This document outlines a proposed study on the health impacts of a community-led waste management system in Bangladesh. It includes the intervention and assignment contexts, proposed methodology, work schedule, team composition, and budget. The intervention context notes rapid urban population growth and rising slum populations are contributing to increased air, water, and soil pollution. The proposed methodology includes surveys, focus group discussions, interviews with stakeholders to collect data from treatment and control groups. The work schedule is 4 weeks and includes preparation, desk research, study design, field data collection, debriefings, and final reporting. The budget totals 900,000 BDT including salaries, field activities, overhead costs, and VAT.
VIP Call Girls Noida Jhanvi 9711199171 Best VIP Call Girls Near Me
Impact Health Waste Led Community System
1. Study on Health Impact
of Community Led Waste
Management System
GreenBioTech (BD) Corporation
2L8, Dr. Kudrat-e-Khuda Road, Sahera
Tower (3rd Floor)
Dhanmondi, Dhaka-1205, Bangladesh.
3. Intervention Context
Urban population growth rate 3.50%
40% by 2040 according to world bank
estimate
7% rise in the slum population annually
Air, water and soil pollution
The slums lack the basic supplies
Study on Health Impact of Community Led
Waste Management System
5. Proposed Methodology
S
l.
Stakeholders Methods Frequency
1 Slum-dwellers of different ages, gender, and
profession, etc.
Survey and FGDs 400 (300 treatment, 100 control
group) Four FGDs
2 Health professional IDIs 4
3 Local Govt duty-bearers KIIs 2
4 Wastes collector of STS and PCSp KIIs 2
5 CBOs KIIs 2
6 Federation members IDIs 2
7 Field staffs KIIs 2
8 Project office staff KIIs 2
9 Consortia members KIIs 2
6. Work Schedule
Task Brief Task
abridged Deliverables
Timeline
W1 W2 W3 W4
Preparatory discussions with responsible persons of the
Consortia members
Preparatory
discussions
Inception
√
Desk review of other relevant global and national
documents/practices and standards on the waste management
system.
Desk review
√
Develop study desig and design all necessary methods, tools &
strategies, and finalize them.
Study
Design
Study
Instruments
√
Consideration of COVID 19 in the study management. COVID 19
consideratio
n
√
Health impact analysis tool testing before finalizing; Field test
Dataset,
recording,
scripts, and
data
dictionary
files
√ √
Field team recruitment, training, and survey conduction. Field data
collection
√ √
Consultation meetings/discussions with field staff and the
project office staff
Staff
consultation
√ √
Consultation with key stakeholders and beneficiaries of the
project
Key
stakeholder
consultation
√ √
Debrief senior management on the findings for their feedback
and inputs to finalize the report;
Debriefing
finding
Presentation √
Final report, Dataset, Data Dictionary Files, PPT slide, Audio, transcripts, and translation √
7. Budget
Sl. Cost Item Cost Type Unit Type Per Unit
cost
Unit
required
Total
Unit
Cost
Total
Cost
1 Remuneration
Team Leader Man-Days 9000 15 135000
340000
Deputy Team Leader Man-Days 8000 16 128000
Advisor Man-Days 9000 5 45000
Organization Focal
Person
Man-Days 8000 4 32000
2 Field Activity
Training 20000
437950
Filed Manager Man-Days 6000 15 90000
Survey Man-Days 2000 80 160000
FGDs Per Session 2500 4 10000
KIIs Per Session 1200 12 14400
IDIs Per Session 1200 4 4800
Transcription Per Transcript 4000 20 80000
Transport and Food Man-Days 750 105 78750
3 Organizational Overhead 000
4 Others 4658.66
5 Total (Excluding VAT) 782608.7
6 Vat (15%) 117391.3
7 Total (Including VAT) 900000