SlideShare a Scribd company logo
1 of 17
Download to read offline
Stockport Interchange Park
Here, we will tell you about…
• The plans for Interchange Park
• How you might use Interchange Park
• Where your ideas can shape Interchange Park
• Conversations with residents so far and what we found out
• Our next steps
• How you can get involved
About Stockport Interchange
Stockport Interchange will be a brand new Transport
Interchange with a public park on top, including:
• A two-acre public park above the Transport
Interchange called Interchange Park
• Transport Interchange with seating, fully accessible
toilets, cycle storage, and a Travelshop
• The pavilion provides stair and lift access from the
park to the Interchange below
• Cycle lift providing access from the park to the
Interchange and Trans Pennine Trail below
• The oculus in the centre gives the Transport
Interchange natural light and ventilation
• A pedestrian and cyclist link from Interchange Park to
Station Road
• Trans Pennine Trail route along the River Mersey
frontage for cyclists and pedestrians
• Around 200 new apartments with cafes and shops on
the ground floor
Artist’s impression
Stockport Interchange will be here…
• It’s currently Stockport’s bus station
• It will sit between Swaine Street, the A6,
the River Mersey and Daw Bank
• The existing bus station services will
move to a temporary location on Heaton
Lane car park in summer 2021
• A two-storey structure will be built. The
lower level will be the Transport
Interchange (including the bus station)
and the upper level will be Interchange
Park
1
2
3
4
5
Key:
1. Existing bus station
2. Stockport Viaduct
3. Location of new apartments
4. The Plaza
5. Stagecoach depot
Artist’s impression
A view from above…
A view from the A6…
Artist’s impression
Interchange Park will sit on top of the Transport Interchange
Artist’s impression
A view of the new Transport Interchange from
Swaine Street…
A view of the link from Station Road…
You will be able to walk or cycle from Station Road to Interchange Park
Artist’s impression
Connect through
PLAY
Connect with
EACH OTHER
Connect with
ART
Connect and
TRAVEL
Connect with
NATURE
How you might use Interchange Park…
You can tell us how you might use Interchange Park and your ideas on this website
The following features are fixed for
structural reasons…
Key:
1. The size and location of the oculus (provides
natural light and ventilation to the Interchange
below)
2. The pavilion building (provides access to the
Interchange below)
3. New apartments, café and shops
4. The pedestrian and cycle link from the park to
Station Road
5. The size and general location of trees
Artist’s impression
The features of Interchange Park that
can be informed by your ideas…
• How you might use the park, for example:
o Community gardening
o Children’s play
o Events
o Pop-ups and festivals
o Relaxation
• Features you’d like to see, for example:
o Art
o Play equipment
o Shelter
o Seating
• How you will access the park
• The landscaping at Hat Works Square and the
river edge
How we have collected feedback so far…
• Engagement in July 2018:
• A leaflet to 8,500 homes
• 330 responses to public consultation
• Engagement events
• Public consultation in March 2020 with 178
responses
• Online art workshops with Stockport families
• Workshops with students at Stockport
College
• Workshops in primary schools
What residents have told us so far…
Local priorities include…
• Seating and areas to rest
• Safety, lighting and CCTV
• Climate and energy efficiency
• Encouraging wildlife
• Decorative planting
• Space for cycle parking
• Outdoor event space
• Shops and cafes
• A safe place to play
Around half of residents who have commented so far, will use Interchange Park as a route
through to other destinations. The other half would like to use it as a destination in itself!
You can tell us if you agree with these priorities and your ideas on how they could
look or work on this website
We want to find out more
Our conversations don’t stop there!
We have planned the following activities:
• An opportunity to comment online through this
website
• A touring roadshow in our VW campervan. We will
visit some of Stockport’s parks and local high
streets to have a conversation in August. We will
post dates and locations on the website soon
• Special issue focus groups with groups we haven’t
heard from so far
Construction
Enabling Works
Begins
AUTUM
N
2021
Summer
2021
AUGUST
2021
Winter
2021
Winter
2021
Our next steps…
Interchange Park
Design Finalised
Further Community
Engagement
Construction Begins Interchange
Park Opens
Spring
2024
Summer/
Autumn
2021
Winter
2021
How to get involved
Our online engagement website is open until 13th October 2021.
We would love to hear from you!
Tell us what you think about Interchange Park and what you’d like to see. There are a few ways you
can do this, choose which one suits you! You can:
Register your interest in our project
Take our survey to give us your feedback
Tell us what you think about the plans for Interchange park on a virtual post it-note
Share your ideas for the park and examples of what you’d like to see in the discussion forum
Contact us with your questions
Thank you for visiting
Interchange Park! People vectors designed by : studiogstock / Freepik
rawpixel.com / Freepik
pch.vector/ Freepik

More Related Content

Similar to Stockport Interchange Park

Leaside station open house
Leaside station open house Leaside station open house
Leaside station open house
Crosstown TO
 
Caledonia station open house
Caledonia station open houseCaledonia station open house
Caledonia station open house
Crosstown TO
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2
Crosstown TO
 
Newhouse - APTA 2016 - Slides with notes
Newhouse - APTA 2016 - Slides with notesNewhouse - APTA 2016 - Slides with notes
Newhouse - APTA 2016 - Slides with notes
Stephen Newhouse
 
Community Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank StationCommunity Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank Station
Crosstown TO
 
Eglinton Station Open House
Eglinton Station Open HouseEglinton Station Open House
Eglinton Station Open House
Crosstown TO
 
Cycles, Pedestrians 1
Cycles, Pedestrians 1Cycles, Pedestrians 1
Cycles, Pedestrians 1
tarlesubba
 
Mount Dennis Station Open House
Mount Dennis Station Open HouseMount Dennis Station Open House
Mount Dennis Station Open House
Crosstown TO
 
Marketing Research Example
Marketing Research ExampleMarketing Research Example
Marketing Research Example
EMBS2007
 

Similar to Stockport Interchange Park (20)

Leaside station open house
Leaside station open house Leaside station open house
Leaside station open house
 
Keelesdale station open house
Keelesdale station open houseKeelesdale station open house
Keelesdale station open house
 
Urban Center Case Study
Urban Center Case StudyUrban Center Case Study
Urban Center Case Study
 
Caledonia station open house
Caledonia station open houseCaledonia station open house
Caledonia station open house
 
ITCamp 2019 - Peter Leeson - Vitruvian Quality
ITCamp 2019 - Peter Leeson - Vitruvian QualityITCamp 2019 - Peter Leeson - Vitruvian Quality
ITCamp 2019 - Peter Leeson - Vitruvian Quality
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2
 
Newhouse - APTA 2016 - Slides with notes
Newhouse - APTA 2016 - Slides with notesNewhouse - APTA 2016 - Slides with notes
Newhouse - APTA 2016 - Slides with notes
 
Avenue station open house
Avenue station open house Avenue station open house
Avenue station open house
 
Avenue station open house presentation
Avenue station open house presentation Avenue station open house presentation
Avenue station open house presentation
 
Community Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank StationCommunity Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank Station
 
Eglinton Station Open House
Eglinton Station Open HouseEglinton Station Open House
Eglinton Station Open House
 
Portfolio_Project
Portfolio_ProjectPortfolio_Project
Portfolio_Project
 
Cycles, Pedestrians 1
Cycles, Pedestrians 1Cycles, Pedestrians 1
Cycles, Pedestrians 1
 
Laird Station Open House
Laird Station Open HouseLaird Station Open House
Laird Station Open House
 
GW-Codman-all
GW-Codman-allGW-Codman-all
GW-Codman-all
 
Bus stops
Bus stopsBus stops
Bus stops
 
Mount Dennis Station Open House
Mount Dennis Station Open HouseMount Dennis Station Open House
Mount Dennis Station Open House
 
Park District Charrete 1 Presentation - DTN/East Lansing, 9.30.13
Park District Charrete 1 Presentation - DTN/East Lansing, 9.30.13Park District Charrete 1 Presentation - DTN/East Lansing, 9.30.13
Park District Charrete 1 Presentation - DTN/East Lansing, 9.30.13
 
Marketing Research Example
Marketing Research ExampleMarketing Research Example
Marketing Research Example
 
Denver union station
Denver union stationDenver union station
Denver union station
 

Recently uploaded

The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
ZurliaSoop
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
DUBAI (+971)581248768 BUY ABORTION PILLS IN ABU dhabi...Qatar
 

Recently uploaded (20)

The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Falcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial Wings
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
BeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdfBeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdf
 
Cracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareCracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' Slideshare
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 

Stockport Interchange Park

  • 2. Here, we will tell you about… • The plans for Interchange Park • How you might use Interchange Park • Where your ideas can shape Interchange Park • Conversations with residents so far and what we found out • Our next steps • How you can get involved
  • 3. About Stockport Interchange Stockport Interchange will be a brand new Transport Interchange with a public park on top, including: • A two-acre public park above the Transport Interchange called Interchange Park • Transport Interchange with seating, fully accessible toilets, cycle storage, and a Travelshop • The pavilion provides stair and lift access from the park to the Interchange below • Cycle lift providing access from the park to the Interchange and Trans Pennine Trail below • The oculus in the centre gives the Transport Interchange natural light and ventilation • A pedestrian and cyclist link from Interchange Park to Station Road • Trans Pennine Trail route along the River Mersey frontage for cyclists and pedestrians • Around 200 new apartments with cafes and shops on the ground floor Artist’s impression
  • 4. Stockport Interchange will be here… • It’s currently Stockport’s bus station • It will sit between Swaine Street, the A6, the River Mersey and Daw Bank • The existing bus station services will move to a temporary location on Heaton Lane car park in summer 2021 • A two-storey structure will be built. The lower level will be the Transport Interchange (including the bus station) and the upper level will be Interchange Park 1 2 3 4 5 Key: 1. Existing bus station 2. Stockport Viaduct 3. Location of new apartments 4. The Plaza 5. Stagecoach depot
  • 6. A view from the A6… Artist’s impression
  • 7. Interchange Park will sit on top of the Transport Interchange Artist’s impression A view of the new Transport Interchange from Swaine Street…
  • 8. A view of the link from Station Road… You will be able to walk or cycle from Station Road to Interchange Park Artist’s impression
  • 9. Connect through PLAY Connect with EACH OTHER Connect with ART Connect and TRAVEL Connect with NATURE How you might use Interchange Park… You can tell us how you might use Interchange Park and your ideas on this website
  • 10. The following features are fixed for structural reasons… Key: 1. The size and location of the oculus (provides natural light and ventilation to the Interchange below) 2. The pavilion building (provides access to the Interchange below) 3. New apartments, café and shops 4. The pedestrian and cycle link from the park to Station Road 5. The size and general location of trees Artist’s impression
  • 11. The features of Interchange Park that can be informed by your ideas… • How you might use the park, for example: o Community gardening o Children’s play o Events o Pop-ups and festivals o Relaxation • Features you’d like to see, for example: o Art o Play equipment o Shelter o Seating • How you will access the park • The landscaping at Hat Works Square and the river edge
  • 12. How we have collected feedback so far… • Engagement in July 2018: • A leaflet to 8,500 homes • 330 responses to public consultation • Engagement events • Public consultation in March 2020 with 178 responses • Online art workshops with Stockport families • Workshops with students at Stockport College • Workshops in primary schools
  • 13. What residents have told us so far… Local priorities include… • Seating and areas to rest • Safety, lighting and CCTV • Climate and energy efficiency • Encouraging wildlife • Decorative planting • Space for cycle parking • Outdoor event space • Shops and cafes • A safe place to play Around half of residents who have commented so far, will use Interchange Park as a route through to other destinations. The other half would like to use it as a destination in itself! You can tell us if you agree with these priorities and your ideas on how they could look or work on this website
  • 14. We want to find out more Our conversations don’t stop there! We have planned the following activities: • An opportunity to comment online through this website • A touring roadshow in our VW campervan. We will visit some of Stockport’s parks and local high streets to have a conversation in August. We will post dates and locations on the website soon • Special issue focus groups with groups we haven’t heard from so far
  • 15. Construction Enabling Works Begins AUTUM N 2021 Summer 2021 AUGUST 2021 Winter 2021 Winter 2021 Our next steps… Interchange Park Design Finalised Further Community Engagement Construction Begins Interchange Park Opens Spring 2024 Summer/ Autumn 2021 Winter 2021
  • 16. How to get involved Our online engagement website is open until 13th October 2021. We would love to hear from you! Tell us what you think about Interchange Park and what you’d like to see. There are a few ways you can do this, choose which one suits you! You can: Register your interest in our project Take our survey to give us your feedback Tell us what you think about the plans for Interchange park on a virtual post it-note Share your ideas for the park and examples of what you’d like to see in the discussion forum Contact us with your questions
  • 17. Thank you for visiting Interchange Park! People vectors designed by : studiogstock / Freepik rawpixel.com / Freepik pch.vector/ Freepik