Case Study “D”: Mr. Christie’s bakery (2150 Lakeshore blvd)
Darren Pigliacelli, Christopher Poole, Wendy Quon, and Farrukh Qureshi
Table of 
Contents
1. Introduction
2. Summary of Issues
3. Principles
4. Surrounding Area Precedents
5. Impacts
6. Policies Pertaining to Site
7. Matrix Analysis
8. Proposed Wholesale Design
9. Fall Concept
10. Questions
INTRODUCTORY VIDEO
https://www.youtube.com/watch?v=v_qN7Of11uQ
CURRENT AND HISTORICAL CONTEXT
 Historical icon in Toronto for over half of a century
 Land’s future use
 Minimal disturbance to existing infrastructure and local community
CURRENT AND HISTORICAL CONTEXT
Tomato garden and shadow analogy for Ontario Food 
Terminal
 initially constructed to address and facilitate the poor food 
distribution for the downtown core in the post‐war period.  
 to provide space for farmers so they could directly get to and 
from the wholesale market. 
 operate as a hub for produce and the agricultural market. 
CURRENT AND HISTORICAL CONTEXT
Factors to consider:
2) Traffic
 Traffic Congestion
 High‐rises and population growth
3) Employment
 Replace and create jobs
2014‐02‐09
2
OWNERS OF LAND
Until 2012 2012 to present
SUMMARY OF ISSUES
SUMMARY OF ISSUES
1. Ontario Food Terminal
 The affects of neighbours and existing buildings in area
 Vital to Toronto’s economy
 Local businesses and farmers
2. Traffic
 North of Gardiner highway
 Major roads of Lakeshore and Park Lawn
 High‐rises
 Population growth
3. Employment
 Displaced 550 workers
PRINCIPLES
10 Principles to Consider
1. Shared vision for the site for future employment‐related uses
2. Build upon the strengths of the site and area
◦ Reuse of existing structure/building
◦ Location
◦ Size
◦ Visibility
◦ Accessibility
◦ Proximity to Labour Market
◦ Ranges of Uses
3. Consider role of Ontario Food Terminal for compatible employment uses
4. Servicing and infrastructure requirements of site (e.g. energy, stormwater mitigation, and 
transportation)
10 Principles to Consider
5. Connect existing transportation network (e.g., GO Transit, TTC, bike lanes, etc)
6. Create a cluster employment, businesses and service to attract employeres
7. Provide broad range of employment uses and built forms that transition from, and are 
compatible with nearby uses
8. Promote multi‐uses/users creating and drawing on collective synergies, such as:
 Public‐private partnerships
 Exploring educational/institutional themes
 Food, energy, and water converging sectors
9. Provide flexible employment spaces
10. Provide opportunities that capitalize the strengths of local labour market, and encourage 
employment intensification on the site
2014‐02‐09
3
SURROUNDING AREA
PRECEDENTS
SITE: 2150 Lakeshore Blvd W
 Challenges & Opportunities
 Encourage/ Maintain existing transformative employment opportunities 
 Capitalize on: unique size, capacity, locational attributes, visibility, and access to 
downtown/ waterfront/ western GTA/ Airport(s) and OFT
 Provincial Policy: designated as a Core Employment Area (Provincial Policy 
Statement 2005)
 City Council Request: “maintain existing jobs with possible new food industry 
tenants for the site” (City Staff Report)
Existing and Proposed Area Precedents
 Ontario Food Terminal
Existing and Proposed Area Precedents
 High‐Rise condo development/ proposals and construction
Existing and Proposed Area Precedents
 Residential and mixed‐use high‐rise/ Low Rise
Existing and Proposed Area Precedents
 Parks/ open space/ recreation along lake
2014‐02‐09
4
Existing and Proposed Area Precedents
 Major Transportation corridor/ Easily accessible area (road/ rail/ public transit)
Area Precedents: Guiding Principles
 Principle 3: Importance of Ontario Food Terminal (attract 
related/ compatible employment uses)
 Principle 5: Enhance & Connect exiting Transportation 
network 
 Principle 7: Compatible to near‐by uses (OFT and High 
Density Residential/ Parks)
Source: City of Toronto: Staff Report
Existing Precedent: Ontario Food Terminal
Mindful: Ontario Food Terminal
 Whole sale market 
 Sold and Distributed to buyers across the GTA
 Profoundly shaped our street scape in area and Toronto
“If we weren’t here where would all the food and vegetable stores buy their product? 
They would be lost; It’s little known by the public how important this facility is to 
Toronto. There is no market like this across North America. It is unique allowing fruit 
and vegetable green grocer stores in Toronto to pop up anywhere selling locally 
grown food. Toronto is blessed by having a facility like this.” Bruce Nickolas‐ OFT GM 
(CBC Raido)
Precedent: High‐Rise Residential 
Neighbourhood
 Proximate to High‐rise residential neighbourhood
 Expected 16,000 people in the next 10 years
 Over 20 High‐rise condos built/ proposed or under 
construction in this area
 Area is turning into Etobicoke/ Mimico town centre 
“inclusive of, and respectful to the diverse stakeholders of the 
area.” (2150 Lakeshore Blvd W, City Staff 2013 Report)
Precedent: High‐Rise Residential 
Neighbourhood
South Beach Condos & Lofts
 88 Park Lawn Rd.
 27, 27 and 2 stories
 Complete 
 Condo/ retail
2014‐02‐09
5
Precedent: High‐Rise Residential 
Neighbourhood
Key West
 36 Park Lawn Rd.
 36 stories
 Under construction (2015)
 Condo
 Units: 343
Precedent: High‐Rise Residential 
Neighbourhood
Westlake Encore
30 Park Lawn Rd.
45 stories
Pre‐construction (2017)
Condo/ Retail
Precedent: High‐Rise Residential 
Neighbourhood
Eu Du Soleil Condos
2183 Lake Shore Blvd. West
63, 49 stories
Pre‐ construction
(2017)
Condo
1285 Units
Precedent: High‐Rise Residential 
Neighbourhood
Jade Waterfront
2175 Lakeshore Blvd. West
38 stories
Under Construction
(2014)
Condo
Precedent: High‐Rise Residential 
Neighbourhood
Lago at the Waterfront
2151 Lakeshore Blvd. West
49, 14, 3 Stories
Under Construction 
(2016)
Condo
622 Units
Precedent: High‐Rise Residential 
Neighbourhood
Waterways Condos
2147 Lakeshore Blvd. West
56, 16 Stories
Pre‐construction
Condo 
2014‐02‐09
6
Precedent: High‐Rise Residential 
Neighbourhood
West Lake
2228 Lakeshore Blvd. West
48, 46, 39 Stories
Under Construction
2015
Condo/ Retail
487 Units
Precedent: High‐Rise Residential 
Neighbourhood
Ocean Club
128 Marine Parade Dr.
39, 10 Stories
Under Construction
2014
Condo/ Retail
511 Units
Precedent: High‐Rise Residential 
Neighbourhood
Waterscapes
68 Marine Parade Dr.
30 stories
Condo/ Retail
Under Construction 
2014
Precedent: High‐Rise Residential 
Neighbourhood
Beyond the Sea
Lake Shore Blvd W at Legion Rd
26, 37, 44 Stories
Condo/ Retail
Complete
Red – Proposed/ Pre‐const. 
Blue – Under construction  Mindful: High‐Density Proximate to location
2014‐02‐09
7
High‐Rise community 
Places to Live/ No where to work (excessive condo development)
“It is a growing issue, because the hot commodity from a market 
perspective is residential in the city… The problem is, if we blanket our 
city with condos, we don’t have anywhere to work.” – Jen Keessmatt
Live/ work (close proximity)
Keeping Employment land follows “smart growth” 
City requires “inclusive of and respectful to the diverse stakeholders 
of the area” (City Staff Report)
Precedent: Parks/ Green Space
Large park space in area
Walk‐able/ Bike‐able area (active transportation)
Humber Bay Shores Park East/ West ‐120 
hectares (300 acres).
Large lake front (Mendoza Bay etc.)
Boardwalks/ Picnic tables/ trails/ beach front/ 
Boat docks/ Mimico Creek
(No need of Park)
Humber Bay Park East & West 
Mindful: Transportation
Street car & Bus (Lake shore Blvd.)
Gardiner Expressway (accessible to GTA by 
car and close to 427 (north/ south rout)
Go train station (5 km away)
Proximate to high‐density (walk‐able) 
Mindful: Transportation
Walk Score is very walk‐able (78/100) 
(Walkscore.com)
Public transportation score 70/100
Bike/ active transportation score 93/100) 
“Benefit from planned transportation and 
transit improvements.” (Staff Report pg 5) 
Mindful: Transportation
Accessible in any form of transportation 
(Bus, Street Car, Train and Car)
Major artery for transportation (good 
place for employment)
Easily accessible destination (Capitalize on: 
locational attributes and access to 
downtown/ waterfront/ western GTA/ 
Airport(s) and OFT
2014‐02‐09
8
Mindful: Transportation
There are future planned transportation 
improvements for area (City: 
Transportation Master Plan)
“Connect and plan for enhancing the 
existing transportation network, including 
GO Transit, TTC, bike lanes, trails, 
sidewalks and streets” (City staff report)
Precedents Conclusion: Area Needs
Employment (550 without work/ 16,000 residents in next 10 
years)
Accommodations to the Ontario Food Terminal  (Wholesale) 
To keep Employment Lands to preserve future local and 
regional prosperity
Density to conform with OP/ Places to Grow
Precedents Conclusion: Area Needs
Area has: Residential (high/low‐rise), Parks and Leisure and 
alternative transportation methods
CONCLUSION
Area needs: Employment (Industrial) accommodating the 
importance to Ontario food Terminal
IMPACTS
Impacts
1. Employment
2. Traffic
3. Green space
Employment
• Displaced 550 workers
• Displaced workers will commute, causing further congestion
• Rezoning lot will implicitly harm the Ontario Food Terminal
2014‐02‐09
9
Ontario Food Terminal
• Directly, and indirectly supporting over 42,000 jobs (OFT, 2009)
• Supports higher farm revenue and stronger rural communities
• Producing an estimated $2.5 to $3.0 billion in economic benefit (Campsie, 2004)
Precedence: Food distribution centre in Cambridge, ON
• Loblaws Maple Grove Distribution Centre supports over 1,500 jobs on a small portion of
OFT’s size.
• Creating more than 550 jobs is possible
Expanding Ontario Food Terminal onto Lot
• Converting 2150 Lakeshore Blvd W to leverage the role of Ontario Food Terminal by
seeking compatible employment uses
• This will help alleviate several space issues for Ontario Food Terminal
Traffic Congestion
Toronto Cycling Map
Traffic around Ontario Food Terminal
• Large number of trucks, more especially with expansion of nearby residential areas
(Campsie, 2004)
Some solutions for Traffic
• Traffic must enter the site at its furthest location from highway ramp
• Smaller trucks should take alternate routes
• Restore rail capacity: reduce energy costs and reduce trucks entering the site daily
2014‐02‐09
10
Bicycle Lanes on Lakeshore
• Take advantage of major multi-use pathway for cyclists to get to and from work safely
• Implementing bicycle stations throughout pathway and at 2150 Lakeshore Blvd W
• Implement changing and shower facilities in 2150 Lakeshore Blvd W
Toronto Cycling Map
Modes of Transportation
• Most commuters use the transit to travel for work
• We must figure out how to improve transit in local area
Mode of Transportation West of Toronto
Transit 86%
Roads 15%
Highways 11%
Cycling Infrastructure 39%
Pedestrian Infrastructure 35%
All of the above 16%
Source: Feeling Congested Phase 1 Engagement Summary Report Final
Public Transit
• Support LRT on Lakeshore Blvd W
Green space
• Rebuild surrounding parks, bike paths, and playgrounds
POLICIES PERTAINING
TO SITE
Provincial Policy Statement
“...planning for, protecting and preserving employment areas for current and
future uses”(1.3.1.3)
2014‐02‐09
11
Provincial Policy Statement
“focus major employment... on sites which are well served by public transit
where this exists or is to be developed” (1.8.1.c)
Provincial Policy Statement
“Planning authorities may permit conversion of lands within employment areas to non
employment uses through a comprehensive review, only where it has been demonstrated
that the land is not required for employment purposes over the long term and that there is a
need for the conversion” (1.3.2)
Growth Plan for the Greater Golden Horseshow (GGH)
Growth Plan for the GGH
Provide “opportunities for a diversified economic base, including maintaining
a range of economic activities and ancillary uses, and take into account the
needs of existing and future businesses” (2.2.6.2.b)
Toronto Official Plan
Source: Toronto Official Plan, Map 15 Land Use Plan, December 2010
Toronto Official Plan
“Supporting the economic function of the Employment Areas and amenity of adjacent areas;
and encouraging the establishment of key clusters of economic activity with significant value-
added employment and assessment” (4.6.6.a & 4.6.6.b)
2014‐02‐09
12
Toronto Official Plan
Source: Toronto Official Plan, Map 15 Land Use Plan, December 2010 Toronto Zoning By-law 569-2013
Toronto Green Roof By-law
Environmental
Site Assessment
(ESA)
• Ministry of the Environment
(MOE) Regulation 153/04
• A Phase 1 ESA will be
required
• If concerned about
potential contamination, a
Phase 2 ESA will be
necessary
• If contamination is located
on-site, a Phase 3 ESA will
be undertaken
MATRIX ANALYSIS
Our
proposals
1. Office Building
2. Manufacturing
3. Wholesale
4. Software Industry
Mr. 
Christie’s 
Bakery
Office 
Building
Software 
Industry
Wholesale
Manu‐
facturing
2014‐02‐09
13
Office
building
Pros: low emissions
Cons: too many
restrictions
Office 
Building
Low 
emissions
Limited 
height 
equates to 
fewer jobs
Outside 
business 
district
Will not 
utilize local 
transit 
corridors
Manufac
turing
Pros: moderate
emissions and local
transit
Cons: noise and
outside storage
Manufacturing
Moderate 
emissions
Will utilize 
local transit 
corridors
High noise 
level
High 
probability of 
outside storage
Software
Industry
Pros: low emissions,
light traffic, good
salaries
Cons: will not use
transit corridors
Software 
Industry
Low 
emissions
Light traffic
Moderate 
to high 
salaries
Will not 
utilize local 
transit 
corridors
Wholesale
Pros: low emissions,
supports Ontario’s
economy, will use local
transit corridors, and
creates thousands of
job positions
Wholesale
Low to 
moderate 
emissions
Supports 
Ontario’s 
growth
Thousands 
of job 
positions
Will utilize 
local 
transit 
corridors
PROPOSED
WHOLESALE DESIGN
Structural Rendering
• Loblaw’s distribution centre – Surrey, British Columbia
• Constructed in 2010
• 420,000 sq/ft
2014‐02‐09
14
Structural Rendering
• Loblaw’s distribution centre – Surrey, British Columbia
• Constructed in 2010
• 420,000 sq/ft
Structural Rendering
• Loblaw’s distribution centre – Surrey, British Columbia
• Constructed in 2010
• 420,000 sq/ft
Structural Rendering
• Loblaw’s distribution centre – Surrey, British Columbia
• Constructed in 2010
• 420,000 sq/ft
Structural Rendering
• Loblaw’s distribution centre – Surrey, British Columbia
• Constructed in 2010
• 420,000 sq/ft
Green Roof Rendering Green Roof Rendering
2014‐02‐09
15
Noise Attenuation Berm Noise Attenuation Berm
FALL CONCEPT
FALL CONCEPT: City planner’s view
In Jill Grant’s “Command Performance” from The Drama of 
Democracy: Contention and Dispute in Community Planning (1994), 
we decided to adopt his layout of actors in interaction from a city 
planner’s view.
Perceived role
of city planner
Perceived role
of politician
Perceived role
of citizen
City planner’s
view
Objective
Independent
Expert
Legitimate
Arbiter
Judge
Selfish
Conservative
Subjective
What is considered as a “Planner”?
 Planner is considered as a facilitator of the will of the people as 
articulated through Council or through participation programs.
 Planner is considered as a visionary ready to bring new ideas and 
approaches to direct the community into the future
 Planners believe citizens have a significant role to play in planning 
their communities and take advantage of opportunities to get 
involved. Good citizenship demands active participation.
Planner’s view of decision context
Planners filter the inputs to Council through the policies of the plan. 
Council’s decision responds to plan policies.
 Planners believe that politician must operate within the policy 
environment of the plan. All concerns must be applicable to the 
rules.
 Planners give advice about whether the developer’s proposed 
project meets the intent of the plan. 
 Policies and procedures set out by municipal and provincial 
legislation determines how the interaction occurs
2014‐02‐09
16
Citizen
body
Planner
Plan
Council
DECISION
Developer
PLANNER’S VIEW OF DECISION CONTEXT (Figure 8.4)
Actors in
Interaction
Role play
1. Mayor Jeffrey J Cantos
2. Ward 6 Councilor Mark Grimes
3. Unemployed
4. Local Residents
5. Local businesses and farmers
6. Developers “Mondelez”
7. Ontario Food Terminal GM,
Bruce Nickolas
8. Metrolinx
9. Build Toronto
Developers 
“Mondelez”
Local Businesses 
and farmers
Local Residents
PLANNERS
Mayor and 
Councilor
Ontario Food 
Terminal GM
Unemployed
Metrolinxand Build 
Toronto
QUESTIONS
Should we focus on ‘wholesale’ as
the preferred proposal to benefit
the Ontario Food Terminal? Why or
why not?
Given the emerging and existing area
context, what do you think the
constraints are to businesses/institutions
locating at this site?
If you owned the lands, what are
the possible mix of employment
uses you would place on the lands?
And why?

More Related Content

Featured

How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
ThinkNow
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
 

Featured (20)

How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 

SOSC 3710 - Case Study Project v1