OHII Engiineerriing,, IInc.. was ffounded tto prroviide comprrehensiive enviirronmenttall and
    OH Eng nee ng nc was ounded o p ov de comp ehens ve env onmen a and
     engiineerriing serrviices tto prriivatte,, iindusttrriiall//commerrciiall and publliic secttorr clliientts..
     eng nee ng se v ces o p va e ndus a comme c a and pub c sec o c en s
                                         Our Miissiion iis Siimplle::
                                         Our M ss on s S mp e
            Create and develop a consulting firm based on your needs and expectations. Not ours.
            Consistently deliver more than expected while treating our clients as we ourselves would
             like to be treated. Fairly. Honestly. Openly.
            Build long-term relationships based on results. Not promises.
            Deliver turnkey solutions designed to save our clients time, money and effort.
                                                Our Serviices::
                                                Our Serv ces
Services we provide include: environmental assessments; Licensed Site Professional services; design,
installation, operation and maintenance of soil and groundwater remediation systems; underground
storage tank removals, installations and compliance; hydrogeological investigations; Geotechnical
Investigations, facility environmental compliance activities; stormwater system design; water and sewer
system design; septic system design; and environmental permitting.
                                           Our Clliientts IIncllude::
                                           Our C en s nc ude
   City of Revere                                                Middlesex Savings Bank
   Fitchburg State College                                       Southeastern Economic Development Corp.
   Massasoit School
   Medway School District                                        Acuity Management
   Silver Lake Regional Schools                                  Applied Biosystems
   Town of Bridgewater                                           Augusta Holdings
   Town of Franklin                                              Bristol Pacific
   Town of Rochester                                             Churchill Forge Properties
   Town of Wrentham                                              Dunham Realty
                                                                  GDC Properties Management
   Argus Construction                                            GFI Partners
   Boro Sand and Stone                                           Independence Mall
   Bovis Lend Lease                                              Norseman Properties
   Clean Harbors Environmental Services                          Altus Pharmaceuticals
   Dowling Corporation                                           Cains Foods
   Geologic Earth Exploration Corp.                              Draka Cableteq
   J&J Contractors                                               DRS Electric Power Tech
   Paolini Construction                                          Exelon Generating Company
   TMC Services                                                  Helping Hands of America
   Triumvirate Environmental                                     INCOM
   Walsh Construction Co.                                        New England Gas Company
                                                                  Paul’s Auto Service
   Atlantic Design Engineers                                     Purecoat North
   Bartlett Nuclear.                                             Rodman Ford
   Doucet & Associates                                           Rosenfeld Realty
   Hatch Mott MacDonald                                          Spotless Cleaners
   McKenzie Engineering                                          Surf Cleaners
   Merrikin Engineering                                          Townsend Ford
   OccuHealth                                                    United Housing Management
   SGC Engineering                                               Varian Semi-Conductors
                                                                  Vermont Electric Power Company
   Anglo Irish Bank                                              Vin’s Cleaners
   Bank of Canton                                                Water Solutions Group
   Key Bank                                                      Wayland Cleaners
   Mansfield Bank                                                South Shore Cooperative Bank
ENVIIRONMENTAL SERVIICES
                        ENV RONMENTAL SERV CES
                        Qualliifiicatiions and Experiience
                        Qua f cat ons and Exper ence

                       Liicensed Siitte Proffessiionall Serviices
                       L censed S e Pro ess ona Serv ces

For projects in the Commonwealth of Massachusetts, OHI Engineering, Inc. offers Licensed Site
Professional (LSP) services to ensure that the work is completed in accordance with the
Massachusetts Contingency Plan (MCP). We have the technical knowledge and experience to
define and remediate existing problems, meet regulatory criteria, implement management plans
and use treatment technologies that work. The issues at a given site are identified and evaluated
to assess the nature and extent of the environmental impact. We work within our clients’
business plan and limitations to recommend sound remediation and/or investigative techniques
that are proven and cost-effective.

Our LSPs have over 50 years of combined
experience in assessment, remediation and
regulatory compliance. We have provided
services for sites impacted by a wide-range
of contaminants including petroleum
products, chlorinated solvents, PCBs,
metals, and other industrial chemicals. Our
projects have included sudden releases of
industrial chemicals and petroleum, PCB
releases to soil, groundwater and surface
water, releases of fuel oil at residences,
chlorinated solvent releases at metal
working and dry cleaning establishments,
among many others.



                                                    We have significant experience in all
                                                    aspects of the MCP including Immediate
                                                    Response Actions, Release Abatement
                                                    Measures,     Utility-related Abatement
                                                    Measures and Comprehensive Response
                                                    Actions.

                                                    We have prepared many Site Specific Risk
                                                    Assessments and/or Activity and Use
                                                    Limitations, which are effective tools, when
                                                    used in the right setting, for minimizing
                                                    remediation costs.




Phone: 508-339-3929                OHI Engineering, Inc.                       44 Wood Avenue
Fax: 508-339-3140                                                    Mansfield, MA 02048-1255
Consttructtiion--Rellatted Serviices
                            Cons ruc on Re a ed Serv ces

OHI Engineering, Inc. has extensive experience in providing environmental consulting services
for construction projects. Our services include preparation of Health and Safety Plans,
Stormwater Pollution Prevention Plans, Dewatering Plans and Remediation General Permits,
Dust Monitoring Plans and Excavated Materials Management Plans. Field services include
excavation oversight, dust monitoring, soil screening, soil stockpiling over-sight including
sampling and analysis, sampling and reporting for dewatering treatment systems, conducting
Utility Related Abatement Measures, and other response actions in accordance with appropriate
state regulations.

Environmental services have been provided by OHI for work in contaminated areas during
construction of athletic fields and parks, marinas, unpermitted solid waste landfill closure, airport
improvements, large-scale underground utility projects, and municipal buildings.




Phone: 508-339-3929                  OHI Engineering, Inc.                         44 Wood Avenue
Fax: 508-339-3140                                                        Mansfield, MA 02048-1255
Remediiattiion Serviices
                                     Remed a on Serv ces


      OHI Engineering, Inc. has expertise in a
wide range of remediation services including
emergency response coordination, oversight
    of contaminated soil excavation with both
     on-site stabilization and off-site disposal,
      and design of in situ chemical oxidation,
dual phase extraction, product recovery, and
   bioremediation systems. We strive to find
   the best system for our clients, and do not
    try to force fit a single technology to Sites
  with different requirements. Our personnel
have experience in developing specifications
for bidding purposes, overseeing installation,
 and in providing turnkey design, installation,
         operation and maintenance services.




Phone: 508-339-3929                    OHI Engineering, Inc.              44 Wood Avenue
Fax: 508-339-3140                                               Mansfield, MA 02048-1255
Enviironmenttall Assessmentts ffor Propertty Transffers
           Env ronmen a Assessmen s or Proper y Trans ers

OHI Engineering, Inc. has extensive experience in conducting environmental assessments for
property transfers including commercial/industrial, manufacturing, warehousing and residential
properties. Environmental site assessments are regularly prepared in conformance with
regulatory agency and private institution requirements prior to property transfers and for
construction projects including utility and building projects. Information gained during an initial
historical and records review allows us to make sound judgments regarding the appropriate level
of investigation at a specific site.




                 Hydrogeollogiicall and Geottechniicall Serviices
                 Hydrogeo og ca and Geo echn ca Serv ces
OHI Engineering, Inc. offers a broad range of services in the earth sciences and related
disciplines through expertise in hydrogeology and engineering geology. Our expertise includes
hazardous waste evaluations and groundwater contamination studies, wastewater discharge,
underground utility construction and site drainage projects. We provide pre-construction
geotechnical assessments, site design, and construction oversight. We use a multidisciplinary
approach to identify issues that have the potential to hinder or even halt a project before
construction begins.




Phone: 508-339-3929                 OHI Engineering, Inc.                        44 Wood Avenue
Fax: 508-339-3140                                                      Mansfield, MA 02048-1255
Brownffiiellds
                                            Brown e ds

Our environmental expertise coupled with our significant experience with civil
engineering/infrastructure design makes us uniquely qualified to provide assessment, remediation
and design services for Brownfields projects. We have been involved in residential housing,
commercial and industrial projects that reuse abandoned, often contaminated, former industrial
properties.




                                                    OHI Engineering is familiar with funding
                                                    mechanisms to aid our clients in obtaining
                                                    funds necessary to complete these projects
                                                    and local permitting processes. We are able
                                                    to assist the owner with administering
                                                    construction and remediation contractors
                                                    and can also provide turnkey services if
                                                    desired.




                            IIndusttriiall Complliiance Serviices
                              ndus r a Comp ance Serv ces

 As the field of waste management continues
to grow in complexity, effective, cost-efficient
   solutions are sought to manage hazardous
         and non-hazardous waste, as well as
   products that pose a liability if mishandled.
               Compliance with the Superfund
        Amendments and Reauthorization Act
(SARA) passed in 1986, OSHA, EPCRA and
   the Clean Air Act, and continually evolving
      state regulations necessitate the use of
 competent, knowledgeable and experienced
           waste management professionals to
    manage complex waste and disposal-site
         issues. OHI Engineering, Inc. has the
  knowledge and experience to assist clients
 in conducting facility compliance audits, and
             achieving and maintaining facility
                                     compliance.




Phone: 508-339-3929                   OHI Engineering, Inc.                   44 Wood Avenue
Fax: 508-339-3140                                                   Mansfield, MA 02048-1255
PROJECT DESCRIPTION


         LICENSED SITE PROFESSIONAL SERVICES
                Wastewater Treatment Plant
OHI Engineering provided Licensed Site Professional Services for a release of 4,000
gallons of Ferric Chloride at a wastewater treatment facility in southeastern
Massachusetts. Ferric chloride is a common compound used in wastewater treatment for
pH adjustment. The release impacted soil, surface water, a detention basin and nearby
wetland. OHI coordinated with the appropriate regulatory agencies and the emergency
response contractor to complete remediation work and to restore the property to pre-
release conditions.



                                              Site work was complicated as the release
                                              occurred during the winter holidays.
                                              Freezing temperatures and heavy rains
                                              added to the difficulty.




Reference:
Hank Suominen
(617) 312-6800
PROJECT DESCRIPTION


          LICENSED SITE PROFESSIONAL SERVICES
           Industrial Facility – Southeastern Massachusetts
OHI Engineering is providing Licensed Site Professional services for an industrial
facility in southeastern Massachusetts. The facility manufactures metallic plates for
photoengraving purposes. As part of the manufacturing process, mineral spirits and other
petroleum products are used for lubrication. A layer of these petroleum products has
formed on the groundwater table due to leaks in the oil recovery system and from
underground storage tanks.


                                               An extensive site assessment was
                                               conducted in the interior of the building.
                                               Issues overcome included small
                                               workspace, ensuring that manufacturing
                                               operations were not negatively affected,
                                               the significant thickness of the existing
                                               concrete slab and the fairly large extent
                                               of impact. In some wells, over three feet
                                               of non-aqueous phase liquid (NAPL)
                                               were identified.




       Free-product recovery is on-going.
   Periodic monitoring has indicated that
          NAPL layer thickness has been
   significantly reduced since the start of
     product recovery. OHI Engineering
prepared submittals to the Massachusetts
Department of Environmental Protection
           that modified the groundwater
 classification at the site so that drinking
water standards no longer have to be met
   resulting in a significant cost and time
                                    savings.
PROJECT DESCRIPTION


          LICENSED SITE PROFESSIONAL SERVICES
           Residential Development – central Massachusetts
OHI Engineering provided Licensed Site Professional Services for a property currently
being developed as a residential subdivision. As is common near the hometown of
Johnny Appleseed, this large property had been used as an apple orchard for
approximately 100 years. Orchard operations included the application of pesticides
including lead arsenate (pre-WW II) and DDT. Residual pesticides remained on-site at
concentrations above the Massachusetts residential standard. An additional area of the
farm included a “pit”, where concentrations of oil and leachable lead exceeded residential
standards.


                                                OHI’s response action to address the oil
                                                and leachable lead at the “pit” included
                                                in-situ soil stabilization to reduce
                                                leachable lead concentrations to levels
                                                below those considered hazardous. The
                                                treated soil was excavated and hauled
                                                off-site for disposal. The appropriate
                                                reports and submittals were made to the
                                                Massachusetts Department of
                                                Environmental Protection. The area
                                                currently contains three newly
                                                constructed homes.



    The former pesticide mixing area had
         extremely high concentrations of
   organochlorine pesticides in soil. The
  soil was excavated and disposed of at a
special facility in Quebec, Canada. Post-
  excavation sampling indicated that site
  conditions were suitable for residential
     construction and the site was closed.




Reference: Steven Goodman                       (617) 292 - 0101
PROJECT DESCRIPTION


                 CONSTRUCTION SERVICES
           Dumping Ground Remediation – southeastern MA
OHI Engineering provided professional services to the site’s General Contractor during
remediation of an unpermitted dumping ground located on State property. The
unpermitted dumping ground contained approximately 35,000 cubic yards of solid waste
including metals, trees and stumps, plastic, tires, glass and other debris, and soil. The
material was excavated and screened. Soil was reused where appropriate and several
waste streams were created for off-site disposal.



                                                                     .




                                                OHI prepared a Health and Safety Plan
                                                (HASP) and Stormwater Pollution
                                                Prevention Plan (SWPPP). OHI’s on-
                                                site personnel conducted soil screening,
                                                dust monitoring and construction
                                                observation services during excavation
                                                activities, coordinated stockpiling
                                                procedures, collected samples for
                                                laboratory analysis of the stockpile and
                                                at the limits of excvation, and identified
                                                appropriate disposal facilities. A closure
                                                report was prepared for submitted to the
                                                Massachusetts Department of
                                                Environmental Protection.




Reference: Steve Dowling
(508) 384-7617
PROJECT DESCRIPTION


                   LICENSED SITE PROFESSIONAL
                                   and
                     CONSTRUCTION SERVICES
                     New Police Facility – Boston, MA
OHI Engineering provided professional services to the site’s General Contractor during
construction of a new Police building in Boston, MA. The construction site previously
contained a metal plating operation that contaminated the property with metals and
chlorinated solvents.




                                               Site work was complicated due to the
                                               limited storage space available on the
                                               property for the soil stockpiles and due
                                               to winter weather conditions.




        OHI provided soil screening and
construction observation services during
       excavation activities, coordinated
       stockpiling procedures, collected
        stockpile samples for laboratory
     analysis, and identified appropriate
disposal facilities for the soil stockpiles.




Reference:
Travis Smith
(978) 452-9898
PROJECT DESCRIPTION


        UNDERGROUND STORAGE TANK CLOSURES
OHI Engineering, Inc. has completed underground storage tank (UST) at numerous
residential, industrial and commercial properties. Facilities have ranged from large
multi-story factories to small commercial facilities and single family residences. OHI has
prepared and obtained permits from local conservation commissions for work near
wetland areas. In several cases, additional evaluation involving sampling and analysis of
soil and/or groundwater samples as well as other regulatory compliance activities were
required to resolve releases from the USTs.


                                                UST closures typically involve
                                                observation during excavation and
                                                removal of the tank, field screening of
                                                soil remaining after tank removal and
                                                sampling and laboratory analysis of soil
                                                and/or groundwater samples. In some
                                                cases, releases of petroleum or
                                                hazardous wastes are identified that
                                                require compliance with appropriate
                                                state regulations. OHI can guide you
                                                through the regulatory process in a cost
                                                effective and expeditious manner.


In one case, an unknown UST was                 in a timely manner without significantly
encountered during construction of a            affecting the construction schedule.
new residence on a lakeside property.
The UST, which was full of #2 fuel oil,
was located under the former residence
that had been demolished. The UST was
struck and released approximately 400
gallons of #2 oil; OHI coordinated with
the appropriate regulatory agencies and
oversaw remediation and cleanup
including measures to limit impacts to
the adjacent lake. This site was closed
PROJECT DESCRIPTION – Remediation


          LICENSED SITE PROFESSIONAL SERVICES
                Silver Lake Regional High School
During construction of an addition to the existing High School, soil and groundwater
impacts associated with a former gasoline-containing underground storage tank were
identified. The impacts caused construction issues relative to the installation of a portion
of the stormwater control system. Due to the conditions encountered, notification of the
Massachusetts Department of Environmental Protection was required and subsequent
activities have been conducted as an Immediate Response Action (IRA) in accordance
with the Massachusetts Contingency Plan.



                                                  OHI Engineering developed the
                                                  necessary health and safety procedures
                                                  to allow installation of the stormwater
                                                  system to proceed thereby avoiding
                                                  delay to the construction schedule.
                                                  Assessment activities were conducted to
                                                  determine the extent of gasoline impacts
                                                  to the soil and groundwater at the project
                                                  site.




 A pilot test was conducted for design of
     a remediation system. High vacuum
    extraction was the chosen technology
      due to the presence of both soil and
 groundwater impacts in a relatively low
     permeability soil strata. The system
          was installed and operated until
dissolved concentrations were reduced to
 below appropriate risk-based standards.

Reference:
David Lewek
781-829-8768
PROJECT DESCRIPTION


                LICENSED SITE PROFESSIONAL
                                 and
              CONSTRUCTION RELATED SERVICES
               New Police and Fire Facility – Revere, MA
OHI Engineering provided professional services during construction of new Police
Headquarters and Fire Station buildings in Revere MA. The construction site previously
was a dumping ground that contained numerous strata of various fill materials containing
elevated levels of metals and petroleum compounds. OHI provided soil screening and
construction observation services during excavation activities, coordinated stockpiling
procedures, collected stockpiles for laboratory analysis, and identified appropriate
disposal facilities for the soil stockpiles. Approximately 4,000 cubic yards of soil were
disposed of off-site.




                                                OHI provided Licensed Site Professional
                                                services and completed appropriate
                                                reports and submittals to the
                                                Massachusetts Department of
                                                Environmental Protection. Site closure
                                                required implementation of an Activity
                                                and Use Limitation (AUL) to control
                                                future exposures to impacted soil that
                                                was left on-Site.




Reference:
Captain James Guido
(781) 286-8353
PROJECT DESCRIPTION


          LICENSED SITE PROFESSIONAL SERVICES
                John D. McGovern Middle School
                    Medway, Massachusetts

The John D. McGovern Middle School in Medway, Massachusetts, contracted the
services of OHI Engineering Inc. to oversee the removal of a historic underground
storage tank located behind the school. During the removal of the tank, petroleum
impacts to the soil where noted. Due to the conditions encountered, notification of the
Massachusetts Department of Environmental Protection was required and subsequent
activities where conducted as an Immediate Response Action in accordance with the
Massachusetts Contingency Plan.

                                                 OHI oversaw the removal of the tank,
                                                 disposal of the tank and contaminated
                                                 soil, and subsequent closure operations
                                                 while taking into consideration the
                                                 special concerns of the Site as a
                                                 functioning school. OHI developed a
                                                 comprehensive plan to ensure that a
                                                 condition of no significant risk was
                                                 present at the Site. Assessment activities
                                                 were conducted to determine the extent
                                                 of the petroleum impacts to soil,
                                                 groundwater and air.

             Soil borings and groundwater
   monitoring wells did not detect further
 petroleum impacts. To ensure the safety
    and health of the occupants of the Site
      OHI conducted a soil-gas survey by
 installing probes adjacent to the building
in the vicinity of the release. Subsequent
 to the assessment operations at the Site a
     Class A-2 Response Action Outcome
                 Statement was submitted.

Reference:
Jim MacLean      508-889-1939
PROJECT DESCRIPTION


             ENVIRONMENTAL SITE ASSESSMENTS

OHI Engineering, Inc. has completed environmental site assessments at numerous
industrial and commercial properties. The assessments were completed in accordance
with ASTM standard practices. Facilities have ranged from large multi-story factories to
small commercial facilities. The assessments are typically performed as a component of
a property transaction. In several cases, additional evaluation involving sampling and
analysis of soil and/or groundwater samples were required to resolve potential recognized
environmental conditions.




                                                Environmental Site Assessments
                                                typically involve a review of historical
                                                information, town files, state files, and a
                                                site visit. Potential recognized
                                                environmental conditions are identified
                                                and resolved through further evaluation.




Subsurface investigations may be
warranted to resolve potential
recognized environmental conditions.
OHI Engineering strives to complete the
work in a scientifically defensible
manner while being sensitive to overall
cost and timeframe. We have extensive
and wide ranging expertise in subsurface
investigations, determination of aquifer
characteristics and fate and transport
evaluations.
PROJECT DESCRIPTION


             HYDROGEOLOGICAL EVALUATIONS
OHI Engineering provides professional services for hydrogeologic evaluations for
wastewater treatment facilities and subsurface absorption systems, stormwater
management and for contaminant plume migration studies. The evaluations typically
include installation of groundwater monitoring wells, field tests to determine soil
permeability and conductivity, and computer mounding simulations to determine future
groundwater conditions.


                                                  A Hydrogeological Evaluation was
                                                conducted for a 24,200 gallon per day
                                              soil absorption system associated with a
                                              private wastewater treatment facility for
                                              a residential development. OHI installed
                                               a series of monitoring wells, conducted
                                                field testing, determined existing high
                                                   groundwater conditions using the
                                                 Frimpter Method, and prepared a 3D
                                                   groundwater model using Visual
 Visual ModFlow was used to model a                 ModFlow. A Hydrogeological
       plume migrating from for a             Evaluation Report was submitted to and
     contaminated property. Future                  approved by the Massachusetts
 projections of plume migration were          Department of Environmental Protection
    used to evaluate monitoring well          as part of the wastewater treatment plant
  locations and for planning response                      permitting process.
                actions.


   An evaluation of an existing septic
system was conducted to determine the
separation distance between an existing
leach field and groundwater table. The
     analysis included installation of
  groundwater monitoring wells, field
 testing and computer simulation of the
   expected mound using the Hantush
                 Method.
James R.. Borrebach,, PE,, LSP
                                              James R Borrebach PE LSP
                                                        Priinciipall
                                                         P r nc pa

                                         Educattiion
                                         Educa on
                 Worcester Polytechnic Institute, 1982, B.S. Civil Engineering

                                      Certtiiffiicattiions
                                      Cer ca ons
          Certified OSHA 40 Hour Hazardous Waste Site Operations (CFR 1910.120)
              Certified OSHA 24 Hour Emergency Site Specialist (CFR 1910.120)
                        Certified 8 Hour Site Supervisor (CFR 1910.120)

                                         Liicensure
                                         L censure
        Registered Professional Engineer in Massachusetts, Vermont and Rhode Island
                     Licensed Site Professional (LSP) in Massachusetts

                                      Qualliiffiicattiions
                                      Qua ca ons
Mr. Borrebach has over twenty seven years of professional experience in civil and
environmental engineering and science.          His expertise includes: environmental site
assessments; hazardous waste site investigations; site remediation and cleanup design,
permitting and installation; environmental monitoring and management for handling/disposal of
contaminated soil encountered during building, underground utility, open space (parks) and
roadway construction projects; Underground Storage Tank removals; hydrogeologic
investigations, and permit filings under numerous state and local development and
environmental statutes. His expertise also includes: engineering site design for residential,
commercial and industrial projects, storm water control system evaluation and design, design of
retaining walls, sewer systems and water supply systems. He is a Licensed Site Professional in
Massachusetts, and a registered Professional Engineer in Massachusetts and Rhode Island.

He has served as the Licensed Site Professional (LSP) of record where a release of oil or
hazardous materials required the implementation of sound response actions in compliance with
the Massachusetts Contingency Plan (MCP). The releases included: releases of gasoline and
fuel oil from underground and above ground storage tanks at commercial and industrial
facilities, power plants and residences; historical releases of oil and hazardous materials (OHM)
at petroleum, commercial and industrial facilities; spills of petroleum and industrial chemicals
from transportation accidents; and, releases of industrial chemicals due to fire.

Mr. Borrebach has directed and completed Immediate Response Actions with associated plans
and Response Action Outcome Statements at more than 100 contaminated sites. He has
designed and implemented site clean ups involving: excavation of contaminated soil; soil vapor
extraction; on-site soil treatment using thermal desorption, asphalt encapsulation, and
bioremediation; groundwater pump and treat systems; in-situ chemical oxidation, and dual
phase extraction.

He has prepared hundreds of environmental site assessments in Massachusetts, Rhode Island,
Connecticut, New York and Maine in compliance with ASTM standards or client specifications.
The projects were completed for private parties, public entities and, small and large lending
institutions.




                                               1
Projjectt Experiience
Pro ec Exper ence

Mr. Borrebach was the Licensed Site Professional of Record for a release of approximately 600
gallons of PCB-containing transformer oil that occurred during decommissioning of an industrial
site. The oil was released in close proximity to a major river in Massachusetts. Shortly after
release, a large sheen was noted on the river, and immediate response actions were
undertaken to place booms in the river to contain the sheen. The released oil moved onto a
nearby beach and impacted the beach and the beach grasses. The release also affected soil in
the vicinity of the vault system, sheet piling and piles along the riverfront. Another significant
concern was the presence of shell fishing beds further downstream from the release.
Assessment and remediation of the release included soil excavaction, cleaning and removal of
the vault system, and remediation of the affected beachfront. A Site Specific Risk Assessment
was prepared as impacts extended to surface water and sediments. The Risk Assessment
showed that the remediation was successful in achieving a condition of no significant risk to
human health, welfare, safety and the environment. Closure reports were prepared and
submitted to the EPA and to the Massachusetts DEP. Work at the site was regulated by both
the USEPA under TOSCA and the Massachusetts Department of Environmental Protection.

He served as project Licensed Site Professional for several construction projects including the
Teddy Ebersol fields in Boston, MA, the Boston Police Department facility in Roxbury, MA,
runway improvements at Hanscom Field, the New Everett Park in Everett, MA, and closure of
an unpermitted dumping ground in southeastern Massachusetts. These projects typically
included soil screening, soil sampling and laboratory analysis, soil disposal facility identification
and preparation of soil disposal paperwork, dust monitoring, health and safety plan preparation,
preparation of Remediation General Permits and Stormwater Pollution Prevention Plans as well
as submittals made to the Massachusetts Department of Environmental Protection to maintain
compliance with the Massachusetts Contingency Plan.

Mr. Borrebach was the Licensed Site Professional of record for a release of over two hundred
gallons of residential heating oil at an ocean front residence in Osterville, Massachusetts. Soils,
both outside and underneath the residence were impacted by the release. Mr. Borrebach was
responsible for developing a structural shoring system to support the three story residence while
excavation was conducted underneath the foundation of the residence. An area of the
foundation of over thirty linear feet was exposed during the excavation work with no impact to
the stability of the structure. Localized groundwater extraction and treatment was also
conducted. Remaining oil concentrations were reduced to the point where a Class A-2
Response Action Outcome was achieved.

Mr. Borrebach has been involved in providing environmental reviews, assessments, remediation
feasibility studies and closure reports for Underground Storage Tank removal projects at
gasoline stations, industrial facilities, manufacturing companies and residences.        His
responsibilities included verifying soil and groundwater conditions through field screening
techniques, developing and implementing remedial measures, and submittal of closure reports
while ensuring compliance with local, state and federal regulations, and in coordination with
owners, permitting agencies and contractors.

He was responsible for the assessment of an industrial property where high concentrations of
chlorinated solvents were discovered. He designed and implemented a remedial system pilot
test and installed a dual phase extraction system for the simultaneous removal of soil vapor and
groundwater. The design resulted in a groundwater extraction rate that was increased by a
factor of ten over that achieved by a typical groundwater extraction well. The design included
retrofitting existing monitoring wells to serve as extraction wells thereby resulting in a significant
cost savings for system installation. Mr. Borrebach prepared the Release Abatement Measure
                                                  2
Plan (RAM Plan), Phase 1 Initial Site Investigation Report, and Tier Classification submittals for
the Site in compliance with the Massachusetts Contingency Plan. Groundwater analyses
indicated a reduction in dissolved Chlorinated solvents of over ninety (90) percent after the first
three months of system operation.

He served as the Project Manager for site engineering design for a 172-unit housing
development in Haverhill, Massachusetts. He was responsible for stormwater control system
design, which included subsurface detention structures and improvements to the City of
Haverhill combined sewer system to eliminate stormwater flow from the project area to the
wastewater treatment plant. He was also responsible for site grading, sewer system design,
design of the water supply system including off-site improvements, preparation of an
Environmental Notification Form submitted under Massachusetts Environmental Policy Act
(MEPA), and for preparation of a Stormwater Pollution Prevention Plan under a National
Pollution Discharge Elimination System (NPDES) General Permit for Construction Activities in
Massachusetts.

Mr. Borrebach served as the Project Manager for site engineering design at the Silver City
Galleria in Taunton, Massachusetts. He was responsible for design of construction level
drawings for site infrastructure including stormwater control system, sanitary sewer and water
supply systems, site access and parking, site grading and retaining wall design, and design of a
large-span arch culvert bridge crossing the Cotley River. Mr. Borrebach also managed the
construction observation team and served as the environmental coordinator to maintain
compliance with the Order of Conditions issued by the Taunton Conservation Commission.

He was responsible for the engineering design of over 200 wireless telecommunications
facilities. He was in responsible charge for site survey, wetland delineation and permitting,
geotechnical and environmental studies, site infrastructure design, attendance at public
meetings for local permitting, and construction observation services. Projects were completed
in Massachusetts, New Hampshire, Rhode Island, Maryland and Virginia.

Mr. Borrebach served as Project Manager for hydrogeological investigations conducted for
small wastewater treatment plants serving commercial and residential projects. The work
included installation of groundwater monitoring wells, development of computer models to
evaluate impacts to groundwater arising from the proposed wastewater treatment facility, and
for preparation of reports and permit applications to the Massachusetts DEP.

He served as Project Manager for design of an industrial wastewater treatment system for a
manufacturing facility. He was responsible for data gathering to assess the quantity and quality
of untreated effluent, and for design of a Reverse Osmosis treatment system with RO reject
treatment via evaporation.




                                                3
Dougllas C.. Morriison
                                                    Doug as C Morr son
                                                   Seniior Projject Manager
                                                   Sen or Pro ect Manager

                                      Educattiion
                                      Educa on
                  University of New Hampshire, 1981, B.S. Geology
              University of Colorado, 1982, (Graduate studies in Geology)

                                    Certtiiffiicattiions
                                    Cer ca ons
                  OSHA 29 CFR 1910.120 40-Hour Safety Training
                 OSHA 29 CFR 1910.120 8-Hour Supervisor’s Training
                    OSHA.29.CFR.1910.120 Level A, B Certified
                  OSHA.29.CFR.1910.120 Confined Space Certified
                    Portable Gas Chromatograph Certified (1994)

                                      Affffiilliiattiions
                                      A          a ons
      Massachusetts Licensed Site Professional Organization, Associate Member
         Massachusetts Association of Land Surveyors and Civil Engineers
                  American Congress on Surveying and Mapping
                          National Water Well Association

                                    Qualliiffiicattiions
                                    Qua ca ons
Mr. Morrison has over twenty five years experience on environmental engineering
projects and construction/remediation projects throughout the continental United States.
Mr. Morrison serves as a Senior Project Manager for OHI Engineering, Inc. He is
responsible for the coordination and management of on-site project operations for sites
being investigated under the MCP regulations, including assessment, field sampling
investigations and remedial design and implementation and construction. Mr. Morrison
also has many years in the survey/engineering field with a fundamental command on
surveying principals as they apply to construction and remedial issues on the projects
he has managed.
His project experience includes assessment and geotechnical/construction
management for major pipeline utilities, commercial, industrial and private petroleum-
related spills and releases, including bulk fuel oil storage facilities and retail gasoline
stations. Mr. Morrison’s duties involve the coordination and supervision of field
investigation, sampling, Immediate Response Actions, Release Abatement Measures
and remedial activities for waste disposal sites managed under the MCP in
Massachusetts and under waste site cleanup regulations in all New England states. He
has demonstrated his knowledge of the Massachusetts Contingency Plan (MCP)
requirements by preparing Response Action Outcome Statements, Phase I through
Phase V reports, Release Abatement Measures, and the filing of Activity and Use
Limitations. Mr. Morrison has significant experience in completing Hazardous Waste
Site cleanup operations in New York, New Jersey, Kentucky and Florida, serving as the
on-site project manager for large-scale remedial projects.
Representative Project Experience
Major Petroleum Bulk Storage and Energy Facilities

Mr. Morrison served as the Project Geologist responsible for the coordination and
management of project operations for major oil company retail facilities and active bulk
terminals in eastern Massachusetts and Rhode Island. Responsibilities have included
design of monitoring well placement and construction; well log and soil interpretation,
water quality sampling and monitoring; aquifer evaluation; data control and graphics
preparation for detailed waste site disposal and hydrogeologic investigation reports. Mr.
Morrison has been involved in all aspects of remedial system design from soil vent and
sparging tests to aquifer pump tests and final implementation, as well as subcontractor
coordination of the associated remedial systems.

Mr. Morrison has been responsible for the project management of underground storage
tank (UST) removal operations throughout New York, Massachusetts, Rhode Island,
and Vermont. His duties on these projects included the coordination of subcontractors,
and supervision of field operations, data collection and management of the preparation
of final closure reports for submittal to appropriate state regulators.

Mr. Morrison has played a critical role in the performance of comprehensive
hydrogeologic investigations and environmental site assessments for major national oil
companies to assess the presence and evaluate the extent of petroleum hydrocarbon
contamination. Duties on these projects included identifying and evaluating possible
source areas, and identifying potential receptors of migrating contamination.

Site history research and environmental assessment activities at these sites have
included: review of current and historic property use; the characterization of subsurface
soil; development of site-specific media sampling plans; preparation of the design and
supervision of the installation of groundwater monitoring wells; soil and groundwater
sampling; sample handling and coordination of appropriate laboratory analyses.

Comprehensive Environmental Site Investigations - Fuel Oil Terminal


Mr. Morrison served as the Project Geologist for a comprehensive site assessment at a
major New England fuel oil terminal. His responsibilities included the coordination and
implementation of all on-site field activities for petroleum plume delineation. The
investigation included the installation of 38 groundwater monitoring wells (both in
bedrock and in overburden), performance of test pits, and implementation of extensive
soil gas surveys with mobile lab gas chromatography (GC) analyses. The project also
involved the decommissioning and excavation/removal of over 500 miles of
underground petroleum pipelines on terminal property and along right’s of ways. Other
investigation duties included: surface water and soil sampling; complete site survey and
data collection for map preparation; bedrock mapping and fracture trace analyses;
extensive file and record reviews of both state and federal records; preparation of
groundwater contour, bedrock, and subsurface utility plans (both historic and current),
surficial topography maps and contaminant isopleth maps.
Briian G.. Snow,, P..G..,, L..S..P..,, L..E..P..
                                            Br an G Snow P G L S P L E P
                                                  Seniior Projject Manager
                                                  Sen or Pro ect Manager

                                         Educattiion
                                         Educa on
                    Framingham State College, B.S. Earth Science, 1992
                Framingham State College, M.A. Business Administration, 2000

                                       Certtiiffiicattiions
                                       Cer ca ons
          Certified OSHA 40 Hour Hazardous Waste Site Operations (CFR 1910.120)
                       Certified 8 Hour Site Supervisor (CFR 1910.120)

                                         Liicensure
                                         L censure
                      Licensed Site Professional (LSP) in Massachusetts
                  Licensed Environmental Professional (LEP) in Connecticut
              Licensed Professional Geologist (New Hampshire and Tennessee)
                       Waste Water Treatment Plant Operator Grade I-2
                                              ‘

                                      Qualliiffiicattiions
                                      Qua ca ons

Mr. Snow has over eighteen years of professional experience in environmental engineering and
science. His expertise includes: site investigation, bedrock investigations, drinking water
treatment, construction support and permitting, remedial design, remediation system
construction, operation and decommissioning, property assessments, indoor air investigation,
litigation support, insurance support, cost assessment, lifecycle costing, compliance assistance,
reimbursement support, risk assessment, and most important regulatory closure.

He has served as the Licensed Site Professional (LSP) of record for numerous response
situations where the release of oil and hazardous materials required the implementation of
sound response actions in compliance with the Massachusetts Contingency Plan (MCP). The
releases included: releases of gasoline and fuel oil from underground and above ground storage
tanks at commercial and industrial facilities, power plants and residences; historical releases of
oil and hazardous materials (OHM) at petroleum, commercial and industrial facilities; spills of
petroleum and industrial chemicals from transportation accidents; and, releases of industrial
chemicals due to fire.

Mr. Snow has directed and completed Immediate Response Actions with associated plans and
Response Action Outcome Statements at more than fifty petroleum contaminated sites. He has
designed and implemented site clean ups involving: excavation of contaminated soil; soil vapor
extraction; on-site soil treatment using thermal desorption, asphalt encapsulation, and
bioremediation; groundwater pump and treat systems; in-situ chemical oxidation, and dual
phase extraction.

He has prepared hundreds of environmental site assessments in Massachusetts, Rhode Island,
Connecticut, New York and Maine in compliance with ASTM standards or client specifications.
The projects were completed for private parties, public entities and, small and large lending
institutions.




                                                1
Projjectt Experiience
                                       Pro ec Exper ence

Mr. Snow served as the Senior Project Manager and LSP for a project on the north shore
(Massachusetts) where petroleum vapors were detected in a daycare adjacent to the client’s
property. The project was also within the Zone A of a Class A surface water body. The project
included the restarting and redesigning of an existing air sparge and soil vapor extraction system.
During the other firm’s initial indoor air assessment and risk assessments, an Imminent Hazard (IH)
was identified. At the client’s request, I reviewed indoor air assessment and risk assessment and
revised the conclusions to more accurately evaluate risk posed by the client’s release. Subsequent
investigations of vapor intrustion pathways included the installation of soil gas probes under and
around the daycare at various depths, and sampling of indoor air, soil gas, groundwater, and soil.
Numerous IH and substantial hazard evaluations were also completed using Method 3 Risk
Characterization. A sulfur hexafluoride tracer gas study was conducted in order to determine the
migration pathway of contaminants to the daycare. Contaminants not related to the disposal site
were ruled out and attributed to the other remaining businesses in the daycare building. I prepared
a Immediate Response Action (IRA) Plan, IRA Status Reports, an IRA Completion report, Phase I,
II, III, IV, and V documents including a Remedy Operating Status Opinion for the site. I also
designed the Phase II investigation, a pilot test, additional remedial components and demonstrated
vacuum influence and source control. I also provided support for litigation related to the indoor air
impacts and to previous parties contributing to the release(s).

Mr. Snow was the Senior Project Manager and LSP for a former industrial site in western
Massachusetts. The site was impacted with PCBs, Metals and petroleum products. A previous
consulting firm conducted an ASTM Phase I for the owner prior to the purchase stating that the
parcel was not likely impacted. Subsequently a second ASTM Phase I was conducted by a
potential purchaser, leading to an ASTM Phase II Investigation. The property was previously
utilized by a major electrical utility company, a junk yard, and machine shop. The property was
also adjacent to multiple rail lines and had a former rail spur and siding through the property. He
designed an MCP Phase II investigation to delineate the PCBs and metals. Since the project was
not in compliance with MCP deadlines, revised deadlines were negotiated with the MassDEP and
penalties were avoided. Impacts at the site extended beyond the property borders, requiring
access to multiple parcels including property owned by the power company and the city. The
project also included legal support with regard to potential suits against the power company
(source of the PCBs) and the first consultant. The project included multiple meetings with counsel,
opposing counsel, and the MassDEP to gain access and determine damages. Multpile cost
estimates and scenarios were presented to counsel and the client regarding potential remedial and
long term management costs. Draft AULs were prepared. TOSCA did not apply to the site and the
PCBs were averaged to below S-1 Standards.

Mr. Snow served as the Senior Project Manager and LSP for an emergency response in Lowell,
Massachusetts. An owner of a restaurant complained to the Fire Department about petroleum
vapors in the basement of their building. Mr. Snow met the Fire Department, Police Department,
MassDEP, and Water and Sewer Department at the site. He determined the source of the release
was a nearby gasoline station. A carbon filtration system was installed in the basement of the
restaurant as well as a series of monitoring wells and soil gas probes. A soil vapor extraction
system (SVES) pilot test was completed and a temporary SVES was installed to provide vacuum
control and abate an IH condition created by an explosive condition in the sewer lines. The
temporary SVES was operational on the second day after the complaint. Follow-up work included
the preparation of MCP deliverables, correspondence with the MassDEP and Fire Department as
well as the permanent design and install of the SVES and migration pathway assessment.




                                                 2
James F.. Dalley,, LSP
                                                   James F Da ey LSP
                                                     Projject Manager
                                                     Pro ect Manager

                                     Educattiion
                                     Educa on
                      University of Vermont, 1989, B.S. Geology

                                      Liicenses
                                      L censes
                        Licensed Site Professional (LSP)
               Massachusetts Board of Hazardous Waste Site Cleanup

                                   Certtiiffiicattiions
                                   Cer ca ons
      Certified OSHA 40 Hour Hazardous Waste Site Operations (CFR 1910.120)
                   Certified 8 Hour Site Supervisor (CFR 1910.120)
                             Confined Space Entry Training

                                   Membershiips
                                   Membersh ps
                        Licensed Site Professional Association
                          National Groundwater Association

                                  Qualliiffiicattiions
                                  Qua ca ons
Mr. Daley has over nineteen years of professional experience. His expertise includes:
environmental, hydrogeologic and geotechnical site investigation, environmental
remediation, waste management, water supply & wastewater evaluations, and related
regulatory compliance reporting. Primary responsibilities include project management,
budgeting and scheduling; work plan development; preparation of technical reports and
correspondence; permitting, communication & coordination w/ regulatory officials; safety
compliance; and data collection, management and quality assurance. General project
experience includes waste site investigation; hydrogeologic evaluation & aquifer
analysis; groundwater & contaminant modeling; storage tank closure; remediation
design & implementation; waste management & disposal; geotechnical investigation,
and other technical drilling projects.

                               Projjectt Experiience
                               Pro ec Exper ence

Mr. Daley was the Project Manager for in-situ bioremediation project at a former
industrial facility. He directed and managed installation of the treatment system to
remediate a dissolved/adsorbed hydrocarbon plume. Mr. Daley was responsible for
reporting, communication, and correspondence to regulatory agencies for acquisition of
permits and approvals, and for coordination of agency site inspections. System
operation required quarterly groundwater contaminant monitoring, and semi-annual bio-
chemistry evaluations.
Mr. Daley was the Project Manager for remedial evaluations at former gasoline filling
station sites where he managed site investigations, developed site conceptual models,
and remedial cost analyses and feasibility evaluations. He prepared contractor bid
documents for solicitation of bids for remediation. Mr. Daley performed SVE, and
groundwater extraction pilot testing, and prepared pilot testing report and developed
remediation plans.

Mr. Daley managed the comprehensive site investigation and remediation of a
perchloroethylene/trichloroethylene release site. Contamination of nearby public water
supply wells and complex geologic setting required special assessment methodologies,
and QA/QC procedures, which were conducted with a high level of regulatory oversight,
and public involvement. He constructed 3D computer model for mapping/modeling of
site geology and contaminant plume, prepared the Preliminary Site Investigation Report,
and Work plan for completion of site characterization and initiation of remedial actions.
In-situ biological and/or chemical remediation technologies were determined to be most
feasible for this site.

Mr. Daley provided oversight and coordination of emergency response & clean-up of a
large PCB-oil release from an electric generation facility to a marine waterway and
adjacent tidal areas. Involvement of EPA, Cost Guard, local officials and numerous
contractors presented substantial technical, regulatory and political challenges.
Remediation wastes classified as federally-regulated TSCA wastes required special
handling & disposal procedures. He designed and implemented a soil, groundwater,
surface water, and sediment sampling program in accordance with EPA PCB protocols.
The site was successfully cleaned-up to satisfaction of EPA, DEP, and local officials.
He produced all applicable regulatory submittals and correspondence including
Immediate Response Action (IRA) Plan, IRA Completion, and Response Action
Outcome (RAO) and Risk Characterization reports.

Mr. Daley installed and operated data collection systems for monitoring of pumping
tests; performed numerical analyses for determination of hydraulic conductivity values;
and constructed groundwater models for simulations of conceptual pumping conditions
for proposed irrigation and public water supply wells and for evaluation of contaminated
sites. The computer models were used to delineate Zone II’s for proposed pumping
conditions, and to evaluate contaminant transport adjacent to Superfund DNAPL site.
He also performed numerous hydrogeological investigations and groundwater modeling
for permitting of proposed wastewater treatment systems. The work included pumping
and slug tests, installation and operation of data collection systems, numerical analysis
of pumping/slug data, and construction of groundwater models for simulation of
proposed wastewater injections. Mr. Daley was responsible for preparation of reports of
investigations and modeling for submittal with permit applications.
Mr. Daley provided oversight and technical support for clean-up of arsenic residue from
pesticide applications at electric substation facilities. He designed and implemented
assessment, remedial, wetlands protection and dust monitoring & control plans. During
the remediation work, Mr. Daley provided oversight and coordination for management
and disposal of waste soils and compliance with municipal and state regulations, and
standard occupational safety practices. The Site was successfully cleaned-up to
applicable risk standards.
Tiimothy J.. Maguiire
                                                     T mothy J Magu re
                                                   Enviironmentall Sciientiist
                                                   Env ronmenta Sc ent st


                                      Educattiion
                                      Educa on
                        Massachusetts Maritime Academy, 2003,
                    B.S. Marine Safety and Environmental Protection


                                    Certtiiffiicattiions
                                    Cer ca ons
                      USGBC LEED® Accredited Professional
                  OSHA 29 CFR 1910.120 40-Hour Safety Training
                OSHA 29 CFR 1910.120 24-Hour Incident Commander
               Massachusetts Wastewater Certified Operator Grade 4-M



                                      Affffiilliiattiions
                                      A          a ons
                        American Institute of Biological Sciences


                                    Qualliiffiicattiions
                                    Qua ca ons
Mr. Maguire has over five years experience in environmental projects and marine
environmental projects throughout the continental United States. Mr. Maguire serves as
an Environmental Scientist for OHI Engineering, Inc. He is responsible for the
coordination of on-site project operations for sites being investigated under the
Massachusetts Contingency Plan (MCP) regulations, including assessment, field
sampling investigations and remedial implementation.
His project experience includes assessments of commercial, industrial and private
petroleum-related spills and releases, including bulk fuel oil storage facilities and retail
gasoline stations. Mr. Maguire’s duties involve the coordination and supervision of field
investigation, sampling, Immediate Response Actions, Release Abatement Measures
and remedial activities for waste disposal sites managed under the MCP in
Massachusetts and under waste site cleanup regulations in all New England states. He
has demonstrated his knowledge of the MCP requirements by preparing Response
Action Outcome Statements, Phase I through Phase V reports, Release Abatement
Measures, and the filing of Activity and Use Limitations.
Deanna D.. Trudeau
                                                      Deanna D Trudeau
                                                    Enviironmentall Engiineer
                                                    Env ronmenta Eng neer



                                    Educattiion
                                    Educa on
             B.S. Chemical Engineering, University of Notre Dame, 1985

                                  Certtiiffiicattiions
                                  Cer ca ons
      Certified OSHA 40 Hour Hazardous Waste Site Operations (CFR 1910.120)
                   Certified 8 Hour Site Supervisor (CFR 1910.120)
                                 Engineer in Training

                                    Affffiilliiattiions
                                    A          a ons
                       American Institute of Chemical Engineers
                            Society of Women Engineers


                                  Qualliiffiicattiions
                                  Qua ca ons
Ms. Trudeau has 17 years of experience in environmental engineering and consulting.
Her expertise includes: environmental site assessments; air emissions and air pollution
controls; contaminated soil management; hazardous materials and hazardous waste
management; storm water pollution prevention and permitting; underground storage
tank investigations, closure and remediation; and environmental reporting such as
Toxics Release Inventory Reporting.

Ms. Trudeau is an Environmental Engineer with responsibilities including environmental
and RCRA compliance reporting, Phase I and Phase II Environmental Site
Assessments, indoor air quality investigations, and industrial hygiene surveys. She is
responsible for data interpretation, conformance with regulatory requirements, and
reporting with detailed recommended response actions.


                               Projjectt Experiience
                               Pro ec Exper ence
Ms. Trudeau managed a multi-faceted environmental protection and natural resources
conservation program for five years. The work was conducted for a highly-visible US
Marine Corps installation that encompassed 433 acres and supported nearly 6,000
personnel. For her efforts, Ms. Trudeau received the Commander-in-Chief’s Special
Recognition for Installation Excellence and the USMC Federal Environmental Engineer
of the Year award.

Statement Of Qualifications Update 8 2010 (2)

  • 1.
    OHII Engiineerriing,, IInc..was ffounded tto prroviide comprrehensiive enviirronmenttall and OH Eng nee ng nc was ounded o p ov de comp ehens ve env onmen a and engiineerriing serrviices tto prriivatte,, iindusttrriiall//commerrciiall and publliic secttorr clliientts.. eng nee ng se v ces o p va e ndus a comme c a and pub c sec o c en s Our Miissiion iis Siimplle:: Our M ss on s S mp e  Create and develop a consulting firm based on your needs and expectations. Not ours.  Consistently deliver more than expected while treating our clients as we ourselves would like to be treated. Fairly. Honestly. Openly.  Build long-term relationships based on results. Not promises.  Deliver turnkey solutions designed to save our clients time, money and effort. Our Serviices:: Our Serv ces Services we provide include: environmental assessments; Licensed Site Professional services; design, installation, operation and maintenance of soil and groundwater remediation systems; underground storage tank removals, installations and compliance; hydrogeological investigations; Geotechnical Investigations, facility environmental compliance activities; stormwater system design; water and sewer system design; septic system design; and environmental permitting. Our Clliientts IIncllude:: Our C en s nc ude  City of Revere  Middlesex Savings Bank  Fitchburg State College  Southeastern Economic Development Corp.  Massasoit School  Medway School District  Acuity Management  Silver Lake Regional Schools  Applied Biosystems  Town of Bridgewater  Augusta Holdings  Town of Franklin  Bristol Pacific  Town of Rochester  Churchill Forge Properties  Town of Wrentham  Dunham Realty  GDC Properties Management  Argus Construction  GFI Partners  Boro Sand and Stone  Independence Mall  Bovis Lend Lease  Norseman Properties  Clean Harbors Environmental Services  Altus Pharmaceuticals  Dowling Corporation  Cains Foods  Geologic Earth Exploration Corp.  Draka Cableteq  J&J Contractors  DRS Electric Power Tech  Paolini Construction  Exelon Generating Company  TMC Services  Helping Hands of America  Triumvirate Environmental  INCOM  Walsh Construction Co.  New England Gas Company  Paul’s Auto Service  Atlantic Design Engineers  Purecoat North  Bartlett Nuclear.  Rodman Ford  Doucet & Associates  Rosenfeld Realty  Hatch Mott MacDonald  Spotless Cleaners  McKenzie Engineering  Surf Cleaners  Merrikin Engineering  Townsend Ford  OccuHealth  United Housing Management  SGC Engineering  Varian Semi-Conductors  Vermont Electric Power Company  Anglo Irish Bank  Vin’s Cleaners  Bank of Canton  Water Solutions Group  Key Bank  Wayland Cleaners  Mansfield Bank  South Shore Cooperative Bank
  • 2.
    ENVIIRONMENTAL SERVIICES ENV RONMENTAL SERV CES Qualliifiicatiions and Experiience Qua f cat ons and Exper ence Liicensed Siitte Proffessiionall Serviices L censed S e Pro ess ona Serv ces For projects in the Commonwealth of Massachusetts, OHI Engineering, Inc. offers Licensed Site Professional (LSP) services to ensure that the work is completed in accordance with the Massachusetts Contingency Plan (MCP). We have the technical knowledge and experience to define and remediate existing problems, meet regulatory criteria, implement management plans and use treatment technologies that work. The issues at a given site are identified and evaluated to assess the nature and extent of the environmental impact. We work within our clients’ business plan and limitations to recommend sound remediation and/or investigative techniques that are proven and cost-effective. Our LSPs have over 50 years of combined experience in assessment, remediation and regulatory compliance. We have provided services for sites impacted by a wide-range of contaminants including petroleum products, chlorinated solvents, PCBs, metals, and other industrial chemicals. Our projects have included sudden releases of industrial chemicals and petroleum, PCB releases to soil, groundwater and surface water, releases of fuel oil at residences, chlorinated solvent releases at metal working and dry cleaning establishments, among many others. We have significant experience in all aspects of the MCP including Immediate Response Actions, Release Abatement Measures, Utility-related Abatement Measures and Comprehensive Response Actions. We have prepared many Site Specific Risk Assessments and/or Activity and Use Limitations, which are effective tools, when used in the right setting, for minimizing remediation costs. Phone: 508-339-3929 OHI Engineering, Inc. 44 Wood Avenue Fax: 508-339-3140 Mansfield, MA 02048-1255
  • 3.
    Consttructtiion--Rellatted Serviices Cons ruc on Re a ed Serv ces OHI Engineering, Inc. has extensive experience in providing environmental consulting services for construction projects. Our services include preparation of Health and Safety Plans, Stormwater Pollution Prevention Plans, Dewatering Plans and Remediation General Permits, Dust Monitoring Plans and Excavated Materials Management Plans. Field services include excavation oversight, dust monitoring, soil screening, soil stockpiling over-sight including sampling and analysis, sampling and reporting for dewatering treatment systems, conducting Utility Related Abatement Measures, and other response actions in accordance with appropriate state regulations. Environmental services have been provided by OHI for work in contaminated areas during construction of athletic fields and parks, marinas, unpermitted solid waste landfill closure, airport improvements, large-scale underground utility projects, and municipal buildings. Phone: 508-339-3929 OHI Engineering, Inc. 44 Wood Avenue Fax: 508-339-3140 Mansfield, MA 02048-1255
  • 4.
    Remediiattiion Serviices Remed a on Serv ces OHI Engineering, Inc. has expertise in a wide range of remediation services including emergency response coordination, oversight of contaminated soil excavation with both on-site stabilization and off-site disposal, and design of in situ chemical oxidation, dual phase extraction, product recovery, and bioremediation systems. We strive to find the best system for our clients, and do not try to force fit a single technology to Sites with different requirements. Our personnel have experience in developing specifications for bidding purposes, overseeing installation, and in providing turnkey design, installation, operation and maintenance services. Phone: 508-339-3929 OHI Engineering, Inc. 44 Wood Avenue Fax: 508-339-3140 Mansfield, MA 02048-1255
  • 5.
    Enviironmenttall Assessmentts fforPropertty Transffers Env ronmen a Assessmen s or Proper y Trans ers OHI Engineering, Inc. has extensive experience in conducting environmental assessments for property transfers including commercial/industrial, manufacturing, warehousing and residential properties. Environmental site assessments are regularly prepared in conformance with regulatory agency and private institution requirements prior to property transfers and for construction projects including utility and building projects. Information gained during an initial historical and records review allows us to make sound judgments regarding the appropriate level of investigation at a specific site. Hydrogeollogiicall and Geottechniicall Serviices Hydrogeo og ca and Geo echn ca Serv ces OHI Engineering, Inc. offers a broad range of services in the earth sciences and related disciplines through expertise in hydrogeology and engineering geology. Our expertise includes hazardous waste evaluations and groundwater contamination studies, wastewater discharge, underground utility construction and site drainage projects. We provide pre-construction geotechnical assessments, site design, and construction oversight. We use a multidisciplinary approach to identify issues that have the potential to hinder or even halt a project before construction begins. Phone: 508-339-3929 OHI Engineering, Inc. 44 Wood Avenue Fax: 508-339-3140 Mansfield, MA 02048-1255
  • 6.
    Brownffiiellds Brown e ds Our environmental expertise coupled with our significant experience with civil engineering/infrastructure design makes us uniquely qualified to provide assessment, remediation and design services for Brownfields projects. We have been involved in residential housing, commercial and industrial projects that reuse abandoned, often contaminated, former industrial properties. OHI Engineering is familiar with funding mechanisms to aid our clients in obtaining funds necessary to complete these projects and local permitting processes. We are able to assist the owner with administering construction and remediation contractors and can also provide turnkey services if desired. IIndusttriiall Complliiance Serviices ndus r a Comp ance Serv ces As the field of waste management continues to grow in complexity, effective, cost-efficient solutions are sought to manage hazardous and non-hazardous waste, as well as products that pose a liability if mishandled. Compliance with the Superfund Amendments and Reauthorization Act (SARA) passed in 1986, OSHA, EPCRA and the Clean Air Act, and continually evolving state regulations necessitate the use of competent, knowledgeable and experienced waste management professionals to manage complex waste and disposal-site issues. OHI Engineering, Inc. has the knowledge and experience to assist clients in conducting facility compliance audits, and achieving and maintaining facility compliance. Phone: 508-339-3929 OHI Engineering, Inc. 44 Wood Avenue Fax: 508-339-3140 Mansfield, MA 02048-1255
  • 7.
    PROJECT DESCRIPTION LICENSED SITE PROFESSIONAL SERVICES Wastewater Treatment Plant OHI Engineering provided Licensed Site Professional Services for a release of 4,000 gallons of Ferric Chloride at a wastewater treatment facility in southeastern Massachusetts. Ferric chloride is a common compound used in wastewater treatment for pH adjustment. The release impacted soil, surface water, a detention basin and nearby wetland. OHI coordinated with the appropriate regulatory agencies and the emergency response contractor to complete remediation work and to restore the property to pre- release conditions. Site work was complicated as the release occurred during the winter holidays. Freezing temperatures and heavy rains added to the difficulty. Reference: Hank Suominen (617) 312-6800
  • 8.
    PROJECT DESCRIPTION LICENSED SITE PROFESSIONAL SERVICES Industrial Facility – Southeastern Massachusetts OHI Engineering is providing Licensed Site Professional services for an industrial facility in southeastern Massachusetts. The facility manufactures metallic plates for photoengraving purposes. As part of the manufacturing process, mineral spirits and other petroleum products are used for lubrication. A layer of these petroleum products has formed on the groundwater table due to leaks in the oil recovery system and from underground storage tanks. An extensive site assessment was conducted in the interior of the building. Issues overcome included small workspace, ensuring that manufacturing operations were not negatively affected, the significant thickness of the existing concrete slab and the fairly large extent of impact. In some wells, over three feet of non-aqueous phase liquid (NAPL) were identified. Free-product recovery is on-going. Periodic monitoring has indicated that NAPL layer thickness has been significantly reduced since the start of product recovery. OHI Engineering prepared submittals to the Massachusetts Department of Environmental Protection that modified the groundwater classification at the site so that drinking water standards no longer have to be met resulting in a significant cost and time savings.
  • 9.
    PROJECT DESCRIPTION LICENSED SITE PROFESSIONAL SERVICES Residential Development – central Massachusetts OHI Engineering provided Licensed Site Professional Services for a property currently being developed as a residential subdivision. As is common near the hometown of Johnny Appleseed, this large property had been used as an apple orchard for approximately 100 years. Orchard operations included the application of pesticides including lead arsenate (pre-WW II) and DDT. Residual pesticides remained on-site at concentrations above the Massachusetts residential standard. An additional area of the farm included a “pit”, where concentrations of oil and leachable lead exceeded residential standards. OHI’s response action to address the oil and leachable lead at the “pit” included in-situ soil stabilization to reduce leachable lead concentrations to levels below those considered hazardous. The treated soil was excavated and hauled off-site for disposal. The appropriate reports and submittals were made to the Massachusetts Department of Environmental Protection. The area currently contains three newly constructed homes. The former pesticide mixing area had extremely high concentrations of organochlorine pesticides in soil. The soil was excavated and disposed of at a special facility in Quebec, Canada. Post- excavation sampling indicated that site conditions were suitable for residential construction and the site was closed. Reference: Steven Goodman (617) 292 - 0101
  • 10.
    PROJECT DESCRIPTION CONSTRUCTION SERVICES Dumping Ground Remediation – southeastern MA OHI Engineering provided professional services to the site’s General Contractor during remediation of an unpermitted dumping ground located on State property. The unpermitted dumping ground contained approximately 35,000 cubic yards of solid waste including metals, trees and stumps, plastic, tires, glass and other debris, and soil. The material was excavated and screened. Soil was reused where appropriate and several waste streams were created for off-site disposal. . OHI prepared a Health and Safety Plan (HASP) and Stormwater Pollution Prevention Plan (SWPPP). OHI’s on- site personnel conducted soil screening, dust monitoring and construction observation services during excavation activities, coordinated stockpiling procedures, collected samples for laboratory analysis of the stockpile and at the limits of excvation, and identified appropriate disposal facilities. A closure report was prepared for submitted to the Massachusetts Department of Environmental Protection. Reference: Steve Dowling (508) 384-7617
  • 11.
    PROJECT DESCRIPTION LICENSED SITE PROFESSIONAL and CONSTRUCTION SERVICES New Police Facility – Boston, MA OHI Engineering provided professional services to the site’s General Contractor during construction of a new Police building in Boston, MA. The construction site previously contained a metal plating operation that contaminated the property with metals and chlorinated solvents. Site work was complicated due to the limited storage space available on the property for the soil stockpiles and due to winter weather conditions. OHI provided soil screening and construction observation services during excavation activities, coordinated stockpiling procedures, collected stockpile samples for laboratory analysis, and identified appropriate disposal facilities for the soil stockpiles. Reference: Travis Smith (978) 452-9898
  • 12.
    PROJECT DESCRIPTION UNDERGROUND STORAGE TANK CLOSURES OHI Engineering, Inc. has completed underground storage tank (UST) at numerous residential, industrial and commercial properties. Facilities have ranged from large multi-story factories to small commercial facilities and single family residences. OHI has prepared and obtained permits from local conservation commissions for work near wetland areas. In several cases, additional evaluation involving sampling and analysis of soil and/or groundwater samples as well as other regulatory compliance activities were required to resolve releases from the USTs. UST closures typically involve observation during excavation and removal of the tank, field screening of soil remaining after tank removal and sampling and laboratory analysis of soil and/or groundwater samples. In some cases, releases of petroleum or hazardous wastes are identified that require compliance with appropriate state regulations. OHI can guide you through the regulatory process in a cost effective and expeditious manner. In one case, an unknown UST was in a timely manner without significantly encountered during construction of a affecting the construction schedule. new residence on a lakeside property. The UST, which was full of #2 fuel oil, was located under the former residence that had been demolished. The UST was struck and released approximately 400 gallons of #2 oil; OHI coordinated with the appropriate regulatory agencies and oversaw remediation and cleanup including measures to limit impacts to the adjacent lake. This site was closed
  • 13.
    PROJECT DESCRIPTION –Remediation LICENSED SITE PROFESSIONAL SERVICES Silver Lake Regional High School During construction of an addition to the existing High School, soil and groundwater impacts associated with a former gasoline-containing underground storage tank were identified. The impacts caused construction issues relative to the installation of a portion of the stormwater control system. Due to the conditions encountered, notification of the Massachusetts Department of Environmental Protection was required and subsequent activities have been conducted as an Immediate Response Action (IRA) in accordance with the Massachusetts Contingency Plan. OHI Engineering developed the necessary health and safety procedures to allow installation of the stormwater system to proceed thereby avoiding delay to the construction schedule. Assessment activities were conducted to determine the extent of gasoline impacts to the soil and groundwater at the project site. A pilot test was conducted for design of a remediation system. High vacuum extraction was the chosen technology due to the presence of both soil and groundwater impacts in a relatively low permeability soil strata. The system was installed and operated until dissolved concentrations were reduced to below appropriate risk-based standards. Reference: David Lewek 781-829-8768
  • 14.
    PROJECT DESCRIPTION LICENSED SITE PROFESSIONAL and CONSTRUCTION RELATED SERVICES New Police and Fire Facility – Revere, MA OHI Engineering provided professional services during construction of new Police Headquarters and Fire Station buildings in Revere MA. The construction site previously was a dumping ground that contained numerous strata of various fill materials containing elevated levels of metals and petroleum compounds. OHI provided soil screening and construction observation services during excavation activities, coordinated stockpiling procedures, collected stockpiles for laboratory analysis, and identified appropriate disposal facilities for the soil stockpiles. Approximately 4,000 cubic yards of soil were disposed of off-site. OHI provided Licensed Site Professional services and completed appropriate reports and submittals to the Massachusetts Department of Environmental Protection. Site closure required implementation of an Activity and Use Limitation (AUL) to control future exposures to impacted soil that was left on-Site. Reference: Captain James Guido (781) 286-8353
  • 15.
    PROJECT DESCRIPTION LICENSED SITE PROFESSIONAL SERVICES John D. McGovern Middle School Medway, Massachusetts The John D. McGovern Middle School in Medway, Massachusetts, contracted the services of OHI Engineering Inc. to oversee the removal of a historic underground storage tank located behind the school. During the removal of the tank, petroleum impacts to the soil where noted. Due to the conditions encountered, notification of the Massachusetts Department of Environmental Protection was required and subsequent activities where conducted as an Immediate Response Action in accordance with the Massachusetts Contingency Plan. OHI oversaw the removal of the tank, disposal of the tank and contaminated soil, and subsequent closure operations while taking into consideration the special concerns of the Site as a functioning school. OHI developed a comprehensive plan to ensure that a condition of no significant risk was present at the Site. Assessment activities were conducted to determine the extent of the petroleum impacts to soil, groundwater and air. Soil borings and groundwater monitoring wells did not detect further petroleum impacts. To ensure the safety and health of the occupants of the Site OHI conducted a soil-gas survey by installing probes adjacent to the building in the vicinity of the release. Subsequent to the assessment operations at the Site a Class A-2 Response Action Outcome Statement was submitted. Reference: Jim MacLean 508-889-1939
  • 16.
    PROJECT DESCRIPTION ENVIRONMENTAL SITE ASSESSMENTS OHI Engineering, Inc. has completed environmental site assessments at numerous industrial and commercial properties. The assessments were completed in accordance with ASTM standard practices. Facilities have ranged from large multi-story factories to small commercial facilities. The assessments are typically performed as a component of a property transaction. In several cases, additional evaluation involving sampling and analysis of soil and/or groundwater samples were required to resolve potential recognized environmental conditions. Environmental Site Assessments typically involve a review of historical information, town files, state files, and a site visit. Potential recognized environmental conditions are identified and resolved through further evaluation. Subsurface investigations may be warranted to resolve potential recognized environmental conditions. OHI Engineering strives to complete the work in a scientifically defensible manner while being sensitive to overall cost and timeframe. We have extensive and wide ranging expertise in subsurface investigations, determination of aquifer characteristics and fate and transport evaluations.
  • 17.
    PROJECT DESCRIPTION HYDROGEOLOGICAL EVALUATIONS OHI Engineering provides professional services for hydrogeologic evaluations for wastewater treatment facilities and subsurface absorption systems, stormwater management and for contaminant plume migration studies. The evaluations typically include installation of groundwater monitoring wells, field tests to determine soil permeability and conductivity, and computer mounding simulations to determine future groundwater conditions. A Hydrogeological Evaluation was conducted for a 24,200 gallon per day soil absorption system associated with a private wastewater treatment facility for a residential development. OHI installed a series of monitoring wells, conducted field testing, determined existing high groundwater conditions using the Frimpter Method, and prepared a 3D groundwater model using Visual Visual ModFlow was used to model a ModFlow. A Hydrogeological plume migrating from for a Evaluation Report was submitted to and contaminated property. Future approved by the Massachusetts projections of plume migration were Department of Environmental Protection used to evaluate monitoring well as part of the wastewater treatment plant locations and for planning response permitting process. actions. An evaluation of an existing septic system was conducted to determine the separation distance between an existing leach field and groundwater table. The analysis included installation of groundwater monitoring wells, field testing and computer simulation of the expected mound using the Hantush Method.
  • 18.
    James R.. Borrebach,,PE,, LSP James R Borrebach PE LSP Priinciipall P r nc pa Educattiion Educa on Worcester Polytechnic Institute, 1982, B.S. Civil Engineering Certtiiffiicattiions Cer ca ons Certified OSHA 40 Hour Hazardous Waste Site Operations (CFR 1910.120) Certified OSHA 24 Hour Emergency Site Specialist (CFR 1910.120) Certified 8 Hour Site Supervisor (CFR 1910.120) Liicensure L censure Registered Professional Engineer in Massachusetts, Vermont and Rhode Island Licensed Site Professional (LSP) in Massachusetts Qualliiffiicattiions Qua ca ons Mr. Borrebach has over twenty seven years of professional experience in civil and environmental engineering and science. His expertise includes: environmental site assessments; hazardous waste site investigations; site remediation and cleanup design, permitting and installation; environmental monitoring and management for handling/disposal of contaminated soil encountered during building, underground utility, open space (parks) and roadway construction projects; Underground Storage Tank removals; hydrogeologic investigations, and permit filings under numerous state and local development and environmental statutes. His expertise also includes: engineering site design for residential, commercial and industrial projects, storm water control system evaluation and design, design of retaining walls, sewer systems and water supply systems. He is a Licensed Site Professional in Massachusetts, and a registered Professional Engineer in Massachusetts and Rhode Island. He has served as the Licensed Site Professional (LSP) of record where a release of oil or hazardous materials required the implementation of sound response actions in compliance with the Massachusetts Contingency Plan (MCP). The releases included: releases of gasoline and fuel oil from underground and above ground storage tanks at commercial and industrial facilities, power plants and residences; historical releases of oil and hazardous materials (OHM) at petroleum, commercial and industrial facilities; spills of petroleum and industrial chemicals from transportation accidents; and, releases of industrial chemicals due to fire. Mr. Borrebach has directed and completed Immediate Response Actions with associated plans and Response Action Outcome Statements at more than 100 contaminated sites. He has designed and implemented site clean ups involving: excavation of contaminated soil; soil vapor extraction; on-site soil treatment using thermal desorption, asphalt encapsulation, and bioremediation; groundwater pump and treat systems; in-situ chemical oxidation, and dual phase extraction. He has prepared hundreds of environmental site assessments in Massachusetts, Rhode Island, Connecticut, New York and Maine in compliance with ASTM standards or client specifications. The projects were completed for private parties, public entities and, small and large lending institutions. 1
  • 19.
    Projjectt Experiience Pro ecExper ence Mr. Borrebach was the Licensed Site Professional of Record for a release of approximately 600 gallons of PCB-containing transformer oil that occurred during decommissioning of an industrial site. The oil was released in close proximity to a major river in Massachusetts. Shortly after release, a large sheen was noted on the river, and immediate response actions were undertaken to place booms in the river to contain the sheen. The released oil moved onto a nearby beach and impacted the beach and the beach grasses. The release also affected soil in the vicinity of the vault system, sheet piling and piles along the riverfront. Another significant concern was the presence of shell fishing beds further downstream from the release. Assessment and remediation of the release included soil excavaction, cleaning and removal of the vault system, and remediation of the affected beachfront. A Site Specific Risk Assessment was prepared as impacts extended to surface water and sediments. The Risk Assessment showed that the remediation was successful in achieving a condition of no significant risk to human health, welfare, safety and the environment. Closure reports were prepared and submitted to the EPA and to the Massachusetts DEP. Work at the site was regulated by both the USEPA under TOSCA and the Massachusetts Department of Environmental Protection. He served as project Licensed Site Professional for several construction projects including the Teddy Ebersol fields in Boston, MA, the Boston Police Department facility in Roxbury, MA, runway improvements at Hanscom Field, the New Everett Park in Everett, MA, and closure of an unpermitted dumping ground in southeastern Massachusetts. These projects typically included soil screening, soil sampling and laboratory analysis, soil disposal facility identification and preparation of soil disposal paperwork, dust monitoring, health and safety plan preparation, preparation of Remediation General Permits and Stormwater Pollution Prevention Plans as well as submittals made to the Massachusetts Department of Environmental Protection to maintain compliance with the Massachusetts Contingency Plan. Mr. Borrebach was the Licensed Site Professional of record for a release of over two hundred gallons of residential heating oil at an ocean front residence in Osterville, Massachusetts. Soils, both outside and underneath the residence were impacted by the release. Mr. Borrebach was responsible for developing a structural shoring system to support the three story residence while excavation was conducted underneath the foundation of the residence. An area of the foundation of over thirty linear feet was exposed during the excavation work with no impact to the stability of the structure. Localized groundwater extraction and treatment was also conducted. Remaining oil concentrations were reduced to the point where a Class A-2 Response Action Outcome was achieved. Mr. Borrebach has been involved in providing environmental reviews, assessments, remediation feasibility studies and closure reports for Underground Storage Tank removal projects at gasoline stations, industrial facilities, manufacturing companies and residences. His responsibilities included verifying soil and groundwater conditions through field screening techniques, developing and implementing remedial measures, and submittal of closure reports while ensuring compliance with local, state and federal regulations, and in coordination with owners, permitting agencies and contractors. He was responsible for the assessment of an industrial property where high concentrations of chlorinated solvents were discovered. He designed and implemented a remedial system pilot test and installed a dual phase extraction system for the simultaneous removal of soil vapor and groundwater. The design resulted in a groundwater extraction rate that was increased by a factor of ten over that achieved by a typical groundwater extraction well. The design included retrofitting existing monitoring wells to serve as extraction wells thereby resulting in a significant cost savings for system installation. Mr. Borrebach prepared the Release Abatement Measure 2
  • 20.
    Plan (RAM Plan),Phase 1 Initial Site Investigation Report, and Tier Classification submittals for the Site in compliance with the Massachusetts Contingency Plan. Groundwater analyses indicated a reduction in dissolved Chlorinated solvents of over ninety (90) percent after the first three months of system operation. He served as the Project Manager for site engineering design for a 172-unit housing development in Haverhill, Massachusetts. He was responsible for stormwater control system design, which included subsurface detention structures and improvements to the City of Haverhill combined sewer system to eliminate stormwater flow from the project area to the wastewater treatment plant. He was also responsible for site grading, sewer system design, design of the water supply system including off-site improvements, preparation of an Environmental Notification Form submitted under Massachusetts Environmental Policy Act (MEPA), and for preparation of a Stormwater Pollution Prevention Plan under a National Pollution Discharge Elimination System (NPDES) General Permit for Construction Activities in Massachusetts. Mr. Borrebach served as the Project Manager for site engineering design at the Silver City Galleria in Taunton, Massachusetts. He was responsible for design of construction level drawings for site infrastructure including stormwater control system, sanitary sewer and water supply systems, site access and parking, site grading and retaining wall design, and design of a large-span arch culvert bridge crossing the Cotley River. Mr. Borrebach also managed the construction observation team and served as the environmental coordinator to maintain compliance with the Order of Conditions issued by the Taunton Conservation Commission. He was responsible for the engineering design of over 200 wireless telecommunications facilities. He was in responsible charge for site survey, wetland delineation and permitting, geotechnical and environmental studies, site infrastructure design, attendance at public meetings for local permitting, and construction observation services. Projects were completed in Massachusetts, New Hampshire, Rhode Island, Maryland and Virginia. Mr. Borrebach served as Project Manager for hydrogeological investigations conducted for small wastewater treatment plants serving commercial and residential projects. The work included installation of groundwater monitoring wells, development of computer models to evaluate impacts to groundwater arising from the proposed wastewater treatment facility, and for preparation of reports and permit applications to the Massachusetts DEP. He served as Project Manager for design of an industrial wastewater treatment system for a manufacturing facility. He was responsible for data gathering to assess the quantity and quality of untreated effluent, and for design of a Reverse Osmosis treatment system with RO reject treatment via evaporation. 3
  • 21.
    Dougllas C.. Morriison Doug as C Morr son Seniior Projject Manager Sen or Pro ect Manager Educattiion Educa on University of New Hampshire, 1981, B.S. Geology University of Colorado, 1982, (Graduate studies in Geology) Certtiiffiicattiions Cer ca ons OSHA 29 CFR 1910.120 40-Hour Safety Training OSHA 29 CFR 1910.120 8-Hour Supervisor’s Training OSHA.29.CFR.1910.120 Level A, B Certified OSHA.29.CFR.1910.120 Confined Space Certified Portable Gas Chromatograph Certified (1994) Affffiilliiattiions A a ons Massachusetts Licensed Site Professional Organization, Associate Member Massachusetts Association of Land Surveyors and Civil Engineers American Congress on Surveying and Mapping National Water Well Association Qualliiffiicattiions Qua ca ons Mr. Morrison has over twenty five years experience on environmental engineering projects and construction/remediation projects throughout the continental United States. Mr. Morrison serves as a Senior Project Manager for OHI Engineering, Inc. He is responsible for the coordination and management of on-site project operations for sites being investigated under the MCP regulations, including assessment, field sampling investigations and remedial design and implementation and construction. Mr. Morrison also has many years in the survey/engineering field with a fundamental command on surveying principals as they apply to construction and remedial issues on the projects he has managed. His project experience includes assessment and geotechnical/construction management for major pipeline utilities, commercial, industrial and private petroleum- related spills and releases, including bulk fuel oil storage facilities and retail gasoline stations. Mr. Morrison’s duties involve the coordination and supervision of field investigation, sampling, Immediate Response Actions, Release Abatement Measures and remedial activities for waste disposal sites managed under the MCP in Massachusetts and under waste site cleanup regulations in all New England states. He has demonstrated his knowledge of the Massachusetts Contingency Plan (MCP) requirements by preparing Response Action Outcome Statements, Phase I through Phase V reports, Release Abatement Measures, and the filing of Activity and Use Limitations. Mr. Morrison has significant experience in completing Hazardous Waste Site cleanup operations in New York, New Jersey, Kentucky and Florida, serving as the on-site project manager for large-scale remedial projects.
  • 22.
    Representative Project Experience MajorPetroleum Bulk Storage and Energy Facilities Mr. Morrison served as the Project Geologist responsible for the coordination and management of project operations for major oil company retail facilities and active bulk terminals in eastern Massachusetts and Rhode Island. Responsibilities have included design of monitoring well placement and construction; well log and soil interpretation, water quality sampling and monitoring; aquifer evaluation; data control and graphics preparation for detailed waste site disposal and hydrogeologic investigation reports. Mr. Morrison has been involved in all aspects of remedial system design from soil vent and sparging tests to aquifer pump tests and final implementation, as well as subcontractor coordination of the associated remedial systems. Mr. Morrison has been responsible for the project management of underground storage tank (UST) removal operations throughout New York, Massachusetts, Rhode Island, and Vermont. His duties on these projects included the coordination of subcontractors, and supervision of field operations, data collection and management of the preparation of final closure reports for submittal to appropriate state regulators. Mr. Morrison has played a critical role in the performance of comprehensive hydrogeologic investigations and environmental site assessments for major national oil companies to assess the presence and evaluate the extent of petroleum hydrocarbon contamination. Duties on these projects included identifying and evaluating possible source areas, and identifying potential receptors of migrating contamination. Site history research and environmental assessment activities at these sites have included: review of current and historic property use; the characterization of subsurface soil; development of site-specific media sampling plans; preparation of the design and supervision of the installation of groundwater monitoring wells; soil and groundwater sampling; sample handling and coordination of appropriate laboratory analyses. Comprehensive Environmental Site Investigations - Fuel Oil Terminal Mr. Morrison served as the Project Geologist for a comprehensive site assessment at a major New England fuel oil terminal. His responsibilities included the coordination and implementation of all on-site field activities for petroleum plume delineation. The investigation included the installation of 38 groundwater monitoring wells (both in bedrock and in overburden), performance of test pits, and implementation of extensive soil gas surveys with mobile lab gas chromatography (GC) analyses. The project also involved the decommissioning and excavation/removal of over 500 miles of underground petroleum pipelines on terminal property and along right’s of ways. Other investigation duties included: surface water and soil sampling; complete site survey and data collection for map preparation; bedrock mapping and fracture trace analyses; extensive file and record reviews of both state and federal records; preparation of groundwater contour, bedrock, and subsurface utility plans (both historic and current), surficial topography maps and contaminant isopleth maps.
  • 23.
    Briian G.. Snow,,P..G..,, L..S..P..,, L..E..P.. Br an G Snow P G L S P L E P Seniior Projject Manager Sen or Pro ect Manager Educattiion Educa on Framingham State College, B.S. Earth Science, 1992 Framingham State College, M.A. Business Administration, 2000 Certtiiffiicattiions Cer ca ons Certified OSHA 40 Hour Hazardous Waste Site Operations (CFR 1910.120) Certified 8 Hour Site Supervisor (CFR 1910.120) Liicensure L censure Licensed Site Professional (LSP) in Massachusetts Licensed Environmental Professional (LEP) in Connecticut Licensed Professional Geologist (New Hampshire and Tennessee) Waste Water Treatment Plant Operator Grade I-2 ‘ Qualliiffiicattiions Qua ca ons Mr. Snow has over eighteen years of professional experience in environmental engineering and science. His expertise includes: site investigation, bedrock investigations, drinking water treatment, construction support and permitting, remedial design, remediation system construction, operation and decommissioning, property assessments, indoor air investigation, litigation support, insurance support, cost assessment, lifecycle costing, compliance assistance, reimbursement support, risk assessment, and most important regulatory closure. He has served as the Licensed Site Professional (LSP) of record for numerous response situations where the release of oil and hazardous materials required the implementation of sound response actions in compliance with the Massachusetts Contingency Plan (MCP). The releases included: releases of gasoline and fuel oil from underground and above ground storage tanks at commercial and industrial facilities, power plants and residences; historical releases of oil and hazardous materials (OHM) at petroleum, commercial and industrial facilities; spills of petroleum and industrial chemicals from transportation accidents; and, releases of industrial chemicals due to fire. Mr. Snow has directed and completed Immediate Response Actions with associated plans and Response Action Outcome Statements at more than fifty petroleum contaminated sites. He has designed and implemented site clean ups involving: excavation of contaminated soil; soil vapor extraction; on-site soil treatment using thermal desorption, asphalt encapsulation, and bioremediation; groundwater pump and treat systems; in-situ chemical oxidation, and dual phase extraction. He has prepared hundreds of environmental site assessments in Massachusetts, Rhode Island, Connecticut, New York and Maine in compliance with ASTM standards or client specifications. The projects were completed for private parties, public entities and, small and large lending institutions. 1
  • 24.
    Projjectt Experiience Pro ec Exper ence Mr. Snow served as the Senior Project Manager and LSP for a project on the north shore (Massachusetts) where petroleum vapors were detected in a daycare adjacent to the client’s property. The project was also within the Zone A of a Class A surface water body. The project included the restarting and redesigning of an existing air sparge and soil vapor extraction system. During the other firm’s initial indoor air assessment and risk assessments, an Imminent Hazard (IH) was identified. At the client’s request, I reviewed indoor air assessment and risk assessment and revised the conclusions to more accurately evaluate risk posed by the client’s release. Subsequent investigations of vapor intrustion pathways included the installation of soil gas probes under and around the daycare at various depths, and sampling of indoor air, soil gas, groundwater, and soil. Numerous IH and substantial hazard evaluations were also completed using Method 3 Risk Characterization. A sulfur hexafluoride tracer gas study was conducted in order to determine the migration pathway of contaminants to the daycare. Contaminants not related to the disposal site were ruled out and attributed to the other remaining businesses in the daycare building. I prepared a Immediate Response Action (IRA) Plan, IRA Status Reports, an IRA Completion report, Phase I, II, III, IV, and V documents including a Remedy Operating Status Opinion for the site. I also designed the Phase II investigation, a pilot test, additional remedial components and demonstrated vacuum influence and source control. I also provided support for litigation related to the indoor air impacts and to previous parties contributing to the release(s). Mr. Snow was the Senior Project Manager and LSP for a former industrial site in western Massachusetts. The site was impacted with PCBs, Metals and petroleum products. A previous consulting firm conducted an ASTM Phase I for the owner prior to the purchase stating that the parcel was not likely impacted. Subsequently a second ASTM Phase I was conducted by a potential purchaser, leading to an ASTM Phase II Investigation. The property was previously utilized by a major electrical utility company, a junk yard, and machine shop. The property was also adjacent to multiple rail lines and had a former rail spur and siding through the property. He designed an MCP Phase II investigation to delineate the PCBs and metals. Since the project was not in compliance with MCP deadlines, revised deadlines were negotiated with the MassDEP and penalties were avoided. Impacts at the site extended beyond the property borders, requiring access to multiple parcels including property owned by the power company and the city. The project also included legal support with regard to potential suits against the power company (source of the PCBs) and the first consultant. The project included multiple meetings with counsel, opposing counsel, and the MassDEP to gain access and determine damages. Multpile cost estimates and scenarios were presented to counsel and the client regarding potential remedial and long term management costs. Draft AULs were prepared. TOSCA did not apply to the site and the PCBs were averaged to below S-1 Standards. Mr. Snow served as the Senior Project Manager and LSP for an emergency response in Lowell, Massachusetts. An owner of a restaurant complained to the Fire Department about petroleum vapors in the basement of their building. Mr. Snow met the Fire Department, Police Department, MassDEP, and Water and Sewer Department at the site. He determined the source of the release was a nearby gasoline station. A carbon filtration system was installed in the basement of the restaurant as well as a series of monitoring wells and soil gas probes. A soil vapor extraction system (SVES) pilot test was completed and a temporary SVES was installed to provide vacuum control and abate an IH condition created by an explosive condition in the sewer lines. The temporary SVES was operational on the second day after the complaint. Follow-up work included the preparation of MCP deliverables, correspondence with the MassDEP and Fire Department as well as the permanent design and install of the SVES and migration pathway assessment. 2
  • 25.
    James F.. Dalley,,LSP James F Da ey LSP Projject Manager Pro ect Manager Educattiion Educa on University of Vermont, 1989, B.S. Geology Liicenses L censes Licensed Site Professional (LSP) Massachusetts Board of Hazardous Waste Site Cleanup Certtiiffiicattiions Cer ca ons Certified OSHA 40 Hour Hazardous Waste Site Operations (CFR 1910.120) Certified 8 Hour Site Supervisor (CFR 1910.120) Confined Space Entry Training Membershiips Membersh ps Licensed Site Professional Association National Groundwater Association Qualliiffiicattiions Qua ca ons Mr. Daley has over nineteen years of professional experience. His expertise includes: environmental, hydrogeologic and geotechnical site investigation, environmental remediation, waste management, water supply & wastewater evaluations, and related regulatory compliance reporting. Primary responsibilities include project management, budgeting and scheduling; work plan development; preparation of technical reports and correspondence; permitting, communication & coordination w/ regulatory officials; safety compliance; and data collection, management and quality assurance. General project experience includes waste site investigation; hydrogeologic evaluation & aquifer analysis; groundwater & contaminant modeling; storage tank closure; remediation design & implementation; waste management & disposal; geotechnical investigation, and other technical drilling projects. Projjectt Experiience Pro ec Exper ence Mr. Daley was the Project Manager for in-situ bioremediation project at a former industrial facility. He directed and managed installation of the treatment system to remediate a dissolved/adsorbed hydrocarbon plume. Mr. Daley was responsible for reporting, communication, and correspondence to regulatory agencies for acquisition of permits and approvals, and for coordination of agency site inspections. System operation required quarterly groundwater contaminant monitoring, and semi-annual bio- chemistry evaluations.
  • 26.
    Mr. Daley wasthe Project Manager for remedial evaluations at former gasoline filling station sites where he managed site investigations, developed site conceptual models, and remedial cost analyses and feasibility evaluations. He prepared contractor bid documents for solicitation of bids for remediation. Mr. Daley performed SVE, and groundwater extraction pilot testing, and prepared pilot testing report and developed remediation plans. Mr. Daley managed the comprehensive site investigation and remediation of a perchloroethylene/trichloroethylene release site. Contamination of nearby public water supply wells and complex geologic setting required special assessment methodologies, and QA/QC procedures, which were conducted with a high level of regulatory oversight, and public involvement. He constructed 3D computer model for mapping/modeling of site geology and contaminant plume, prepared the Preliminary Site Investigation Report, and Work plan for completion of site characterization and initiation of remedial actions. In-situ biological and/or chemical remediation technologies were determined to be most feasible for this site. Mr. Daley provided oversight and coordination of emergency response & clean-up of a large PCB-oil release from an electric generation facility to a marine waterway and adjacent tidal areas. Involvement of EPA, Cost Guard, local officials and numerous contractors presented substantial technical, regulatory and political challenges. Remediation wastes classified as federally-regulated TSCA wastes required special handling & disposal procedures. He designed and implemented a soil, groundwater, surface water, and sediment sampling program in accordance with EPA PCB protocols. The site was successfully cleaned-up to satisfaction of EPA, DEP, and local officials. He produced all applicable regulatory submittals and correspondence including Immediate Response Action (IRA) Plan, IRA Completion, and Response Action Outcome (RAO) and Risk Characterization reports. Mr. Daley installed and operated data collection systems for monitoring of pumping tests; performed numerical analyses for determination of hydraulic conductivity values; and constructed groundwater models for simulations of conceptual pumping conditions for proposed irrigation and public water supply wells and for evaluation of contaminated sites. The computer models were used to delineate Zone II’s for proposed pumping conditions, and to evaluate contaminant transport adjacent to Superfund DNAPL site. He also performed numerous hydrogeological investigations and groundwater modeling for permitting of proposed wastewater treatment systems. The work included pumping and slug tests, installation and operation of data collection systems, numerical analysis of pumping/slug data, and construction of groundwater models for simulation of proposed wastewater injections. Mr. Daley was responsible for preparation of reports of investigations and modeling for submittal with permit applications. Mr. Daley provided oversight and technical support for clean-up of arsenic residue from pesticide applications at electric substation facilities. He designed and implemented assessment, remedial, wetlands protection and dust monitoring & control plans. During the remediation work, Mr. Daley provided oversight and coordination for management and disposal of waste soils and compliance with municipal and state regulations, and standard occupational safety practices. The Site was successfully cleaned-up to applicable risk standards.
  • 27.
    Tiimothy J.. Maguiire T mothy J Magu re Enviironmentall Sciientiist Env ronmenta Sc ent st Educattiion Educa on Massachusetts Maritime Academy, 2003, B.S. Marine Safety and Environmental Protection Certtiiffiicattiions Cer ca ons USGBC LEED® Accredited Professional OSHA 29 CFR 1910.120 40-Hour Safety Training OSHA 29 CFR 1910.120 24-Hour Incident Commander Massachusetts Wastewater Certified Operator Grade 4-M Affffiilliiattiions A a ons American Institute of Biological Sciences Qualliiffiicattiions Qua ca ons Mr. Maguire has over five years experience in environmental projects and marine environmental projects throughout the continental United States. Mr. Maguire serves as an Environmental Scientist for OHI Engineering, Inc. He is responsible for the coordination of on-site project operations for sites being investigated under the Massachusetts Contingency Plan (MCP) regulations, including assessment, field sampling investigations and remedial implementation. His project experience includes assessments of commercial, industrial and private petroleum-related spills and releases, including bulk fuel oil storage facilities and retail gasoline stations. Mr. Maguire’s duties involve the coordination and supervision of field investigation, sampling, Immediate Response Actions, Release Abatement Measures and remedial activities for waste disposal sites managed under the MCP in Massachusetts and under waste site cleanup regulations in all New England states. He has demonstrated his knowledge of the MCP requirements by preparing Response Action Outcome Statements, Phase I through Phase V reports, Release Abatement Measures, and the filing of Activity and Use Limitations.
  • 28.
    Deanna D.. Trudeau Deanna D Trudeau Enviironmentall Engiineer Env ronmenta Eng neer Educattiion Educa on B.S. Chemical Engineering, University of Notre Dame, 1985 Certtiiffiicattiions Cer ca ons Certified OSHA 40 Hour Hazardous Waste Site Operations (CFR 1910.120) Certified 8 Hour Site Supervisor (CFR 1910.120) Engineer in Training Affffiilliiattiions A a ons American Institute of Chemical Engineers Society of Women Engineers Qualliiffiicattiions Qua ca ons Ms. Trudeau has 17 years of experience in environmental engineering and consulting. Her expertise includes: environmental site assessments; air emissions and air pollution controls; contaminated soil management; hazardous materials and hazardous waste management; storm water pollution prevention and permitting; underground storage tank investigations, closure and remediation; and environmental reporting such as Toxics Release Inventory Reporting. Ms. Trudeau is an Environmental Engineer with responsibilities including environmental and RCRA compliance reporting, Phase I and Phase II Environmental Site Assessments, indoor air quality investigations, and industrial hygiene surveys. She is responsible for data interpretation, conformance with regulatory requirements, and reporting with detailed recommended response actions. Projjectt Experiience Pro ec Exper ence Ms. Trudeau managed a multi-faceted environmental protection and natural resources conservation program for five years. The work was conducted for a highly-visible US Marine Corps installation that encompassed 433 acres and supported nearly 6,000 personnel. For her efforts, Ms. Trudeau received the Commander-in-Chief’s Special Recognition for Installation Excellence and the USMC Federal Environmental Engineer of the Year award.