The document discusses responsibilities for contractors working on a construction project. Contractors must verify all dimensions on site before beginning work. Any errors or discrepancies found in drawings, specifications, or other contract documents must be reported in writing to the designer within two days of discovery. The designer will not assume responsibility or liability if contractors do not follow these instructions. The document was produced using an Autodesk educational product.