SlideShare a Scribd company logo
1 of 4
Download to read offline
MAIN STAIR
CONCRETE
FORMULA:
CLASS AA (4000psi) - CONCRETE MIXTURE
1ST-2ND 2ND-3RD MID-LANDING
WIDTH (m) 2.4 2.4 2.4
RISE (m) 0.2 0.2 0.2
THREAD (m) 0.3 0.3 1.2
NO. OF STEPS 18 15 1
VOLUME OF CONCRETE (cu.m) 2.592 2.16 0.576
TOTAL VOLUME OF CONCRETE (cu.m) 4.752
12 - NO. OF CEMENT (bags) 57.024
0.5 - VOL. OF SAND (cu.m) 2.376
1- VOL. OF GRAVEL (cu.m) 4.752
0.6 - VOL. OF WATER (cu.m) 2.8512
TOTAL GF SF
VOLUME OF CONCRETE (cu.m) 3.168 2.736
12 - NO. OF CEMENT (bags) 38.016 32.832
0.5 - VOL. OF SAND (cu.m) 1.584 1.368
1 - VOL. OF GRAVEL (cu.m) 3.168 2.736
0.6 - VOL. OF WATER (cu.m) 1.9008 1.6416
FIRE EXIT STAIR
CONCRETE
FORMULA:
CLASS AA (4000psi) - CONCRETE MIXTURE
1ST-2ND 2ND-3RD 3RD-4TH MID-LANDING
WIDTH (m) 1.5 1.5 1.5 3
RISE (m) 0.2 0.2 0.2 0.2
THREAD (m) 0.3 0.3 0.3 1.2
NO. OF STEPS 18 15 15 1
VOLUME OF CONCRETE (cu.m) 1.62 1.35 1.35 0.72
TOTAL VOLUME OF CONCRETE (cu.m) 5.04
12 - NO. OF CEMENT (bags) 60.48
0.5 - VOL. OF SAND (cu.m) 2.52
1- VOL. OF GRAVEL (cu.m) 5.04
0.6 - VOL. OF WATER (cu.m) 3.024
TOTAL GF SF TF
VOLUME OF CONCRETE (cu.m) 2.34 2.07 2.07
12 - NO. OF CEMENT (bags) 28.08 24.84 24.84
0.5 - VOL. OF SAND (cu.m) 1.17 1.035 1.035
1 - VOL. OF GRAVEL (cu.m) 2.34 2.07 2.07
0.6 - VOL. OF WATER (cu.m) 1.404 1.242 1.242
STAIRS (OUTSIDE)
CONCRETE
FORMULA:
CLASS AA (4000psi) - CONCRETE MIXTURE
LEFT RIGHT REAR MID-LANDING
WIDTH (m) 2 2 2 2
RISE (m) 0.1 0.1 0.1 0.1
THREAD (m) 0.3 0.3 0.3 0.5
NO. OF STEPS 2 2 2 1
VOLUME OF CONCRETE (cu.m) 0.12 0.12 0.12 0.1
TOTAL VOLUME OF CONCRETE (cu.m) 0.46
12 - NO. OF CEMENT (bags) 5.52
0.5 - VOL. OF SAND (cu.m) 0.23
1- VOL. OF GRAVEL (cu.m) 0.46
0.6 - VOL. OF WATER (cu.m) 0.276
TOTAL LEFT RIGHT REAR TOTAL
VOLUME OF CONCRETE (cu.m) 0.22 0.22 0.22 0.66
12 - NO. OF CEMENT (bags) 2.64 2.64 2.64 7.92
0.5 - VOL. OF SAND (cu.m) 0.11 0.11 0.11 0.33
1 - VOL. OF GRAVEL (cu.m) 0.22 0.22 0.22 0.66
0.6 - VOL. OF WATER (cu.m) 0.132 0.132 0.132 0.396
STAIRS (OUTSIDE)
CONCRETE
FORMULA:
CLASS AA (4000psi) - CONCRETE MIXTURE
FRONT MID-LANDING
WIDTH (m) 10 10
RISE (m) 0.1 0.1
THREAD (m) 1.2 1.2
NO. OF STEPS 2 1
VOLUME OF CONCRETE (cu.m) 2.4 1.2
TOTAL VOLUME OF CONCRETE (cu.m) 3.6
12 - NO. OF CEMENT (bags) 43.2
0.5 - VOL. OF SAND (cu.m) 1.8
1- VOL. OF GRAVEL (cu.m) 3.6
0.6 - VOL. OF WATER (cu.m) 2.16
TOTAL MAIN TOTAL FOR BOQ
VOLUME OF CONCRETE (cu.m) 3.6 4.26
12 - NO. OF CEMENT (bags) 43.2 51.12
0.5 - VOL. OF SAND (cu.m) 1.8 2.13
1 - VOL. OF GRAVEL (cu.m) 3.6 4.26
0.6 - VOL. OF WATER (cu.m) 2.16 2.556
RAMPS (OUTSIDE)
CONCRETE
FORMULA:
CLASS AA (4000psi) - CONCRETE MIXTURE
LEFT RIGHT MID-LANDING
WIDTH (m) 3 3 3
RISE (m) 0.3 0.3 0.3
THREAD (m) 1.4 1.4 0.8
NO. OF STEPS 1 1 1
VOLUME OF CONCRETE (cu.m) 1.26 1.26 0.72
TOTAL VOLUME OF CONCRETE (cu.m) 2.52
12 - NO. OF CEMENT (bags) 30.24
0.5 - VOL. OF SAND (cu.m) 1.26
1- VOL. OF GRAVEL (cu.m) 2.52
0.6 - VOL. OF WATER (cu.m) 1.512
TOTAL LEFT RIGHT TOTAL
VOLUME OF CONCRETE (cu.m) 1.98 1.98 3.96
12 - NO. OF CEMENT (bags) 23.76 23.76 47.52
0.5 - VOL. OF SAND (cu.m) 0.99 0.99 1.98
1 - VOL. OF GRAVEL (cu.m) 1.98 1.98 3.96
0.6 - VOL. OF WATER (cu.m) 1.188 1.188 2.376
RAMPS (OUTSIDE)
CONCRETE
FORMULA:
CLASS AA (4000psi) - CONCRETE MIXTURE
REAR MID-LANDING
WIDTH (m) 2 2
RISE (m) 0.3 0.3
THREAD (m) 1.4 1.4
NO. OF STEPS 1 1
VOLUME OF CONCRETE (cu.m) 0.84 0.84
TOTAL VOLUME OF CONCRETE (cu.m) 1.68
12 - NO. OF CEMENT (bags) 20.16
0.5 - VOL. OF SAND (cu.m) 0.84
1- VOL. OF GRAVEL (cu.m) 1.68
0.6 - VOL. OF WATER (cu.m) 1.008
TOTAL MAIN TOTAL FOR BOQ
VOLUME OF CONCRETE (cu.m) 1.68 5.64
12 - NO. OF CEMENT (bags) 20.16 67.68
0.5 - VOL. OF SAND (cu.m) 0.84 2.82
1 - VOL. OF GRAVEL (cu.m) 1.68 5.64
0.6 - VOL. OF WATER (cu.m) 1.008 3.384
MAIN STAIR
GF-MID
HORIZONTAL/VERTICAL cc=15mm dleng=65mm Steps = 12
STAIRS W Spacing R T No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
(TEMP TOP) 2.4 0.26 0.4 0.6 10.2308 0.01 0.38 0.58 0.4450 0.6450 1.0900 6 5.5046 5 1.8586 0.174
TOTAL 22.3031 3.1271
PARALLEL
STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
(TEMP BOT1) 2.4 0.26 6 24.0769 0.01 3.363 6 1.7841 1 13.4951 0.409
(TEMP BOT2) 2.4 0.26 4.8 19.4615 0.01 3.363 6 1.7841 1 10.9082 0.330
GF STEP 2.4 12 0.01 3.363 6 1.7841 1 6.7260 0.204
TOTAL 31.1293 0.943
DIAGONAL
STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
TOP 2.4 0.15 6.42 17.0000 0.012 6.42 6 1.1033 1 18.1900 0.289
BOT 2.4 0.15 5.5 17.0000 0.012 5.5 6 1.0909 1 15.5833 0.289
TOTAL 33.7733 0.577
SF-MID
HORIZONTAL/VERTICAL cc=15mm dleng=65mm Steps = 9
STAIRS W Spacing R T No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
(TEMP TOP) 2.4 0.26 0.4 0.6 10.2308 0.01 0.38 0.58 0.4450 0.6450 1.0900 6 5.5046 5 1.8586 0.174
TOTAL 16.7273 3.1271
PARALLEL
STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
(TEMP BOT1) 2.4 0.26 5.6 22.5385 0.01 3.363 6 1.7841 1 12.6328 0.383
(TEMP BOT2) 2.4 0.26 4.7 19.0769 0.01 3.363 6 1.7841 1 10.6926 0.324
GF STEP 2.4 9 0.01 3.363 6 1.7841 1 5.0445 0.153
TOTAL 28.3699 0.860
DIAGONAL
STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
TOP 2.4 0.17 6.2 15.1176 0.012 6.2 6 1.0667 1 15.6216 0.257
BOT 2.4 0.17 5 15.1176 0.012 5 6 1.2000 1 12.5980 0.257
TOTAL 28.2196 0.513
MID-(SF&TF)
HORIZONTAL/VERTICAL cc=15mm dleng=65mm Steps = 8
STAIRS W Spacing R T No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
(TEMP TOP) 2.4 0.26 0.4 0.6 10.2308 0.01 0.38 0.58 0.4450 0.6450 1.0900 6 5.5046 5 1.8586 0.174
TOTAL 14.8687 3.1271
PARALLEL
STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
(TEMP BOT1) 2.4 0.26 4 16.3846 0.01 3.363 6 1.7841 1 9.1836 0.278
(TEMP BOT2) 2.4 0.26 4.6 18.6923 0.01 3.363 6 1.7841 1 18.6923 0.317
GF STEP 2.4 8 0.01 3.363 6 1.7841 1 8.0000 0.136
TOTAL 35.8759 0.731
DIAGONAL
STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
TOP 2.4 0.17 6 15.1176 0.012 6 6 1.0333 1 15.1176 0.257
BOT 2.4 0.17 5.5 15.1176 0.012 5.5 6 1.0909 1 13.8578 0.257
TOTAL 28.9755 0.513
FIRE EXIT
GF-MID
HORIZONTAL/VERTICAL cc=15mm dleng=65mm Steps = 12
STAIRS W Spacing R T No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
(TEMP TOP) 2.4 0.26 0.4 0.6 10.2308 0.01 0.38 0.58 0.4450 0.6450 1.0900 6 5.5046 5 1.8586 0.174
TOTAL 22.3031 3.1271
PARALLEL
STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
(TEMP BOT1) 2.4 0.26 5.5 22.1538 0.01 3.363 6 1.7841 1 12.4172 0.376
(TEMP BOT2) 2.4 0.26 4.8 19.4615 0.01 3.363 6 1.7841 1 10.9082 0.330
GF STEP 2.4 12 0.01 3.363 6 1.7841 1 6.7260 0.204
TOTAL 30.0514 0.910
DIAGONAL
STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
TOP 2.4 0.15 6.6 17.0000 0.012 6.6 6 1.1333 1 18.7000 0.289
BOT 2.4 0.15 5.5 17.0000 0.012 5.5 6 1.0909 1 15.5833 0.289
TOTAL 34.2833 0.577
(SF&TF)-MID
HORIZONTAL/VERTICAL cc=15mm dleng=65mm Steps = 9
STAIRS W Spacing R T No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
(TEMP TOP) 2.4 0.26 0.4 0.6 10.2308 0.01 0.38 0.58 0.4450 0.6450 1.0900 6 5.5046 5 1.8586 0.174
TOTAL 16.7273 3.1271
PARALLEL
STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
(TEMP BOT1) 2.4 0.26 4.9 19.8462 0.01 3.363 6 1.7841 1 11.1238 0.337
(TEMP BOT2) 2.4 0.26 6.8 27.1538 0.01 3.363 6 1.7841 1 15.2197 0.461
GF STEP 2.4 9 0.01 3.363 6 1.7841 1 5.0445 0.153
TOTAL 31.3880 0.951
DIAGONAL
STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
TOP 2.4 0.17 5.5 15.1176 0.012 5.5 6 1.0909 1 13.8578 0.257
BOT 2.4 0.17 7.1 15.1176 0.012 7.1 6 0.8451 0 17.8892 0.257
TOTAL 31.7471 0.513
MID-(SF&TF&RD)
HORIZONTAL/VERTICAL cc=15mm dleng=65mm Steps = 8
STAIRS W Spacing R T No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
(TEMP TOP) 2.4 0.26 0.4 0.6 10.2308 0.01 0.38 0.58 0.4450 0.6450 1.0900 6 5.5046 5 1.8586 0.174
TOTAL 14.8687 3.1271
PARALLEL
STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
(TEMP BOT1) 2.4 0.26 5.7 22.9231 0.01 3.363 6 1.7841 1 12.8484 0.389
(TEMP BOT2) 2.4 0.26 4.9 19.8462 0.01 3.363 6 1.7841 1 11.1238 0.337
GF STEP 2.4 8 0.01 3.363 6 1.7841 1 4.4840 0.136
TOTAL 28.4562 0.862
DIAGONAL
STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg)
TOP 2.4 0.17 6.3 15.1176 0.012 6.3 6 1.0833 1 15.8735 0.257
BOT 2.4 0.17 5.2 15.1176 0.012 5.2 6 1.1538 1 13.1020 0.257
TOTAL 28.9755 0.513
SUMMARY FOR TIE BARS TOTAL
MAIN STAIRS (GF) 9.020
MAIN STAIRS (SF) 8.872
FIRE EXIT STAIRS (GF) 9.118
FIRE EXIT STAIRS (SF) 9.094
FIRE EXIT STAIRS (3F) 9.094

More Related Content

Similar to stairs.pdfhedsiugfisgfygfyugfuyegwugufef

Similar to stairs.pdfhedsiugfisgfygfyugfuyegwugufef (17)

02 - Group 3 - P&ID - Piping and Instrumentation Diagrams
02 - Group 3 - P&ID - Piping and Instrumentation Diagrams02 - Group 3 - P&ID - Piping and Instrumentation Diagrams
02 - Group 3 - P&ID - Piping and Instrumentation Diagrams
 
232365141 1-qs-techinical-data
232365141 1-qs-techinical-data232365141 1-qs-techinical-data
232365141 1-qs-techinical-data
 
Analysis Report
Analysis ReportAnalysis Report
Analysis Report
 
Shallow and Deep Founation Design Calucations
Shallow and Deep Founation Design CalucationsShallow and Deep Founation Design Calucations
Shallow and Deep Founation Design Calucations
 
Diesel Production: Equipments Design
Diesel Production: Equipments DesignDiesel Production: Equipments Design
Diesel Production: Equipments Design
 
Bjs green belt ppt
Bjs green belt pptBjs green belt ppt
Bjs green belt ppt
 
CONVERSIONS TO USE METRIC PREFIXES This table us
CONVERSIONS TO USE   METRIC PREFIXES This table usCONVERSIONS TO USE   METRIC PREFIXES This table us
CONVERSIONS TO USE METRIC PREFIXES This table us
 
6. diseño de puente compuesto2
6. diseño de puente compuesto26. diseño de puente compuesto2
6. diseño de puente compuesto2
 
Shi20396 ch08
Shi20396 ch08Shi20396 ch08
Shi20396 ch08
 
Quishpe mireya practica6
Quishpe mireya practica6Quishpe mireya practica6
Quishpe mireya practica6
 
All hvac calculation
All hvac calculationAll hvac calculation
All hvac calculation
 
Cost of breeder farm
Cost of breeder farmCost of breeder farm
Cost of breeder farm
 
Raccordi per alte pressioni - Fitok serie 20
Raccordi per alte pressioni - Fitok serie 20Raccordi per alte pressioni - Fitok serie 20
Raccordi per alte pressioni - Fitok serie 20
 
Hasil perhitungan Orifice Gas
Hasil perhitungan Orifice GasHasil perhitungan Orifice Gas
Hasil perhitungan Orifice Gas
 
current cotton selling price
current cotton selling pricecurrent cotton selling price
current cotton selling price
 
friction loss along a pipe
friction loss along a pipefriction loss along a pipe
friction loss along a pipe
 
App1(1)
App1(1)App1(1)
App1(1)
 

Recently uploaded

Design Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxDesign Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxTusharBahuguna2
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdftbatkhuu1
 
Pastel Portfolio _ by Slidesgo.pptx. Xxx
Pastel Portfolio _ by Slidesgo.pptx. XxxPastel Portfolio _ by Slidesgo.pptx. Xxx
Pastel Portfolio _ by Slidesgo.pptx. XxxSegundoManuelFaichin1
 
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...SUHANI PANDEY
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...kumaririma588
 
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...home
 
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Delhi Call girls
 
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...amitlee9823
 
call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...Delhi Call girls
 
Case Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, PuneCase Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, PuneLukeKholes
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...Pooja Nehwal
 
infant assessment fdbbdbdddinal ppt.pptx
infant assessment fdbbdbdddinal ppt.pptxinfant assessment fdbbdbdddinal ppt.pptx
infant assessment fdbbdbdddinal ppt.pptxsuhanimunjal27
 
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfThe_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfAmirYakdi
 
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Call Girls in Nagpur High Profile
 
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️soniya singh
 
Stark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxStark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxjeswinjees
 
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Call Girls in Nagpur High Profile
 

Recently uploaded (20)

Design Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxDesign Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptx
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdf
 
Pastel Portfolio _ by Slidesgo.pptx. Xxx
Pastel Portfolio _ by Slidesgo.pptx. XxxPastel Portfolio _ by Slidesgo.pptx. Xxx
Pastel Portfolio _ by Slidesgo.pptx. Xxx
 
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
 
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
 
B. Smith. (Architectural Portfolio.).pdf
B. Smith. (Architectural Portfolio.).pdfB. Smith. (Architectural Portfolio.).pdf
B. Smith. (Architectural Portfolio.).pdf
 
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
 
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
 
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
 
call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Kaushambi (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
 
Case Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, PuneCase Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, Pune
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
 
infant assessment fdbbdbdddinal ppt.pptx
infant assessment fdbbdbdddinal ppt.pptxinfant assessment fdbbdbdddinal ppt.pptx
infant assessment fdbbdbdddinal ppt.pptx
 
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfThe_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
 
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
 
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
 
Stark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxStark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptx
 
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
 

stairs.pdfhedsiugfisgfygfyugfuyegwugufef

  • 1. MAIN STAIR CONCRETE FORMULA: CLASS AA (4000psi) - CONCRETE MIXTURE 1ST-2ND 2ND-3RD MID-LANDING WIDTH (m) 2.4 2.4 2.4 RISE (m) 0.2 0.2 0.2 THREAD (m) 0.3 0.3 1.2 NO. OF STEPS 18 15 1 VOLUME OF CONCRETE (cu.m) 2.592 2.16 0.576 TOTAL VOLUME OF CONCRETE (cu.m) 4.752 12 - NO. OF CEMENT (bags) 57.024 0.5 - VOL. OF SAND (cu.m) 2.376 1- VOL. OF GRAVEL (cu.m) 4.752 0.6 - VOL. OF WATER (cu.m) 2.8512 TOTAL GF SF VOLUME OF CONCRETE (cu.m) 3.168 2.736 12 - NO. OF CEMENT (bags) 38.016 32.832 0.5 - VOL. OF SAND (cu.m) 1.584 1.368 1 - VOL. OF GRAVEL (cu.m) 3.168 2.736 0.6 - VOL. OF WATER (cu.m) 1.9008 1.6416 FIRE EXIT STAIR CONCRETE FORMULA: CLASS AA (4000psi) - CONCRETE MIXTURE 1ST-2ND 2ND-3RD 3RD-4TH MID-LANDING WIDTH (m) 1.5 1.5 1.5 3 RISE (m) 0.2 0.2 0.2 0.2 THREAD (m) 0.3 0.3 0.3 1.2 NO. OF STEPS 18 15 15 1 VOLUME OF CONCRETE (cu.m) 1.62 1.35 1.35 0.72 TOTAL VOLUME OF CONCRETE (cu.m) 5.04 12 - NO. OF CEMENT (bags) 60.48 0.5 - VOL. OF SAND (cu.m) 2.52 1- VOL. OF GRAVEL (cu.m) 5.04 0.6 - VOL. OF WATER (cu.m) 3.024 TOTAL GF SF TF VOLUME OF CONCRETE (cu.m) 2.34 2.07 2.07 12 - NO. OF CEMENT (bags) 28.08 24.84 24.84 0.5 - VOL. OF SAND (cu.m) 1.17 1.035 1.035 1 - VOL. OF GRAVEL (cu.m) 2.34 2.07 2.07 0.6 - VOL. OF WATER (cu.m) 1.404 1.242 1.242 STAIRS (OUTSIDE) CONCRETE FORMULA: CLASS AA (4000psi) - CONCRETE MIXTURE LEFT RIGHT REAR MID-LANDING WIDTH (m) 2 2 2 2 RISE (m) 0.1 0.1 0.1 0.1 THREAD (m) 0.3 0.3 0.3 0.5 NO. OF STEPS 2 2 2 1 VOLUME OF CONCRETE (cu.m) 0.12 0.12 0.12 0.1 TOTAL VOLUME OF CONCRETE (cu.m) 0.46 12 - NO. OF CEMENT (bags) 5.52 0.5 - VOL. OF SAND (cu.m) 0.23 1- VOL. OF GRAVEL (cu.m) 0.46 0.6 - VOL. OF WATER (cu.m) 0.276 TOTAL LEFT RIGHT REAR TOTAL VOLUME OF CONCRETE (cu.m) 0.22 0.22 0.22 0.66 12 - NO. OF CEMENT (bags) 2.64 2.64 2.64 7.92 0.5 - VOL. OF SAND (cu.m) 0.11 0.11 0.11 0.33 1 - VOL. OF GRAVEL (cu.m) 0.22 0.22 0.22 0.66 0.6 - VOL. OF WATER (cu.m) 0.132 0.132 0.132 0.396
  • 2. STAIRS (OUTSIDE) CONCRETE FORMULA: CLASS AA (4000psi) - CONCRETE MIXTURE FRONT MID-LANDING WIDTH (m) 10 10 RISE (m) 0.1 0.1 THREAD (m) 1.2 1.2 NO. OF STEPS 2 1 VOLUME OF CONCRETE (cu.m) 2.4 1.2 TOTAL VOLUME OF CONCRETE (cu.m) 3.6 12 - NO. OF CEMENT (bags) 43.2 0.5 - VOL. OF SAND (cu.m) 1.8 1- VOL. OF GRAVEL (cu.m) 3.6 0.6 - VOL. OF WATER (cu.m) 2.16 TOTAL MAIN TOTAL FOR BOQ VOLUME OF CONCRETE (cu.m) 3.6 4.26 12 - NO. OF CEMENT (bags) 43.2 51.12 0.5 - VOL. OF SAND (cu.m) 1.8 2.13 1 - VOL. OF GRAVEL (cu.m) 3.6 4.26 0.6 - VOL. OF WATER (cu.m) 2.16 2.556 RAMPS (OUTSIDE) CONCRETE FORMULA: CLASS AA (4000psi) - CONCRETE MIXTURE LEFT RIGHT MID-LANDING WIDTH (m) 3 3 3 RISE (m) 0.3 0.3 0.3 THREAD (m) 1.4 1.4 0.8 NO. OF STEPS 1 1 1 VOLUME OF CONCRETE (cu.m) 1.26 1.26 0.72 TOTAL VOLUME OF CONCRETE (cu.m) 2.52 12 - NO. OF CEMENT (bags) 30.24 0.5 - VOL. OF SAND (cu.m) 1.26 1- VOL. OF GRAVEL (cu.m) 2.52 0.6 - VOL. OF WATER (cu.m) 1.512 TOTAL LEFT RIGHT TOTAL VOLUME OF CONCRETE (cu.m) 1.98 1.98 3.96 12 - NO. OF CEMENT (bags) 23.76 23.76 47.52 0.5 - VOL. OF SAND (cu.m) 0.99 0.99 1.98 1 - VOL. OF GRAVEL (cu.m) 1.98 1.98 3.96 0.6 - VOL. OF WATER (cu.m) 1.188 1.188 2.376 RAMPS (OUTSIDE) CONCRETE FORMULA: CLASS AA (4000psi) - CONCRETE MIXTURE REAR MID-LANDING WIDTH (m) 2 2 RISE (m) 0.3 0.3 THREAD (m) 1.4 1.4 NO. OF STEPS 1 1 VOLUME OF CONCRETE (cu.m) 0.84 0.84 TOTAL VOLUME OF CONCRETE (cu.m) 1.68 12 - NO. OF CEMENT (bags) 20.16 0.5 - VOL. OF SAND (cu.m) 0.84 1- VOL. OF GRAVEL (cu.m) 1.68 0.6 - VOL. OF WATER (cu.m) 1.008 TOTAL MAIN TOTAL FOR BOQ VOLUME OF CONCRETE (cu.m) 1.68 5.64 12 - NO. OF CEMENT (bags) 20.16 67.68 0.5 - VOL. OF SAND (cu.m) 0.84 2.82 1 - VOL. OF GRAVEL (cu.m) 1.68 5.64 0.6 - VOL. OF WATER (cu.m) 1.008 3.384
  • 3. MAIN STAIR GF-MID HORIZONTAL/VERTICAL cc=15mm dleng=65mm Steps = 12 STAIRS W Spacing R T No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg) (TEMP TOP) 2.4 0.26 0.4 0.6 10.2308 0.01 0.38 0.58 0.4450 0.6450 1.0900 6 5.5046 5 1.8586 0.174 TOTAL 22.3031 3.1271 PARALLEL STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg) (TEMP BOT1) 2.4 0.26 6 24.0769 0.01 3.363 6 1.7841 1 13.4951 0.409 (TEMP BOT2) 2.4 0.26 4.8 19.4615 0.01 3.363 6 1.7841 1 10.9082 0.330 GF STEP 2.4 12 0.01 3.363 6 1.7841 1 6.7260 0.204 TOTAL 31.1293 0.943 DIAGONAL STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg) TOP 2.4 0.15 6.42 17.0000 0.012 6.42 6 1.1033 1 18.1900 0.289 BOT 2.4 0.15 5.5 17.0000 0.012 5.5 6 1.0909 1 15.5833 0.289 TOTAL 33.7733 0.577 SF-MID HORIZONTAL/VERTICAL cc=15mm dleng=65mm Steps = 9 STAIRS W Spacing R T No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg) (TEMP TOP) 2.4 0.26 0.4 0.6 10.2308 0.01 0.38 0.58 0.4450 0.6450 1.0900 6 5.5046 5 1.8586 0.174 TOTAL 16.7273 3.1271 PARALLEL STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg) (TEMP BOT1) 2.4 0.26 5.6 22.5385 0.01 3.363 6 1.7841 1 12.6328 0.383 (TEMP BOT2) 2.4 0.26 4.7 19.0769 0.01 3.363 6 1.7841 1 10.6926 0.324 GF STEP 2.4 9 0.01 3.363 6 1.7841 1 5.0445 0.153 TOTAL 28.3699 0.860 DIAGONAL STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg) TOP 2.4 0.17 6.2 15.1176 0.012 6.2 6 1.0667 1 15.6216 0.257 BOT 2.4 0.17 5 15.1176 0.012 5 6 1.2000 1 12.5980 0.257 TOTAL 28.2196 0.513 MID-(SF&TF) HORIZONTAL/VERTICAL cc=15mm dleng=65mm Steps = 8 STAIRS W Spacing R T No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg) (TEMP TOP) 2.4 0.26 0.4 0.6 10.2308 0.01 0.38 0.58 0.4450 0.6450 1.0900 6 5.5046 5 1.8586 0.174 TOTAL 14.8687 3.1271 PARALLEL STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg) (TEMP BOT1) 2.4 0.26 4 16.3846 0.01 3.363 6 1.7841 1 9.1836 0.278 (TEMP BOT2) 2.4 0.26 4.6 18.6923 0.01 3.363 6 1.7841 1 18.6923 0.317 GF STEP 2.4 8 0.01 3.363 6 1.7841 1 8.0000 0.136 TOTAL 35.8759 0.731 DIAGONAL STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg) TOP 2.4 0.17 6 15.1176 0.012 6 6 1.0333 1 15.1176 0.257 BOT 2.4 0.17 5.5 15.1176 0.012 5.5 6 1.0909 1 13.8578 0.257 TOTAL 28.9755 0.513
  • 4. FIRE EXIT GF-MID HORIZONTAL/VERTICAL cc=15mm dleng=65mm Steps = 12 STAIRS W Spacing R T No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg) (TEMP TOP) 2.4 0.26 0.4 0.6 10.2308 0.01 0.38 0.58 0.4450 0.6450 1.0900 6 5.5046 5 1.8586 0.174 TOTAL 22.3031 3.1271 PARALLEL STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg) (TEMP BOT1) 2.4 0.26 5.5 22.1538 0.01 3.363 6 1.7841 1 12.4172 0.376 (TEMP BOT2) 2.4 0.26 4.8 19.4615 0.01 3.363 6 1.7841 1 10.9082 0.330 GF STEP 2.4 12 0.01 3.363 6 1.7841 1 6.7260 0.204 TOTAL 30.0514 0.910 DIAGONAL STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg) TOP 2.4 0.15 6.6 17.0000 0.012 6.6 6 1.1333 1 18.7000 0.289 BOT 2.4 0.15 5.5 17.0000 0.012 5.5 6 1.0909 1 15.5833 0.289 TOTAL 34.2833 0.577 (SF&TF)-MID HORIZONTAL/VERTICAL cc=15mm dleng=65mm Steps = 9 STAIRS W Spacing R T No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg) (TEMP TOP) 2.4 0.26 0.4 0.6 10.2308 0.01 0.38 0.58 0.4450 0.6450 1.0900 6 5.5046 5 1.8586 0.174 TOTAL 16.7273 3.1271 PARALLEL STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg) (TEMP BOT1) 2.4 0.26 4.9 19.8462 0.01 3.363 6 1.7841 1 11.1238 0.337 (TEMP BOT2) 2.4 0.26 6.8 27.1538 0.01 3.363 6 1.7841 1 15.2197 0.461 GF STEP 2.4 9 0.01 3.363 6 1.7841 1 5.0445 0.153 TOTAL 31.3880 0.951 DIAGONAL STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg) TOP 2.4 0.17 5.5 15.1176 0.012 5.5 6 1.0909 1 13.8578 0.257 BOT 2.4 0.17 7.1 15.1176 0.012 7.1 6 0.8451 0 17.8892 0.257 TOTAL 31.7471 0.513 MID-(SF&TF&RD) HORIZONTAL/VERTICAL cc=15mm dleng=65mm Steps = 8 STAIRS W Spacing R T No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg) (TEMP TOP) 2.4 0.26 0.4 0.6 10.2308 0.01 0.38 0.58 0.4450 0.6450 1.0900 6 5.5046 5 1.8586 0.174 TOTAL 14.8687 3.1271 PARALLEL STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg) (TEMP BOT1) 2.4 0.26 5.7 22.9231 0.01 3.363 6 1.7841 1 12.8484 0.389 (TEMP BOT2) 2.4 0.26 4.9 19.8462 0.01 3.363 6 1.7841 1 11.1238 0.337 GF STEP 2.4 8 0.01 3.363 6 1.7841 1 4.4840 0.136 TOTAL 28.4562 0.862 DIAGONAL STAIRS W Spacing L No. of Bars ø Bar Length R Length T Total Length R Total Length T Total Length RL Com. Length (m) Cuts of 6m Say No. of Steel Bars #16 G.I. wire (kg) TOP 2.4 0.17 6.3 15.1176 0.012 6.3 6 1.0833 1 15.8735 0.257 BOT 2.4 0.17 5.2 15.1176 0.012 5.2 6 1.1538 1 13.1020 0.257 TOTAL 28.9755 0.513 SUMMARY FOR TIE BARS TOTAL MAIN STAIRS (GF) 9.020 MAIN STAIRS (SF) 8.872 FIRE EXIT STAIRS (GF) 9.118 FIRE EXIT STAIRS (SF) 9.094 FIRE EXIT STAIRS (3F) 9.094