1
1
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
…du Produit au Manufacturing Engineering
Paris, 9th April 2013
SOGEFI GROUP / Engine System Division / Air & Cooling / Orbey , March 2013
Manufacturing Air & cooling Production System
MAPS
Developping People First !
2
2
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
 SOGEFI Group
 MAPS, Historique et principales réalisations
 Un choix : celui d’embarquer de suite le développement et
l’ingénierie
 Le Lean en Ingénierie : participation aux HOSHIN, « Ingénierie
Carton », Slow Build, A3 Report, et les quelques décisions
prises comme le découplage et ses conséquences sur l’indus …
 L’Obeya Projet et Industrialisation
 Les Targets Cost Event
 Questions/Réponses
Sommaire
3
3
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
 SOGEFI Group
 MAPS, Historique et principales réalisations
 Un choix : celui d’embarquer de suite le développement et
l’ingénierie
 Le Lean en Ingénierie : participation aux HOSHIN, « Ingénierie
Carton », Slow Build, A3 Report, et les quelques décisions
prises comme le découplage et ses conséquences sur l’indus …
 L’Obeya Projet et Industrialisation
 Les Targets Cost Event
 Questions/Réponses
Sommaire
4
4
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
SOGEFI
Sogefi is a world leader
in the design and
manufacturing of
engine filtration,
suspension vehicle
technologies
Sogefi owns a fully integrated
industrial process – from
engineering to manufacturing
to assembly – that guarantees
the best quality and
improvement of product
performance
Innovation drives
each of Sogefi’s
core businesses,
supported by
engineers and
technicians
in 9 R&D centers
across the world
SOGEFI, an Italian group on the Italian Stock Exchange, is a Worldwide
leader in the automotive parts industry, specialised in engine systems
and flexible suspensions components since 1980
5
5
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
SOGEFI
SOGEFI Group can provide to car manufacturers sub-
assemblies and complete modules with high added
value in the areas of air intake and cooling
AIR INTAKE & COOLING SYSTEMS
 Headquarter: Orbey, France
 Manufacturing locations : France, Romania,
Canada, Mexico, India, China and Brazil
 1200 employees
 312 M€ External Revenues in 2011
6
6
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
 SOGEFI Group
 MAPS, bref historique et principales réalisations
 Un choix : celui d’embarquer de suite le développement et
l’ingénierie
 Le Lean en Ingénierie : participation aux HOSHIN, « Ingénierie
Carton », Slow Build, A3 Report, et les quelques décisions
prises comme le découplage et ses conséquences sur l’indus …
 L’Obeya Projet et Industrialisation
 Les Targets Cost Event
 Questions/Réponses
Sommaire
7
7
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
Manufacturing Air & cooling Production System
Developping People First !
v
vv
v
v
8
8
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
Lean en Production
Lean en Conception des Moyens de Production
Lean en Conception Produit
Notre choix …
9
9
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
Qu’avons-nous fait depuis 2009 ?
2009 Project start up
Benchmark and TOP Management training
Training Program : 400 employees / 4000 hours
Value Stream Mapping (VSM) in all Plants
Visual management : Parts board on all machines
Lean and Supply Chain departments created
Japan Study Tour at Toyota and Sensei
2010
10
10
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
Qu’avons-nous fait depuis 2009 ?
Focus on Employees Empowerment
Team Leader Organization Launching
Management Visuel (Shop stock, Part Boards, Red Bin, …)
Kaizen : 1 Hoshin / month / plant
5S, Standardized Work, Red Bins, SMED and Kanban as common Tools
Pull System : Levelling, Truck Preparation Area / Pool Stocks,
Shop stocks are being to be implemented
2011
11
11
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
Qu’avons-nous fait depuis 2009 ?
2011 Product / Process Developpment  Obeya Room
- Visual Managment Project
- Target Cost managing for major project
12
12
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
Avec Quelle Dynamique ?
To reach a Lean Level, we have to do :
- Improve Customer Satisfaction
- Internal Quality … from 60 000 to 10 PPM
- Reduce Lead Time … to increase our Cash
- Standardized Work, to do all on right time …
… , for Production and Developpment
13
13
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
Avec Quelle Dynamique ?
To Improve
Engineering
« simulation »
Pull Flow
HOSHIN
Let’s move the company !
- Customer Satisfaction
- Our JIT Conditions
- Our JIDOKA
- Our Standardized Work
The leader is the Plant …
… because Added Value is created by the Plant !
Co-Conception
Product/Process
Target Cost
Management
HOSHIN
14
14
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
Qu’avons-nous appris ?
A HOSHIN Plan for all Plants
This is the Key for our Lean Plan :
- Training to production team (Supervisors and Team Leader)
to reset our production cells :
 Improve Operators Work Conditions
 Takt Time for each production cell
 Improve Internal Quality on the shop floor (internal ppm)
 Operators empowerment with Standardized Work
15
15
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
Qu’avons-nous appris ?
100 HOSHIN :
- 1500 Ergonomy issues fixed
- Internal Quality : - 50% Internal ppm
- Lead time decrease : - 20% / year
- Standardized Work done with Operators
- Direct Labor Efficiency Improvment : + 20%
- A real « Flight simulator » for Engineering Dpt who participe at
each Workshop
16
16
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
17
17
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
18
18
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
Qu’avons-nous appris ?
A “Flight Simulator” for Engineering … The HOSHIN workshop done before launch
- Material and Information Flow Analysis and A3 report / project
- Data base for Time standard (MTM2) and Standardized Machine
- Standardized work for each new Production line, Slow Build and “Ingénierie Carton”
- Standardized Work at Engineering Dpt (Technical's Meeting each Friday, …)
 Improve Customer Satisfaction (Production)
 Improve internal Quality (capability machine)
 CAPEX Reduction (more flexibility)
 Reduce the Engineering Lead Time
 Technical Expertise Improvment
19
19
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
ENSEMBLE
OUTILS
PRODUCTION
CONCEPTION PROCESS
« METHODES »
Apprentissage … Le métier
• Participation aux chantiers Hoshin
Capitalisation des bonnes pratiques et les intégrer dans l’ingénierie des nouveaux produits
• Amélioration de l’Ergonomie des postes de travail et validation avec CAP TMS
• Industrialisation Carton
Maquetter avec les opérateurs pour optimiser les flux et l’ergonomie.
• Slow Build (avec des fournisseurs de moyens)
Analyser les opérations d’assemblage pour les optimiser
20
20
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
Apprentissage … Le métier
• Target Cost
Participation aux Event pour optimiser le coût total du produit, et consolider la marge
• Plan d’innovation : pour séparer l’innovation des développements
• Set-based : Etude de toutes les solutions pour ne pas prendre des décisions trop tôt qui créent
des surcoûts.
• A3 d’industrialisation : Etablir la communication avec l’usine et challenger les équipes avec des
objectifs communs.
• Travail standardisé : Définir le guide d’utilisation du process pour le manager de production
• Machine standards : standardiser pour diminuer les CAPEX et intégrer les besoins de la
production
21
21
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
Apprentissage … Le métier
22
22
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
Apprentissage … Le métier
23
23
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
24
24
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
25
25
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
26
26
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
27
27
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
28
28
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
Qu’avons-nous appris ?
Improve the Product/Process Co-Conception to reach Targets Cost
OBEYA Room created :
- Visual Management for major projects
- Target Cost Management
- Understand the Real production problems
- Research and Development Standardized Work
29
29
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
30
30
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
Qu’avons-nous appris ?
Improve the Product/Process Co-Conception to reach Targets Cost
 Improve the Customer Satisfaction and developing our business
 Reach Targets Cost
 Improve Quality
 Reduce the R&D Lead time
 Improve our Technical and “know how” Expertise
31
31
ILF /Journée Lean en Ingénierie / DJ, LVParis, 9 Avril 2013
SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document.
Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval.
Du Produit au Manufacturing Engineering
www.sogefi.it
THANK YOU
FOR YOUR ATTENTION

Sogefi : Du produit au lean engineering

  • 1.
    1 1 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering …du Produit au Manufacturing Engineering Paris, 9th April 2013 SOGEFI GROUP / Engine System Division / Air & Cooling / Orbey , March 2013 Manufacturing Air & cooling Production System MAPS Developping People First !
  • 2.
    2 2 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering  SOGEFI Group  MAPS, Historique et principales réalisations  Un choix : celui d’embarquer de suite le développement et l’ingénierie  Le Lean en Ingénierie : participation aux HOSHIN, « Ingénierie Carton », Slow Build, A3 Report, et les quelques décisions prises comme le découplage et ses conséquences sur l’indus …  L’Obeya Projet et Industrialisation  Les Targets Cost Event  Questions/Réponses Sommaire
  • 3.
    3 3 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering  SOGEFI Group  MAPS, Historique et principales réalisations  Un choix : celui d’embarquer de suite le développement et l’ingénierie  Le Lean en Ingénierie : participation aux HOSHIN, « Ingénierie Carton », Slow Build, A3 Report, et les quelques décisions prises comme le découplage et ses conséquences sur l’indus …  L’Obeya Projet et Industrialisation  Les Targets Cost Event  Questions/Réponses Sommaire
  • 4.
    4 4 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering SOGEFI Sogefi is a world leader in the design and manufacturing of engine filtration, suspension vehicle technologies Sogefi owns a fully integrated industrial process – from engineering to manufacturing to assembly – that guarantees the best quality and improvement of product performance Innovation drives each of Sogefi’s core businesses, supported by engineers and technicians in 9 R&D centers across the world SOGEFI, an Italian group on the Italian Stock Exchange, is a Worldwide leader in the automotive parts industry, specialised in engine systems and flexible suspensions components since 1980
  • 5.
    5 5 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering SOGEFI SOGEFI Group can provide to car manufacturers sub- assemblies and complete modules with high added value in the areas of air intake and cooling AIR INTAKE & COOLING SYSTEMS  Headquarter: Orbey, France  Manufacturing locations : France, Romania, Canada, Mexico, India, China and Brazil  1200 employees  312 M€ External Revenues in 2011
  • 6.
    6 6 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering  SOGEFI Group  MAPS, bref historique et principales réalisations  Un choix : celui d’embarquer de suite le développement et l’ingénierie  Le Lean en Ingénierie : participation aux HOSHIN, « Ingénierie Carton », Slow Build, A3 Report, et les quelques décisions prises comme le découplage et ses conséquences sur l’indus …  L’Obeya Projet et Industrialisation  Les Targets Cost Event  Questions/Réponses Sommaire
  • 7.
    7 7 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering Manufacturing Air & cooling Production System Developping People First ! v vv v v
  • 8.
    8 8 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering Lean en Production Lean en Conception des Moyens de Production Lean en Conception Produit Notre choix …
  • 9.
    9 9 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering Qu’avons-nous fait depuis 2009 ? 2009 Project start up Benchmark and TOP Management training Training Program : 400 employees / 4000 hours Value Stream Mapping (VSM) in all Plants Visual management : Parts board on all machines Lean and Supply Chain departments created Japan Study Tour at Toyota and Sensei 2010
  • 10.
    10 10 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering Qu’avons-nous fait depuis 2009 ? Focus on Employees Empowerment Team Leader Organization Launching Management Visuel (Shop stock, Part Boards, Red Bin, …) Kaizen : 1 Hoshin / month / plant 5S, Standardized Work, Red Bins, SMED and Kanban as common Tools Pull System : Levelling, Truck Preparation Area / Pool Stocks, Shop stocks are being to be implemented 2011
  • 11.
    11 11 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering Qu’avons-nous fait depuis 2009 ? 2011 Product / Process Developpment  Obeya Room - Visual Managment Project - Target Cost managing for major project
  • 12.
    12 12 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering Avec Quelle Dynamique ? To reach a Lean Level, we have to do : - Improve Customer Satisfaction - Internal Quality … from 60 000 to 10 PPM - Reduce Lead Time … to increase our Cash - Standardized Work, to do all on right time … … , for Production and Developpment
  • 13.
    13 13 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering Avec Quelle Dynamique ? To Improve Engineering « simulation » Pull Flow HOSHIN Let’s move the company ! - Customer Satisfaction - Our JIT Conditions - Our JIDOKA - Our Standardized Work The leader is the Plant … … because Added Value is created by the Plant ! Co-Conception Product/Process Target Cost Management HOSHIN
  • 14.
    14 14 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering Qu’avons-nous appris ? A HOSHIN Plan for all Plants This is the Key for our Lean Plan : - Training to production team (Supervisors and Team Leader) to reset our production cells :  Improve Operators Work Conditions  Takt Time for each production cell  Improve Internal Quality on the shop floor (internal ppm)  Operators empowerment with Standardized Work
  • 15.
    15 15 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering Qu’avons-nous appris ? 100 HOSHIN : - 1500 Ergonomy issues fixed - Internal Quality : - 50% Internal ppm - Lead time decrease : - 20% / year - Standardized Work done with Operators - Direct Labor Efficiency Improvment : + 20% - A real « Flight simulator » for Engineering Dpt who participe at each Workshop
  • 16.
    16 16 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering
  • 17.
    17 17 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering
  • 18.
    18 18 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering Qu’avons-nous appris ? A “Flight Simulator” for Engineering … The HOSHIN workshop done before launch - Material and Information Flow Analysis and A3 report / project - Data base for Time standard (MTM2) and Standardized Machine - Standardized work for each new Production line, Slow Build and “Ingénierie Carton” - Standardized Work at Engineering Dpt (Technical's Meeting each Friday, …)  Improve Customer Satisfaction (Production)  Improve internal Quality (capability machine)  CAPEX Reduction (more flexibility)  Reduce the Engineering Lead Time  Technical Expertise Improvment
  • 19.
    19 19 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering ENSEMBLE OUTILS PRODUCTION CONCEPTION PROCESS « METHODES » Apprentissage … Le métier • Participation aux chantiers Hoshin Capitalisation des bonnes pratiques et les intégrer dans l’ingénierie des nouveaux produits • Amélioration de l’Ergonomie des postes de travail et validation avec CAP TMS • Industrialisation Carton Maquetter avec les opérateurs pour optimiser les flux et l’ergonomie. • Slow Build (avec des fournisseurs de moyens) Analyser les opérations d’assemblage pour les optimiser
  • 20.
    20 20 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering Apprentissage … Le métier • Target Cost Participation aux Event pour optimiser le coût total du produit, et consolider la marge • Plan d’innovation : pour séparer l’innovation des développements • Set-based : Etude de toutes les solutions pour ne pas prendre des décisions trop tôt qui créent des surcoûts. • A3 d’industrialisation : Etablir la communication avec l’usine et challenger les équipes avec des objectifs communs. • Travail standardisé : Définir le guide d’utilisation du process pour le manager de production • Machine standards : standardiser pour diminuer les CAPEX et intégrer les besoins de la production
  • 21.
    21 21 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering Apprentissage … Le métier
  • 22.
    22 22 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering Apprentissage … Le métier
  • 23.
    23 23 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering
  • 24.
    24 24 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering
  • 25.
    25 25 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering
  • 26.
    26 26 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering
  • 27.
    27 27 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering
  • 28.
    28 28 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering Qu’avons-nous appris ? Improve the Product/Process Co-Conception to reach Targets Cost OBEYA Room created : - Visual Management for major projects - Target Cost Management - Understand the Real production problems - Research and Development Standardized Work
  • 29.
    29 29 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering
  • 30.
    30 30 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering Qu’avons-nous appris ? Improve the Product/Process Co-Conception to reach Targets Cost  Improve the Customer Satisfaction and developing our business  Reach Targets Cost  Improve Quality  Reduce the R&D Lead time  Improve our Technical and “know how” Expertise
  • 31.
    31 31 ILF /Journée Leanen Ingénierie / DJ, LVParis, 9 Avril 2013 SOGEFI is the legal owner or licensee of any intellectual property rights contained in this confidential document. Any use, in whatever form or for whatever purpose, in whole or in part, and regardless of the means used, is subject to SOGEFI's prior written approval. Du Produit au Manufacturing Engineering www.sogefi.it THANK YOU FOR YOUR ATTENTION