway Second Quarter 2018 Earnings Results Presentation
 
Swy corporate presentation td securities mining conference jan 18 2017
Swy corporate presentation td securities mining conference jan 18 2017Swy corporate presentation td securities mining conference jan 18 2017
Swy corporate presentation td securities mining conference jan 18 2017
 
AGM 2017 Presentation
AGM 2017 PresentationAGM 2017 Presentation
AGM 2017 Presentation
 
Stornoway q1 2018 earnings results presentation final
Stornoway q1 2018 earnings results presentation finalStornoway q1 2018 earnings results presentation final
Stornoway q1 2018 earnings results presentation final
 
Stornoway Diamond Corporation Q1 2018 Earnings Release Supplemental Materials
Stornoway Diamond Corporation Q1 2018 Earnings Release Supplemental MaterialsStornoway Diamond Corporation Q1 2018 Earnings Release Supplemental Materials
Stornoway Diamond Corporation Q1 2018 Earnings Release Supplemental Materials
 
Swy corporate presentation bmo feb 25 28 2018
Swy corporate presentation bmo feb 25 28 2018Swy corporate presentation bmo feb 25 28 2018
Swy corporate presentation bmo feb 25 28 2018
 
A Dive into the International World of Diamonds
A Dive into the International World of DiamondsA Dive into the International World of Diamonds
A Dive into the International World of Diamonds
 
Swy corporate presentation pdac investor exchange march 5 2018
Swy corporate presentation pdac investor exchange march 5 2018Swy corporate presentation pdac investor exchange march 5 2018
Swy corporate presentation pdac investor exchange march 5 2018
 
Stornoway AGA 2018
Stornoway AGA 2018 Stornoway AGA 2018
Stornoway AGA 2018
 
Stornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation finalStornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation final
 
Stornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation finalStornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation final
 
Stornoway 2015 Annual General Meeting Presentation
Stornoway 2015 Annual General Meeting PresentationStornoway 2015 Annual General Meeting Presentation
Stornoway 2015 Annual General Meeting Presentation
 
Renard Diamond Mine Financing Presentation
Renard Diamond Mine Financing PresentationRenard Diamond Mine Financing Presentation
Renard Diamond Mine Financing Presentation
 
Stornoway Presentation at PDAC 2014
Stornoway Presentation at PDAC 2014Stornoway Presentation at PDAC 2014
Stornoway Presentation at PDAC 2014
 
Ssr mining corp. pres. 180531 - june presentation final
Ssr mining corp. pres.   180531 - june presentation finalSsr mining corp. pres.   180531 - june presentation final
Ssr mining corp. pres. 180531 - june presentation final
 
Ssr mining corp. pres. 180712 - july presentation-final
Ssr mining corp. pres.   180712 - july presentation-finalSsr mining corp. pres.   180712 - july presentation-final
Ssr mining corp. pres. 180712 - july presentation-final
 
Corporate presentation january 2017 v final
Corporate presentation   january 2017 v finalCorporate presentation   january 2017 v final
Corporate presentation january 2017 v final
 
Corporate presentation january 2017 v final
Corporate presentation   january 2017 v finalCorporate presentation   january 2017 v final
Corporate presentation january 2017 v final
 
Stornoway Diamond Presentation at the Precious Metals Summit Beaver Creek, CO...
Stornoway Diamond Presentation at the Precious Metals Summit Beaver Creek, CO...Stornoway Diamond Presentation at the Precious Metals Summit Beaver Creek, CO...
Stornoway Diamond Presentation at the Precious Metals Summit Beaver Creek, CO...
 

Recently uploaded

Osisko Gold Royalties Ltd - Corporate Presentation, March 2024
Osisko Gold Royalties Ltd - Corporate Presentation, March 2024Osisko Gold Royalties Ltd - Corporate Presentation, March 2024
Osisko Gold Royalties Ltd - Corporate Presentation, March 2024Osisko Gold Royalties Ltd
 
Nicola Mining Inc. Corporate Presentation March 2024
Nicola Mining Inc. Corporate Presentation March 2024Nicola Mining Inc. Corporate Presentation March 2024
Nicola Mining Inc. Corporate Presentation March 2024nicola_mining
 
Deutsche EuroShop | Company Presentation | 03/24
Deutsche EuroShop | Company Presentation | 03/24Deutsche EuroShop | Company Presentation | 03/24
Deutsche EuroShop | Company Presentation | 03/24Deutsche EuroShop AG
 
WWW.SOFTSOP.COM PITCH DECK PRESENTATION.PDF
WWW.SOFTSOP.COM PITCH DECK PRESENTATION.PDFWWW.SOFTSOP.COM PITCH DECK PRESENTATION.PDF
WWW.SOFTSOP.COM PITCH DECK PRESENTATION.PDFMichael Claudio
 
Deutsche EuroShop | Preliminary Results FY 2023
Deutsche EuroShop | Preliminary Results FY 2023Deutsche EuroShop | Preliminary Results FY 2023
Deutsche EuroShop | Preliminary Results FY 2023Deutsche EuroShop AG
 
Advancing Discovery New Craigmont Project’s High-grade Copper Potential
Advancing Discovery New Craigmont Project’s High-grade Copper PotentialAdvancing Discovery New Craigmont Project’s High-grade Copper Potential
Advancing Discovery New Craigmont Project’s High-grade Copper Potentialnicola_mining
 
Terna Capital Markets Day 2024 Presentation
Terna Capital Markets Day 2024 PresentationTerna Capital Markets Day 2024 Presentation
Terna Capital Markets Day 2024 PresentationTerna SpA
 

Recently uploaded (7)

Osisko Gold Royalties Ltd - Corporate Presentation, March 2024
Osisko Gold Royalties Ltd - Corporate Presentation, March 2024Osisko Gold Royalties Ltd - Corporate Presentation, March 2024
Osisko Gold Royalties Ltd - Corporate Presentation, March 2024
 
Nicola Mining Inc. Corporate Presentation March 2024
Nicola Mining Inc. Corporate Presentation March 2024Nicola Mining Inc. Corporate Presentation March 2024
Nicola Mining Inc. Corporate Presentation March 2024
 
Deutsche EuroShop | Company Presentation | 03/24
Deutsche EuroShop | Company Presentation | 03/24Deutsche EuroShop | Company Presentation | 03/24
Deutsche EuroShop | Company Presentation | 03/24
 
WWW.SOFTSOP.COM PITCH DECK PRESENTATION.PDF
WWW.SOFTSOP.COM PITCH DECK PRESENTATION.PDFWWW.SOFTSOP.COM PITCH DECK PRESENTATION.PDF
WWW.SOFTSOP.COM PITCH DECK PRESENTATION.PDF
 
Deutsche EuroShop | Preliminary Results FY 2023
Deutsche EuroShop | Preliminary Results FY 2023Deutsche EuroShop | Preliminary Results FY 2023
Deutsche EuroShop | Preliminary Results FY 2023
 
Advancing Discovery New Craigmont Project’s High-grade Copper Potential
Advancing Discovery New Craigmont Project’s High-grade Copper PotentialAdvancing Discovery New Craigmont Project’s High-grade Copper Potential
Advancing Discovery New Craigmont Project’s High-grade Copper Potential
 
Terna Capital Markets Day 2024 Presentation
Terna Capital Markets Day 2024 PresentationTerna Capital Markets Day 2024 Presentation
Terna Capital Markets Day 2024 Presentation
 

Swy td conference 2019 presentation

  • 1. TD Securities Mining Conference Toronto, January 16th-17th, 2019
  • 2. Forward Looking Information 2 This document contains forward-looking information (as defined in National Instrument 51 102 – Continuous Disclosure Obligations) and forward-looking statements within the meaning of Canadian securities legislation and the United States Private Securities Litigation Reform Act of 1995 (collectively referred to herein as “forward-looking information” or “forward-looking statements”). These forward-looking statements are made as of the date of this document and, the Corporation does not intend, and does not assume any obligation, to update these forward-looking statements, except as required by law. These forward-looking statements relate to future events or future performance and include, among others, statements with respect to Stornoway’s objectives for the ensuing year, our medium and long-term goals, and strategies to achieve those objectives and goals, as well as statements with respect to our management’s beliefs, plans, objectives, expectations, estimates, intentions and future outlook and anticipated events or results. Although management considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect. Forward-looking statements reflect current expectations or beliefs regarding future events and include, but are not limited to, statements with respect to: (i) the amount of Mineral Reserves, Mineral Resources and exploration targets; (ii) the estimated amount of future production over any period; (iii) net present value and internal rates of return of the mining operation; (iv) expectations and targets relating to recovered grade, size distribution and quality of diamonds, average ore recovery, carats recovered, carats sold, internal dilution, mining dilution and other mining parameters set out in the 2016 Technical Report as well as levels of diamond breakage; (v) expectations, targets and forecasts relating to gross revenues, operating cash flows and other revenue metrics set out in the 2016 Technical Report, growth in diamond sales, cost of goods sold, cash cost of production, gross margins estimates, planned and projected diamond sales, mix of diamonds sold, and capital expenditures, liquidity and working capital requirements; (vi) mine and resource expansion potential, expected mine life, and estimated incremental ore recovery, revenue and other mining parameters from potential additional mine life extension; (vii) expected time frames for completion of permitting and regulatory approvals related to ongoing construction activities at the Renard Diamond Mine; (viii) the expected time frames for the completion of the open pit and underground mine at the Renard Diamond Mine; (ix) the expected financial obligations or costs incurred by Stornoway in connection with the ongoing development of the Renard Diamond Mine; (x) mining, development, production, processing and exploration rates, progress and plans, as compared to schedule and budget, and planned optimization, expansion opportunities, timing thereof and anticipated benefits therefrom; (xi) future exploration plans and potential upside from targets identified for further exploratio; (xii) expectations concerning outlook and trends in the diamond industry, rough diamond production, rough diamond market demand and supply, and future market prices for rough diamonds and the potential impact of the foregoing on various Renard financial metrics and diamond production; (xiii) the economic benefits of using liquefied natural gas rather than diesel for power generation; (xiv) requirements for and sources of, and access to, financing and uses of funds; (xv) the ability to meet Subject Diamonds Interest delivery obligations under the Purchase and Sale Agreement; (xvi) the foreign exchange rate between the US dollar and the Canadian dollar; and (xvii) the anticipated benefits from recently approved plant modification measures and the anticipated timeframe and expected capital cost thereof. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as “expects”, “anticipates”, “plans”, “projects”, “estimates”, “assumes”, “intends”, “strategy”, “goals”, “objectives”, “schedule” or variations thereof or stating that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements. Forward-looking statements are made based upon certain assumptions by Stornoway or its consultants and other important factors that, if untrue, could cause the actual results, performances or achievements of Stornoway to be materially different from future results, performances or achievements expressed or implied by such statements. Such statements and information are based on numerous assumptions regarding present and future business prospects and strategies and the environment in which Stornoway will operate in the future, including the recovered grade, size distribution and quality of diamonds, average ore recovery, internal dilution, and levels of diamond breakage, the price of diamonds, anticipated costs and Stornoway’s ability to achieve its goals, anticipated financial performance, regulatory developments, development plans, exploration, development and mining activities and commitments, access to financing, and the foreign exchange rate between the US and Canadian dollars. Although management considers its assumptions on such matters to be reasonable based on information currently available to it, they may prove to be incorrect. Certain important assumptions by Stornoway or its consultants in making forward-looking statements include, but are not limited to: (i) the accuracy of our estimates regarding capital and estimated workforce requirements; (ii) estimates of net present value and internal rates of return; (iii) recovered grade, size distribution and quality of diamonds, average ore recovery, carats recovered, carats sold, internal dilution, mining dilution and other mining parameters set out in the 2016 Technical Report as well as levels of diamond breakage; (iv) the expected mix of diamonds sold, and successful mitigation of ongoing issues of diamond breakage in the Renard Diamond Mine process plant and realization of the anticipated benefits from plant modification measures within the anticipated timeframe and expected capital cost; (v) the stabilization of the Indian currency market and full recovery of prices; (vi) receipt of regulatory approvals on acceptable terms within commonly experienced time frames and absence of adverse regulatory developments; (vii) anticipated timelines for the
  • 3. Forward Looking Information (continued) 3 development of an open pit and underground mine at the Renard Diamond Mine; (viii) anticipated geological formations; (ix) continued market acceptance of the Renard diamond production, conservative forecasting of future market prices for rough diamonds and impact of the foregoing on various Renard financial metrics and diamond production; (x) the timeline, progress and costs of future exploration, development, production and mining activities, plans, commitments and objectives; (xi) the availability of existing credit facilities and any required future financing on favourable terms and the satisfaction of all covenants and conditions precedent relating to future funding commitments; (xii) the ability to meet Subject Diamonds Interest delivery obligations under the Purchase and Sale Agreement; (xiii) Stornoway’s interpretation of the geological drill data collected and its potential impact on stated Mineral Resources and mine life; (xiv) the continued strength of the US dollar against the Canadian dollar and absence of significant variability in interest rates; (xv) improvement of long-term diamond industry fundamentals and absence of material deterioration in general business and economic conditions; and absence of significant variability in interest rates; (xvi) increasing carat recoveries with progressively increasing grade in LOM plan; (xvii) estimated incremental ore recovery, revenue and other mining parameters from potential additional mine life extension with minimal capital expenditures; (xviii) availability of skilled employees and maintenance of key relationships with financing partners, local communities and other stakeholders; (xix) long-term positive demand trends and rough diamond demand meaningfully exceeding supply; (xx) high depletion rates from existing diamond mines; (xxi) global rough diamond production remaining stable; (xxii) modest capital requirements post-2018 with significant resource expansion available at marginal cost; (xxiii) substantial resource upside within scope of mine plan; (xxiv) opportunities for high grade ore acceleration and processing expansion and realization of anticipated benefits therefrom; (xxv) significant potential upside from targets identified for further exploration; and (xxvi) limited cash income taxes payable over the medium term. By their very nature, forward-looking statements involve inherent risks and uncertainties. We caution readers not to place undue reliance on these forward- looking statements as a number of important risk factors could cause the actual outcomes to differ materially from the beliefs, plans, objectives, expectations, anticipations, estimates, assumptions and intentions expressed in such forward-looking statements. The operating results and financial condition of the Corporation are subject to a number of inherent risks and uncertainties associated with its business activities, which include the financing, exploration, development, construction and operation of its mine and processing facility. The operating results and financial condition are also subject to numerous external factors, which include economic, regulatory, legal, tax and market risks impacting, among other things, supply of materials and demand for rough diamonds, rough diamond prices, foreign exchange rates, inflation and the availability and cost of capital to fund the capital requirements of the business. Each of these risks could have a material adverse effect on the Corporation’s future business, financial condition, prospects, results of operations or cash flow, and could cause actual results to differ materially from those described in any forward-looking statements contained in this document. There can be no assurance that the Corporation has been or will be successful in identifying all risks or that any risk-mitigating strategies adopted to reduce or eliminate risk will be successful. These risks should be considered when evaluating the Corporation and its guidance. With the exception of the going concern risk, which is described in the Corporation’s most recently filed MD&A, a comprehensive discussion of the risks faced by the Corporation can be found in the Corporation’s 2017 Annual MD&A and most recently filed AIF, which are available on SEDAR at www.sedar.com under the Corporation’s profile. Qualified Persons The Qualified Persons that prepared the technical reports and press releases that form the basis for the presentation are listed in the Company’s AIF dated March 29, 2018. Disclosure of a scientific or technical nature in this presentation was prepared under the supervision of Mr. Patrick Godin, P.Eng. (Québec), President and Chief Executive Officer and Mr. Robin Hopkins, P.Geol. (NT/NU), Vice President, Exploration, both “qualified persons” under National Instrument (“NI”) 43-101. Non-IFRS Financial Measures This document refers to certain financial measures, such as Adjusted Net Loss, Adjusted Revenues, Adjusted EBITDA, Adjusted EBITDA Margin, Average Diamond Pricing Achieved, Cash Operating Cost per Tonne Processed, Cash Operating Cost per Carat Recovered and Capital Expenditures, which are not measures recognized under IFRS and do not have a standardized meaning prescribed by IFRS. As a result, these measures may not be comparable to similar measures reported by other corporations. Each of these measures have been derived from the Corporation’s financial statements and have been defined and calculated based on management’s reasonable judgement. These measures are used by management and by investors to assist in assessing the Corporation’s performance. The measures are intended to provide additional information to the user and should not be considered in isolation or as a substitute for measures prepared in accordance with IFRS. Refer to the “Non-IFRS Financial Measures” section of the Corporation’s Management Discussion and Analysis as at and for the quarter ended September 30, 2018 for further discussion of these items, including reconciliations to IFRS measures.
  • 4. 100% Owned Renard Diamond Mine – Québec’s First Diamond Mine The only Canadian Diamond Mine Connected by Permanent Road Access 4 2017: First Full Operating Year $85m Adjusted EBITDA1 in FY2017 at 43% Adjusted EBITDA margin1. Lower pricing than expected. Good resource reconciliation. Cost targets achieved. 2018: Mining and Processing Transition Ramped up UG mine. Implemented ore waste sorting. Improved diamond recoveries and pricing. Steady state operations achieved late August 2018. 2019: Steady-state Underground Operations, Upside Evaluation Production from existing R2 290m level. Introduction of higher-grade R3 ore into feed. Evaluation of R4-R9 open pit. Drilling of R7 kimberlite pipe. Low Cost, Long Life Asset with Strong Sector Fundamentals Lowest cost diamond producer in Canada; Life of Mine Plan to FY2030; Upside on mine life, processing capacity and market pricing. Strong Social License and Institutional Support Partnered with the Crees of Eeyou Istchee; Investissement Québec, CDPQ, Orion and Osisko as investors, lenders and/or streamers. 1. See Note on “Non-IFRS Financial Measures”
  • 5. 160L 240L 290L 2018: First underground mining panels in Renard 2 (Blasted and/or mucked ore) R9 R4 R65 R2 R3 2016-2017: Renard 2-3 open pit mining 2017-2018: Renard 65 open pit mining Q2 2019: First Renard 3 underground production planned 2019: development of second Renard 2 underground mining horizon
  • 6. 2018: Transitioning to Underground Mining UG to be principal source of production ore 2018- 2030. First production blast December 2017; production ramp-up completed August 2018. Ramp access; 6,000 tpd ore design capacity; surpassed this target in each month of Q4 2018. First Experiences More competent country rock and less competent kimberlite than expected. Migration to assisted block caving as principal mining method: long term benefits in production costs and dilution. First production panels developed at the north pipe margin of the 290m level in highly dilute, low grade kimberlite. Grade has significantly increased as mining has progressed to the center of R2; recovered grade of 80 cpht in Q4 2018. 6 1,445 1,982 4,172 3,585 3,848 5,801 5,587 6,218 7,128 7,046 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 AverageDailyTonnage(tonnesperday) Underground Production - Ore Tonnes Hauled to Surface UG Mine Design Capacity = 6,000 tpd
  • 7. 5 Quarter Processing and Sales At December 31, 2018. All quoted figures in CAD$ unless noted 7 Processing Carat Sales1,2,3 ROM Sales: Gross Proceeds and Pricing4,5 1. Q1 FY18 includes 127,616 carats that were sold in the first quarter for which revenue was realized in the second quarter. 4. See note on “Non-IFRS Financial Measures” 5. Before Stream and royalty 2. “ROM” Carats represent all diamonds larger than +1 DTC sieve size. “Supplemental” carats represent additional diamonds smaller than the 7 DTC sieve size that have been recovered in excess of that expected in the Renard Mineral Resource statement. 3. Q1 to Q4 2018 supplemental sales were 42,663 carats sold for gross proceeds of $1.0M (US$18.50/ct), 41,979 carats sold for gross proceeds of $1.0M (US$18.50/ct), 21,367 carats sold for gross proceeds of $0.4M (US$13/ct), and 58,313 carats sold from gross proceeds of $1.1M (US$14/ct). $49.1 $56.6 $28.6 $24.7 $30.6 $86 $112 $109 $103 $92 $108 $142 $142 $134 $122 $0 $20 $40 $60 $80 $100 $120 $0 $50 $100 $150 Q4 FY17 Q1 FY18 Q2 FY18 Q3 FY18 Q4 FY18 Millionsdollars PriceperCarat Gross Proceeds US$/ct $/ct 519 563 562 598 606 398 286 223 329 486 77 51 40 55 80 0 200 400 600 800 1,000 Q4 FY17 Q1 FY18 Q2 FY18 Q3 FY18 Q4 FY18 ThousandTonnes/Carats Tonnes Carats Grade (cpht) 454 399 201 185 25443 42 21 58 0 200 400 600 Q4 FY17 Q1 FY18 Q2 FY18 Q3 FY18 Q4 FY18 Thousand Tonnes/Carats ROM Carats Supplemental Carats
  • 8. 1314151617181920212223 Looking West12 Underground Mine Ore Supply Assisted Block Cave and Horizontal Panels 17 Nov-2018 Dec-2018 Pre Nov-2018 Caving/Mucking Sequence 290L 160L 240L 270LPost 2018 R2R3
  • 9. Steady State Operations Achieved Mining Ramp-up in the underground mine achieved late August 2018 Underground mining rates: 3,641 tpd in July, 6,168 tpd in August, 5,707 tpd in September, 6,100 tpd in October, 7,037 tpd in November, 6,564 tpd in December Transition to assisted block cave mining completed. 22 draw points open as of end October 2018 Breakthrough to the R2-R3 open pit achieved October 11, 2018 Processing Steady state processing with ore-sorting (“OSP”) fully operational Processing rates: 5,712 tpd in July, 6,971 tpd in August, 6,820 tpd in September, 7,053 tpd in October, 6,332 tpd in November, 6,366 tpd in December Diamond recoveries since OSP introduction have exhibited lower levels of breakage than previously observed with comparable feed composition, ongoing efforts to improve process plant front-end throughput (rockbreaker availability, steam-heated ore bins) 9 6-Month Processing Performance, July to December 2018 UG Mine Design Capacity Achieved Production halted for 3 days in July due to forest fire 177 216 205 219 190 197 77 123 130 161 165 160 43 57 63 74 87 81 0 50 100 150 200 250 300 350 400 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 ThousandTonnes/Carats Tonnes Carats Grade (cpht)
  • 10. FY2019 Guidance Provided January 16, 2019 All quoted figures in CAD$ unless noted 10 MINING AND PROCESSING Carats Recovered1 (million) 1.80 to 2.10 Grade1 (cpht) 71 to 87 Tonnes Processed (million) 2.40 to 2.55 SELLING AND MARKETING Carats Sold1 (million) 1.80 to 2.10 Average Diamond Pricing1 (US$/ct) US$ 80-105 COST Capital Expenditures2 (million) C$ 70-80 Cash Operating Cost per Tonne Processed2 ($/t) C$ 47-54 Cash Operating Cost per Carat Recovered2 ($/ct) C$ 57-72 1. Inclusive of both run-of-mine and supplemental diamond production 2. See note on “Non-IFRS Financial Measures”
  • 11. Diamond Market 11 SWY Real Price Index vs WWW’s Rough Price Index2, Real Terms1 1. Sale by sale basis, normalized for variations in quality and size distribution 2. Roughprices.com Stornoway sells its production by tender through the Antwerp offices of its sales agent Bonas-Couzyn. In real terms (excluding changes in mix) pricing for Renard diamonds increased 27% between the first sale in November 2016 and June 20181. Market weakness is being shown principally in smaller and lower quality items. Underlying polished diamond demand remains strong, particularly in the US market. Rough market weakness is being affected by currency weakness in the emerging markets and cutting centers amidst global trade concerns, and market uncertainty on the impact of synthetic diamonds in small diamond categories. 100 101 102 95 98 100 101 98 96 93 94 95 97 97 98 100 102 100 100 101 102 100 112 110 114 115 119 119 110 111 114 120 119 120 125 127 123 118 113 114 90 95 100 105 110 115 120 125 130 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 WWW SWY
  • 12. Renard Resource Development 12 7 9 10 11 R3 OPEN PIT R2 OPEN PITR65 OPEN PIT RETURN AIR RAISE FRESH AIR RAISE PORTAL BACKFILL RAISES IN CROWN PILLAR 410L 270L 710L 590L 470L 290L 400L 250L 860L VENTILATION RAISE 5 1 4 2 3 8 6 RENARD 65 RENARD 4 RENARD 9 RENARD 2 RENARD 3 Reserve and Resource categories conform to "CIM Definition Standards on Mineral Resources and Reserves". Mineral resources that are not mineral reserves do not have demonstrated economic viability. The potential quantity and grade of any Exploration Target (previously referred to as a “Potential Mineral Deposit”) is conceptual in nature, and it is uncertain if further exploration will result in the target being delineated as a mineral resource. Renard Mine Plan, Including Inferred Mineral Resources, March 30, 2016 Indicated Mineral Resources Inferred Mineral Resources Target for Further Exploration Renard 4 13,546 tonne sample excavated from surface at R4 to evaluate potential future open pit at Renard 4 and Renard 9 in area of Mineral Resources currently outside the Renard Mine Plan Surface sample results to date (evaluation ongoing as of Jan 11, 2019) Unit “4a” sample (2018) 2,444 carats from 10,359t at 24 cpht Unit “4b” sample (2018) 574 carats from 1,287t at 45 cpht Unit “4d” sample (2007) 2,722 carats from 2,104t at 129 cpht R4A and R4B samples also processed in Renard bulk sample plant for QA/QC purposes Three “special” stones recovered: 14.9ct, 12.4ct and 11.1ct Initial indications suggests grade, size distribution and quality of the new recoveries are consistent with previous sampling. 2018-2019 drilling and sampling aimed at accelerating the mining of R3 and R4 in the Renard mine plan. Renard 3 5,345m delineation drilling completed to 315m depth Confirmed widths and location of R3, and presence of high grade 3dg and 3h units R3 ore above the 290m mining level included in the 2019 production schedule, several years earlier than expected Exploration drilling planned at depth in 2019 to expand resource base 12.4 ct 14.9 ct Renard 9 To be tested with sustaining drilling from existing underground workings in 2019 Renard 2 Exploration drilling planned at depth to expand resource base
  • 13. Victor De Beers Komsomolskaya ALROSA Argyle2 Rio Tinto Voorspoed De Beers Koffiefontein Petra Diavik Rio Tinto / Washington Corp Sable, Pigeon, Lynx, Misery Main, Koala (Ekati) Washington Corp 30 25 20 15 0 35 2016 2017F 2018F 2019F 2020F 2021F 10 5 2022F 2023F 2024F 2025F The supply outlook, driven by the depletion of existing mines and handicapped to “likely production”, shows a downward trending CAGR of -1% to -2% to 2030 Rough-Diamond Supply, Mct, Base Scenario 2010 2014 2018F 2022F 2026F 2030F 120 90 60 30 0 180 150 Existing mines CAGR (2016-2030) 9% -3% - -1 – -2% New mines/ projects Additional production Forecast Diamond Supply Outlook1 Decrease in mine supply from 2018 Source: Bain & Company “The Global Diamond Industry 2017: The Enduring Story in a Changing World” 1. Additional resources include tailings retreatment, which could be viable in older mines as run-of-mine is depleted, early-stage projects and projects currently marginal, which may become viable as rough prices increases 2. Argyle production profile based on SWY management estimates 13 Argyle Mine, Australia Diavik Mine, Canada Ekati Mine, Canada Rough-Diamond Depletion Curve, Mct
  • 14. 14 Head Office: 1111 Rue St. Charles Ouest, Longueuil, Québec J4K 4G4 Tel: +1 (450) 616-5555 Investor Relations Contact: Alex Burelle, Manager – IR and Business Development aburelle@stornowaydiamonds.com Tel: +1 (450) 616-5555 x2264 www.stornowaydiamonds.com Info@stornowaydiamonds.com Stornoway Diamond Corporation TSX:SWY, TSX:SWY.DB.U