The document provides guidelines for the safe handling, storage, quality inspection, and fabrication of Staron solid surface products. It details best practices for handling sheets and sinks/bowls, storing sheets flat or vertically, and inspecting for defects. Fabricators are responsible for inspecting each sheet for defects and color matches before fabrication. Staron will replace defective materials according to product specifications but is not liable for labor costs incurred during or after fabrication.
Cart-Away Auger Wet Concrete Batching System - 4 minute cycle loadingBruce A. Christensen
The auger style concrete loading systems are used mainly for pre-cast concrete companies. But many older U-cart locations still use the Cart-Away auger batching systems.
This document provides guidance on various fabrication techniques for working with Alucobond material, including:
- Sawing, shearing, routing, drilling, punching, joining, finishing, and curving panels
- Recommendations for blade types and speeds for different cutting methods
- Details on routing techniques for bending edges and creating folds, with diagrams demonstrating proper rout depth
- Methods for achieving small radius bends through routing and folding or using rollers and press brakes
Daewoo doosan dx18 mini crawler excavator service repair manual (serial numbe...ufjjsjkkekmmd
The document provides information about track assembly components and procedures for checking and adjusting track tension on Doosan excavators. Key points include:
1. The track assembly consists of the track, front idler roller, upper roller, lower roller, and track spring/adjustment cylinder.
2. Periodic adjustment of track tension is needed to compensate for wear of track shoe link pins and bushings.
3. Track tension is checked by jacking one side of the excavator and measuring the distance between the track roller and contact surface of the track, which should be 10-15mm for proper tension.
Daewoo doosan dx15 mini crawler excavator service repair manual (serial numbe...fjskekdmmmse
The document provides specifications and maintenance procedures for track assemblies on Doosan excavators. Key points include:
- Track tension should be checked regularly and adjusted using the grease fitting to compensate for wear, maintaining 10-15mm of clearance between the track and roller.
- Wear limits and tolerances are provided for track components like idlers, rollers, and springs to determine when rebuilding or replacement is needed.
- Cleaning and inspection of tracks and components is important, comparing dimensions to the figures and tables provided to evaluate condition.
- Safety precautions must be followed when working on the tracks, as the adjustment mechanism is under high pressure. Blocking and two persons are required for safe
Daewoo doosan dx15 mini crawler excavator service repair manual (serial numbe...ufjjsjkkekmmd
This document provides instructions for servicing the track assembly on Doosan excavators. It describes the major components of the track assembly and provides procedures for checking and adjusting track tension. Track tension should be checked periodically and adjusted as needed to compensate for wear. The adjustment is made by measuring the distance between the track roller and the crawler and maintaining a specified clearance of 10-15 mm. Proper tension is important to prevent excessive component wear while avoiding adjustments that are too tight for certain ground conditions. Safety precautions must be followed when jacking up or working on the track assembly.
Daewoo doosan dx18 mini crawler excavator service repair manual (serial numbe...jfjkskefsmemwe
The document provides specifications and maintenance procedures for track assemblies on Doosan DX15 and DX18 excavators. Key points include:
- Track tension should be checked regularly and adjusted using the grease cylinder if needed to compensate for wear.
- Wear limits and tolerances are provided for track components like idlers, rollers, and springs. Rebuilding or replacement is recommended when limits are exceeded.
- Cleaning and inspection of tracks and components is important, with rubber track shoe friction determining replacement needs depending on work conditions.
Daewoo doosan dx18 mini crawler excavator service repair manual (serial numbe...fjskekdmmmse
The document provides specifications and maintenance procedures for track assemblies on Doosan excavators. Key points include:
- Track tension should be checked regularly and adjusted using the grease fitting to compensate for wear, maintaining 10-15mm clearance between the track and roller.
- Wear limits and tolerances are provided for track components like idlers, rollers, and springs to determine when rebuilding or replacement is needed.
- Cleaning and inspection of tracks and components is important, comparing dimensions to the figures and tables provided to evaluate condition.
- Safety precautions must be followed when working on the tracks, as the adjustment mechanism is under high pressure. Blocking and two people are required for safe measurement
Daewoo doosan dx15 mini crawler excavator service repair manual (serial numbe...jfjkskefsmemwe
The document provides specifications and maintenance procedures for track assemblies on Doosan excavators. Key points include:
- Track tension should be checked regularly and adjusted using the grease fitting to compensate for wear, maintaining 10-15mm clearance between the track and roller.
- Wear limits and tolerances are provided for track components like idlers, rollers, and springs to determine when rebuilding or replacement is needed.
- Cleaning and inspection of tracks and components is important, comparing dimensions to the figures and tables specifying normal, maintenance, and replacement specifications.
Cart-Away Auger Wet Concrete Batching System - 4 minute cycle loadingBruce A. Christensen
The auger style concrete loading systems are used mainly for pre-cast concrete companies. But many older U-cart locations still use the Cart-Away auger batching systems.
This document provides guidance on various fabrication techniques for working with Alucobond material, including:
- Sawing, shearing, routing, drilling, punching, joining, finishing, and curving panels
- Recommendations for blade types and speeds for different cutting methods
- Details on routing techniques for bending edges and creating folds, with diagrams demonstrating proper rout depth
- Methods for achieving small radius bends through routing and folding or using rollers and press brakes
Daewoo doosan dx18 mini crawler excavator service repair manual (serial numbe...ufjjsjkkekmmd
The document provides information about track assembly components and procedures for checking and adjusting track tension on Doosan excavators. Key points include:
1. The track assembly consists of the track, front idler roller, upper roller, lower roller, and track spring/adjustment cylinder.
2. Periodic adjustment of track tension is needed to compensate for wear of track shoe link pins and bushings.
3. Track tension is checked by jacking one side of the excavator and measuring the distance between the track roller and contact surface of the track, which should be 10-15mm for proper tension.
Daewoo doosan dx15 mini crawler excavator service repair manual (serial numbe...fjskekdmmmse
The document provides specifications and maintenance procedures for track assemblies on Doosan excavators. Key points include:
- Track tension should be checked regularly and adjusted using the grease fitting to compensate for wear, maintaining 10-15mm of clearance between the track and roller.
- Wear limits and tolerances are provided for track components like idlers, rollers, and springs to determine when rebuilding or replacement is needed.
- Cleaning and inspection of tracks and components is important, comparing dimensions to the figures and tables provided to evaluate condition.
- Safety precautions must be followed when working on the tracks, as the adjustment mechanism is under high pressure. Blocking and two persons are required for safe
Daewoo doosan dx15 mini crawler excavator service repair manual (serial numbe...ufjjsjkkekmmd
This document provides instructions for servicing the track assembly on Doosan excavators. It describes the major components of the track assembly and provides procedures for checking and adjusting track tension. Track tension should be checked periodically and adjusted as needed to compensate for wear. The adjustment is made by measuring the distance between the track roller and the crawler and maintaining a specified clearance of 10-15 mm. Proper tension is important to prevent excessive component wear while avoiding adjustments that are too tight for certain ground conditions. Safety precautions must be followed when jacking up or working on the track assembly.
Daewoo doosan dx18 mini crawler excavator service repair manual (serial numbe...jfjkskefsmemwe
The document provides specifications and maintenance procedures for track assemblies on Doosan DX15 and DX18 excavators. Key points include:
- Track tension should be checked regularly and adjusted using the grease cylinder if needed to compensate for wear.
- Wear limits and tolerances are provided for track components like idlers, rollers, and springs. Rebuilding or replacement is recommended when limits are exceeded.
- Cleaning and inspection of tracks and components is important, with rubber track shoe friction determining replacement needs depending on work conditions.
Daewoo doosan dx18 mini crawler excavator service repair manual (serial numbe...fjskekdmmmse
The document provides specifications and maintenance procedures for track assemblies on Doosan excavators. Key points include:
- Track tension should be checked regularly and adjusted using the grease fitting to compensate for wear, maintaining 10-15mm clearance between the track and roller.
- Wear limits and tolerances are provided for track components like idlers, rollers, and springs to determine when rebuilding or replacement is needed.
- Cleaning and inspection of tracks and components is important, comparing dimensions to the figures and tables provided to evaluate condition.
- Safety precautions must be followed when working on the tracks, as the adjustment mechanism is under high pressure. Blocking and two people are required for safe measurement
Daewoo doosan dx15 mini crawler excavator service repair manual (serial numbe...jfjkskefsmemwe
The document provides specifications and maintenance procedures for track assemblies on Doosan excavators. Key points include:
- Track tension should be checked regularly and adjusted using the grease fitting to compensate for wear, maintaining 10-15mm clearance between the track and roller.
- Wear limits and tolerances are provided for track components like idlers, rollers, and springs to determine when rebuilding or replacement is needed.
- Cleaning and inspection of tracks and components is important, comparing dimensions to the figures and tables specifying normal, maintenance, and replacement specifications.
➒➌➎➏➑➐➋➑➐➐ Satta Matka Dpboss Matka Guessing Indian Matka Satta Matta Matka KALYAN MATKA | MATKA RESULT | KALYAN MATKA TIPS | SATTA MATKA | MATKA.COM | MATKA PANA JODI TODAY | BATTA SATKA | MATKA PATTI JODI NUMBER | MATKA RESULTS | MATKA CHART | MATKA JODI | SATTA COM | FULL RATE GAME | MATKA GAME | MATKA WAPKA | ALL MATKA RESULT LIVE ONLINE | MATKA RESULT | KALYAN MATKA RESULT | DPBOSS MATKA 143
KALYAN CHART SATTA MATKA DPBOSS KALYAN MATKA RESULTS KALYAN MATKA MATKA RESULT KALYAN MATKA TIPS SATTA MATKA MATKA COM MATKA PANA JODI TODAY BATTA SATKA MATKA PATTI JODI NUMBER MATKA RESULTS MATKA CHART MATKA JODI SATTA COM INDIA SATTA MATKA MATKA TIPS MATKA WAPKA ALL MATKA RESULT LIVE ONLINE MATKA RESULT KALYAN MATKA RESULT DPBOSS MATKA 143 MAIN MATKA KALYAN MATKA RESULTS KALYAN CHART
➒➌➎➏➑➐➋➑➐➐ Satta Matka Dpboss Matka Guessing Indian Matka KALYAN MATKA | MATKA RESULT | KALYAN MATKA TIPS | SATTA MATKA | MATKA.COM | MATKA PANA JODI TODAY | BATTA SATKA | MATKA PATTI JODI NUMBER | MATKA RESULTS | MATKA CHART | MATKA JODI | SATTA COM | FULL RATE GAME | MATKA GAME | MATKA WAPKA | ALL MATKA RESULT LIVE ONLINE | MATKA RESULT | KALYAN MATKA RESULT | DPBOSS MATKA 143 | MAIN MATKA
Discover the Beauty and Functionality of The Expert Remodeling Serviceobriengroupinc04
Unlock your kitchen's true potential with expert remodeling services from O'Brien Group Inc. Transform your space into a functional, modern, and luxurious haven with their experienced professionals. From layout reconfiguration to high-end upgrades, they deliver stunning results tailored to your style and needs. Visit obriengroupinc.com to elevate your kitchen's beauty and functionality today.
SATTA MATKA DPBOSS KALYAN MATKA RESULTS KALYAN CHART KALYAN MATKA MATKA RESULT KALYAN MATKA TIPS SATTA MATKA MATKA COM MATKA PANA JODI TODAY BATTA SATKA MATKA PATTI JODI NUMBER MATKA RESULTS MATKA CHART MATKA JODI SATTA COM INDIA SATTA MATKA MATKA TIPS MATKA WAPKA ALL MATKA RESULT LIVE ONLINE MATKA RESULT KALYAN MATKA RESULT DPBOSS MATKA 143 MAIN MATKA KALYAN MATKA RESULTS KALYAN CHART
SATTA MATKA DPBOSS KALYAN MATKA RESULTS KALYAN CHART KALYAN MATKA MATKA RESULT KALYAN MATKA TIPS SATTA MATKA MATKA COM MATKA PANA JODI TODAY BATTA SATKA MATKA PATTI JODI NUMBER MATKA RESULTS MATKA CHART MATKA JODI SATTA COM INDIA SATTA MATKA MATKA TIPS MATKA WAPKA ALL MATKA RESULT LIVE ONLINE MATKA RESULT KALYAN MATKA RESULT DPBOSS MATKA 143 MAIN MATKA KALYAN MATKA RESULTS KALYAN CHART
Easy Earnings Through Refer and Earn Apps Without KYC.pptxFx Lotus
Learn how to make extra money with refer and earn apps that don’t require KYC. Find out the advantages, top apps, and strategies to boost your earnings quickly and easily.
SATTA MATKA DPBOSS KALYAN MATKA RESULTS KALYAN CHART KALYAN MATKA MATKA RESULT KALYAN MATKA TIPS SATTA MATKA MATKA COM MATKA PANA JODI TODAY BATTA SATKA MATKA PATTI JODI NUMBER MATKA RESULTS MATKA CHART MATKA JODI SATTA COM INDIA SATTA MATKA MATKA TIPS MATKA WAPKA ALL MATKA RESULT LIVE ONLINE MATKA RESULT KALYAN MATKA RESULT DPBOSS MATKA 143 MAIN MATKA KALYAN MATKA RESULTS KALYAN CHART
Adani Group's Active Interest In Increasing Its Presence in the Cement Manufa...Adani case
Time and again, the business group has taken up new business ventures, each of which has allowed it to expand its horizons further and reach new heights. Even amidst the Adani CBI Investigation, the firm has always focused on improving its cement business.
Adani Group Requests For Additional Land For Its Dharavi Redevelopment Projec...Adani case
It will bring about growth and development not only in Maharashtra but also in our country as a whole, which will experience prosperity. The project will also give the Adani Group an opportunity to rise above the controversies that have been ongoing since the Adani CBI Investigation.
SATTA MATKA DPBOSS KALYAN MATKA RESULTS KALYAN CHART KALYAN MATKA MATKA RESULT KALYAN MATKA TIPS SATTA MATKA MATKA COM MATKA PANA JODI TODAY BATTA SATKA MATKA PATTI JODI NUMBER MATKA RESULTS MATKA CHART MATKA JODI SATTA COM INDIA SATTA MATKA MATKA TIPS MATKA WAPKA ALL MATKA RESULT LIVE ONLINE MATKA RESULT KALYAN MATKA RESULT DPBOSS MATKA 143 MAIN MATKA KALYAN MATKA RESULTS KALYAN CHART
➒➌➎➏➑➐➋➑➐➐ Satta Matka Dpboss Matka Guessing Indian Matka
KALYAN MATKA | MATKA RESULT | KALYAN MATKA TIPS | SATTA MATKA | MATKA.COM | MATKA PANA JODI TODAY | BATTA SATKA | MATKA PATTI JODI NUMBER | MATKA RESULTS | MATKA CHART | MATKA JODI | SATTA COM | FULL RATE GAME | MATKA GAME | MATKA WAPKA | ALL MATKA RESULT LIVE ONLINE | MATKA RESULT | KALYAN MATKA RESULT | DPBOSS MATKA 143 | MAIN MATKA
Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...Niswey
50 million companies worldwide leverage WhatsApp as a key marketing channel. You may have considered adding it to your marketing mix, or probably already driving impressive conversions with WhatsApp.
But wait. What happens when you fully integrate your WhatsApp campaigns with HubSpot?
That's exactly what we explored in this session.
We take a look at everything that you need to know in order to deploy effective WhatsApp marketing strategies, and integrate it with your buyer journey in HubSpot. From technical requirements to innovative campaign strategies, to advanced campaign reporting - we discuss all that and more, to leverage WhatsApp for maximum impact. Check out more details about the event here https://events.hubspot.com/events/details/hubspot-new-delhi-presents-unlocking-whatsapp-marketing-with-hubspot-integrating-messaging-into-your-marketing-strategy/
2024 State of Marketing Report – by HubspotMarius Sescu
https://www.hubspot.com/state-of-marketing
· Scaling relationships and proving ROI
· Social media is the place for search, sales, and service
· Authentic influencer partnerships fuel brand growth
· The strongest connections happen via call, click, chat, and camera.
· Time saved with AI leads to more creative work
· Seeking: A single source of truth
· TLDR; Get on social, try AI, and align your systems.
· More human marketing, powered by robots
ChatGPT is a revolutionary addition to the world since its introduction in 2022. A big shift in the sector of information gathering and processing happened because of this chatbot. What is the story of ChatGPT? How is the bot responding to prompts and generating contents? Swipe through these slides prepared by Expeed Software, a web development company regarding the development and technical intricacies of ChatGPT!
➒➌➎➏➑➐➋➑➐➐ Satta Matka Dpboss Matka Guessing Indian Matka Satta Matta Matka KALYAN MATKA | MATKA RESULT | KALYAN MATKA TIPS | SATTA MATKA | MATKA.COM | MATKA PANA JODI TODAY | BATTA SATKA | MATKA PATTI JODI NUMBER | MATKA RESULTS | MATKA CHART | MATKA JODI | SATTA COM | FULL RATE GAME | MATKA GAME | MATKA WAPKA | ALL MATKA RESULT LIVE ONLINE | MATKA RESULT | KALYAN MATKA RESULT | DPBOSS MATKA 143
KALYAN CHART SATTA MATKA DPBOSS KALYAN MATKA RESULTS KALYAN MATKA MATKA RESULT KALYAN MATKA TIPS SATTA MATKA MATKA COM MATKA PANA JODI TODAY BATTA SATKA MATKA PATTI JODI NUMBER MATKA RESULTS MATKA CHART MATKA JODI SATTA COM INDIA SATTA MATKA MATKA TIPS MATKA WAPKA ALL MATKA RESULT LIVE ONLINE MATKA RESULT KALYAN MATKA RESULT DPBOSS MATKA 143 MAIN MATKA KALYAN MATKA RESULTS KALYAN CHART
➒➌➎➏➑➐➋➑➐➐ Satta Matka Dpboss Matka Guessing Indian Matka KALYAN MATKA | MATKA RESULT | KALYAN MATKA TIPS | SATTA MATKA | MATKA.COM | MATKA PANA JODI TODAY | BATTA SATKA | MATKA PATTI JODI NUMBER | MATKA RESULTS | MATKA CHART | MATKA JODI | SATTA COM | FULL RATE GAME | MATKA GAME | MATKA WAPKA | ALL MATKA RESULT LIVE ONLINE | MATKA RESULT | KALYAN MATKA RESULT | DPBOSS MATKA 143 | MAIN MATKA
Discover the Beauty and Functionality of The Expert Remodeling Serviceobriengroupinc04
Unlock your kitchen's true potential with expert remodeling services from O'Brien Group Inc. Transform your space into a functional, modern, and luxurious haven with their experienced professionals. From layout reconfiguration to high-end upgrades, they deliver stunning results tailored to your style and needs. Visit obriengroupinc.com to elevate your kitchen's beauty and functionality today.
SATTA MATKA DPBOSS KALYAN MATKA RESULTS KALYAN CHART KALYAN MATKA MATKA RESULT KALYAN MATKA TIPS SATTA MATKA MATKA COM MATKA PANA JODI TODAY BATTA SATKA MATKA PATTI JODI NUMBER MATKA RESULTS MATKA CHART MATKA JODI SATTA COM INDIA SATTA MATKA MATKA TIPS MATKA WAPKA ALL MATKA RESULT LIVE ONLINE MATKA RESULT KALYAN MATKA RESULT DPBOSS MATKA 143 MAIN MATKA KALYAN MATKA RESULTS KALYAN CHART
SATTA MATKA DPBOSS KALYAN MATKA RESULTS KALYAN CHART KALYAN MATKA MATKA RESULT KALYAN MATKA TIPS SATTA MATKA MATKA COM MATKA PANA JODI TODAY BATTA SATKA MATKA PATTI JODI NUMBER MATKA RESULTS MATKA CHART MATKA JODI SATTA COM INDIA SATTA MATKA MATKA TIPS MATKA WAPKA ALL MATKA RESULT LIVE ONLINE MATKA RESULT KALYAN MATKA RESULT DPBOSS MATKA 143 MAIN MATKA KALYAN MATKA RESULTS KALYAN CHART
Easy Earnings Through Refer and Earn Apps Without KYC.pptxFx Lotus
Learn how to make extra money with refer and earn apps that don’t require KYC. Find out the advantages, top apps, and strategies to boost your earnings quickly and easily.
SATTA MATKA DPBOSS KALYAN MATKA RESULTS KALYAN CHART KALYAN MATKA MATKA RESULT KALYAN MATKA TIPS SATTA MATKA MATKA COM MATKA PANA JODI TODAY BATTA SATKA MATKA PATTI JODI NUMBER MATKA RESULTS MATKA CHART MATKA JODI SATTA COM INDIA SATTA MATKA MATKA TIPS MATKA WAPKA ALL MATKA RESULT LIVE ONLINE MATKA RESULT KALYAN MATKA RESULT DPBOSS MATKA 143 MAIN MATKA KALYAN MATKA RESULTS KALYAN CHART
Adani Group's Active Interest In Increasing Its Presence in the Cement Manufa...Adani case
Time and again, the business group has taken up new business ventures, each of which has allowed it to expand its horizons further and reach new heights. Even amidst the Adani CBI Investigation, the firm has always focused on improving its cement business.
Adani Group Requests For Additional Land For Its Dharavi Redevelopment Projec...Adani case
It will bring about growth and development not only in Maharashtra but also in our country as a whole, which will experience prosperity. The project will also give the Adani Group an opportunity to rise above the controversies that have been ongoing since the Adani CBI Investigation.
SATTA MATKA DPBOSS KALYAN MATKA RESULTS KALYAN CHART KALYAN MATKA MATKA RESULT KALYAN MATKA TIPS SATTA MATKA MATKA COM MATKA PANA JODI TODAY BATTA SATKA MATKA PATTI JODI NUMBER MATKA RESULTS MATKA CHART MATKA JODI SATTA COM INDIA SATTA MATKA MATKA TIPS MATKA WAPKA ALL MATKA RESULT LIVE ONLINE MATKA RESULT KALYAN MATKA RESULT DPBOSS MATKA 143 MAIN MATKA KALYAN MATKA RESULTS KALYAN CHART
➒➌➎➏➑➐➋➑➐➐ Satta Matka Dpboss Matka Guessing Indian Matka
KALYAN MATKA | MATKA RESULT | KALYAN MATKA TIPS | SATTA MATKA | MATKA.COM | MATKA PANA JODI TODAY | BATTA SATKA | MATKA PATTI JODI NUMBER | MATKA RESULTS | MATKA CHART | MATKA JODI | SATTA COM | FULL RATE GAME | MATKA GAME | MATKA WAPKA | ALL MATKA RESULT LIVE ONLINE | MATKA RESULT | KALYAN MATKA RESULT | DPBOSS MATKA 143 | MAIN MATKA
Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...Niswey
50 million companies worldwide leverage WhatsApp as a key marketing channel. You may have considered adding it to your marketing mix, or probably already driving impressive conversions with WhatsApp.
But wait. What happens when you fully integrate your WhatsApp campaigns with HubSpot?
That's exactly what we explored in this session.
We take a look at everything that you need to know in order to deploy effective WhatsApp marketing strategies, and integrate it with your buyer journey in HubSpot. From technical requirements to innovative campaign strategies, to advanced campaign reporting - we discuss all that and more, to leverage WhatsApp for maximum impact. Check out more details about the event here https://events.hubspot.com/events/details/hubspot-new-delhi-presents-unlocking-whatsapp-marketing-with-hubspot-integrating-messaging-into-your-marketing-strategy/
2024 State of Marketing Report – by HubspotMarius Sescu
https://www.hubspot.com/state-of-marketing
· Scaling relationships and proving ROI
· Social media is the place for search, sales, and service
· Authentic influencer partnerships fuel brand growth
· The strongest connections happen via call, click, chat, and camera.
· Time saved with AI leads to more creative work
· Seeking: A single source of truth
· TLDR; Get on social, try AI, and align your systems.
· More human marketing, powered by robots
ChatGPT is a revolutionary addition to the world since its introduction in 2022. A big shift in the sector of information gathering and processing happened because of this chatbot. What is the story of ChatGPT? How is the bot responding to prompts and generating contents? Swipe through these slides prepared by Expeed Software, a web development company regarding the development and technical intricacies of ChatGPT!
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
The realm of product design is a constantly changing environment where technology and style intersect. Every year introduces fresh challenges and exciting trends that mold the future of this captivating art form. In this piece, we delve into the significant trends set to influence the look and functionality of product design in the year 2024.
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
Mental health has been in the news quite a bit lately. Dozens of U.S. states are currently suing Meta for contributing to the youth mental health crisis by inserting addictive features into their products, while the U.S. Surgeon General is touring the nation to bring awareness to the growing epidemic of loneliness and isolation. The country has endured periods of low national morale, such as in the 1970s when high inflation and the energy crisis worsened public sentiment following the Vietnam War. The current mood, however, feels different. Gallup recently reported that national mental health is at an all-time low, with few bright spots to lift spirits.
To better understand how Americans are feeling and their attitudes towards mental health in general, ThinkNow conducted a nationally representative quantitative survey of 1,500 respondents and found some interesting differences among ethnic, age and gender groups.
Technology
For example, 52% agree that technology and social media have a negative impact on mental health, but when broken out by race, 61% of Whites felt technology had a negative effect, and only 48% of Hispanics thought it did.
While technology has helped us keep in touch with friends and family in faraway places, it appears to have degraded our ability to connect in person. Staying connected online is a double-edged sword since the same news feed that brings us pictures of the grandkids and fluffy kittens also feeds us news about the wars in Israel and Ukraine, the dysfunction in Washington, the latest mass shooting and the climate crisis.
Hispanics may have a built-in defense against the isolation technology breeds, owing to their large, multigenerational households, strong social support systems, and tendency to use social media to stay connected with relatives abroad.
Age and Gender
When asked how individuals rate their mental health, men rate it higher than women by 11 percentage points, and Baby Boomers rank it highest at 83%, saying it’s good or excellent vs. 57% of Gen Z saying the same.
Gen Z spends the most amount of time on social media, so the notion that social media negatively affects mental health appears to be correlated. Unfortunately, Gen Z is also the generation that’s least comfortable discussing mental health concerns with healthcare professionals. Only 40% of them state they’re comfortable discussing their issues with a professional compared to 60% of Millennials and 65% of Boomers.
Race Affects Attitudes
As seen in previous research conducted by ThinkNow, Asian Americans lag other groups when it comes to awareness of mental health issues. Twenty-four percent of Asian Americans believe that having a mental health issue is a sign of weakness compared to the 16% average for all groups. Asians are also considerably less likely to be aware of mental health services in their communities (42% vs. 55%) and most likely to seek out information on social media (51% vs. 35%).
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
Creative operations teams expect increased AI use in 2024. Currently, over half of tasks are not AI-enabled, but this is expected to decrease in the coming year. ChatGPT is the most popular AI tool currently. Business leaders are more actively exploring AI benefits than individual contributors. Most respondents do not believe AI will impact workforce size in 2024. However, some inhibitions still exist around AI accuracy and lack of understanding. Creatives primarily want to use AI to save time on mundane tasks and boost productivity.
Organizational culture includes values, norms, systems, symbols, language, assumptions, beliefs, and habits that influence employee behaviors and how people interpret those behaviors. It is important because culture can help or hinder a company's success. Some key aspects of Netflix's culture that help it achieve results include hiring smartly so every position has stars, focusing on attitude over just aptitude, and having a strict policy against peacocks, whiners, and jerks.
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
PepsiCo provided a safe harbor statement noting that any forward-looking statements are based on currently available information and are subject to risks and uncertainties. It also provided information on non-GAAP measures and directing readers to its website for disclosure and reconciliation. The document then discussed PepsiCo's business overview, including that it is a global beverage and convenient food company with iconic brands, $91 billion in net revenue in 2023, and nearly $14 billion in core operating profit. It operates through a divisional structure with a focus on local consumers.
Content Methodology: A Best Practices Report (Webinar)contently
This document provides an overview of content methodology best practices. It defines content methodology as establishing objectives, KPIs, and a culture of continuous learning and iteration. An effective methodology focuses on connecting with audiences, creating optimal content, and optimizing processes. It also discusses why a methodology is needed due to the competitive landscape, proliferation of channels, and opportunities for improvement. Components of an effective methodology include defining objectives and KPIs, audience analysis, identifying opportunities, and evaluating resources. The document concludes with recommendations around creating a content plan, testing and optimizing content over 90 days.
How to Prepare For a Successful Job Search for 2024Albert Qian
The document provides guidance on preparing a job search for 2024. It discusses the state of the job market, focusing on growth in AI and healthcare but also continued layoffs. It recommends figuring out what you want to do by researching interests and skills, then conducting informational interviews. The job search should involve building a personal brand on LinkedIn, actively applying to jobs, tailoring resumes and interviews, maintaining job hunting as a habit, and continuing self-improvement. Once hired, the document advises setting new goals and keeping skills and networking active in case of future opportunities.
A report by thenetworkone and Kurio.
The contributing experts and agencies are (in an alphabetical order): Sylwia Rytel, Social Media Supervisor, 180heartbeats + JUNG v MATT (PL), Sharlene Jenner, Vice President - Director of Engagement Strategy, Abelson Taylor (USA), Alex Casanovas, Digital Director, Atrevia (ES), Dora Beilin, Senior Social Strategist, Barrett Hoffher (USA), Min Seo, Campaign Director, Brand New Agency (KR), Deshé M. Gully, Associate Strategist, Day One Agency (USA), Francesca Trevisan, Strategist, Different (IT), Trevor Crossman, CX and Digital Transformation Director; Olivia Hussey, Strategic Planner; Simi Srinarula, Social Media Manager, The Hallway (AUS), James Hebbert, Managing Director, Hylink (CN / UK), Mundy Álvarez, Planning Director; Pedro Rojas, Social Media Manager; Pancho González, CCO, Inbrax (CH), Oana Oprea, Head of Digital Planning, Jam Session Agency (RO), Amy Bottrill, Social Account Director, Launch (UK), Gaby Arriaga, Founder, Leonardo1452 (MX), Shantesh S Row, Creative Director, Liwa (UAE), Rajesh Mehta, Chief Strategy Officer; Dhruv Gaur, Digital Planning Lead; Leonie Mergulhao, Account Supervisor - Social Media & PR, Medulla (IN), Aurelija Plioplytė, Head of Digital & Social, Not Perfect (LI), Daiana Khaidargaliyeva, Account Manager, Osaka Labs (UK / USA), Stefanie Söhnchen, Vice President Digital, PIABO Communications (DE), Elisabeth Winiartati, Managing Consultant, Head of Global Integrated Communications; Lydia Aprina, Account Manager, Integrated Marketing and Communications; Nita Prabowo, Account Manager, Integrated Marketing and Communications; Okhi, Web Developer, PNTR Group (ID), Kei Obusan, Insights Director; Daffi Ranandi, Insights Manager, Radarr (SG), Gautam Reghunath, Co-founder & CEO, Talented (IN), Donagh Humphreys, Head of Social and Digital Innovation, THINKHOUSE (IRE), Sarah Yim, Strategy Director, Zulu Alpha Kilo (CA).
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
The search marketing landscape is evolving rapidly with new technologies, and professionals, like you, rely on innovative paid search strategies to meet changing demands.
It’s important that you’re ready to implement new strategies in 2024.
Check this out and learn the top trends in paid search advertising that are expected to gain traction, so you can drive higher ROI more efficiently in 2024.
You’ll learn:
- The latest trends in AI and automation, and what this means for an evolving paid search ecosystem.
- New developments in privacy and data regulation.
- Emerging ad formats that are expected to make an impact next year.
Watch Sreekant Lanka from iQuanti and Irina Klein from OneMain Financial as they dive into the future of paid search and explore the trends, strategies, and technologies that will shape the search marketing landscape.
If you’re looking to assess your paid search strategy and design an industry-aligned plan for 2024, then this webinar is for you.
5 Public speaking tips from TED - Visualized summarySpeakerHub
From their humble beginnings in 1984, TED has grown into the world’s most powerful amplifier for speakers and thought-leaders to share their ideas. They have over 2,400 filmed talks (not including the 30,000+ TEDx videos) freely available online, and have hosted over 17,500 events around the world.
With over one billion views in a year, it’s no wonder that so many speakers are looking to TED for ideas on how to share their message more effectively.
The article “5 Public-Speaking Tips TED Gives Its Speakers”, by Carmine Gallo for Forbes, gives speakers five practical ways to connect with their audience, and effectively share their ideas on stage.
Whether you are gearing up to get on a TED stage yourself, or just want to master the skills that so many of their speakers possess, these tips and quotes from Chris Anderson, the TED Talks Curator, will encourage you to make the most impactful impression on your audience.
See the full article and more summaries like this on SpeakerHub here: https://speakerhub.com/blog/5-presentation-tips-ted-gives-its-speakers
See the original article on Forbes here:
http://www.forbes.com/forbes/welcome/?toURL=http://www.forbes.com/sites/carminegallo/2016/05/06/5-public-speaking-tips-ted-gives-its-speakers/&refURL=&referrer=#5c07a8221d9b
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
Everyone is in agreement that ChatGPT (and other generative AI tools) will shape the future of work. Yet there is little consensus on exactly how, when, and to what extent this technology will change our world.
Businesses that extract maximum value from ChatGPT will use it as a collaborative tool for everything from brainstorming to technical maintenance.
For individuals, now is the time to pinpoint the skills the future professional will need to thrive in the AI age.
Check out this presentation to understand what ChatGPT is, how it will shape the future of work, and how you can prepare to take advantage.
The document provides career advice for getting into the tech field, including:
- Doing projects and internships in college to build a portfolio.
- Learning about different roles and technologies through industry research.
- Contributing to open source projects to build experience and network.
- Developing a personal brand through a website and social media presence.
- Networking through events, communities, and finding a mentor.
- Practicing interviews through mock interviews and whiteboarding coding questions.
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
1. Core updates from Google periodically change how its algorithms assess and rank websites and pages. This can impact rankings through shifts in user intent, site quality issues being caught up to, world events influencing queries, and overhauls to search like the E-A-T framework.
2. There are many possible user intents beyond just transactional, navigational and informational. Identifying intent shifts is important during core updates. Sites may need to optimize for new intents through different content types and sections.
3. Responding effectively to core updates requires analyzing "before and after" data to understand changes, identifying new intents or page types, and ensuring content matches appropriate intents across video, images, knowledge graphs and more.
A brief introduction to DataScience with explaining of the concepts, algorithms, machine learning, supervised and unsupervised learning, clustering, statistics, data preprocessing, real-world applications etc.
It's part of a Data Science Corner Campaign where I will be discussing the fundamentals of DataScience, AIML, Statistics etc.
Time Management & Productivity - Best PracticesVit Horky
Here's my presentation on by proven best practices how to manage your work time effectively and how to improve your productivity. It includes practical tips and how to use tools such as Slack, Google Apps, Hubspot, Google Calendar, Gmail and others.
The six step guide to practical project managementMindGenius
The six step guide to practical project management
If you think managing projects is too difficult, think again.
We’ve stripped back project management processes to the
basics – to make it quicker and easier, without sacrificing
the vital ingredients for success.
“If you’re looking for some real-world guidance, then The Six Step Guide to Practical Project Management will help.”
Dr Andrew Makar, Tactical Project Management
2. TABLE OF CONTENTS
1
FABRICATION MANUAL
SAFETY HANDLING AND STORAGE
1.1 Handling Staron�
Sheets
1.2 Handling Staron�
Sinks & Bowls
1.3 Storing Staron�
Sheets
1.4 Storing Staron�
Sinks & Bowls
QUALITY INSPECTION
2.1 Staron�
Sheet Quality Inspection
2.2 Staron�
Sink & Bowl Quality Inspection
ADHESIVE
3.1 Product Description
3.2 Features & Benefits
3.3 Physical Properties (Uncured)
3.4 Physical Properties (Cured)
3.5 Handling and Application
3.6 Dispensing Adhesive
3.7 Storage and Shelf Life
3.8 Helpful Hints
TOOLS AND ACCESSORIES
4.1 Basic Fabrication Shop
4.2 Tool Check List
SITE PREPARATION
5.1 Site Inspection
5.2 Leveling
5.3 Required Tools
PREFACE
This manual is designed to provide necessary guidelines for optimal fabrication, installation, and performance of
Samsung Staron�
solid surface products, per their unique chemical composition and properties.
Though the information contained herein is deemed reliable, none of the contents--including but not limited to the
instructions, techniques, graphics, and recommendations--is to be understood as implying legal liability of fitness for
a specific purpose, any other type of warranty, or being complete or absolute in its range and nature of information.
Depending on the user's particular application, all necessary measures must be taken to verify and test the adequacy
for such needs or application at his/her discretion. Any information or recommendation herein is strictly for purposes
of reference and as such, Samsung Cheil Industries Inc. and its affiliates assume no responsibility for its suitability or
accuracy or the use of such information for products other than Samsung Staron�
solid surfaces.
3. TABLE OF CONTENTS TABLE OF CONTENTS
2 FABRICATION MANUAL 3
FABRICATION MANUAL
INLAYS
11.1 Overview
11.2 Hard Inlays
11.3 Poured Inlays
SINK & BOWL CUTOUTS
12.1 Tools Needed
12.2 Making Cutout Templates
12.3 Making Cutouts Using Templates
12.4 Making Cutouts Freehand
COOKTOP CUTOUTS
13.1 Cooktop Templates
13.2 Cooktop Cutout
13.3 High Strength Support
13.4 Final Rout
13.5 Sanding
13.6 Potential Problems
13.7 Prevention
SUPPORT
14.1 Countertop Support
14.2 Overhang Support
STARON�
SHAPES
15.1 Handling Staron�
Sink & Bowl
TEMPLATES
6.1 Measurement Templates
6.2 Luann Strip Templates
6.3 Cardboard Templates
6.4 Digital Templates
6.5 Tools Needed
SEAM PLACEMENT
7.1 Planning
7.2 Positioning
CUTTING
8.1 Tools Needed
8.2 Overview
SEAMING
9.1 Tools Needed
9.2 Wavy Edge Bit
9.3 Straight Cut
9.4 Mirror Cut
9.5 Edge Preparation
9.6 Seam Adhesive
9.7 Ski Routing and Sanding
9.8 Seam Plate
EDGE DETAILS AND BUILDUPS
10.1 Stacked Edge
10.2a Drop Edge (Standard)
10.2b Drop Edge (Rabbet Method)
10.3 V-Grooving
10.4 Inside Corner Buildup
10.5 Decorative Edge Profile
4. TABLE OF CONTENTS TABLE OF CONTENTS
4 FABRICATION MANUAL 5
FABRICATION MANUAL
VERTICAL APPLICATIONS
20.1 Overview
20.2 Fabrication & Installation
COMMERCIAL APPLICATIONS
21.1 Food Service Application (Hot Wells)
21.2 Food Service Application (Cold Wells)
THERMOFORMING
22.1 Material Preparation
22.2 Mold Preparation
22.3 Oven
22.4 Oven Calibration
22.5 Thermoforming
22.6 Thermoforming Checklist
TRAINING CENTER
23.1 Certification
23.2 Training School
REPAIR
24.1 Introduction
24.2 Inside Corner Repair
24.3 Bevel Repair
24.4 Solid Surface Sink Replacement
RECOMMENDED TOOLS
25.1 Recommended Tools
FASTENING TO STARON�
16.1 Stainless Steel Sinks
16.2 Cast Iron Sinks
16.3 China Bowls
16.4 Wood Insert
16.5 Wood Edge
16.6 Handicap Bar & HandlesㅣShower Doors
16.7 Soap DishesㅣShower Caddies
16.8 TilesㅣHot Pot Areas
BACKSPLASHES
17.1 Loose Backsplash
17.2 Coved Backsplash
17.2-1 Method (I)
17.2-2 Method (II)
17.2-3 Method (III)
17.2-4 Method (IV)
17.3 Full Height Backsplash
FINISHING AND POLISHING
18.1 Finishing
18.2 Polishing
INSTALLATION
19.1 Transportation
19.2 Site Preparation
19.3 Carrying & Positioning
19.4 Dry Fitting
19.5 Seam Plate
19.6 Faucet Holes
19.7 Final Placement
19.8 Anchoring Dishwasher
19.9 Preparing Cooktop Cutout
19.10 Do’s and Don’ts
5. 7
FABRICATION MANUAL
01 _ Safety Handling and Storage
Extreme temperatures will affect the product. Make sure to use caution
when handling at a temperature below 40。
F (4。
C).
For your safety, always use common sense and follow the safety guidelines
when handling Staron�
Sheets.
Sheets should be carried one at a time on edge with one hand under to support
and one hand for control
If lifting device is not available, Staron�
Sheets can be unloaded manually.
However, it is very important to follow special procedures
for your safety:
- Handle one sheet at a time
- Sheet should be handled on the edge
- Carry Vertically
- Always have heavy-duty protective gloves and proper safety shoes.
- Two people
TIP
Safety Handling and Storage _ 01
Forklift should have minimum of 6' forks.
Staron�
Sheets are usually transported on pallets.
Staron�
pallets should be unloaded with a forklift or other lifting device
capable of handling following dimensions safely.
1.1 Handling Staron�
Sheets
TIP
6 FABRICATION MANUAL
StaronSheet EmptyPallet 10StaronSheets+Pallet
[ 1.1 - A ] [ 1.1 - B ]
Height (in) 0.5 6.8 11.8
Width (in) 30 32 32
Length (in) 145 146 146
Weight (lbs) 121 55 1,265
[ 1.1-C ]
6. Safety Handling and Storage _ 01 01 _ Safety Handling and Storage
Staron�
Sinks and Bowls should not be stacked more than 6 boxes high.
Remember! To reduce the chance of damage, do not drop, apply pressure,
or place heavy loads on top.
Staron�
Sinks and Bowls should be handled carefully according to the
instructions on the package. Although Staron�
Sinks and Bowls are packaged
to give maximum protection, it is important to use caution when handling them.
1.2 Handling Staron�
Sinks & Bowls
TIP
Special care should be taken in storing Staron�
Sheets to prevent them from
warping and sagging.
Storage system, which allows easy accessibility, handling, and Lot identification,
are the key.
Exposuretomoistureanddirectsunlightduringstoragemaydamagethesheets.
There are two ways of storing Staron�
Sheets to avoid warping or sagging.
Staron�
Sheets are most effectively stored at temperatures between
59 ~ 73 ℉(15 ~ 23 ℃) and should be kept in a dry and well ventilated indoor
area. Avoid exposure to moisture during storage.
- Staron�
Sheets should be stored flat and evenly supported as illustrated in
(Figure 1.3 - A).
- Staron�
Sheets could also be stored on its edge (Vertical Storage).
As illustrated in the (Figure 1.3 - B), the sheets should be stored on
Vertical Storage Racks, with the base of the sheet fully supported by flat
floor or stable platform.
1.3 Storing Staron�
Sheets
TIP
8 FABRICATION MANUAL 9
FABRICATION MANUAL
[ 1.3 - A ] [ 1.3 - B ]
Staron�
Sheets should be stored for easy access where Lot Numbers and
Colors can be identified.
Note
7. 11
FABRICATION MANUAL
02 _ Quality Inspection
Safety Handling and Storage _ 01
Staron�
Sinks and Bowls should not be stacked more than 6 boxes high.
Remember! To reduce the chance of damage, do not drop, apply pressure,
or place heavy loads.
Staron�
Sinks and Bowls should be handled carefully according to the
instructions on the package. Although Staron�
Sinks and Bowls are packaged
to give maximum protection, it is important to use caution when handling them.
1.4 Storing Staron�
Sinks & Bowls
TIP
10 FABRICATION MANUAL
[ 1.4 - A ]
After thorough inspection of the sheet, if you find any defect which will greatly
increase your fabrication time, please contact your Staron�
Distributor.
Your Staron�
Distributor will answer any question and provide assistance on
Staron�
Solid Surface Products.
If you are unsure of the quality of the material, please contact your
Staron�
distributor for service.
The goal at Samsung Staron�
is to provide the highest quality materials to our
fabricators to insure customer satisfaction. As a result, we check and recheck
each individual sheet to meet our rigorous quality standards.
However, it is the fabricators' responsibility to conduct a visual inspection for
defects and color match for every sheet they work with.
2.1 Staron�
Sheet Quality Inspection
TIP
Samsung Staron�
will replace materials which do not meet our product
specification when delivered. However, Samsung Staron�
will not be responsible
for any labor charges incurred during or after fabrication on the defective
materials
Note
8. 12 FABRICATION MANUAL 13
FABRICATION MANUAL
02 _ Quality Inspection
Fabrication and Installation Check List:
Residential 10-year limited warranty of Staron�
solid surface products will not
cover damages caused by improper fabrication and installation.
The following list is a mandatory check list for fabricators when working with
Staron�
Solid Surface products.
Quality Inspection _ 02
Please inspect carefully upon receipt of the Staron�
product. Samsung Staron�
replacement policy does not allow for any labor charges incurred during or after
fabrication on the defective materials.
Table 2.1-A shows some of the standards set to help with the inspection upon
receipt of Staron�
Sheets (at the time of delivery).
Note
Specification
Inspection Standards
None
Broken / Cracked
Color Difference
(Sheet to Sheet)
Color Difference
(With same Sheet)
Samsung does not guarantee color match.
This characteristic is inherent with Solid Surface
products in the industry.
Checking for color match before fabrication is not
onlyrequired,butveryhighlyrecommended.
Requirements on Color Match:
∙Use sheets from same pallet
∙CheckandusefromsameLot#andstaywith
in specified range of sequence
∙Trial Color Match(Dry-fit test)
Less than 1.8mm or 1/14" (approx.)
None
Less than 3 per sheet
Less than 3 per sheet
Warping after cutting of the sheet
Receding of Particulate (None)
Less than approx. 1.19mm or 3/64" (approx.)
None
Warping
Pit Hole
Foreign Particle
White Spots
Curving
Concave
Tapered Edge
Discoloration
[ 2.1 - A ]
General Installation
1. Be sure to check dye lot numbers upon delivery of the product for
color-match. Sheets that are to be seamed together must be the same lot
number.
2. The following checklist must be completed and the job physically
inspected before a Distributor representative is sent to inspect a claim.
3. The tops of the cabinets must be flat and true to within ⅛ "(3mm) of
a flat surface.
4. Clean surfaces with denatured alcohol before applying adhesive to
prevent bonding failure.
5. Provide only perimeter support (top edges of cabinets with or without
build-up strips). Use only dime size dabs of flexible adhesive (clear
silicon) every 12 ~ 18" (305 ~ 457mm) to fasten Staron�
tops to the
perimeter.
6. Allow ⅛ " (3mm) minimum clearance between Staron�
and walls for
every 10".
7. Never install mechanical fasteners (screws, nails, etc) into Staron�
.
8. Must leave a piece of color match materials (the same lot #) from each
counter on the job for future repairs (minimum 2sq.ft.).
9. 14 FABRICATION MANUAL 15
FABRICATION MANUAL
02 _ Quality Inspection
22. High strength corners are required on all cutouts made for heat generating
appliances.
23. Avoid ‘stress risers’, (defined as a notch, gap, offset or sharp inside
corner in a solid surface assembly). Stress risers weaken the overall
assembly, eventually causing cracks in solid surfacing.
24. Avoid placing seams at inside or outside corners. Seams should be
placed at least 1" (25mm) away from inside and outside corner radiuses
to prevent cracks. Seams are potential weak point where crack(s) can start.
Seams that are located further away from the corner can better prevent
crack(s).
25. Apply Heat-Conductive Aluminum Tape (One Layer of 4 mils, at least 2"
wide, ex: 3M 425 Aluminum Foil Tapes or similar) in recommended fashion
to cook-top and around heat sources in family housing to protect from heat
damage and thermal stress. Apply Insulating Felt Tape for use with drop-in
food wells used in commercial food service applications to insulate Staron�
product from hot or cold appliance.
* if a cook-top is to be mounted to Staron�
product, be sure that there is
room inside the cabinet to hold the top and any pop-up vents that will be
installed with it
Quality Inspection _ 02
9. Support overhangs exceeding 6" (152mm) for 1/2" Staron�
material.
10. All seams should be supported by 4"(102mm) minimum seam plate,
both edges should be beveled at 45 ~ degrees.
11. Radius all inside corners to a minimum of ½ " (13mm) radius.
This will reduce stress in the countertop. Larger radius give more
protection.
12. Do not install Staron�
over under-layment (full substrate) or over old
countertops. Integral dust covers may be left in place if removal is
unacceptable to the customer.
13. In wet wall installations, leave a ½ " (13mm) air gap at the bottom,
to prevent water leaks from wicking up between the Staron�
and
the wall.
14. Use only routers. Use ⅜ " (10mm) or larger diameter bits.
15. Remove all nicks, tool marks, etc. Use 150 grit (80 or 60 micron)
or finer sandpaper.
16. Support within 3" (76mm), but no closer than 1" (25mm), from the
edge of the cutout.
17. Reinforce all shop and field seams.
18. Seams should not go through cutouts. In addition, seams should be
at least 3" away from any cutouts.
19. Leave at least ¼ " (6mm) clearance space on all sides to allow cook-
top/sink expansion. Clearance space should be as big as possible.
20. Use only approved adhesives.
21. Do not rigidly adhere Staron�
to other solid surface products.
10. 16 FABRICATION MANUAL 17
FABRICATION MANUAL
Table 2.2-A shows some of the standards set to help with the inspection upon
receipt of Staron�
Shapes (at the time of delivery).
2.2 Staron�
Sinks & Bowls Quality Inspection
02 _ Quality Inspection
Please inspect carefully upon receipt of the Staron�
product. Samsung Staron�
replacement policy does not allow for any labor charges incurred during or after
fabrication on the defective materials.
Note
Quality Inspection _ 02
Tub and Shower Surround Installation
1. Staron�
in ¼ " (6mm) thickness is not recommended for use on
countertops or other horizontal surfaces.
2. Use water-resistant wallboard. Do not apply directly to masonry that
could become moist.
3. Wallboard must stop ½ " (13mm) above tub or shower flange to prevent
damage caused by wicking.
4. When installing over tile or other wall material it must be clean, sound
and dry.
5. Before cutting holes make sure that sheet is firmly supported.
6. Cut all holes with router or hole saw.
7. Provide plumbing holes ¼ " (6mm) larger than hardware or fixtures.
8. All corners of cutouts must be round and edges smooth.
9. Wipe walls and sheets with denatured alcohol before applying
adhesive.
10. Use 100% silicone.
11. Leave 1/16" (1.6mm) space for caulking between Staron�
and tub
flange; also for caulking between sheets at corners.
12. Wipe joints with denatured alcohol before caulking.
13. Force caulk into joints with pushing motion.
Make sure to check for any cracks, especially
around drain holes. Any chips or cracks will
affect the integrity of the sinks and bowls.
Check to see if the delivered goods are correct.
Broken / Cracked
Remember, there are many sinks and bowls
with similar designs. Measuring for correct
size is recommended.
Correct Size
Color Order
Make sure all accessories are included in the
package.
Accessory
Please check to see for correct dimension.
None
Less than 2
Less than 2
Check for correct location and placement.
Check for correct location and dimension
None
Color match between shape and sheet is not
guaranteed.
Correct Specification
Structureuniformities
Foreign Particle
Pit Holes
Overflow
Drain Holes
Discoloration
Color Difference
(Shape to Sheet)
Specification
Inspection Standards
[ 2.2 - A ]
11. 18 FABRICATION MANUAL 19
FABRICATION MANUAL
03 _ Adhesive
Adhesive _ 03
Staron�
Methyl Methacrylate Adhesive is a specially formulated 10:1 ratio
decorative solid surface adhesive. Staron�
adhesive is translucent, U.V. Stable,
non yellowing and readily accepts pigments for color matching applications.
It offers excellent adhesion to all types of solid surface products, including
densified cast polyester, acrylic, and formulations that include both acrylic and
polyester blends. Staron�
adhesive has a working time of 10~15 minutes and
products seamed with Staron�
adhesive may be handled 20 minutes after gel time.
Fabrication of bonded parts (sanding, finishing, routing) may take place within
one hour after assembly of parts.
Staron�
adhesive has excellent performance in U.V light, impact resistance,
wear resistance, scuffing, staining, and in resisting water penetration,
including boiling water.
3.1 Product Description
Product Description
- 100% Reactive - U.V. Stable
- Translucent - Sandable
- Color Matchable - Phthalate Free
- Fast Room Temperature Curing - Non Yellowing
3.2 Features and Benefits
Part A Part B
Adhesive Activator
Viscosity (Centipoise) - Brookfield RVF 20,000~22,000 6,000~8,000
(Spindle 7; 20 rpm)
Color Clear Off-White
Weight (pounds per gallon) 9.1 9.5
Mix Ratio by Volume 10 1
Flash Point 50℉ (10℃)
Mixed Viscosity (Centipoise) 16,000 ~ 20,000
Open Work Time (Minutes) 10 at 72℉(22℃)
Assembly Time (Minutes) 15 at 72℉(22℃)
Fixture Time (Minutes) 25 at 72℉(22℃)
Solvents that are in product None
3.3 Physical Properties (Uncured)
Butt Joint Cast Polyester -------------------- 4,000 psi
Cast Acrylic -------------------- 4,000 psi
Cultured Marble -------------------- Exceed Product
Compression Shear Cast Polyester -------------------- Exceed Product
UV Light Resistance -------------------- Very Good
Thermal Resistance -------------------- Very Good
Operating Temperature Range ---------- 40℉ ~ 250℉( 4℃ ~ 121℃)
3.4 Physical Properties(Cured)
12. 20 FABRICATION MANUAL 21
FABRICATION MANUAL
03 _ Adhesive
All Staron�
Adhesive should be stored in a cool, dry place when not used for a
long period of time. Staron�
Adhesive has a shelf life of 12 months from
manufactured date or more when stored at room temperature 72℉(22℃) in
their original containers. Shelf life may be extended by refrigeration.
This information is being supplied by the Manufacturer of Staron�
Adhesive,
and all information is provided to the best of the Manufacturer's knowledge.
The Manufacturer makes no representations or warranties of any kind
concerning this data or information on this data sheet. Due to conditions
outside of the control of the Manufacturer, the Manufacturer does not accept
liability for results obtained. Any questions concerning this information or
product use should be directed to the manufacturer of Staron�
Adhesive.
3.7 Storage and Shelf Life
Adhesive _ 03
Staron�
Adhesive Part A is flammable, containing methacrylate esters.
Keep containers closed after use. Avoid eye and skin contact. Wash with soap
and water after skin contact. In case of eye contact, flush with water for15minutes
and get immediate medical attention. Harmful if swallowed.
Keep out of the reach of children. Keep away from heat, sparks, and open flames.
NOTE: Because of the rapid curing features of this product, large amounts of
heat are generated when large masses of material are mixed at one time
(bond joints and thicknesses greater than ⅛ " (3mm) should be avoided).
The heat generated by the exotherm resulting from the mixing of large masses
of adhesive can result in the release of entrapped air and volatile components
as evidenced by gassing.
3.5 Handling and Application
Staron�
Adhesive is generally applied using pre-measured cartridges or Paks.
Hand-held guns (manual or pneumatic) are generally used with the pre-
measured cartridges. To assure maximum bond strength, clean surfaces must
be mated within the specific open time. Use sufficient material to insure 100%
joint fill when parts are mated and clamped.
Avoid over tightening of seam. Use spring activated clamps. All adhesive
application, part positioning, and fixturing must occur before the assembly time
of the mix has expired. After indicated assembly time, parts must remain
undisturbed until the fixture cure is reached. Avoid contact with copper, brass,
or copper alloys in all fittings, pumps, etc. Seals and gaskets should be made of
Teflon, Teflon coated PVC foam or polyethylene. Avoid the use of Vitron, BUNA-N,
Neoprene or other elastomers for seals or gaskets. Cleanup is best performed
before the adhesive has cured. If the adhesive is already cured, careful scraping,
followed by a solvent wipe may be the most effective method of cleanup.
Application of adhesive at temperatures between 60℉(16 ℃) and 90℉(32 ℃)
will insure proper cure speeds. Temperatures below 45℉(7 ℃) will slow cure;
above 90℉(32 ℃) will speed cure.
3.6 Dispensing Adhesive
Helpful hints on using and storing Staron�
Adhesive
Always store adhesive in an upright position. Adhesive should be stored in the
cooler areas of the shop, with temperatures 50℉~70℉(10℃~21℃) Storing the
adhesive in a separate refrigerator (from lunches, snacks, drinks), will prolong
the life of the adhesive. Do not freeze the adhesive.
When using a fresh, unopened tube, squirt a little material out (with no tip
attached) to ensure that you have both adhesive and catalyst flow.
Many fabricators squirt this out into their trash can or onto a piece of paper.
Then attach a tip, squirt out into the trash a little bit of adhesive and you are
ready to begin seaming or making buildups.
After you are done using the adhesive, many fabricators leave the tip on the tube.
The material will set up in the mix tip, but will not set up in the cartridge or in
the feed chamber. You can re-store the tube with tip attached in the upright
position. Then when you need to reuse the tube of adhesive, simply take off the
set up tip, and squirt a little out to make sure you have adhesive and catalyst
flow. Attach a new clean tip onto the cartridge, squirt a little adhesive out of the
tip into the trash and you are ready to begin seaming.
3.8 Helpful Hints
13. 23
FABRICATION MANUAL
22 FABRICATION MANUAL
04 _ Tools and Accessories
Similar to other industries, Staron�
Fabricators vary on the brand of tools
they like and use in their shops.
The following are the recommended tools to be used on Staron�
100%
Acrylic Solid Surface materials.
It is up to the fabricator to choose the brand of tools to fit their needs.
However, it is very important to follow the guidelines on fabrication methods
and tools that are not recommended or prohibited.
4.1 Basic Fabrication Shop
Adhesive _ 03
HelpfulhintswhenusingStaron�
Adhesivetomakeseamsorbuildups
Always use mirror cutting techniques to cut the seam. Routed mirror cut seams
provide the cleanest seams and often help reduce gaps due to router chatter.
Always dry fit seams. If you can't see the seam when it's dry fitted, you will
probably not see the seam once adhesive has been applied. For best bonding
strength, use 150 grit (80 or 60 micron) sandpaper to "rough up" the seamed
areas. Many fabricators use a block of wood and adhere the 150 grit (80 or 60
micron) sandpaper to the block and gently swipe the seamed area roughing up
the edges to be seamed. But be careful not to round out the top edges of the
seamed areas. It is always best to wipe the seam with denatured alcohol
immediately prior to seaming in order to remove dust or oily films left by your
hand.
It's always best to use spring clamps or Dani Clamps when making seams or
buildups. Jorgeson clamps or screw clamps can put too much pressure on the
seam squirting out the adhesive too much. It is always best to lay two to three
small beads down, rather than one large thick bead. Apply adhesive in a small
bead from one end of the build up or seam to the other in a back and forth
motion. Two to three passes maximizes the chance of full of proper catalyst /
adhesive mix.
�Router
- Trim Router
- 1½ H.P. Router
- 3¼ H.P. Router
�Hole Saw Kit
- 1⅛ ", 1¼ ", 1⅜ ", 1½ "
�Drill
�Hot Glue Gun
�Glue Stick
�Straight Edge
�Sander
- 6" with vacuum
- Stiff pad and contour pad
�Jig Saw (For making Templates only, Do Not use on Staron�
)
�Adhesive Gun
�Circular Saw
�Belt Sander
�Grinder
�Bar Clamps
- 12"x 4" throat
�2" Spring Clamps
- 200 to start (4 for every foot of edge buildup)
- daniclamps - PVC pipe type (4 for every foot of edge buildup)
4.2 Tools Check List
14. 24 FABRICATION MANUAL 25
FABRICATION MANUAL
04 _ Tools and Accessories
The recommendations above are based on maximizing maintenance
on routers and quality tungsten tipped bits in day-to-day operations
TIP
Tools and Accessories _ 04
�4" Spring Clamps
- For seams (depending on seaming method)
�Carpenters Square
�4" Drywall Square
�⅛ " Luan or Cardboard for Templates
�Caulk Gun
�Spray Bottle
�Denatured Alcohol
�Vacuum
�Aluminum Tape - For Cook tops and Slide in Ranges
�Micron Sand Paper - 100, 80, 60, 30
�Scotch BriteTM
- (Maroon and Grey)
�31/32 AC Fir Plywood - Buildup Strips
�Silicone
- Clear for general purpose
- Colored for splashes
�Router Bit
- Bowl Bit
- 2" Straight Bit
- ¾ x 2" Template Bit - (Top Bearing)
- Various Decorative Router Bits for Edge Details
�Table Saw
�Coved Splash Kit
- ⅜ " Cove Bit
- ⅞ ~ 1" Straight Bit
- Router Guide
- Bar Clamp - 2 for every 6" of Back Splash
- Daniclamps - 2 for every 6" of Back Splash
�Seaming Tools
- Depending on the Method you choose
�Additional Tools
- Depending on the need, more Router, Sanders, Panel Saw,
- CNC machine, Shaper, V-Groove machine...
Router
[ 4.2 - A ]
Trim Router N/A
Carbide tripped trim
router bits
Heavy duty work:
e.g. bulk cutouts,
banjo cuts, coving
Revolution per minute (rpm) : 10,000 ~ 28,000
3 Hp
(2.3 kw)
Task Minimum Power Tool/Bit
Generalpurposework:
e.g.edgeandseam
trimming,cutouts
1½ Hp
(1.1 kw)
12mm (½ ")carbide tripped
single flute with
12mm (½ ") shank
10mm (⅜ ")carbide tripped
double flute with
12mm (½ ") shank
15. 27
FABRICATION MANUAL
26 FABRICATION MANUAL
05 _ Site preparation
Before installing Staron�
, it is very important to make sure all relevant site
details are checked and verified.
Overview
1. Inspect the surroundings from parking lot to installation site.
- accessibility from the parking lot to the front door
- check for the distance and other obstacles
- entrance size
- wall condition
- ceiling height
- cabinet condition
- electrical and plumbing positioning
- make note of any other information which will help to minimize
problems during fabrication and installation of Staron�
Countertop
2. Relationship between you and your customer.
- Code of Conduct
- professionalism
- detailed instructions on what they need to have completed before
the installation date
- inform consumers on what they should expect and what you will do
to minimize the noise, dust, and other impacts
5.1 Site Inspection
Tools and Accessories _ 04
Saws
Regardless of the type of saw, all saws must :
1. Be heavy duty
2. Have triple-chip blades of tungsten carbide
3. Have hook angle blades with pitch of -5 to 10 degrees
and be described as “for cutting hard plastics”
4. Have 4,000 ~ 6,000 rpm
5. Have a quietblade, small gullets, brass plugs and heavier blade stock
6. Be used for cutting a straight line
Blades must be sharpened regularly with a 400 ~ 600 grit (20 ~ 40 micron)
grinding wheel.
Blades must have 8 teeth per diameter inch (25mm diameter) and
are recommended for Solid Surface.
200/8 64 2.2/0.09 2.8/0.11
250/10 80 2.6/0.10 3.2/0.13
300/12 96 2.6/0.10 3.2/0.13
350/14 108 3.0/0.12 3.6/0.14
400/16 120 3.6/0.14 4.4/0.17
450/18 144 3.6/0.14 4.4/0.17
500/20 160 3.6/0.14 4.4/0.17
Blade diameter
(mm/inch)
No. of teeth
Plate
(mm/inch)
Task
(mm/inch)
[ 4.2 - B ]
16. 28 FABRICATION MANUAL 29
FABRICATION MANUAL
05 _ Site preparation
Have the contractor or cabinet installer reset the cabinets.
Remember, if something should happen while you are resetting the
cabinets, you will be held responsible if any damage occurs.
5.2 Leveling
TIP
Site preparation _ 05
Provide friendly consumer service, treating all consumers with service oriented
attitudes, courtesy, and respect at all time.
- On-time Scheduling.
∙Provide accurate scheduling.
∙Arrive on the day and time as promised.
∙In case of delay or cancellation, notify the consumer before the scheduled
appointment.
- Provide professional image at all time, maintaining appropriate dress code.
- Do not smoke during service call.
- Do not be under the influence of drugs or alcohol during service call.
- Do not use drugs or alcohol during service call.
- Do not play radios or any other listening devices during service call.
- Do not take lunch break on service call premises.
- Do not use inappropriate language during service call.
- Keep the working area clean from beginning to the end, cleaning up all debris
and dust during and after the installation.
∙Take all necessary precaution to protect the premises from dust and debris
- Please be sensitive to the consumer's concern.
∙Providing them the necessary information and explanation of the job.
∙All work should be discussed and agreed upon prior to the installation.
- Provide instructional materials and verbal instructions to the consumer
on proper care and maintenance of the Staron�
products.
Prior to installing Staron�
Countertops, make sure that all the cabinets are
leveled.
Leveling and clearing all debris from the cabinets is very important in
preventing future crack(s) to the Staron�
Countertops.
Step 1 : Make sure cabinets are all on the same plane.
- Up to ⅛ " difference in the plane can be corrected by shimming
the Cabinets straight.
- If there is more than an ⅛ " gap between the cabinets, they
need to be reset.
Overview
[ 5.2 - A ]
17. 31
FABRICATION MANUAL
30 FABRICATION MANUAL
06 _ Templates
Before any fabrication of Staron�
, make accurate templates that are true
representation of the top. This will help to insure problem free fit during
installation.
Templating is a vital part of the fabrication process.
If your templates are perfect and top is fabricated according to the templates, the
installation will be problem free.
There are many different ways of making the templates, it is up to you to choose
the one that best suits your business.
1. Measurement Templates
2. Luann Strip Templates
3. Cardboard Templates
4. Digital Templates
Introduction
Site preparation _ 05
Moving Blanket
Take some moving blankets to the Jobsite. Spread the blankets out from the
entrance to the installation site. Make sure that your shoes or your tools don't
touch the customers floor or cabinets. Your customers will appreciate your
effort and you will gain their confidence and trust.
Step 2 : Make sure all cabinet frames are clean and clear of all obstacles.
Old Cabinets - make sure all the old glue is completely cleaned from
the top of the cabinets.
New Cabinets - Make sure all the staples, screws, brads and
other obstacles are either pulled out or at least
flush with the top of the cabinets.
Step 3 : Allcabinetsandendpanelsshouldbesecuredtothewallorthefloor.
Make sure that no movement will occur.
Any movement will cause stress in the Staron�
Countertop.
TIP
Having proper tools will save time and insure quality workmanship.
- Level, 2', 4', and 6'
- Chisel
- Hammer
- Screwdriver
- Straight edge 6' ~ 8'
5.3 Required Tools
This method is used most often by Fabricators.
However, this method takes the longest time.
You need to spend more time and take more accurate measurements
to make sure the top fits with minimal fitting on the jobsite.
[ 6.1 - A ]
6.1 Measurement Templates
18. 32 FABRICATION MANUAL 33
FABRICATION MANUAL
06 _ Templates
Templates _ 06
6.2 Luann Strip Templates
⅛ " Luann is ripped to specific width depending on the overhang you desire.
Example :
�1¼ " overhang
- cut the strip to 2" wide
2" strip = 1¼ " overhang + ¾ " cabinet frame
�1½ " overhang
- cut the strip to 2¼ " wide
2¼ " strip = 1½ " overhang + ¾ " cabinet frame
Some people will make the template flush with the front of the cabinet and add
the overhang later.
As you create your templates, choose the method you are most comfortable with.
[ 6.2 - A ]
1. Make sure you have enough template material on hand.
2. Plug in your hot glue gun.
3.Startlayingoutyourstripsonthecabinetsasillustratedinthedrawing (6.2-B)
�When the glue gun is hot, start gluing the wood pieces together.
�Do not bend the stick 1 and 2 tight to the wall, “let it float”.
�Glue the sticks 3, 4, 5, and 6 tight against the wall.
�The sticks should be tight against the corner, where 1 and 2 meet.
�The points where 3, 4, 5, and 6 touch the wall will become your scribe points.
�Don't forget to mark the centers of your sink base on the templates.
�Mark the center of the cooktop or any other cutouts.
�Set sticks 3, 4, 5, and 6 flush with backside of the cabinet frame for exact
overhang.
Overview
[ 6.2 - B ]
19. 34 FABRICATION MANUAL 35
FABRICATION MANUAL
06 _ Templates
DO NOT FOLD THE CARDBOARD
Cardboard templates will show the customers the actual size of the top and
give them the opportunity to change the size of the overhang or other features.
Mark all the necessary information right on the template for easy access.
Cardboard templates can be used after the installation is completed to
protect the countertop by taping it to the top. This will help protect against
other trades such as painters, electrician, plumbers, etc from accidentally
damaging the top.
Remember, in many instances, you will be held responsible for the damage
caused by other trades coming in after you.
Protect your work by informing the customer and whatever barrier you
can supply (cardboard template is a good start).
TIP
Templates _ 06
6.3 Cardboard Templates
Tips on why cardboard templates are good to use : (fits into small vehicle,
use it as a cover, write customer info right on the template, doesn't fold easily.
1. Place the cardboard on the cabinets as illustrated in the drawing. (6.3-A)
Overlap the pieces (overlap by 8" - 10").
Hot glue the pieces together.
2. When you get the cardboard to cover the cabinets, take your strips of
cardboard (1½ " wide strips) and glue them to form the frame as
illustrated in the drawing (6.3-C)
These strips will give you exact measurements for scribing to the wall.
If you scribe the template to the walls, you can pre-scribe the top in the shop.
Making the installation go faster.
Overview
[ 6.3 - A ]
[ 6.3 - C ]
[ 6.3 - B ]
3. When the template is finished, trace the front edge of the cabinets to
calculate and add the overhang.
Calculate the overhang you want and cut down to size.
Remember to mark all centerlines of the cutouts (sinks, cooktops, etc.).
[ 6.3 - D ]
20. 36 FABRICATION MANUAL 37
FABRICATION MANUAL
06 _ Templates
With the advancement of technology, there are many different variety of
equipments and programs to help with your templating needs.
Please contact your Digital Template manufacturers for further information
and instructions.
6.4 Digital Templates
Templates _ 06
It is not recommended to cut templates, the integrity of the template
structure will be voided.
4. Cutting the template
In some instances, the template will be too big to fit in your vehicle.
Note
[ 6.3 - E ] [ 6.3 - F ]
DO NOT FOLD CARDBOARD!
TIP
The preferred method with card board templates. :
a. If you have to cut apart the template to be able to fit it in your vehicle,
cut it at one of your overlays (only through the top layer).
Illustrated in the drawing (6.3-E and 6.3-F)
b. Afterwards, you can glue the template back together, where it will line up exactly.
�Hot glue gun
�Glue Stick
�Utility Knife
�Tape Measure
�Straight Edge
�Level 2', 4', 6'
�Paper and Pencil
�Magic Marker
�Template Material (depending on the templating method)
- Luann
- Cardboard
- Digital Template Equipment
6.5 Tools Needed
21. 38 FABRICATION MANUAL 39
FABRICATION MANUAL
07 _ Seam Placement
Seam Placement _ 07
Careful planning is the key factor to a successful job.
When planning a job, having the right seam placement will help you minimize
the use of material and time.
Remember, saving of material and time will help your business be competitive
in the market.
In addition, the correct seam placement will help to insure that your customers
to enjoy the beauty of Staron�
Countertop without problems for years to come.
7.1 Planning
[ 7.2 - A ]
[ 7.2 - B ]
All seams need to be at least 3" from sink cutout.
7.2 Positioning
All seams need to be at least 3" from any cutout.
NO SEAMS THROUGH A COOKTOP!
Under no circumstances, should a seam go through a cooktop cutout.
If the kitchen is designed where there is no other choice, please contact
Staron�
Technical Service for advice.
All seams need to be at least 1" (25mm) past the radius of an inside corner.
Seams are potential weak point where crack(s) can start.
Seams that are located further away from the corner can better prevent crack(s).
[ 7.2 - C ]
22. 40 FABRICATION MANUAL 41
FABRICATION MANUAL
Seam Placement _ 07
There should be no seams in an overhang on a peninsula or island.
Seams perpendicular to the overhang is allowed.
[ 7.2 - D ]
[ 7.2 - E ]
[ 7.2 - F ]
07 _ Seam Placement
On rare occasions, you will have a job seam going over a dishwasher.
You will need to support it from cabinet to cabinet with plywood.
Make sure to notch out plywood to accept seam plate.
Seams are not allowed through sink cutouts.
On rare occasions, there is no other choice but to seam on a splay corner
with sinks.
Please consult with Staron�
Technical Services before proceeding.
[ 7.2 - G ]
[ 7.2 - H ] [ 7.2 - I ]
23. 42 FABRICATION MANUAL 43
FABRICATION MANUAL
08 _ Cutting
All inside corners should have at least ½ " radius.
This includes all cutouts.
Square corners will not be covered under warranty.
Any 90 degree inside corner is a stress point, and will crack eventually.
Note
Cutting _ 08
The following tools must NOT be used to cut Staron�
at any time:
- Jig Saw
- Hacksaw
- Non Solid Surface Saw Blades
- Auger Bits
Recommended Tools
- Circular saw with Carbide or Diamond Blades
- Table Saw (with out-feed table)
∙3 HP minimum
- Panel Saw
∙5 HP (recommended)
∙Cabinet Saw or Stationary Saw (recommended)
- Routers (3HP minimum)
- Bar Clamps, "C" Clamps
- ½ " Straight Bit (Carbide tipped)
8.1 Tools Needed
When cutting Staron�
, make sure the piece is totally supported.
When using a Circular saw, you will be rough cutting only. Always use a router
and straight edge for final cuts.
Jigsaws should never be used to cut Staron�
solid surface.
When using a router, always run the router left to right (clockwise).
All inside corners should have a minimum of ½ " (13mm) radius.
Remember, the bigger the radius the better.
Radius larger than ½ " should be done with a template.
8.2 Overview
[ 8.2 - A ]
[ 8.2 - B ]
24. 44 FABRICATION MANUAL 45
FABRICATION MANUAL
09 _ Seaming
9.2 Wavy Edge Bit
Seaming _ 09
Router : 3 1/4HP
½ " x 1½ " double flute bit
Straight edge
Clamps
Denatured alcohol
Clean Rags
Clamping Method
Release paper or Scotch tape
Ski router
Sander
Vacuum
Sandpaper : 80 grit
Panel Saw (Optional)
Table Saw (For rough cuts)
9.1 Tools Needed
Introduction
When planning any fabrication and installation of Staron�
, seams should be
planned in a manner which minimizes the use of materials and maximize
product performance.
Before putting seam adhesive between the two pieces to be seamed together,
you need to machine the two pieces to match.
There are 3 ways to cut seams
1) Wavy edge bit
2) Straight cut using Panel Saw
3) Mirror cut
1. This bit has a slight wave to it. It requires a special router base.
2. Cut one piece with one side of the base.
3. Then, cut the other piece with the 2nd side of the base.
4. This offsets the “wave” of the router bit by ½ ".
5. Set up your straight edge back the amount of the router base.
6. Run the router from left to right.
7. By cutting your seams using this type of bit, you are allowing 50%
more seam area.
[ 9.2 - C ]
[ 9.2 - A ] [ 9.2 - B ]
25. 46 FABRICATION MANUAL 47
FABRICATION MANUAL
09 _ Seaming
9.4 Mirror Cut
Seaming _ 09
9.3 Straight Cut
1. This method requires Panel Saw with Solid Surface Blade or CNC Router.
2. Remember, you should never use following tools as your final cut
before seaming.
- Table saw
- Circular saw
- Straight edge router
- Or any other cutting method except Panel Saw, CNC Machine,
or Wavy Edge.
[ 9.3 - A ]
[ 9.3 - B ]
1. Most effective method of getting a good seam when expensive machines
such as Panel saw or CNC are not available, is to use a method called
the “MIRROR CUT”.
2. With this method, you will cut both pieces to be seamed at the same time.
3. This will make the two pieces match up perfectly “mirror” to each other.
Procedures:
1. Take the 2 pieces to be seamed together and set them ⅜ " apart,
making sure that the 2 pieces are parallel to each other.
[ 9.4 - A ]
26. 48 FABRICATION MANUAL 49
FABRICATION MANUAL
09 _ Seaming
2. After making sure that the 2 pieces are exactly ⅜ " apart and parallel
to each other, use a ½ " bit and a router to cut.
3. Set up your straight edge on the left side of the 2 pieces being cut.
4. Measure the distance from the edge of the router bit to the edge of
the router base + 1/16".
5. Set the straight edge on the left side, back the same distance you just
measured.
6. Set the depth of the router bit to go through the material.
7. Run the router from left to right.
Seaming _ 09
You may want to make a “Jig” to make sure that the 2 pieces are
exactly ⅜ " apart throughout the seam line.
This “Jig” could be made from a piece of Staron�
or any other materials
that will keep its form.
Note
[ 9.4 - B ]
[ 9.4 - C ]
[ 9.4 - D ]
27. 50 FABRICATION MANUAL 51
FABRICATION MANUAL
09 _ Seaming
Abrade by hand. You could round off the top edge with a sanding block.
If you round off the top edge, your seam will show when finished.
9.5 Edge Preparation
TIP
Seaming _ 09
Make sure the cord does not get caught on a clamp or table.
Once you start the cut, DO NOT STOP!
Make sure to clamp all the pieces so they do not move.
When using a Mirror Cut to cut your seam, make sure to have the 2 pieces FLAT.
If your pieces are not flat, the seam will open up, resulting in a bad (visible) seam.
If the 2 pieces are flat when cutting, your seam should turn out perfect.
The seam line should disappear if your cut is perfect when you dry-fit the 2 pieces.
Remember, if you see a seam line when you dry-fit the 2 pieces, you will see the
line after you glue them. Re-Cut the pieces before proceeding.
TIP
[ 9.4 - E ]
If the seam disappears without seam adhesive, then your seam
will disappear with seam adhesive as well.
Note
After seams are cut, using one of the methods listed above, you will be
ready to apply seam adhesive.
However, before applying seam adhesive, good edge preparations are
necessary by removing and following procedures below.
Procedures:
- Abrade or sand the edge of the material, make sure not to round
off the edge you just cut.
- You need to use 150 grit (100 micron) or equivalent sandpaper.
- All you need to do is to go over the edge 2 to 3 times.
- Abrade everything but the top 1/16". Abrading the whole edge
will round the top you've just cut.
[ 9.5 - A ]
28. 52 FABRICATION MANUAL 53
FABRICATION MANUAL
09 _ Seaming
Seaming _ 09
1. After Seam preparation is completed, you are now ready to apply the adhesive.
2. Place some sort of release paper (red rosin or craft paper) under the seam.
Without a release paper under the seam, the seam adhesive will glue the top
to the table.
3. Release paper can be anything from wax paper to Scotch Tape�
.
4. 2" wide Scotch Tape�
seems to be enough, however, it is advisable to
place another layer side by side to just in case the top moves.
9.6 Seam Adhesive
[ 9.6 - A ]
5. Wipe the 2 seam pieces down with denatured alcohol.
6. Remember to wipe in one direction. This way, you will not contaminate
the area you just wiped.
7. Remember, once you wipe the material down, do not touch the pieces.
The seam adhesive could pick up the oils from your skin and discolor
the seam. This happens most commonly on the light color materials.
8. Decide what kind of clamping method you will use to clamp the two
pieces to be seamed. There are several ways to clamp the pieces together.
A. Wood block and clamps
B. Suction cups and clamps
C. Parallign or similar clamping system
[ 9.6 - B ]
[ 9.6 - D ]
[ 9.6 - C ]
29. 54 FABRICATION MANUAL 55
FABRICATION MANUAL
09 _ Seaming
It is easier to start at the furthest point of the seam and pull the seam
adhesive toward you.
Note
Seaming _ 09
The sheets need to be flat before seaming. The flatter the sheets are,
the easier the sanding will be when the seam adhesive is fully cured.
If the sheets are not flat, they will need to be shimmed up.
Remember, this needs to be done before applying seam adhesive.
Note
9. Once you decide on a clamping method, the seam adhesive can be applied.
10. Pull the 2 seam pieces apart about ⅛ ".
[ 9.6 - E ] [ 9.6 - F ]
[ 9.6 - G ]
11. Before placing the mixing tip on the adhesive cartridge, make sure to
purge (squeeze) a small amount of seam adhesive out, to ensure both
Adhesive and Activator are dispensing properly. Place the mixing tip
and tighten with (locking nut) and once again purge (squeeze) the
trigger twice to make sure you have good mixing at the tip.
12. After the seam adhesive is ready, start at one end and fill the ⅛ " gap.
It should be about ½ full. Do not leave any air holes or lapses in the
adhesive. If there are any air holes or lapses, go over the entire seam
again with second bead.
[ 9.6 - H ] [ 9.6 - I ]
30. 56 FABRICATION MANUAL 57
FABRICATION MANUAL
09 _ Seaming
9.7 Ski Routing and Sanding
Seaming _ 09
Once the seam adhesive is fully cured, it can be sanded down.
The seam adhesive is cured when it is no longer wet. It should be hard to
the touch.
Some of the seam adhesive will squeeze out when the sheets are pulled
together. They could be easily removed using a Ski-Router or a sander.
Note
13. Once the seam adhesive is placed in the seam, the 2 pieces can be
pulled together with whatever method of clamping you have chosen.
14. Let the seam adhesive dry until it is as hard as the sheets themselves.
This usually takes approximately 45-60 minutes, depending on the air
temperature and sheet temperature. The seam will dry faster when it
is warmer and take longer when the temperature is cooler.
[ 9.6 - J ] [ 9.6 - K ]
[ 9.6 - L ]
Once the seam adhesive has fully cured, it can be taken down using a Ski router.
Ski routers can be purchased or made, using a router with ½ " bit and a ski
(piece of wood or Staron material) attached to the base of the router.
1. Set the bit flush with the top.
2. Run the ski router over the cured seam adhesive and route off any
excess seam material.
3. Once the excess seam material is routed off, you can finish up by
sanding the area. Sand it with 150 grit (100 micron) sandpaper.
Do not stay in one area too long while sanding. This will create a valley on the top.
Remember to keep the sander moving at all time.
4. When the sanding is finished, an area of about 18"~ 20" should have
been sanded, This will help feather out the seam area.
[ 9.7 - A ] [ 9.7 - B ]
31. 58 FABRICATION MANUAL 59
FABRICATION MANUAL
09 _ Seaming
This will give an adequate amount of seam adhesive to give 100% coverage
When seaming on a seam plate, there are several steps that need to be taken.
1. Make sure the seam plate does not rock. Seam plate should sit flat on the top.
2. Cut the seam plate from the back of the front buildup to the rear of the top.
There shouldn't be any gap between the front edge build up and the seam plate.
3. Abrade both the seam plate and the top where they will be glued together.
4. Center the seam plate over the seam. There should be 2" on both sides of
the seam. Trace out the seam plate. Clean with denatured alcohol.
5. Place the seam adhesive on the top where the seam plate was traced out.
Apply seam adhesive on all the perimeters and every ¾ " to fill in the traced
out area.
TIP
Seaming _ 09
Spray the seam area with water and look at the seam. It is at this point,
you need to decide if the seam is acceptable or needs to be redone.
If the seam needs to be redone, it is better to do it now, rather than after
all the work is done. This will save you time and material in the long run.
9.8 Seam Plate
TIP
After the seams are sanded, seam plates need to be seamed on.
A seam plate is a 4" wide piece of Staron�
material with 45。
angle cut on both sides.
[ 9.8 - A ]
Remember, 90。
seam plate is a stress riser.
Seam plates should be cut to 45。
angle.
Note
[ 9.8 - B ]
32. 61
FABRICATION MANUAL
60 FABRICATION MANUAL
10 _ Edge Details and Buildups
Stacked Edge Buildups
Stacked Edge buildup is a deck with 2 layers of ½ " material stacked on top of
each other. (Illustrated in 10.1-A)
With this method, in addition to building up the edges, decorative inlay stripes
can be accomplished very easily.
10.1 Stacked Edge
Seaming _ 09
6. Place the seam adhesive between the seam plate and the front edge buildup.
This will make the top, seam plate, and the front edge buildup become one piece.
7. Clamp the seam plate to the top. When the seam plate is clamped,
the seam adhesive will spread to give 100% glue coverage.
[ 9.8 - C ]
Seam adhesive should bead up along the outside edge of the seam plate.
Do not scrape off the excess. This adds strength to the plate and the top.
Note
In fabricating a Staron�
Countertop, you have the option to give the customer
a unique edge treatment, which will look great and make the people love their
Staron�
Countertops.
There are three effective ways to buildup the edges for Staron�
Countertops.
- Stacked Edge
- Drop Edge
- V-Grooving
[ 10.1 - A ]
33. 62 FABRICATION MANUAL 63
FABRICATION MANUAL
10 _ Edge Details and Buildups
Clamp the edge build up with 2" spring clamps or Dani clamps every 2" ~ 3".
This will give just enough clamping pressure to make the seams inconspicuous.
Edge Details and Buildups _ 10
With accent strips, use the color seam adhesive that matches the strip
being put in the top.
Wood blocks can be made from any wood.
⅜ " MDF seems to be the best choice.
MDF is easy to remove when the buildups and other tasks are finished.
When applying seam adhesive to the deck, place seam adhesive on back edge,
front edge, middle where the stacked edge is being place.
Apply double ¼ " bead of adhesive to the top of each other.
Place wood blocks every 12" behind the build up to keep the build up from
sliding back once the adhesive is applied.
Hot glue these blocks down at 45。
angle on the deck. This will make it easy to
remove them later, when all the buildups are seamed on.
TIP
[ 10.1 - B ]
Once all the Edge Buildups are seamed on and dried, route the front edge
square to the top.
This can be accomplished by either setting up a straight edge and router
with template guide or using a flush cutter.
[ 10.1 - C ]
[ 10.1 - E ] [ 10.1 - F ]
[ 10.1 - D ]
Too much clamping can cause all the seam adhesive to be squeezed out.
This is called "Starving the Seam". If you starve the seam, there is a good
chance of seam failure during the life of the countertop due to lack of seam
adhesive holding the materials together.
Note
34. 64 FABRICATION MANUAL 65
FABRICATION MANUAL
10 _ Edge Details and Buildups
Similarly, with the interlocking system, you can use either the 1" template guide
and ½ " bit and follow the instruction on the previous page or use a flush cutter
with the top bearing.
Using Top Bearing Flush Cutter : With a top bearing flush cutter, the straight
edge does not have to be set back.
The Straight edge should be placed right on the line to be cut.
Unlike using a template guide, you are cutting right against the Straight edge.
Using the flush cutter will eliminate the chance of any measurement
error in trying to set the straight edge back ¼ " to compensate for the
template guide.
If the line is traced right off the template, then cut on the line.
Clamp the straight edge down and route the excess material off.
Edge Details and Buildups _ 10
For easy fabrication, use the straight edge system that uses interlocking radius
corners and straight lines.
With an interlocking straight edge system, misaligning the straight edge and the
radius template could be avoided.
Using Template Guide : To route flush with a straight edge, use router with 1"
template guide and ½ " bit.
Setup the straight edge ¼ " back from the front edge. Clamp in place and route.
Run the router from left to right. This will cut the entire thickness of the buildup
flush and keep the front edge square to the top.
Make sure to line up the radius template with the edges already cut.
Repeat the process to cut all the straight sides.
TIP
[ 10.1 - G ]
Run the router from left to right when using a template.
Note
Turn to Decorative Edge Profile for further instructions. (10.5 page 73 )
Note
Once the buildups are cut to size with the router, Decorative Edge can be routed
to give the Staron�
countertop the elegance and grace...
35. 66 FABRICATION MANUAL 67
FABRICATION MANUAL
10 _ Edge Details and Buildups
Edge Details and Buildups _ 10
10.2a Drop Edge (Standard)
With Drop Edge Buildups, the buildup strips are cut in 1" width and set
on the countertop.
In addition, second piece of Staron�
strips are required to be seamed
up-against the front piece. This will allow the added strength it requires.
With this method, instead of 2 seams possibly showing in the front edge,
there will be only 1 seam and it will minimize the chances of error.
Remember, if the seams are fabricated correctly, you should not worry about
seams showing!!!
Drop Edge (Standard) Buildups
[ 10.2 - A ]
When dry fitting all the buildup pieces, place the front pieces (#1) on first.
Temporarily clamp in place for the entire top.
When the front pieces (#1) are all finished, cut and place the back pieces (#2).
Block the back with wood blocks every 12" with hot glue. This will help stop the
build up from sliding all over the place when the seam adhesives are applied.
Mark the pieces to avoid mix-ups.
Prepare all pieces for seam adhesion by abrading with 150 grit (100 micron)
sandpaper, wiping down with denatured alcohol.
[ 10.2 - B ]
For the recommended edge buildups to Staron�
product that has the larger
particulates, such as Quarry, Talus and Breccia Series, please see
10.2b Drop Edge (Rabbet Method).
Note
36. 68 FABRICATION MANUAL 69
FABRICATION MANUAL
10 _ Edge Details and Buildups
10.3 V-Grooving Buildups
Edge Details and Buildups _ 10
When using Drop Edge buildup method, different color inlay strip
cannot by added during the buildup process.
TIP
Start applying seam adhesive in the corner and work out from there.
Place the seam adhesive where the piece #2 sets.
Seam all the #2 pieces first. When #2 pieces are seamed, apply the seam
adhesive on the back area of #1 pieces.
By applying seam adhesive on the back of #1 pieces, this will seam the #1 and
#2 pieces together = making them one.
Similar to the Stacked Edges, when the seam adhesives are fully cured,
route off excess material and glue from the edge buildup.
Refer to section 10.1 for instruction.
[ 10.2 - C ] V-Grooving is an easy way to do a drop edge.
We will briefly discuss this type of edge treatment. However, for more details,
contact your V-grooving Machine manufacturers.
With V-grooving system, “V” is routed into the Staron�
top.
Seam adhesive is placed in the “V” and folded up.
Very few clamps are needed to clamp it closed.
[ 10.3 - A ] [ 10.3 - B ]
Route a rabbet at least 3/16” deep at the bottom side of front deck edge.
Cut the strips to desired height/width.
The larger and front-facing strip is then adhered to the 3/16” rabbet on the
leading edge of the deck (10.2b-A).
Back with a second strip of Staron�
to add strength and support.
[ 10.2b - A ]
10.2b Drop Edge (Rabbet Method)
Drop Edge into rabbet is recommended for fabricating Staron�
product that has
larger particulates, such as Quarry, Talus and Breccia series. While basic
fabrication remains the same as other Staron�
color families, the larger
particulates that define the unique patterns in the Quarry, Talus and Breccia
require modification to the method which is used to create an edge minimizes
visible seams at the edge build-up.
On your first Quarry / Talus / Breccia project we suggest you experiment, prior
to final fabrication, the drop edge with rabbet described next.
Remember that you should prepare the seaming area by wiping out the “V” with
denatured alcohol.
When the seam adhesive is fully cured, pull the tape off the front.
There is no additional routing of the edge like in the stacked or dropped edge buildups.
The decorative edge can be routed right away.
37. 71
FABRICATION MANUAL
10 _ Edge Details and Buildups
Edge Details and Buildups _ 10
This method will save fabrication time, however, you will have to purchase
very expensive machinery.
Similar to drop edge, different color inlay strip cannot be added during
the buildup process.
It is strongly recommended that a second piece be seamed behind the
front piece for added strength. (10.3-C)
All inside corner must have a minimum of ½ ” (13mm) radius, but the bigger the
radius the better. Also use a block of Staron�
at least 6”x 6” in inside corner.
With every Staron�
Countertop built with inside corners, it is very important
to take precaution in building the inside corner buildups properly to prevent
any future cracks from occurring.
In order to provide added strength, the inside corner buildups need to be
over lapped.
�Stacked Edge Buildups
- Stack two 4"x 6" block pieces in the corner.
�Drop Edge Buildups
- Stack two 6"x 6" block pieces in the corner.
�V-Grooving Buildups
- Refer to V-Grooving Machine manufacturer for details.
10.4 Inside Corner Buildup
TIP
70 FABRICATION MANUAL
Stacked Edge : The two 4"x 6" block pieces need to be going in opposite directions.
This way, all the seams in the edge build up will have seam plates built in.
Drop Edge : Use the two 6" x 6" block pieces to seam the inside corners together.
End of 6" x 6" corner block must be overlapped a minimum of 1” (25mm) or more
past from deck seam.
[ 10.4 - B ]
[ 10.4 - A ]
[ 10.4 - D ]
[ 10.4 - C ]
Deck seam in buildup edge must be a minimum of 1” (25mm) past the radius in
the inside corner, but further located seam from the inside corner can better
prevent crack(s).
All inside corner must have a minmum of ½ ” (13mm) radius, but the bigger the
radius the better.
Note
[ 10.3 - C ]
38. 72 FABRICATION MANUAL
10 _ Edge Details and Buildups
The smoother the edge, the easier it will be to finish the decorative edge profile.
Remember, if the front edge is left rough, the bearing on the decorative edge bit
will follow the roughness, which will transfer into the decorative profile.
This will take a lot of hand sanding to finish.
Decorative Edges can be added to Staron�
Countertop to add beauty and style.
Remember, most of the countertops have Decorative Edge Profile.
Amongst the following are the most commonly used.
- ¼ ", ½ ", ¾ " Radius
- Bull Nose
- Champher
- Ogee
Because particulate distribution is heaviest on the top surface, quarter or half
round edge routing is recommended for Staron�
product that has the larger
particulates, such as Quarry, Talus and Breccia series, to minimize the chance
of an inconsistent appearance after the edge is completely routed.
10.5 Decorative Edge Profile
TIP
73
FABRICATION MANUAL
Edge Details and Buildups _ 10
When inside corner buildup blocks are ready, seam all the buildups at
the same time. 100% glue coverage is required.
Remember, with drop edge inside corner buildup, make sure all the
pieces line up in the back. There shouldn't be any notch or set backs
in the buildups.
The notch will act as stress riser.
After all the edges are routed flush and square to the top.
Sand the front face with 150 grit (100 micron) sandpaper on a orbital sander.
Sand out all imperfections left from the router when routing the front edge flush.
Wrong
[ 10.4 - E ]
There are many different tool manufacturers developing bits
for different edge profiling, please consult with the bit manufacturers
for details on technical and warranty issues.
Note
Samsung Staron�
will not be responsible for edge failures due to defective bit,
flawed design of the edge, and other related circumstances
These are often routed both top and bottom of the top
Comprehensive Edge details are listed on the following pages.
TIP
1/4" Corner Round 1/2" Corner Round 1/2" Corner Round
Top and Bottom
39. 74 FABRICATION MANUAL 75
FABRICATION MANUAL
10 _ Edge Details and Buildups
Edge Details and Buildups _ 10
See finishing and polishing section for more details. (18.1 page 141)
When all the edge buildups are seamed on, cured, routed flush, and square to
the top, the decorative edge can be routed on to the top.
Mark the place to be profiled and always route from left to right.
When finished routing, the edge needs to be sanded.
Sand the decorative route and the front edge to the desire finish.
TIP
Always run the router on a scrap piece of material to check that the router
bit is set to the correct depth.
When working with decorative edges that are very extensive, make sure you
have enough buildup material and that there are no air holes in the middle
of the buildup. They will show when you cut on that spot.
Note
[ 10.5 - A ]
Flush Trim Bits
Flush Trim Bits
Flush Trim Bits
Flush Trim Bits
Flush Trim Bits
(Olympia)
(Oakdale)
(Hillside)
(N.Ocean)
40. 76 FABRICATION MANUAL 77
FABRICATION MANUAL
11 _ Inlays
11.2 Hard Inlays
Inlays _ 11
Inlays can give added beauty and decorative features to Staron�
Countertops.
Inlays could range from decorative stripes in the Edge Buildups, signage,
drawing, inscription, and many more for commercial and advanced
decorative applications.
There are two categories in fabrication inlays.
- Hard Inlays
Pieces of Staron�
are set into a routed slot and seamed together to
form stripes and other decorative features.
- Poured Inlays
Liquid resins, ATH (Aluminum Tri-Hydroxide) and pigments are mixed to
make the desired colors. These are then poured into routed slots.
11.1 Overview
Creating a slot in the counter:
Rout a slot with a straight bit.
This slot shouldn't be more than 3/16" deep.
Creating the insert piece:
The inlay insert piece should be cut on a slight angle of 1。
to 2。
.
Make the inlay insert piece 1/16" thicker than the depth of the slot.
This will allow the seam adhesive to work it's way out and fill all the edges of
the inlay.
[ 11.2 - A ]
[ 11.2 - B ]
41. 78 FABRICATION MANUAL 79
FABRICATION MANUAL
11 _ Inlays
Remember to always feather out when sanding.
Check for air holes in the seam. Small gaps or air holes can be repaired
by mixing some seam adhesive and fill.
Let it cure completely before sanding.
For curved inlays, the insert materials can be thermoformed to fit the
desired design. (Refer to Chapter 22 for further Thermoforming instruction)
Ski-rout or sand the excess insert material and cured seam adhesive off.
Sand out with 150 grit (100 micron) sandpaper until smooth.
TIP
Inlays _ 11
Dry fit all the pieces first to be sure everything fits the way it is desired.
Abrade all pieces and slot with 150 grit (100 micron) sandpaper.
Wipe out the slot and the insert pieces with denatured alcohol.
After the alcohol is dried, place the seam adhesive in the corners of the slot.
Place the insert pieces into the slots and rock back and forth to help spread the
seam adhesive.
Clamp the insert pieces in place. This will also help spread the seam.
[ 11.2 - C ]
[ 11.2 - D ]
42. 80 FABRICATION MANUAL 81
FABRICATION MANUAL
11 _ Inlays
If the inlay kit is not fully cured before sanding, the inlay will shrink.
If too much catalyst is added to speed up the process, it will cause the inlay to
crack due to the heat it creates.
Remember, it is very important to allow enough time for the inlay to fully cure.
To accomplish intricate designs where more than one color are needed, repeat
the steps to create layers.
With CNC Machine, you will be able to accomplish multiple layers without sanding.
Poured Inlays (Finishing)
Allow the inlay kit to fully cure
The curing process can take anywhere from 1 hour to 24 hours depending on
the amount of catalyst in the inlay kit.
The curing times are effected by air temperature and humidity as well.
(Most Inlay Kits come with instructions)
When the inlay kit is fully cured, sand the inlay with 80-grit sandpaper
to make it even with the countertop.
Finish the top as before (Refer to Chapter 18)
TIP
Inlays _ 11
Always overfill the slot with Inlay Kit,
This will let the air bubbles rise to the top and compensate for
shrinkage of the inlay kit.
Poured Inlays are usually used for difficult stripes and other decorative designs
which requires more than straight strips.
With poured inlays, you are limited only by your imagination.
Poured Inlays(Creating Slot)
On all inlays, do not rout out more than 3/16" to create the slot.
Using your hot glue, create a dam around the slot.
This dam will allow for overfilling of "Inlay Kit" to compensate for shrinkage.
11.3 Poured Inlays
TIP
[ 11.3 - A ]
43. 82 FABRICATION MANUAL 83
FABRICATION MANUAL
12 _ Sink & Bowl Cutouts
Always mark your template with a centerline and the model number of the shape.
Mark what size of bit and template guide to be used.
TIP
Sink & Bowl Cutouts _ 12
For a setback to a cutout,
- 1½ " minimum from the back
- 3½ " minimum from the front (undermount)
- 2¼ " minimum from the front (drop-in)
[ 12.2 - A ]
Recommended Tools
- 3HP Router
- ½ " double fluted carbide router bit
- Templates
- 1" template guide for router
- Clamps
12.1 Tools Needed
Sink & Bowl cutout Templates are an important part of fabricating Staron�
tops.
Sink & Bowl cutout Templates will save you time and materials.
It is recommended to have templates of all the Staron�
Sinks and Bowls for
faster and accurate cutouts.
12.2 Making Cutout Templates
Overview
1. You will need to make a wooden template of the sink to be cutout.
2. Trace the inside of the sink with a pencil.
3. Cutout the pencil mark of the template with a jig saw and sand to the line.
4. When you set the template on the sink, it should be flush to the
inside of the sink.
5. If you cannot trace the inside of the sink, trace the outside and add
the lip of the sink.
[ 12.2 - B ]
44. 84 FABRICATION MANUAL 85
FABRICATION MANUAL
12 _ Sink & Bowl Cutouts
12.4 Making Cutouts Freehand
Sink & Bowl Cutouts _ 12
Another way is to make the template ¼ " smaller.
Use a top bearing flush cutter.
Remember, both methods will give same results.
12.3MakingCutoutsUsingTemplates
TIP
[ 12.3 - A ]
[ 12.3 - B ]
Overview
1. Always use a router for all cutouts.
2. NEVER USE A JIG SAW ON CUTOUTS !
3. Use a ½ " bit with a 1" template guide for cutting out your sinkholes.
4. Remember, cutout should be ¼ " smaller than the sink itself.
Overview
1. Sink & Bowl cutouts could be done freehand.
2. Remember, this method is not recommended.
3. Trace the sink on your piece of Staron�
.
4. Add ¼ " to the inside of the sink.
5. Route freehand along the marking.
6. When routing, always run the router clockwise for smoother cut.
This method is not recommended unless you have years of experience
using routers.
There is a greater chance of ruining the material and possibility
of getting hurt.
It is recommended that templates are used whenever possible.
Note
45. 86 FABRICATION MANUAL 87
FABRICATION MANUAL
13 _ Cooktop Cutouts
13.2 Cooktop Cutout
Cooktop Cutouts _ 13
Make sure all corners are at a 90 degree
13.1 Cooktop Templates
TIP
Overview
1. When cutting out Cooktops, always use a router.
2. You can make a template for each cooktop cutout or you can use
pieces of MDF (3" wide) as illustrated in (13.1-A)
3. Remember, unlike sinks & bowls, there are too many different sizes
of cooktops for making permanent templates.
4. Draw out the cooktop cutout on the top
5. Remember to center the cutout front to back.
6. Take your 3" pieces of MDF and hot glue them to your lines.
7. Put hot glue approximately every 8" (dime size amount will be enough).
[ 13.1 - A ]
Overview
1. Take ¾ " top bearing flush cutter with the bearing ½ way down the MDF.
2. Plunge the bit into and through the material.
3. Run your router clockwise (slowly).
4. When you are finished cutting out the top, spray the wood pieces with
denatured alcohol and let it soak.
5. This will help to release the hot glue.
6. Pry the pieces up with a chisel.
7. Use caution, do not chip or scratch the material.
8. Scrape off the rest of the glue with the chisel.
[ 13.2 - A ]
46. 88 FABRICATION MANUAL 89
FABRICATION MANUAL
13 _ Cooktop Cutouts
Cooktop Cutouts _ 13
13.3 High Strength Support
Overview
1. Put high strength blocks in the corner of the cooktop cutout.
2. These blocks need to be 4" by 4" or larger.
3. They also need to be cut at a 45。
angle on all sides except
where the piece may touch the buildup.
4. Leave the seam block square, where it touches the buildup.
[ 13.3 - A ] [ 13.3 - B ]
[ 13.3 - C ] [ 13.3 - D ]
5. When lining up the seam blocks, you need to flip over the top.
6. Center the blocks at the corner.
7. Trace the outside of the block with a pencil or scribe.
8. Seam the pieces to the top using seam adhesive.
9. There must be 100% glue coverage on the Seam blocks.
10. When the seam kit is dry, you will need to cut off the extra material
with a router.
Final Route (Corners of cooktop cutout)
[ 13.3 - E ]
47. 90 FABRICATION MANUAL 91
FABRICATION MANUAL
13 _ Cooktop Cutouts
13.5 Sanding
Cooktop Cutouts _ 13
13.4 Final Route
Overview
1. Next, you need to round off the corners.
2. To do this, you will need to raise the bit so the bearing is not below
the base of the router.
3. Move the router into the corner (router off).
4. After lining up the router, turn the router on and run the router into the
corner at a 45。
angle until the bit touches the corner where the two lines
meet (prior pencil mark when tracing the cooktop).
Use Router Bit ¾ " or bigger.
5. Repeat this step at all 4 corners.
[ 13.4 - A ] [ 13.4 - B ]
Overview
1. When you get all the corners cut out, you will have to sand the entire
cutout with 150 grit (80 or 60 micron) sandpaper.
2. Rout a ⅛ " radius on the top edge of the cutout.
3. Sand this until smooth.
4. Sand the bottom edge with a sander or by hand.
5. You need to get all the chips and router chatter out.
6. Remember, both the top and the bottom have to be sanded smooth to
prevent cracks.
7. The smoother you get the cutouts, the better the end result.
8. Finally, you need to put Heat-Conductive Aluminum Tape
(One layer of 4 mils, at least 2” wide, ex: 3M 425 Aluminum Foil Tapes or
similar) around the cutout.
[Please refer to the “Installation” Chapter 19]
[ 13.5 - A ] [ 13.5 - B ]
48. 93
FABRICATION MANUAL
92 FABRICATION MANUAL
14 _ Support
14.1 Countertop Support
Cooktop Cutouts _ 13
13.6 Potential Problems
Overview
The cooktop area is the area where most failures can occur.
The following is the list of possible causes.
1. Heat - expansion and contraction (excessive heat).
2. Stress points in the cutout.
3. Missing protective heat tape.
4. Faulty cooktop, dispensing too much heat.
5. Not enough space between the cooktop and the countertop.
6. Missing high strength corner or seam blocks.
Overview
Preventive measures.
1. Always use router for the cutouts.
2. Make the cutout as big as possible.
Example: If the cooktop manufacturer suggest the cut out to be
26"~28" by 18"~20"; the cutout should be at 28" x 20".
3. Minimum of 4"x4"x½ cooktop blocks with 100% glue coverage.
4. ⅛ " radius on the top edge of the cutout.
5. "Sand! Sand! Sand!" both top and bottom of the cutout.
6. Use 150 grit (80 or 60 micron) sandpaper on entire cutout.
7. Properly install protective heat tape (Refer to Chapter 19 on Installation)
8. Educate the customer on heat tape and it's proper use.
13.7 Prevention
Overview
1. All tops need to be supported every 12".
2. A normal countertop can be supported with wood strips (15/16" x 1¼ ").
3. Glue these strips on the Staron�
top with 100% clear silicone and
hot glue round the perimeter and down the middle.
4. If the Staron�
buildup is 2" wide, you don't need to place wood buildup
in the front.
5. It should be on the back and middle only.
[ 14.1 - A ]
49. 94 FABRICATION MANUAL 95
FABRICATION MANUAL
14 _ Support
Support _ 14
100% sub-tops are not allowed.
Remember, you need to have air flow on both sides of the sheet to
allow for expansion and contraction.
In some cases, you will need to cut out the cabinet covers.
TIP
Overview
If the Staron�
buildup is 1½ " or less, you need to put wood support behind the
Staron�
buildup as well.
Remember to leave ⅛ " gap between the buildup and support.
[ 14.1 - B ]
Framing
Another method of giving support is framing
1. Common technique
Create a perimeter frame in the workshop. Glue the worktop onto the
perimeter with silicone. Adjust the worktop to a perfect level when installing.
2. Special technique
Position a perimeter frame on-site and place the worktop over the
frame for exact adjustment and leveling with the minimum of
adhesion to allow for maximum movement.
The following materials are recommended for a perimeter frame.
- 25mm (1") moisture resistant M.D.F. board.
- 25mm (1") moisture resistant particle board.
- 25mm (1") moisture resistant plywood.
Remember, DO NOT use full underlayment because it can cause heat
accumulation and thermal expansion, because Staron�
and the wood
frames are different materials, heat accumulation and thermal
expansion could cause warping or cracking.
[ 14.1 - C ]
[ 14.1 - D ]
50. 96 FABRICATION MANUAL 97
FABRICATION MANUAL
14 _ Support
This is not considered to be 100% sub-top, because there will be 10½ " airspace
on the back of the cabinet.
TIP
Support _ 14
It is recommended to put a piece of wood under this type of overhang to
fill in the void. The customers will appreciate the professionalism.
14.2 Overhang Support
TIP
6" or Less
Overhangs of 6" or less do not need to be supported.
[ 14.2 - A ]
7" ~ 15" Overhang
1. Overhang of 7" ~ 15" need to be supported with plywood, metal frame
or Corbels.
2. For full plywood under mount, screw the support to the Cabinet from top.
(Use 3" coarse threaded screws)
3. Afterward, silicon the top to the plywood.
[ 14.2 - B ]
51. 98 FABRICATION MANUAL 99
FABRICATION MANUAL
14 _ Support
Support _ 14
4. With metal frame, you can give it entire coverage, because it is very
similar to a “Ladder Support” described in Section (14.1-C and 14.1-D).
You will have air on both sides.
5. Corbels
Usually made out of wood to match the cabinets, they can be made
from Staron�
materials to match the Staron�
top.
Corbels need to be 50% longer than the width.
[ 14.2 - C ]
[ 14.2 - D ] [ 14.2 - E ]
- Brackets must be installed every 600mm (2') or less. Determine the
number of brackets to fabricate by measuring the cabinet. Brackets
must be long enough to reach within 127mm (5") of the countertop edge.
- Fabricate the backer plates that will be used to mount the brackets to
the cabinet.
- Drill screw holes into the backer plate every 600mm (2') or less
determined earlier to match up with the brass inserts in the brackets.
- Fasten the brackets to the backer plates using screws.
- Fasten the backer plates to the cabinet frame with wood screws before
attaching the plywood underlayment.
- Use one dab of silicone adhesive every 300mm (1') to 457mm (1'6")
to secure Staron worktop to the plywood underlayment.
- Use one dab of silicone adhesive 1"(25mm) from the tip of each bracket.
Apply dabs of silicone every 300mm (1') to 457mm (1'6") to the
upper edges of the cabinets.
[ 14.2 - F ]
52. 100 FABRICATION MANUAL 101
FABRICATION MANUAL
14 _ Support
Support _ 14
Both Corbels and Legs could be made of Wood or from Staron�
.
You will need to support it every 3'.
TIP
16" or Larger Overhangs
6. Overhangs of 16" or more need to be supported to the floor.
[ 14.2 - G ]
[ 14.2 - H ]
Screw the plywood sub-top down to the wall using 3" coarse threaded screws.
When you silicone the top down to the plywood, use dime size dabs every 18".
Remember, too much silicone will not allow the top to move freely.
Overhangs on Raised Bar
7. Overhangs on raised bars for kitchen tops, reception desks and other areas.
You can put full sub-tops on these overhangs.
However, make sure to leave ⅛ " ~ ¼ " air gap between the wood
and Staron�
edge.
[ 14.2 - I ]
Because of the air gap and no walls, the materials have enough
room to expand and contract.
Note
53. 102 FABRICATION MANUAL 103
FABRICATION MANUAL
15 _ Staron�
Shapes
Staron�
Shapes _ 15
How to mount the Sink & Bowl
15.1 Handling Staron�
Sink & Bowl
Seam-mount (and Under-Mount)
Seam-Mount or Under-Mount is the mounting method that the face rim
of the bowl is glued to the underside of the countertop.
[ Under Mount ] [ Seam-Mount ] [ Angled Mount(Bevel) ]
1. Check the bowl rim face for flatness
using aluminum level.
2. Check sheet back for flatness
3. Clamp the template into position.
4. Use a router for all cutouts.
5. Remove the template, position the bowl
and fix the bowl positioning blocks into
position with hot melt.
Any cutouts not using a router will be
void from warranty.
Note
54. 104 FABRICATION MANUAL 105
FABRICATION MANUAL
15 _ Staron�
Shapes
Staron�
Shapes _ 15
6. Sand the rim for proper glue adhesion.
Clean the rim face of the bowl with
denatured alcohol.
7. Apply Joint adhesive to the rim and glue
into position.
8. Fix them by using clamp and allow to dry.
9. Turn the countertop over and route the
surplus material to the edge of the bowl
with the decorative bit to get the desired
edge.
10. Polish the entire surface and bowl to
the desired gloss level.
To install overflow attachments, connect all
the components as illustrated.
It is important to hand-tighten all joints after
assembly and installation to prevent leaks.
After overflow attachments are complete,
it is now ready to be connected by a plumber.
Overflow attachments for Bowls
55. 106 FABRICATION MANUAL 107
FABRICATION MANUAL
15 _ Staron�
Shapes
Staron�
Shapes _ 15
Angled mount
All the Staron bowls have a 15 degree beveled edge, which enables the bowls to
be dropped into the sheet so that it fits flush with the sheet surface.
1. Clamp the appropriate template into
position on the top of the sheet
or countertop.
2. Route the bowl cutout with a 30mm
sleeve guide and use the router in
one motion
3. Route the cutout to a 15 degree bevel
finish with an oblique router bit.
The first pass should be set 12mm (1/2")
below the top surface of the sheet.
4. Drop the bowl into position for trial fit.
The rim face of the bowl must protrude
above the sheet to a maximum 0.2mm.
If necessary, repeat step 3 several times.
5. Remove template.
6. Clean the cutout edge and the edge of
the bowl with denatured alcohol.
7. Apply Joint adhesive to the cutout edge
and to the bowl, then glue them into
position.
8. Fix them by using clamp and allow to dry.
9. Level the sheet with sander.
56. 109
FABRICATION MANUAL
108 FABRICATION MANUAL
16 _ Fastening to Staron�
16.1 Stainless Steel Sinks
Introduction
- Stainless Steel Bowls
- Cast Iron Bowls
- China Bowls
- Wood Insert
- Wood Edge Insert
- Laminate Inserts
- Handicap Handles and Bars-Shower / Tub Surrounds
- Shower Doors
- Soap Dishes / Shower Caddies
- Tile (ceramic)-Hot Pot Areas
Staron�
Shapes _ 15
10. Make the edge of the bowl with the
decorative bit to get the desired edge.
11. Polish the entire surface and the bowl
to the desired gloss level.
Stainless Steel Sinks
Stainless Steel Sinks can be top mounted or under-mounted to Staron�
Countertops.
Top Mounted / Drop-In
To top mount or drop in a Stainless Steel Sink, a hole needs to be cut in
the countertop.
1. Layout the sink cutout on the counter. Mark the centerline on the top
and draw a line with a square from front to back.
The measurement back from the front edge should be the overhang +¾ "
for the cabinet face + ½ " for space to accept the sink clips.
This will be the front of the cutout.
2. Set up a plunge router (3 HP minimum) with a ½ " x 2" (cut) 2 flute
carbide router bit.
3. Plunge the bit into the material so the bit goes through the material.
Freehand-run the router counter clockwise on the inside of the line
traced out for the cutout. Wood template-Use a 1" template guide + ½ "
bit and run the router clockwise. Cutout the entire hole.
4. Once the hole is cutout, check to see if the sink fits. If it fits, the
cutout is finished. If the sink does not fit, mark and trim as needed.
57. 110 FABRICATION MANUAL 111
FABRICATION MANUAL
16 _ Fastening to Staron�
9. Using sink clips from AirDraulics / Chemical Concepts, apply seam adhesive
to the underside of the countertop where the clips will be placed.
Fastening to Staron�
_ 16
Under-mount
There are 3 different ways a stainless steel under-mount sink can look.
1. Decide which method will be used.
2. Make a template to match the method that was chosen.
3. Cut out the sink hole.
4. Sand the cutout smooth with 150 grit (80 or 60 micron) sandpaper and a sander.
5. Route the cutout with ¼ " radius bit.
6. Sand and finish the cutout to desired finish. See Finish and Polishing section.
(18.1 page 141)
7. Flip the top over and center the undermount sink in place.
8. Hot glue the locating blocks. This will allow the sink to be put back in
the same place after the silicone is applied.
[ 16.1 - A ]
[ 16.1 - B ]
[ 16.1 - C ]
If the top is flipped over before the silicone fully cures, the seal can be broken.
TIP
Should use 3 clips for the front, 3 clips of the back, and 2 clips on each
sides. These should be equally spaced.
Make sure the entire base of each clip is covered with seam adhesive. Let it Dry.
TIP
10. Lift the sink off. Using denatured alcohol, wipe the rim of the sink
and the area where the sink will sit. Let it dry.
11. Apply 100% color matching silicone to the area where the sink will sit.
This bead should be about ¼ " wide and in the center of the area.
12. Set sink in silicone.
Tighten the clips down all the way.
13. Once all the clips are tightened, get underneath the top and make sure
the silicone is coming out all the way around the sink.
DO NOT FLIP THE TOP OVER UNTIL SILICONE IS FULLY CURED!
Spray silicone with denatured alcohol and wipe off the excess silicone.
58. 112 FABRICATION MANUAL 113
FABRICATION MANUAL
16 _ Fastening to Staron�
China bowls can be under-mounted following the same directions as
Stainless Steel Under-mounts.
16.3 China Bowls
Fastening to Staron�
_ 16
Cast Iron Sinks can be either top mounted / drop-in or under-mounted.
Top Mount / Drop
Follow the same directions as the Stainless Steel Sink (Section 16.1).
Under-Mount
Follow the same directions as the Stainless Steel Sink Installation
from steps 1-8 (Section 16.1).
9. Make a 1x3 wood frame. This frame needs to be attached to the inside
of the sink base. Screw into cabinet and wall, making sure it will hold
the weight of the sink, water, and any dishes in the sink.
16.2 Cast Iron Sinks
11. Bring top in and fit in place. Move the sink around to set it in the center of
the cutout.
12. Lift top off.
13. Apply silicone on the rim of sink using color-matching 100% silicone.
14. Set top back in place. Push top down all around sink to make sure silicone
is coming out. If not, apply silicone bead where needed.
15. Spray silicone with denatured alcohol and wipe excess silicone off.
Make sure the wood frame is ½ " above the top of the cabinet and
centered in the cabinet from side to side
Note
10. Place the sink on the wood frame.
Attach all plumbing to sink at this time.
Do not move top or sink for 24 hours.
[ 16.4 - A ]
¼ " overhang into the bowl is recommended.
Note
Wood inserts need to be fabricated using the following directions.
Do not use solid wood only as an insert.
Solid wood can be used, as long as it is backed up with a piece of Staron�
.
16.4 Wood Insert
Flip the top over and lay out the wood first. The wood should be no bigger
than ½ the depth of the buildup.
After the wood has been laid out, back it up with a piece of Staron�
.
Seam only 1 layer on, at a time. After the seam adhesive is cured,
the two pieces need to be sanded smooth. Next, the second layer can
be applied.
59. 114 FABRICATION MANUAL 115
FABRICATION MANUAL
16 _ Fastening to Staron�
Once it is fully cured, route and sand the front edge as needed.
Finish to desired finish.
See Finishing and Polishing section. (Chapter 18)
Fastening to Staron�
_ 16
Wipe everything down with denatured alcohol.
Hot glue the wood blocks to fix the pieces after the seam adhesive is applied.
Apply seam adhesive to the back pieces first.
Set the back pieces.
Apply seam adhesive to the backside of the wood between the wood and the
back piece. Also apply the seam adhesive to the front edge of the top.
Clamp everything together.
When fully cured, sand the topside of the buildup smooth with 80-grit
sandpaper using a sander. Make sure to keep the sander flat.
Do not sand the front edge any more!
Remember that wood is softer than Staron�
and will sand down faster.
When finished sanding, layout the bottom layer of buildup.
Wipe down with denatured alcohol.
Apply seam adhesive to the back and the front edge of the Staron�
piece
and to the wood piece.
Clamp the buildup on and let cure.
Note
[ 16.4 - B ]
[ 16.5 - A ]
Tape off the Staron�
and stain the wood after everything is finished.
Note
16.5 Wood Edge
Because of dissimilar materials (wood and Staron�
), the two will expand
and contract at different rates. The silicone will allow this to happen.
Note
Wood Edge
To apply a wood edge to a piece of Staron�
, the wood needs to be adhered
with 100% pure silicone.
60. 116 FABRICATION MANUAL 117
FABRICATION MANUAL
16 _ Fastening to Staron�
Fill the hole with silicone. Then push the screw through.
This will act like a bushing.
Handicap Bars & Handles / Shower Doors
Remember, all these need to be screwed into wood studs or blocking.
Locate studs / blocking where bars / handles or shower doors will go.
Drill a hole bigger than the screw being used.
16.6 Handicap Bars & Handles / Shower Doors
TIP
Fastening to Staron�
_ 16
Laminate Insert
Build the top the same as any other top with 2 layers.
After the top is finished, take a rabbet bit (⅛ "x½ ") and rabbet out
where the laminate will go.
Tape off the Staron�
and apply contact adhesive to the rabbet and the back
of the laminate.
Let it dry to touch and apply laminate to the top.
Push in place with a rag, making sure to put pressure all the way around the
laminate.
Pull tape off and clean up.
[ 16.5 - B ]
Make sure when the Staron�
is placed on the wall, there are no voids
in the areas where you are placing the handles, bars or doors.
If there are voids, the sheets can crack if the screws are tightened too much.
Note
Screw into the wood. It will void from warranty if screwed directly into
Staron�
products.
61. 119
FABRICATION MANUAL
118 FABRICATION MANUAL
17 _ Backsplashes
Fastening to Staron�
_ 16
Soap Dishes / Shower Caddies (Made from Staron�
)
Silicone and hot glue these to the sheets on the wall.
Nothing else is needed.
It is possible to use Seam Adhesive to adhere to the wall.
16.7 Soap Dishes / Shower Caddies
[ 16.8 - A ]
Tiles / Ceramic / Hot Pot Areas
When insetting tile into a top, route out the area where the tile will go.
Route this area no deeper than 3/16".
16.8 Tiles / Hot Pot Areas
If the tile is thicker than ¼ " and the area needs to be routed deeper than 3/16",
then a piece needs to be seamed under that area on the bottom side.
This piece needs to be at least 2" bigger than the tile area, all the way around.
Set the tile in silicone. Grout with silicone
Note
Introduction
There are many different decorative options when selecting Backsplashes
for Staron�
countertops. Depending on customers' decorative need,
they have the option to choose the Backsplash design, material,
and decorative finishes.
When working with Staron�
Solid Surface, there are three Backsplash
options to choose from.
�Loose Splash (Set On Splash)
�Coved Splash
�Full Height Splash
Loose Splash
Most common and widely used method, this Backsplash is set on the top
of the countertop using mainly silicone.
Loose Splash can be any height. Generally, they are 3"~ 4" high and made
of ½ " thick Staron�
Material.
For the purpose of decorative feature, Loose Splashes usually have ⅛ " radius
routed on the top edge.
[ 17.1 - A ]
17.1 Loose Backsplash
62. 120 FABRICATION MANUAL 121
FABRICATION MANUAL
17 _ Backsplashes
Use a laminate chip with a small 45。
angle sanded on one corner.
Once the bead of silicone is placed in the corner, spray the bead and
material with denatured alcohol.
If the silicone bead does not touch both the splash and the top,the denatured
alcohol spray will seep under the splash and the silicone will not stick to either
the splash or to the top. There will be a void in the silicone.
After the silicone and material have been sprayed, wipe the excess silicone out
of the joint. Make sure to keep the joint area wet with denatured alcohol
after every time the silicone is wiped off.
TIP
Backsplashes _ 17
Cut the backsplash strip to the desired width and length.
For ⅛ " routed top-edge, lay the splash back side down. Clamp to the table.
Mark out where the splash is to get routed. Set up the ⅛ " router bit in a router
and route the splash. (Make sure to run the router from left to right)
When finished routing, sand the splash. (Refer to Finishing and Polishing.
(Chapter 18)
[ 17.1 - B ]
To install a loose splash, run a bead of silicone on the deck (top).
Also, put dime size dabs on the back of the splash. Use hot glue to help hold
the splash in place. Hot glue should be placed between the dabs of silicone on
the back. These dabs of silicone should be spaced approximately every 12".
Set the splash in the bead of silicone on the deck and push tight to wall and
deck of the countertop.
Lay bead of silicone in corner between the top and splash.
Make sure the bead of silicone touches the splash and the top.
After the silicone joint has been sprayed, take the laminate chip and
place in the corner. Pull the chip from one side to another and wipe
off the excess silicone.
[ 17.1 - C ]
[ 17.1 - D ]
63. 122 FABRICATION MANUAL 123
FABRICATION MANUAL
17 _ Backsplashes
Backsplashes _ 17
Although coved backsplashes are more complicated than the Loose Splash, It is
preferred by many people due to its continuous look from the countertop to the
backsplash.
Coved Splashes are not set on the countertop and caulked, they are
seamed together with the countertop to make it one piece.
There are many different methods of accomplishing the Coved Splashes.
Following are couple of examples.
- Method A
- Hand Held Cove Router
- Shaper With Power Feed
- “V” Grooving
17.2 Coved Backsplash
Method A
Using this method, there are 3 pieces needed.
1. Cut a piece of material 5" wide, the length of the top. Set the piece face
up on the table and clamp down. Take ⅜ " cove router bit and rout one
long edge. Make sure to set the depth of the bit to leave ⅛ " of flat
surface on the piece.
[ 17.2 - 1 - A ]
17.2-1 Method A(Ⅰ)
2. After the ⅜ " cove is routed into the 5" wide piece, take a piece of the
same material and stand it up on the 5" piece.
Set the scrap piece on top of the 5" piece.
It should be flush with the ⅜ " cove rout that was just routed in.
Take a utility knife and put a scratch in the top of the 5" piece, following the
back of the scrap piece. This will give you the exact measurement needed to
cut off the cove piece. This piece should be approximately ⅞ " ( +/-).
Set the table saw up with a sharp blade and set the fence to the desired width.
(Distance from front edge to scribe line.)
Cut this piece off the 5" wide piece. This piece will become the cove part of the
splash. After cutting this off, the rest of the 5" piece becomes the splash piece.
[ 17.2 - 1 - B ]
[ 17.2 - 1 - C ]
This ⅛ " flat surface will fit into a ⅛ " rabbet routed into the deck of the top .
Note
To reduce the chance of visible seams at the backsplash, Coved Backsplashes
are not recommended to fabrication with Staron�
product that has the larger
particulates, such as Quarry, Talus and Breccia Series, unless V-grooved.
Note
64. 124 FABRICATION MANUAL 125
FABRICATION MANUAL
17 _ Backsplashes
Use a profile (soft) pad. This will allow the pad to curve to the cove.
Be careful not to push too hard into the cove. This could deform the cove.
Start out with 80-grit paper. This will take down the seam adhesive fast.
Flip the cove piece on its backside and clamp to the splash using dani-clamps.
Let it cure.
TIP
Backsplashes _ 17
3. Place release paper / tape down on the table and set both pieces on the
release paper / tape. The splash should be faced up.
4. Make sure to abrade the bottom edge of the splash and top of cove piece.
5. Wipe down with denatured alcohol.
6. Placeseamadhesiveonthecovepiece.(¼ "widebeadinthemiddleofthepiece.)
[ 17.2 - 1 - D ]
[ 17.2 - 1 - E ]
[ 17.2 - 1 - F ]
[ 17.2 - 1 - G ]
This will make a 4" high coved splash. The ⅛ " rabbet routed into the deck of
the top will take up the extra ⅛ ".
Note
7. Once the seam adhesive is fully cured, cut down the new coved splash
to its final size. Use a table saw and cut down to 4 ⅛ " overall.
8. While the splash is still loose, sand off the excess cured seam adhesive.
Use an orbital sander.
9. Finish sanding and route the entire splash to the desired finish.
65. 126 FABRICATION MANUAL 127
FABRICATION MANUAL
17 _ Backsplashes
Backsplashes _ 17
With a block sander and 80 grit sandpaper, sand the bottom edge of the cove
splash on a slight angle. This will allow the splash to fit easily into the rabbet.
TIP
10. With the deck of the top facing up and the back of the top facing out,
take a rabbet bit or wing cutter and route a rabbet ⅛ " deep and ⅞ " wide,
along the entire length where the splash will go.
11. Once the rabbet is finished, abrade the rabbet and the bottom of the
cove splash.
[ 17.2 - 1 - I ]
[ 17.2 - 1 - H ]
[ 17.2 - 1 - J ] [ 17.2 - 1 - K ]
The depth of the rabbet should be the same as the lip left on the
cove part of the splash.
Note
12. It is very important to keep the splash square to the deck. One simple
way of doing this is to cut some wood blocks (MDF or particleboard)
4" by 4" with a 45 degree cut on the bottom.
Cut approximately 2 per foot of splash. These will be hot glued down
to the deck. The reason for the 45。
cut is so the wood blocks
can be pushed as close to the splash as possible.
13. Dry fit the splash and clamp in place. Once this is done, start placing
the wood blocks on the top. One should be placed about 2"~ 3" in from
each end. Then, they should be placed every 12" from there.
Place hot glue on the bottom of the wood block. Push the block
against the splash to make it 90。
to the deck. Push the wood block
down to the deck and hold until the hot glue sets up. Repeat this step
with every wood block needed.
[ 17.2 - 1 - L ] [ 17.2 - 1 - M ]
[ 17.2 - 1 - N ]
66. 128 FABRICATION MANUAL 129
FABRICATION MANUAL
17 _ Backsplashes
The splash piece should already be sanded to finish. Be careful not to sand
the cove area too much. Only sand the seam adhesive off and part of the deck.
16. Clamp the splash downward and from front to back. This will make
sure the splash is down all the way and still kept at 90。
.
TIP
Backsplashes _ 17
When setting the splash into the seam adhesive, set it half way into the
⅛ " bead in front and push forward. This will ensure that the seam
adhesive will be under the splash and in the front seam.
TIP
Once all the wood blocks are set, take all the clamps off. Set the splash
upside down, so the bottom is facing up. (Lean against wood blocks.)
14. Wipe down the bottom of the splash and the rabbet with denatured alcohol.
15. When the denatured alcohol is completely dry, apply the seam
adhesive to the rabbet area. Place ⅛ " bead to the front of the rabbet
and a ¼ " bead on the backside, approximately ¼ " in.
[ 17.2 - 1 - O ]
17. Let the seam adhesive fully cure. After the seam adhesive is fully cured,
take the wood blocks off the top and clean up the hot glue.
Sand down the excess seam adhesive with an orbital sander using 80 grit
sandpaper. This will take the adhesive down fast.
18. Sand this area to the desired finish.
Refer to Finishing and Polishing (Chapter 18)
[ 17.2 - 1 - P ]
[ 17.2 - 1 - R ]
[ 17.2 - 1 - Q ]