This document provides instructions on performing a liquid subterranean termite treatment, including inspecting the structure, calculating the amount of termiticide needed, mixing and applying the termiticide. Key steps include graphing the structure and measuring linear footage to determine how much termiticide is required. The document demonstrates mixing a Termidor SC solution and treating different construction types like slab foundations by drilling and applying the termiticide.