SlideShare a Scribd company logo
Innovation Tournament
SUNRISERS
SAP Code Team Member Department Band Zone
24004088 ROHIT AGARWALA ACCOUNTS L-5M EAST
23064406 KISHAN BACHANI DIRECT MARKETING L-7O EAST
24002553 PRASANT KUMAR MISHRA INFORMATION TECHNOLOGY L-7O EAST
23125296 AGNI SOM LEGAL DEPARTMENT L-8O EAST
24003320 TARUN DE OPERATIONS L-7O EAST
23132991 ANJALI JOSEPH HR OPERATIONS L-8O EAST
What is the need for this Idea ?
We see two major organizational challenges in the present scenario:
1. Control on increasing NPA & PNPA :
Reduction and control of increasing NPA & PNPA has become a basic requirement. We put most of
our time to hold this line of control, but in actual this process gradually has become our biggest
weakness. Somehow, we are getting into the habit of collecting minimum-to-solve. In this way
permanent or significant reversal of these contracts are getting neglected. Due to huge number of
contracts in individual trial repeat visit to these contracts or spending required time towards any
chronic contracts is getting difficult.
2.Portfolio management :
Overall portfolio is deteriorating day by day which is leading to substantial increase of
OD & NPA provision. We are losing focus from the soft ageing cases as most of our time and energy
is spent to solve the NPAs. Therefore managing every bucket all together is getting difficult
resulting in deterioration of portfolio health.
Significant change of approach and methodology can arrest the scenario where we all
are suffering. This is where our idea gave birth.
What’s our Idea ?
Our idea is to drive recovery through 2 separate teams.
One team for soft bucket i.e. 0-2 aging contracts and another to handle 3 & above aging
contracts.
The team which handles 0-2 aging contracts will ensure timely payment and restrict slippage
of buckets. As a result our CD efficiency will improve and flow into 3 age will be arrested.
Approach towards 3 & above aging contracts required change to control further deterioration.
The second team will ensure repeated follow ups which in turn will result in control of overdue
along with portfolio correction. This will enhance the focus on every bucket movement rather
our present approach of only focusing on NPAs and PNPAs.
The method of the allocation is shown in the next slides.
Continued..
0 1 2 3 4 5 6 7 8 Abv
0-2 aging
TEAM A
3 & above aging
TEAM B
0
1 2 3 4 5 6 7 80
0 2
2
2
2
2
1
1
1
1
1
1
1
3 4 6 7 8
4 5 6 7
3 5 6
3 4
3 4
5
0
0
0
0
0
0
2
Target will be to bounce back any flow from 0-2 age from the line.
Target for 3 & above aging will be to reduce them to the left side of the line.
5
>
>
>
>
The red line indicates a line of control
Tele caller
normally
calls 0-2 age
contracts of
all these
trials
(1800)
Total contract of branch XYZ
(2400)
No of REC in branch 7 + one Telecaller
REC 1 (340)
REC 2 (340)
REC 3 (340)
REC 4 (340)
REC 5 (340)
REC 6 (340)
REC 7 (360)
PRESENT METHOD
Observations:
• Contracts are allocated to executives
based on geographical area only. So when
one new executive joins, one portion of the
existing geography is taken out for him.
• Telecaller’s job and productivity is
overlapped with REC’s. Separate
identification of his/her productivity
cannot be measured.
• One REC has to attain every type of
customer, ranging from 0 aging to 11 aging
or higher. Specified focus in any bucket not
possible.
• Contract size in every trial looks bigger
and unmanageable.
• When executives are driven for PNPA,
focus from 0-2 ageing are neglected
resulting lower CD efficiency.
Sample branch Krishnagar West Bengal
Tele caller +
Total contract of branch XYZ
(2400)
BRANCH HEAD
No of REC in
branch 7 + one
Telecaller
ECS/PDC contracts
(500)
Field payment
(600)
REC 4 (150)
3 & Above
(600)
TEAM B
SUGGESTED METHOD
Office payment
contracts (700)
0-2 aging
(1800)
TEAM A
REC 5 (150)
REC 6 (150)
REC 7 (150)
REC 1 (1200)
REC 2 (300)
REC 3 (300)
Steps :
• Two teams will be created
namely Team A and Team B
headed by the Branch Head.
•Team A will handle 0-2 ageing
contracts and Team B will
handle 3 & above contracts.
• For Team A, contracts to be
first separated by their mode of
payment -
1.ECS / PDC
2.Office collection
3.Field collection.
• For Team B, rest 3 & above
contracts will be allocated to
the senior & skilled employees
from the team.
Team A Team B
Contracts to be handled 0 - 2 ageing cases 3 & above cases
Nos of contracts handled
(refer diagram as example)
1800 contracts 600 contracts
Allocation of manpower 1 Telecaller & 3 REC's 4 REC'S
Role of the Team
Focused approach on PDC/ECS and office
payment contracts.
Collection of short PDC's and collection of
payment from customer’s whose ECS and
PDC's bounced.
One REC will be tagged with the Telecaller for
any specific field movement and overall
collection efficiency.
2 REC’s will be involved in collection of field
payment contracts.
Focused approach on 3 and above
contracts.
4 REC’s will be handling the rest 600
contracts.
They will make case to case visit and
repeat visit on the commitment date.
Benefits
Reminder of monthly EMI which will reduce
the payment defaults.
Timely collection of short PDC.
CD Efficiency will improve.
Strengthen our relationship with customers.
Prevention of bucket jump and to stop
contracts from going above 3 ageing.
Contract size will be smaller and
manageable.
Focus can be given to the chronic cases
as executives will have time to visit
these cases.
OD efficiency will increase.
Control on PNPA and NPA’s.
What is the expected Impact ?
1. Focus on PNPA & NPA contracts will increase. There will be more time for effectively handling
these cases with more repeat visits.
2. Due to reduction in number of contracts, concentration on 3-4-5 aging will improve. So
contracts flow into PNPA will be less.
3. Due to the above reason from these buckets OD collection will rise because of better planning
and execution
4. On the other hand there will be separate mechanism in driving the good portfolio of a branch.
Customers will be knocked for payment/PDC in due time.
5. This will not only improve our CD efficiency but relationship with our good customers also will
improve.
6. With the existing manpower only this innovative structure can be implemented.
7. No additional cost in implementation/execution of the concept.
8. We also see a future benefit on the concept. The day we implement the new statutory
regulation of NPA (3 aging), by that time we will be absolutely ready for the same.
What is the expected Impact ?
1. Focus on PNPA & NPA contracts will increase. There will be more time for effectively handling
these cases with more repeat visits.
2. Due to reduction in number of contracts, concentration on 3-4-5 aging will improve. So
contracts flow into PNPA will be less.
3. Due to the above reason from these buckets OD collection will rise because of better planning
and execution
4. On the other hand there will be separate mechanism in driving the good portfolio of a branch.
Customers will be knocked for payment/PDC in due time.
5. This will not only improve our CD efficiency but relationship with our good customers also will
improve.
6. With the existing manpower only this innovative structure can be implemented.
7. No additional cost in implementation/execution of the concept.
8. We also see a future benefit on the concept. The day we implement the new statutory
regulation of NPA (3 aging), by that time we will be absolutely ready for the same.

More Related Content

Viewers also liked

MF-Connect 3000 for eMaharasthra Award-2013
MF-Connect 3000 for eMaharasthra Award-2013MF-Connect 3000 for eMaharasthra Award-2013
MF-Connect 3000 for eMaharasthra Award-2013
Prasant Mishra
 
Perawatan komputer (2)
Perawatan komputer (2)Perawatan komputer (2)
Perawatan komputer (2)sptrbt
 
An automatic promotion policy upto class v
An automatic promotion policy upto class vAn automatic promotion policy upto class v
An automatic promotion policy upto class vnitisha22
 
Melakukan perawatan pheriperal (1)
Melakukan perawatan pheriperal (1)Melakukan perawatan pheriperal (1)
Melakukan perawatan pheriperal (1)sptrbt
 
10. aas + uv vis(2)(1)
10. aas + uv vis(2)(1)10. aas + uv vis(2)(1)
10. aas + uv vis(2)(1)Celia See
 
Melakukan perawatan pheriperal (2)
Melakukan perawatan pheriperal (2)Melakukan perawatan pheriperal (2)
Melakukan perawatan pheriperal (2)sptrbt
 
Comparison Tourism Policies Hong Kong Singapore
Comparison Tourism Policies Hong Kong SingaporeComparison Tourism Policies Hong Kong Singapore
Comparison Tourism Policies Hong Kong Singapore
Eva Albrecht
 
Perawatan komputer (2)
Perawatan komputer (2)Perawatan komputer (2)
Perawatan komputer (2)sptrbt
 
Melakukan perawatan pheriperal (4)
Melakukan perawatan pheriperal (4)Melakukan perawatan pheriperal (4)
Melakukan perawatan pheriperal (4)sptrbt
 
Perawatan komputer (1)
Perawatan komputer (1)Perawatan komputer (1)
Perawatan komputer (1)sptrbt
 

Viewers also liked (10)

MF-Connect 3000 for eMaharasthra Award-2013
MF-Connect 3000 for eMaharasthra Award-2013MF-Connect 3000 for eMaharasthra Award-2013
MF-Connect 3000 for eMaharasthra Award-2013
 
Perawatan komputer (2)
Perawatan komputer (2)Perawatan komputer (2)
Perawatan komputer (2)
 
An automatic promotion policy upto class v
An automatic promotion policy upto class vAn automatic promotion policy upto class v
An automatic promotion policy upto class v
 
Melakukan perawatan pheriperal (1)
Melakukan perawatan pheriperal (1)Melakukan perawatan pheriperal (1)
Melakukan perawatan pheriperal (1)
 
10. aas + uv vis(2)(1)
10. aas + uv vis(2)(1)10. aas + uv vis(2)(1)
10. aas + uv vis(2)(1)
 
Melakukan perawatan pheriperal (2)
Melakukan perawatan pheriperal (2)Melakukan perawatan pheriperal (2)
Melakukan perawatan pheriperal (2)
 
Comparison Tourism Policies Hong Kong Singapore
Comparison Tourism Policies Hong Kong SingaporeComparison Tourism Policies Hong Kong Singapore
Comparison Tourism Policies Hong Kong Singapore
 
Perawatan komputer (2)
Perawatan komputer (2)Perawatan komputer (2)
Perawatan komputer (2)
 
Melakukan perawatan pheriperal (4)
Melakukan perawatan pheriperal (4)Melakukan perawatan pheriperal (4)
Melakukan perawatan pheriperal (4)
 
Perawatan komputer (1)
Perawatan komputer (1)Perawatan komputer (1)
Perawatan komputer (1)
 

Similar to SUNRISERS INNOVATION

Case Study - Deficit Analysis
Case Study - Deficit AnalysisCase Study - Deficit Analysis
Case Study - Deficit Analysis
vivek pratap singh
 
Customer churn - how to stop it?
Customer churn - how to stop it?Customer churn - how to stop it?
Customer churn - how to stop it?
Divante
 
Ketan cv for billing and collections
Ketan cv for billing and collectionsKetan cv for billing and collections
Ketan cv for billing and collections
Ketan Mehta
 
SIKKIM MANIPAL ASSIGNMENTS SECOND SEMESTER
SIKKIM MANIPAL ASSIGNMENTS SECOND SEMESTERSIKKIM MANIPAL ASSIGNMENTS SECOND SEMESTER
SIKKIM MANIPAL ASSIGNMENTS SECOND SEMESTER
Thom Delta
 
Six_Sigma_Report_Template_v2 (2).pptx
Six_Sigma_Report_Template_v2 (2).pptxSix_Sigma_Report_Template_v2 (2).pptx
Six_Sigma_Report_Template_v2 (2).pptx
PhngPhmTrung
 
MS Project 2010 schedule template for large NASA procurements $10-450 million
MS Project 2010 schedule template for large NASA procurements $10-450 millionMS Project 2010 schedule template for large NASA procurements $10-450 million
MS Project 2010 schedule template for large NASA procurements $10-450 million
Self employed
 
Project Storyboard: Reducing Cycle Time for Bid Tab Creation by 33%
Project Storyboard: Reducing Cycle Time for Bid Tab Creationby 33%Project Storyboard: Reducing Cycle Time for Bid Tab Creationby 33%
Project Storyboard: Reducing Cycle Time for Bid Tab Creation by 33%
GoLeanSixSigma.com
 
Analysis of Operations on Grameenphone
Analysis of Operations on GrameenphoneAnalysis of Operations on Grameenphone
Analysis of Operations on Grameenphone
Azas Shahrier
 
EXPA - Gcdp business rules
EXPA - Gcdp business rulesEXPA - Gcdp business rules
EXPA - Gcdp business rules
Nomaan Shaikh
 
PROJECT STORYBOARD: Project Storyboard: Reducing Underwriting Resubmits by Ov...
PROJECT STORYBOARD: Project Storyboard: Reducing Underwriting Resubmits by Ov...PROJECT STORYBOARD: Project Storyboard: Reducing Underwriting Resubmits by Ov...
PROJECT STORYBOARD: Project Storyboard: Reducing Underwriting Resubmits by Ov...
GoLeanSixSigma.com
 
White papers selecting erp for oil and gas industry contractors and vendors
White papers selecting erp for oil and gas industry contractors and vendorsWhite papers selecting erp for oil and gas industry contractors and vendors
White papers selecting erp for oil and gas industry contractors and vendors
Kaizenlogcom
 
White papers selecting erp for oil and gas industry contractors and vendors
White papers selecting erp for oil and gas industry contractors and vendorsWhite papers selecting erp for oil and gas industry contractors and vendors
White papers selecting erp for oil and gas industry contractors and vendors
Kaizenlogcom
 
How to apply Six Sigma DMAIC for Reducing Client's Line Wait Time at the Bank...
How to apply Six Sigma DMAIC for Reducing Client's Line Wait Time at the Bank...How to apply Six Sigma DMAIC for Reducing Client's Line Wait Time at the Bank...
How to apply Six Sigma DMAIC for Reducing Client's Line Wait Time at the Bank...
Jeremy Jay V. Lim, MBB, PMP
 
Iocl ppt
Iocl pptIocl ppt
Iocl ppt
Ankit Agarwal
 
Iocl ppt
Iocl pptIocl ppt
Iocl ppt
Ankit Agarwal
 
Kreischer Miller Architecture & Engineering Industry Seminar - October 16, 2013
Kreischer Miller Architecture & Engineering Industry Seminar - October 16, 2013Kreischer Miller Architecture & Engineering Industry Seminar - October 16, 2013
Kreischer Miller Architecture & Engineering Industry Seminar - October 16, 2013Kreischer Miller
 
Building a bullet proof business case
Building a bullet proof business caseBuilding a bullet proof business case
Building a bullet proof business case
Jonathan L'Ecuyer
 
Agile Development with Agile Contract
Agile Development with Agile ContractAgile Development with Agile Contract
Agile Development with Agile Contract
NUS-ISS
 
ERP Impact on Organizational Efficiencies
ERP Impact on Organizational EfficienciesERP Impact on Organizational Efficiencies
ERP Impact on Organizational Efficiencies
Eastern Software Systems
 

Similar to SUNRISERS INNOVATION (20)

Case Study - Deficit Analysis
Case Study - Deficit AnalysisCase Study - Deficit Analysis
Case Study - Deficit Analysis
 
Customer churn - how to stop it?
Customer churn - how to stop it?Customer churn - how to stop it?
Customer churn - how to stop it?
 
Ketan cv for billing and collections
Ketan cv for billing and collectionsKetan cv for billing and collections
Ketan cv for billing and collections
 
SIKKIM MANIPAL ASSIGNMENTS SECOND SEMESTER
SIKKIM MANIPAL ASSIGNMENTS SECOND SEMESTERSIKKIM MANIPAL ASSIGNMENTS SECOND SEMESTER
SIKKIM MANIPAL ASSIGNMENTS SECOND SEMESTER
 
Six_Sigma_Report_Template_v2 (2).pptx
Six_Sigma_Report_Template_v2 (2).pptxSix_Sigma_Report_Template_v2 (2).pptx
Six_Sigma_Report_Template_v2 (2).pptx
 
MS Project 2010 schedule template for large NASA procurements $10-450 million
MS Project 2010 schedule template for large NASA procurements $10-450 millionMS Project 2010 schedule template for large NASA procurements $10-450 million
MS Project 2010 schedule template for large NASA procurements $10-450 million
 
Automated analytics forecast review
Automated analytics forecast reviewAutomated analytics forecast review
Automated analytics forecast review
 
Project Storyboard: Reducing Cycle Time for Bid Tab Creation by 33%
Project Storyboard: Reducing Cycle Time for Bid Tab Creationby 33%Project Storyboard: Reducing Cycle Time for Bid Tab Creationby 33%
Project Storyboard: Reducing Cycle Time for Bid Tab Creation by 33%
 
Analysis of Operations on Grameenphone
Analysis of Operations on GrameenphoneAnalysis of Operations on Grameenphone
Analysis of Operations on Grameenphone
 
EXPA - Gcdp business rules
EXPA - Gcdp business rulesEXPA - Gcdp business rules
EXPA - Gcdp business rules
 
PROJECT STORYBOARD: Project Storyboard: Reducing Underwriting Resubmits by Ov...
PROJECT STORYBOARD: Project Storyboard: Reducing Underwriting Resubmits by Ov...PROJECT STORYBOARD: Project Storyboard: Reducing Underwriting Resubmits by Ov...
PROJECT STORYBOARD: Project Storyboard: Reducing Underwriting Resubmits by Ov...
 
White papers selecting erp for oil and gas industry contractors and vendors
White papers selecting erp for oil and gas industry contractors and vendorsWhite papers selecting erp for oil and gas industry contractors and vendors
White papers selecting erp for oil and gas industry contractors and vendors
 
White papers selecting erp for oil and gas industry contractors and vendors
White papers selecting erp for oil and gas industry contractors and vendorsWhite papers selecting erp for oil and gas industry contractors and vendors
White papers selecting erp for oil and gas industry contractors and vendors
 
How to apply Six Sigma DMAIC for Reducing Client's Line Wait Time at the Bank...
How to apply Six Sigma DMAIC for Reducing Client's Line Wait Time at the Bank...How to apply Six Sigma DMAIC for Reducing Client's Line Wait Time at the Bank...
How to apply Six Sigma DMAIC for Reducing Client's Line Wait Time at the Bank...
 
Iocl ppt
Iocl pptIocl ppt
Iocl ppt
 
Iocl ppt
Iocl pptIocl ppt
Iocl ppt
 
Kreischer Miller Architecture & Engineering Industry Seminar - October 16, 2013
Kreischer Miller Architecture & Engineering Industry Seminar - October 16, 2013Kreischer Miller Architecture & Engineering Industry Seminar - October 16, 2013
Kreischer Miller Architecture & Engineering Industry Seminar - October 16, 2013
 
Building a bullet proof business case
Building a bullet proof business caseBuilding a bullet proof business case
Building a bullet proof business case
 
Agile Development with Agile Contract
Agile Development with Agile ContractAgile Development with Agile Contract
Agile Development with Agile Contract
 
ERP Impact on Organizational Efficiencies
ERP Impact on Organizational EfficienciesERP Impact on Organizational Efficiencies
ERP Impact on Organizational Efficiencies
 

Recently uploaded

The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
DhatriParmar
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
joachimlavalley1
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
Vivekanand Anglo Vedic Academy
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
TechSoup
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
Levi Shapiro
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
Peter Windle
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
TechSoup
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
Honest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptxHonest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptx
timhan337
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
kaushalkr1407
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
BhavyaRajput3
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
DeeptiGupta154
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
MIRIAMSALINAS13
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
Pavel ( NSTU)
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
Ashokrao Mane college of Pharmacy Peth-Vadgaon
 

Recently uploaded (20)

The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
 
The French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free downloadThe French Revolution Class 9 Study Material pdf free download
The French Revolution Class 9 Study Material pdf free download
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
Honest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptxHonest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptx
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.Biological Screening of Herbal Drugs in detailed.
Biological Screening of Herbal Drugs in detailed.
 

SUNRISERS INNOVATION

  • 2. SUNRISERS SAP Code Team Member Department Band Zone 24004088 ROHIT AGARWALA ACCOUNTS L-5M EAST 23064406 KISHAN BACHANI DIRECT MARKETING L-7O EAST 24002553 PRASANT KUMAR MISHRA INFORMATION TECHNOLOGY L-7O EAST 23125296 AGNI SOM LEGAL DEPARTMENT L-8O EAST 24003320 TARUN DE OPERATIONS L-7O EAST 23132991 ANJALI JOSEPH HR OPERATIONS L-8O EAST
  • 3. What is the need for this Idea ? We see two major organizational challenges in the present scenario: 1. Control on increasing NPA & PNPA : Reduction and control of increasing NPA & PNPA has become a basic requirement. We put most of our time to hold this line of control, but in actual this process gradually has become our biggest weakness. Somehow, we are getting into the habit of collecting minimum-to-solve. In this way permanent or significant reversal of these contracts are getting neglected. Due to huge number of contracts in individual trial repeat visit to these contracts or spending required time towards any chronic contracts is getting difficult. 2.Portfolio management : Overall portfolio is deteriorating day by day which is leading to substantial increase of OD & NPA provision. We are losing focus from the soft ageing cases as most of our time and energy is spent to solve the NPAs. Therefore managing every bucket all together is getting difficult resulting in deterioration of portfolio health. Significant change of approach and methodology can arrest the scenario where we all are suffering. This is where our idea gave birth.
  • 4. What’s our Idea ? Our idea is to drive recovery through 2 separate teams. One team for soft bucket i.e. 0-2 aging contracts and another to handle 3 & above aging contracts. The team which handles 0-2 aging contracts will ensure timely payment and restrict slippage of buckets. As a result our CD efficiency will improve and flow into 3 age will be arrested. Approach towards 3 & above aging contracts required change to control further deterioration. The second team will ensure repeated follow ups which in turn will result in control of overdue along with portfolio correction. This will enhance the focus on every bucket movement rather our present approach of only focusing on NPAs and PNPAs. The method of the allocation is shown in the next slides. Continued..
  • 5. 0 1 2 3 4 5 6 7 8 Abv 0-2 aging TEAM A 3 & above aging TEAM B 0 1 2 3 4 5 6 7 80 0 2 2 2 2 2 1 1 1 1 1 1 1 3 4 6 7 8 4 5 6 7 3 5 6 3 4 3 4 5 0 0 0 0 0 0 2 Target will be to bounce back any flow from 0-2 age from the line. Target for 3 & above aging will be to reduce them to the left side of the line. 5 > > > > The red line indicates a line of control
  • 6. Tele caller normally calls 0-2 age contracts of all these trials (1800) Total contract of branch XYZ (2400) No of REC in branch 7 + one Telecaller REC 1 (340) REC 2 (340) REC 3 (340) REC 4 (340) REC 5 (340) REC 6 (340) REC 7 (360) PRESENT METHOD Observations: • Contracts are allocated to executives based on geographical area only. So when one new executive joins, one portion of the existing geography is taken out for him. • Telecaller’s job and productivity is overlapped with REC’s. Separate identification of his/her productivity cannot be measured. • One REC has to attain every type of customer, ranging from 0 aging to 11 aging or higher. Specified focus in any bucket not possible. • Contract size in every trial looks bigger and unmanageable. • When executives are driven for PNPA, focus from 0-2 ageing are neglected resulting lower CD efficiency. Sample branch Krishnagar West Bengal
  • 7. Tele caller + Total contract of branch XYZ (2400) BRANCH HEAD No of REC in branch 7 + one Telecaller ECS/PDC contracts (500) Field payment (600) REC 4 (150) 3 & Above (600) TEAM B SUGGESTED METHOD Office payment contracts (700) 0-2 aging (1800) TEAM A REC 5 (150) REC 6 (150) REC 7 (150) REC 1 (1200) REC 2 (300) REC 3 (300) Steps : • Two teams will be created namely Team A and Team B headed by the Branch Head. •Team A will handle 0-2 ageing contracts and Team B will handle 3 & above contracts. • For Team A, contracts to be first separated by their mode of payment - 1.ECS / PDC 2.Office collection 3.Field collection. • For Team B, rest 3 & above contracts will be allocated to the senior & skilled employees from the team.
  • 8. Team A Team B Contracts to be handled 0 - 2 ageing cases 3 & above cases Nos of contracts handled (refer diagram as example) 1800 contracts 600 contracts Allocation of manpower 1 Telecaller & 3 REC's 4 REC'S Role of the Team Focused approach on PDC/ECS and office payment contracts. Collection of short PDC's and collection of payment from customer’s whose ECS and PDC's bounced. One REC will be tagged with the Telecaller for any specific field movement and overall collection efficiency. 2 REC’s will be involved in collection of field payment contracts. Focused approach on 3 and above contracts. 4 REC’s will be handling the rest 600 contracts. They will make case to case visit and repeat visit on the commitment date. Benefits Reminder of monthly EMI which will reduce the payment defaults. Timely collection of short PDC. CD Efficiency will improve. Strengthen our relationship with customers. Prevention of bucket jump and to stop contracts from going above 3 ageing. Contract size will be smaller and manageable. Focus can be given to the chronic cases as executives will have time to visit these cases. OD efficiency will increase. Control on PNPA and NPA’s.
  • 9. What is the expected Impact ? 1. Focus on PNPA & NPA contracts will increase. There will be more time for effectively handling these cases with more repeat visits. 2. Due to reduction in number of contracts, concentration on 3-4-5 aging will improve. So contracts flow into PNPA will be less. 3. Due to the above reason from these buckets OD collection will rise because of better planning and execution 4. On the other hand there will be separate mechanism in driving the good portfolio of a branch. Customers will be knocked for payment/PDC in due time. 5. This will not only improve our CD efficiency but relationship with our good customers also will improve. 6. With the existing manpower only this innovative structure can be implemented. 7. No additional cost in implementation/execution of the concept. 8. We also see a future benefit on the concept. The day we implement the new statutory regulation of NPA (3 aging), by that time we will be absolutely ready for the same.
  • 10. What is the expected Impact ? 1. Focus on PNPA & NPA contracts will increase. There will be more time for effectively handling these cases with more repeat visits. 2. Due to reduction in number of contracts, concentration on 3-4-5 aging will improve. So contracts flow into PNPA will be less. 3. Due to the above reason from these buckets OD collection will rise because of better planning and execution 4. On the other hand there will be separate mechanism in driving the good portfolio of a branch. Customers will be knocked for payment/PDC in due time. 5. This will not only improve our CD efficiency but relationship with our good customers also will improve. 6. With the existing manpower only this innovative structure can be implemented. 7. No additional cost in implementation/execution of the concept. 8. We also see a future benefit on the concept. The day we implement the new statutory regulation of NPA (3 aging), by that time we will be absolutely ready for the same.