SlideShare a Scribd company logo
1 of 15
Supply Chain Engineering
PortfolioofSelectAccomplishmentsfrom2000toPresent
James Emmitt
417 Canyon Dr. N.
Columbus, Oh 43214
(614) 369-2066
jemmitt2@gmail.com
Portfolio Contents
• Summary of Major Accomplishments
• Detail of Major Accomplishments
• Page detail of each major project
• Minor Projects with Summary of Each
• List of Managed Vendors and Integrators
Tuesday,April12,2016JamesDEmmitt
2
Summary of Major Projects
• Innotrac Grove City Closure
• Rolled 388,000 sq.ft. FC into 280,000 sq. ft. of existing FC while maintaining
100% operational status - $2.0 million
• T. Marzetti Global Waste Reduction Program
• By running projects in 14 facilities, reduced raw material and labor shrinkage costs
moving average by 1.5% across six years – average of $1.75 million annually
• Staples NAD KIVA Pick and Pack system
• Managed design specification and SOP’s for KIVA robot implementation at
Quill in Chambersburg, PA - $3.5 million
• Newell Rubbermaid
• Rolled 230,000 sq. ft. of product at 3PL back into existing 1.2 million sq. ft.
and adding 330,000 sq. ft. of new product to same while maintaining 100%
operational status- $5.2 million
Tuesday,April12,2016JamesDEmmitt
3
Innotrac Grove City Closure
Tuesday,April12,2016JamesDEmmitt
4
Condensed 388,000 sq. ft. into 283,000 sq. ft.
• Location: from Grove City, Ohio to Groveport, Ohio
• Purpose: recover $4.2 million annually in FC Operations to reduce
operating costs.
• Product: Textiles, durable goods, and food supplements
• Volume profile: Seasonal e-commerce with a distinct Pareto distribution –
3,780 SKU’s, 45,000 orders per day, 4.5 line items average per order with lot
control
• Solution: Brownfield project condensed 388,000 sq. ft. into 283,000 sq. ft.
existing operation while maintaining 100% operational status. Used Very
Narrow Aisle (VNA) single select racking six levels high to create 14,000 PP
(6,000 more than in existing facility). Forward pick area and returns placed
in pick module and product picked in batch to recover 35% labor. Medium
movers placed in pallet flow. 37% of product shipped in kits. Kitting area
added. Packing done using Put-to-Light system fed by NBS30 pop-up
sorters. Product shipped using sliding shoe sorter at 80 cartons per minute.
Used Pyramid WCS with Manhattan WMOS. Designed all components:
electrical, conveyor, racking, lift truck, PTL, sorters, mezzanine.
• Completed with total costs at $2 million in six months. Payback was
$350,000 per month.
Innotrac Grove City Closure
Tuesday,April12,2016JamesDEmmitt
5
Innotrac Grove City Closure
Tuesday,April12,2016JamesDEmmitt
6
Partial overview of put-to-light sorters
for packing. NBS30 bi-directional
pop-up divert rollers are yellow.
Packing used air pillows when
required. Some product shipped freely.
Innotrac Grove City Closure
Tuesday,April12,2016JamesDEmmitt
7
Put Side – sort to lightPack Side – pick to light
• Location: Various across US.
• Purpose: Reduced net operating costs by 1% annually.
• Product: Perishable consumer goods (dressings, dips, sauces, bread)
• Volume profile: Consistent batch manufacturing and distribution– 1,628
SKU’s, 185 orders per day, 1 line item average per order, 1,428 cases per
line average.
• Solution: Annual waste was determined to exceed $8 million company-
wide through shrinkage as well as under-utilization. The actual physical
waste was measured as great as 32% in pounds, cycles, labor hours, etc. By
implementing at least five projects per facility to address the waste drivers,
the company as able to do the following:
• Reduce net operating cost by 1.5% ($1.75 million annually)
• Increase volume by 1,540 cases daily (.58% or $27,970 per day)
• Reduce total lead time (order to cash) by five days
• Reduce labor by .25%
• Increase yield by .526%
• Completed with total costs of $2,800 over twelve months.
T. Marzetti Global Waste Reduction Program
Tuesday,April12,2016JamesDEmmitt
8
• Location: Chambersburg, PA
• Purpose: recover 45% labor, improve accuracy to 9.99%, and
reduce lead times by 50%.
• Product: Durable office goods
• Volume profile: Seasonal e-commerce and B2B with a steep
distribution – 6,800 SKU’s, 32,000 orders per day, 8.2 line items
average per order.
• Solution: This project was the initial pilot project of 30 robots
in 50,000 sq. ft. The company has since expanded to 500
robots in 140,000 sq. ft. Implemented the robots with 600
pods and eighteen pack stations. Lines per hour jumped 150
to 400 in a matter of three months. Wrote the SOP’s and
training for these units.
• Completed with total costs at $3.5 million in eleven months.
Staples, NAD KIVA Pick and Pack
Tuesday,April12,2016JamesDEmmitt
9
Staples, NAD KIVA Pick and Pack
Tuesday,April12,2016JamesDEmmitt
10
KIVA RobotTypical picking area
• Location: from Manitowoc, WI to Lancaster, OH
• Purpose: reduce net operating costs for durable consumer goods
division by 28% while maintaining 100% operational status.
• Product: Durable consumer goods (glassware and cookware)
• Volume profile: Direct to Store and Distributor at 8,000 orders per
day, mostly FTL. Full case picking. 4,200 SKU’s, 28 lines per order.
• Solution: This brownfield/greenfield project consolidated 330,000
sq. ft. of full pallet storage into an existing 1.2 million sq. ft. facility,
and also 280,000 sq. ft. of 3PL storage into the same. Removed all
existing rack (drive-in racking), changed pallet stacking models to a
more supportive design, and used a mix of forward pallet flow pick,
case pick, and bulk stack to increase the density without increasing
damage. Assisted in moved manufacturing operations to newly built
Maquiladora facility in Nuevo Laredo, MX.
• Completed with total distribution costs at $1.2 million over eight
months, with a projected savings of $450,000 per month.
Anchor Hocking/Mirro Wearever
Consolidation (Newell Rubbermaid)
Tuesday,April12,2016JamesDEmmitt
11
• Location: Wareham, Massachusetts
• Purpose: to increase throughput capacity for crouton division
by 125% while maintaining 100% operational status, at no
extra operating cost.
• Product: Croutons
• Volume profile: Direct to Distributor at 590 orders per day at
1,000 lbs. per order, mostly FTL/Full Pallet. 28 SKU’s, 3.5 lines
per order.
• Solution: This brownfield project consisted of redesigning the
mixing, proofing, and baking process for 59,000 lbs. of
croutons per day. Added one new mixer and redesigned one,
replaced continuous oven, added new holding bins and
redesigned proofing room.
• Completed with total costs at $13.2 million in 16 months.
T. Marzetti Crouton Process Redesign
Tuesday,April12,2016JamesDEmmitt
12
T. Marzetti Crouton Process Redesign
Tuesday,April12,2016JamesDEmmitt
13
Summary of Minor Projects
• T. Marzetti Cook Kitchen and Spice Blending Redesign, Milpitas, CA
• Redesigned 7,600 sq. ft. layout and process of seven 200 gallon cook and
blend kitchen stations and Spice Blending room using lean methodology.
Added automated lift systems to bring product to tanks. – $.82 mil
• Staples NAD Detroit Cross Dock Redesign (u/c Vargo)
• Redesigned 42,000 sq. ft. brownfield cross dock in Detroit, MI to double
throughput – $.165 mil
• KMH (Kalida Manufacturing Honda), Ottawa, Ohio (Vargo)
• Designed and implemented 80,000 sq. ft. Drive-in rack design for
automotive parts - $1.6 million
• Abercrombie & Fitch Greenfield, New Albany, OH
• Oversaw rack and mezzanine design and installation, assisted in design of
Direct to Store conveyor system- $1.8 million
Tuesday,April12,2016JamesDEmmitt
14
Summary of Vendors, Integrators
and Sub-contractors Managed
Rohrenbeck Electrical, Columbus, OH
Advanced Handling Systems, Hebron, KY
All Pack Services, Columbus, OH
Vargo Engineered Systems, Hilliard, OH
Fairborn Equipment, Cincinnati, OH
Storage Concepts, Inc., Cincinnati, OH
Hytek Material Handling, Columbus, OH
MH Equipment, Columbus, OH
Brocon Services, Columbus, OH
Elford Construction, Columbus, OH
Gemini Equipment, Philadelphia, PA
Shorr Packaging, Cincinnati, OH
Unisource Packaging, Columbus, OH
Tuesday,April12,2016JamesDEmmitt
15

More Related Content

Viewers also liked

CORPORATE PRESENTATION
CORPORATE PRESENTATIONCORPORATE PRESENTATION
CORPORATE PRESENTATIONAakash Sidhant
 
Erics College Degrees and Professional Certificates
Erics College Degrees and Professional CertificatesErics College Degrees and Professional Certificates
Erics College Degrees and Professional Certificateseric garcia
 
Estudio de la colección e impacto en los usuarios de la biblioteca c.g.a.
Estudio de la colección e impacto en los usuarios de la biblioteca c.g.a.Estudio de la colección e impacto en los usuarios de la biblioteca c.g.a.
Estudio de la colección e impacto en los usuarios de la biblioteca c.g.a.DaneyV1
 
Evaluation Q1) In what ways your media product use, develop or challenge form...
Evaluation Q1) In what ways your media product use, develop or challenge form...Evaluation Q1) In what ways your media product use, develop or challenge form...
Evaluation Q1) In what ways your media product use, develop or challenge form...Brooke maynard
 
Nuevas tecnologías
Nuevas tecnologíasNuevas tecnologías
Nuevas tecnologíasMariiPcy
 

Viewers also liked (8)

CORPORATE PRESENTATION
CORPORATE PRESENTATIONCORPORATE PRESENTATION
CORPORATE PRESENTATION
 
Top 5 equipos liga fútbol sala
Top 5 equipos liga fútbol salaTop 5 equipos liga fútbol sala
Top 5 equipos liga fútbol sala
 
Erics College Degrees and Professional Certificates
Erics College Degrees and Professional CertificatesErics College Degrees and Professional Certificates
Erics College Degrees and Professional Certificates
 
Estudio de la colección e impacto en los usuarios de la biblioteca c.g.a.
Estudio de la colección e impacto en los usuarios de la biblioteca c.g.a.Estudio de la colección e impacto en los usuarios de la biblioteca c.g.a.
Estudio de la colección e impacto en los usuarios de la biblioteca c.g.a.
 
Evaluation Q1) In what ways your media product use, develop or challenge form...
Evaluation Q1) In what ways your media product use, develop or challenge form...Evaluation Q1) In what ways your media product use, develop or challenge form...
Evaluation Q1) In what ways your media product use, develop or challenge form...
 
Brazilian Butt Lift 101
Brazilian Butt Lift 101Brazilian Butt Lift 101
Brazilian Butt Lift 101
 
Nuevas tecnologías
Nuevas tecnologíasNuevas tecnologías
Nuevas tecnologías
 
Japan henny
Japan   hennyJapan   henny
Japan henny
 

Similar to SupplyChainEngineeringPortfolio

Business and Environment Series: Babcock - Closing the Loop, Managing Downstr...
Business and Environment Series: Babcock - Closing the Loop, Managing Downstr...Business and Environment Series: Babcock - Closing the Loop, Managing Downstr...
Business and Environment Series: Babcock - Closing the Loop, Managing Downstr...Environmental Initiative
 
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS Julian Kalac P.Eng
 
Haynesville Re-Frac Study
Haynesville Re-Frac StudyHaynesville Re-Frac Study
Haynesville Re-Frac Study Energent Group
 
Supernova - Clean Expo Presentation 28 Jan 2015
Supernova - Clean Expo Presentation 28 Jan 2015Supernova - Clean Expo Presentation 28 Jan 2015
Supernova - Clean Expo Presentation 28 Jan 2015Jacqueline Young C.G.A.
 
3. capacity planning
3. capacity planning3. capacity planning
3. capacity planningSudipta Saha
 
A Turbocharger for Digestion: Thermal Hydrolysis at Davyhulme, UK
A Turbocharger for Digestion: Thermal Hydrolysis at Davyhulme, UKA Turbocharger for Digestion: Thermal Hydrolysis at Davyhulme, UK
A Turbocharger for Digestion: Thermal Hydrolysis at Davyhulme, UKBlack & Veatch
 
A case for change transforming solid waste mangement in nova scotia
A case for change   transforming solid waste mangement in nova scotiaA case for change   transforming solid waste mangement in nova scotia
A case for change transforming solid waste mangement in nova scotiaGord Helm
 
CARE Carpet Recycling & COVID: Navigating the Pandemic
CARE Carpet Recycling & COVID: Navigating the PandemicCARE Carpet Recycling & COVID: Navigating the Pandemic
CARE Carpet Recycling & COVID: Navigating the PandemicCarpet America Recovery Effort
 
20 Points of an Outcome Based Product Support Business Model - Commercial
20 Points of an Outcome Based Product Support Business Model - Commercial20 Points of an Outcome Based Product Support Business Model - Commercial
20 Points of an Outcome Based Product Support Business Model - Commercialrgiuntini
 
Julian Kalac lean 6 sigma project list--2018
 Julian Kalac lean 6 sigma  project list--2018 Julian Kalac lean 6 sigma  project list--2018
Julian Kalac lean 6 sigma project list--2018Julian Kalac P.Eng
 
Johnson & johnson project
Johnson & johnson projectJohnson & johnson project
Johnson & johnson projectRadivoj Jovanov
 
Strategic capacity planning for products and services
Strategic capacity planning for products and servicesStrategic capacity planning for products and services
Strategic capacity planning for products and servicesgerlyn bonus
 
Velocys ppt140730_Velocys_GTL Technology Forum
Velocys ppt140730_Velocys_GTL Technology ForumVelocys ppt140730_Velocys_GTL Technology Forum
Velocys ppt140730_Velocys_GTL Technology ForumJohn Glenning
 
WAYNE A Resumeupdated149UP
WAYNE A Resumeupdated149UPWAYNE A Resumeupdated149UP
WAYNE A Resumeupdated149UPWayne Johnson
 

Similar to SupplyChainEngineeringPortfolio (20)

Lean Six Sigma Projects
Lean Six Sigma ProjectsLean Six Sigma Projects
Lean Six Sigma Projects
 
Business and Environment Series: Babcock - Closing the Loop, Managing Downstr...
Business and Environment Series: Babcock - Closing the Loop, Managing Downstr...Business and Environment Series: Babcock - Closing the Loop, Managing Downstr...
Business and Environment Series: Babcock - Closing the Loop, Managing Downstr...
 
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
 
Haynesville Re-Frac Study
Haynesville Re-Frac StudyHaynesville Re-Frac Study
Haynesville Re-Frac Study
 
Supernova - Clean Expo Presentation 28 Jan 2015
Supernova - Clean Expo Presentation 28 Jan 2015Supernova - Clean Expo Presentation 28 Jan 2015
Supernova - Clean Expo Presentation 28 Jan 2015
 
3. capacity planning
3. capacity planning3. capacity planning
3. capacity planning
 
A Turbocharger for Digestion: Thermal Hydrolysis at Davyhulme, UK
A Turbocharger for Digestion: Thermal Hydrolysis at Davyhulme, UKA Turbocharger for Digestion: Thermal Hydrolysis at Davyhulme, UK
A Turbocharger for Digestion: Thermal Hydrolysis at Davyhulme, UK
 
A case for change transforming solid waste mangement in nova scotia
A case for change   transforming solid waste mangement in nova scotiaA case for change   transforming solid waste mangement in nova scotia
A case for change transforming solid waste mangement in nova scotia
 
Stewartclyde4
Stewartclyde4Stewartclyde4
Stewartclyde4
 
Alvaro Gonzalez resume 1
Alvaro Gonzalez resume 1Alvaro Gonzalez resume 1
Alvaro Gonzalez resume 1
 
CARE Carpet Recycling & COVID: Navigating the Pandemic
CARE Carpet Recycling & COVID: Navigating the PandemicCARE Carpet Recycling & COVID: Navigating the Pandemic
CARE Carpet Recycling & COVID: Navigating the Pandemic
 
20 Points of an Outcome Based Product Support Business Model - Commercial
20 Points of an Outcome Based Product Support Business Model - Commercial20 Points of an Outcome Based Product Support Business Model - Commercial
20 Points of an Outcome Based Product Support Business Model - Commercial
 
Julian Kalac lean 6 sigma project list--2018
 Julian Kalac lean 6 sigma  project list--2018 Julian Kalac lean 6 sigma  project list--2018
Julian Kalac lean 6 sigma project list--2018
 
Pagel - MnTAP Assistance Overview
Pagel - MnTAP Assistance OverviewPagel - MnTAP Assistance Overview
Pagel - MnTAP Assistance Overview
 
Johnson & johnson project
Johnson & johnson projectJohnson & johnson project
Johnson & johnson project
 
Strategic capacity planning for products and services
Strategic capacity planning for products and servicesStrategic capacity planning for products and services
Strategic capacity planning for products and services
 
Velocys ppt140730_Velocys_GTL Technology Forum
Velocys ppt140730_Velocys_GTL Technology ForumVelocys ppt140730_Velocys_GTL Technology Forum
Velocys ppt140730_Velocys_GTL Technology Forum
 
2022 presentation on using recycled materials in asphalt pavements
2022 presentation on using recycled materials in asphalt pavements2022 presentation on using recycled materials in asphalt pavements
2022 presentation on using recycled materials in asphalt pavements
 
International productions operations management
International productions  operations managementInternational productions  operations management
International productions operations management
 
WAYNE A Resumeupdated149UP
WAYNE A Resumeupdated149UPWAYNE A Resumeupdated149UP
WAYNE A Resumeupdated149UP
 

SupplyChainEngineeringPortfolio

  • 1. Supply Chain Engineering PortfolioofSelectAccomplishmentsfrom2000toPresent James Emmitt 417 Canyon Dr. N. Columbus, Oh 43214 (614) 369-2066 jemmitt2@gmail.com
  • 2. Portfolio Contents • Summary of Major Accomplishments • Detail of Major Accomplishments • Page detail of each major project • Minor Projects with Summary of Each • List of Managed Vendors and Integrators Tuesday,April12,2016JamesDEmmitt 2
  • 3. Summary of Major Projects • Innotrac Grove City Closure • Rolled 388,000 sq.ft. FC into 280,000 sq. ft. of existing FC while maintaining 100% operational status - $2.0 million • T. Marzetti Global Waste Reduction Program • By running projects in 14 facilities, reduced raw material and labor shrinkage costs moving average by 1.5% across six years – average of $1.75 million annually • Staples NAD KIVA Pick and Pack system • Managed design specification and SOP’s for KIVA robot implementation at Quill in Chambersburg, PA - $3.5 million • Newell Rubbermaid • Rolled 230,000 sq. ft. of product at 3PL back into existing 1.2 million sq. ft. and adding 330,000 sq. ft. of new product to same while maintaining 100% operational status- $5.2 million Tuesday,April12,2016JamesDEmmitt 3
  • 4. Innotrac Grove City Closure Tuesday,April12,2016JamesDEmmitt 4 Condensed 388,000 sq. ft. into 283,000 sq. ft.
  • 5. • Location: from Grove City, Ohio to Groveport, Ohio • Purpose: recover $4.2 million annually in FC Operations to reduce operating costs. • Product: Textiles, durable goods, and food supplements • Volume profile: Seasonal e-commerce with a distinct Pareto distribution – 3,780 SKU’s, 45,000 orders per day, 4.5 line items average per order with lot control • Solution: Brownfield project condensed 388,000 sq. ft. into 283,000 sq. ft. existing operation while maintaining 100% operational status. Used Very Narrow Aisle (VNA) single select racking six levels high to create 14,000 PP (6,000 more than in existing facility). Forward pick area and returns placed in pick module and product picked in batch to recover 35% labor. Medium movers placed in pallet flow. 37% of product shipped in kits. Kitting area added. Packing done using Put-to-Light system fed by NBS30 pop-up sorters. Product shipped using sliding shoe sorter at 80 cartons per minute. Used Pyramid WCS with Manhattan WMOS. Designed all components: electrical, conveyor, racking, lift truck, PTL, sorters, mezzanine. • Completed with total costs at $2 million in six months. Payback was $350,000 per month. Innotrac Grove City Closure Tuesday,April12,2016JamesDEmmitt 5
  • 6. Innotrac Grove City Closure Tuesday,April12,2016JamesDEmmitt 6 Partial overview of put-to-light sorters for packing. NBS30 bi-directional pop-up divert rollers are yellow. Packing used air pillows when required. Some product shipped freely.
  • 7. Innotrac Grove City Closure Tuesday,April12,2016JamesDEmmitt 7 Put Side – sort to lightPack Side – pick to light
  • 8. • Location: Various across US. • Purpose: Reduced net operating costs by 1% annually. • Product: Perishable consumer goods (dressings, dips, sauces, bread) • Volume profile: Consistent batch manufacturing and distribution– 1,628 SKU’s, 185 orders per day, 1 line item average per order, 1,428 cases per line average. • Solution: Annual waste was determined to exceed $8 million company- wide through shrinkage as well as under-utilization. The actual physical waste was measured as great as 32% in pounds, cycles, labor hours, etc. By implementing at least five projects per facility to address the waste drivers, the company as able to do the following: • Reduce net operating cost by 1.5% ($1.75 million annually) • Increase volume by 1,540 cases daily (.58% or $27,970 per day) • Reduce total lead time (order to cash) by five days • Reduce labor by .25% • Increase yield by .526% • Completed with total costs of $2,800 over twelve months. T. Marzetti Global Waste Reduction Program Tuesday,April12,2016JamesDEmmitt 8
  • 9. • Location: Chambersburg, PA • Purpose: recover 45% labor, improve accuracy to 9.99%, and reduce lead times by 50%. • Product: Durable office goods • Volume profile: Seasonal e-commerce and B2B with a steep distribution – 6,800 SKU’s, 32,000 orders per day, 8.2 line items average per order. • Solution: This project was the initial pilot project of 30 robots in 50,000 sq. ft. The company has since expanded to 500 robots in 140,000 sq. ft. Implemented the robots with 600 pods and eighteen pack stations. Lines per hour jumped 150 to 400 in a matter of three months. Wrote the SOP’s and training for these units. • Completed with total costs at $3.5 million in eleven months. Staples, NAD KIVA Pick and Pack Tuesday,April12,2016JamesDEmmitt 9
  • 10. Staples, NAD KIVA Pick and Pack Tuesday,April12,2016JamesDEmmitt 10 KIVA RobotTypical picking area
  • 11. • Location: from Manitowoc, WI to Lancaster, OH • Purpose: reduce net operating costs for durable consumer goods division by 28% while maintaining 100% operational status. • Product: Durable consumer goods (glassware and cookware) • Volume profile: Direct to Store and Distributor at 8,000 orders per day, mostly FTL. Full case picking. 4,200 SKU’s, 28 lines per order. • Solution: This brownfield/greenfield project consolidated 330,000 sq. ft. of full pallet storage into an existing 1.2 million sq. ft. facility, and also 280,000 sq. ft. of 3PL storage into the same. Removed all existing rack (drive-in racking), changed pallet stacking models to a more supportive design, and used a mix of forward pallet flow pick, case pick, and bulk stack to increase the density without increasing damage. Assisted in moved manufacturing operations to newly built Maquiladora facility in Nuevo Laredo, MX. • Completed with total distribution costs at $1.2 million over eight months, with a projected savings of $450,000 per month. Anchor Hocking/Mirro Wearever Consolidation (Newell Rubbermaid) Tuesday,April12,2016JamesDEmmitt 11
  • 12. • Location: Wareham, Massachusetts • Purpose: to increase throughput capacity for crouton division by 125% while maintaining 100% operational status, at no extra operating cost. • Product: Croutons • Volume profile: Direct to Distributor at 590 orders per day at 1,000 lbs. per order, mostly FTL/Full Pallet. 28 SKU’s, 3.5 lines per order. • Solution: This brownfield project consisted of redesigning the mixing, proofing, and baking process for 59,000 lbs. of croutons per day. Added one new mixer and redesigned one, replaced continuous oven, added new holding bins and redesigned proofing room. • Completed with total costs at $13.2 million in 16 months. T. Marzetti Crouton Process Redesign Tuesday,April12,2016JamesDEmmitt 12
  • 13. T. Marzetti Crouton Process Redesign Tuesday,April12,2016JamesDEmmitt 13
  • 14. Summary of Minor Projects • T. Marzetti Cook Kitchen and Spice Blending Redesign, Milpitas, CA • Redesigned 7,600 sq. ft. layout and process of seven 200 gallon cook and blend kitchen stations and Spice Blending room using lean methodology. Added automated lift systems to bring product to tanks. – $.82 mil • Staples NAD Detroit Cross Dock Redesign (u/c Vargo) • Redesigned 42,000 sq. ft. brownfield cross dock in Detroit, MI to double throughput – $.165 mil • KMH (Kalida Manufacturing Honda), Ottawa, Ohio (Vargo) • Designed and implemented 80,000 sq. ft. Drive-in rack design for automotive parts - $1.6 million • Abercrombie & Fitch Greenfield, New Albany, OH • Oversaw rack and mezzanine design and installation, assisted in design of Direct to Store conveyor system- $1.8 million Tuesday,April12,2016JamesDEmmitt 14
  • 15. Summary of Vendors, Integrators and Sub-contractors Managed Rohrenbeck Electrical, Columbus, OH Advanced Handling Systems, Hebron, KY All Pack Services, Columbus, OH Vargo Engineered Systems, Hilliard, OH Fairborn Equipment, Cincinnati, OH Storage Concepts, Inc., Cincinnati, OH Hytek Material Handling, Columbus, OH MH Equipment, Columbus, OH Brocon Services, Columbus, OH Elford Construction, Columbus, OH Gemini Equipment, Philadelphia, PA Shorr Packaging, Cincinnati, OH Unisource Packaging, Columbus, OH Tuesday,April12,2016JamesDEmmitt 15