SlideShare a Scribd company logo
1 of 2
Download to read offline
www.europrogress.it - e-mail: info@europrogress.it - Tel. +39.0535.26090
                                                                                EUROPROGRESS

                                                                                                                          Tunnel art
                                                                                                                    The exclusive technical innovations and his groin-shape
                                                                                                                    allow a significant improvement of the performances:

                                                                                                                        EUROPROGRESS
                                                                                                                    more light, more resistance, absence of dropping and more
                                                                                                                    volume.


                                                                              Material and coating with zinc
                                                                              The structures, complying the laws UNI, are original and patented.
                                                                              The used material is in part zinc-coated Sendzimir Z 275,
                                                                               EUROPROGRESS
                                                                              Sendzimir Z 275 and in part hot galvanized.

                                                                              Structure characteristics:
                                                                              - Arches in tubular ø 60mm
                                                                              - Trusses realized with simple supports triangle-shaped
                                                                              - Standard poles of the gutter 75x45mm or 80x50mm thickness 3mm



                                                                                                                        EUROPROGRESS
                                                                              - Wheel base poles from 1,00 – 1,50 – 2,00 – 2,50 – 3,00 m.
                                                                              - Extremity tie-rods in tubular, ø 32mm with at least 6 bracings
                                                                              - Transversal reinforce tie-rods in tubular diameter 32mm
                                                                              - Nuts and bolts type 8.8 protected against corrosion
                                                                              - Culture support up to 7 hanging points for cultures outside the ground
                                                                              - Support of the gutter widely dimensioned thickness 3mm                         Model 8 m. groin-shape

                                                                              - Standard poles of the heads 75x45 or 80x50mm thickness 3mm
                                                                              - Head transverse 55x30mm
                                                                              - Angulars of closure and finishes in galvanized sheet metal
                                                                              - Fixing of the plastic film through profiles in aluminium and PVC
                                                                               EUROPROGRESS




                                                                                                                        EUROPROGRESS
EUROPROGRESS


                                                                                                         EUROPROGRESS



                                                                                                                                          EUROPROGRESS



                                                                                                                                                                                             EUROPROGRESS

                                                                               EUROPROGRESS
                                                                              Tip-up head with central door                                                                        Anchor for the fixing



                                                                                                                                        Foundations:
                                                                                                                                        The anchorage to the soil is done through a system
                                                                                                                                        of screw anchors.

                                                                                                                                        Coverings and plugging:

                                                                                                                        EUROPROGRESS    The kind of structure presents different options of coverings
                                                                                                                                        and plugging such as:
                                                                                                                                        - Film with double inflated wall with system of inflation of the films
                                                                                                                                        - Film with single wall with tighten-film or through cables anti-UV
                                                                                                                                        - Semi-rigid materials (such as ondex, wavy polycarbonate,
                                                                                                                                          polyester, sandwich panel, etc)


                                                                              Example of tunnel joined among them
Doors:




                                                                                                                            www.europrogress.it - e-mail: info@europrogress.it - Tel. +39.0535.26090
- Single or double knocker
  width from m. 1,50 to m. 2,50
- Sliding door with two knocker
  width from m. 2,00 to m. 4,00
- Sliding door with one knocker
  width from m. 2,00 to m. 4,00
- Heads with knocker
  can be completely opened


Characteristics:
Standard model in galvanized iron or in silver anodized
aluminium. On demand in the knocker doors it can be add
anti-panic handle and go-back spring. On demand in the
sliding doors it can be add an aluminium system of
automatic movement.


Openings:		
- Of gutter
- Double of the ridge
- Single of the ridge
- Wrapping on the sides
- Wrapping on the heads


Characteristics:
The openings can be motorized or with manual control
In the openings of the sides and of the heads it can be used reducers of stress to facilitate the movement.
The administration of the motorized openings will be given to a control switchboard of expansions with wind, humidity,
wind direction and connection to the pc.




                                                                                                                         EUROPROGRESS
                                              TUNNELART
                      Height to
      Model                         Ridge height                 Step                           Sections
                     the tie-rod
       6,0              2,1             2,7        1,0    1,5    2,0    2,5   3,0

       8,0              2,2             3,3        1,0    1,5    2,0    2,5   3,0

       9,6
 EUROPROGRESS
                        2,4             3,8        1,0    1,5    2,0    2,5   3,0

8,0 OGIVART             2,5             4,0        1,0    1,5    2,0    2,5   3,0

9,6 OGIVART     EUROPROGRESS
                   2,6   4,2                       1,0    1,5    2,0    2,5   3,0


 EUROPROGRESS
                EUROPROGRESS s.r.l.
                Via per Concordia, 20 - 41037 Mirandola (MO)
                Tel 0535 26090 - Fax 0535 26379
                EUROPROGRESS
                www.europrogress.it - e-mail: info@europrogress.it

More Related Content

Similar to Solarii Tunel (10)

Corporate Brochure Etem
Corporate Brochure EtemCorporate Brochure Etem
Corporate Brochure Etem
 
Presentation 2015
Presentation 2015Presentation 2015
Presentation 2015
 
Slide & Fold Door (1) (1).pptx
Slide & Fold Door (1) (1).pptxSlide & Fold Door (1) (1).pptx
Slide & Fold Door (1) (1).pptx
 
LB-1337 RevA Fibulock Sell Sheet
LB-1337 RevA Fibulock Sell SheetLB-1337 RevA Fibulock Sell Sheet
LB-1337 RevA Fibulock Sell Sheet
 
Catalog KOWA Spotting Scopes | Optics Trade
Catalog KOWA Spotting Scopes | Optics TradeCatalog KOWA Spotting Scopes | Optics Trade
Catalog KOWA Spotting Scopes | Optics Trade
 
Catalog KOWA Binoculars | Optics Trade
Catalog KOWA Binoculars | Optics TradeCatalog KOWA Binoculars | Optics Trade
Catalog KOWA Binoculars | Optics Trade
 
Brochure Algemeen
Brochure AlgemeenBrochure Algemeen
Brochure Algemeen
 
Technical information
Technical informationTechnical information
Technical information
 
Technical information
Technical informationTechnical information
Technical information
 
Product Sheet I Aimpoint 3X-P | Optics Trade
Product Sheet I Aimpoint 3X-P | Optics TradeProduct Sheet I Aimpoint 3X-P | Optics Trade
Product Sheet I Aimpoint 3X-P | Optics Trade
 

Recently uploaded

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 

Recently uploaded (20)

Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 

Solarii Tunel

  • 1. www.europrogress.it - e-mail: info@europrogress.it - Tel. +39.0535.26090 EUROPROGRESS Tunnel art The exclusive technical innovations and his groin-shape allow a significant improvement of the performances: EUROPROGRESS more light, more resistance, absence of dropping and more volume. Material and coating with zinc The structures, complying the laws UNI, are original and patented. The used material is in part zinc-coated Sendzimir Z 275, EUROPROGRESS Sendzimir Z 275 and in part hot galvanized. Structure characteristics: - Arches in tubular ø 60mm - Trusses realized with simple supports triangle-shaped - Standard poles of the gutter 75x45mm or 80x50mm thickness 3mm EUROPROGRESS - Wheel base poles from 1,00 – 1,50 – 2,00 – 2,50 – 3,00 m. - Extremity tie-rods in tubular, ø 32mm with at least 6 bracings - Transversal reinforce tie-rods in tubular diameter 32mm - Nuts and bolts type 8.8 protected against corrosion - Culture support up to 7 hanging points for cultures outside the ground - Support of the gutter widely dimensioned thickness 3mm Model 8 m. groin-shape - Standard poles of the heads 75x45 or 80x50mm thickness 3mm - Head transverse 55x30mm - Angulars of closure and finishes in galvanized sheet metal - Fixing of the plastic film through profiles in aluminium and PVC EUROPROGRESS EUROPROGRESS EUROPROGRESS EUROPROGRESS EUROPROGRESS EUROPROGRESS EUROPROGRESS Tip-up head with central door Anchor for the fixing Foundations: The anchorage to the soil is done through a system of screw anchors. Coverings and plugging: EUROPROGRESS The kind of structure presents different options of coverings and plugging such as: - Film with double inflated wall with system of inflation of the films - Film with single wall with tighten-film or through cables anti-UV - Semi-rigid materials (such as ondex, wavy polycarbonate, polyester, sandwich panel, etc) Example of tunnel joined among them
  • 2. Doors: www.europrogress.it - e-mail: info@europrogress.it - Tel. +39.0535.26090 - Single or double knocker width from m. 1,50 to m. 2,50 - Sliding door with two knocker width from m. 2,00 to m. 4,00 - Sliding door with one knocker width from m. 2,00 to m. 4,00 - Heads with knocker can be completely opened Characteristics: Standard model in galvanized iron or in silver anodized aluminium. On demand in the knocker doors it can be add anti-panic handle and go-back spring. On demand in the sliding doors it can be add an aluminium system of automatic movement. Openings: - Of gutter - Double of the ridge - Single of the ridge - Wrapping on the sides - Wrapping on the heads Characteristics: The openings can be motorized or with manual control In the openings of the sides and of the heads it can be used reducers of stress to facilitate the movement. The administration of the motorized openings will be given to a control switchboard of expansions with wind, humidity, wind direction and connection to the pc. EUROPROGRESS TUNNELART Height to Model Ridge height Step Sections the tie-rod 6,0 2,1 2,7 1,0 1,5 2,0 2,5 3,0 8,0 2,2 3,3 1,0 1,5 2,0 2,5 3,0 9,6 EUROPROGRESS 2,4 3,8 1,0 1,5 2,0 2,5 3,0 8,0 OGIVART 2,5 4,0 1,0 1,5 2,0 2,5 3,0 9,6 OGIVART EUROPROGRESS 2,6 4,2 1,0 1,5 2,0 2,5 3,0 EUROPROGRESS EUROPROGRESS s.r.l. Via per Concordia, 20 - 41037 Mirandola (MO) Tel 0535 26090 - Fax 0535 26379 EUROPROGRESS www.europrogress.it - e-mail: info@europrogress.it