Parts arrive at a machine system according to an exponential distribution with a mean of 20 minutes. The machine processes parts with a triangular distribution of 11-16-18 minutes. 25% of parts are sent for reprocessing with the same time. The simulation was run for 20,000 minutes and recorded average and maximum parts in the machine and inspection queues, number of parts processed, and average part cycle time.