Software Architectural And Detailed Design Description TemplateArash Sharif
A comprehensive template for describing software architecture and detailed design. I wrote it based on the IEEE 1471 and IEEE 1016 specifications. Visit http://orphanware.blogspot.com/ for more technical reading.
Software Architectural And Detailed Design Description TemplateArash Sharif
A comprehensive template for describing software architecture and detailed design. I wrote it based on the IEEE 1471 and IEEE 1016 specifications. Visit http://orphanware.blogspot.com/ for more technical reading.
Title of PresentationStudent’s nameFeel free to adjust the c.docxherthalearmont
Title of Presentation
Student’s name
Feel free to adjust the color and scheme of this template. Color and design are recommended in an appealing visual presentation.
1
Introduction
Includes
The name of the student evaluated and the topic
Also should detail the purpose and flow of the presentation
Feel free to adjust the color and scheme of this template. Color and design are recommended in an appealing visual presentation.
‹#›
Format of Paper
Evaluate the following three questions regarding the overall format of the paper.
Were all required sections included?
Were they clearly distinguished from one another?
If not, were reasons given for not including some?
Feel free to adjust the color and scheme of this template. Color and design are recommended in an appealing visual presentation.
‹#›
Historical Timeline and Predecessor Assessment Evaluation
Assess the following three components as detailed on the Student Evaluation Form
Sources
Content
Writing Skills
Remember that graphics go a long way in a visual presentation. Add them to play up the visual appeal of this slide but be sure to cite them in proper APA format.
Add additional slides as needed for this section.
Feel free to adjust the color and scheme of this template. Color and design are recommended in an appealing visual presentation.
‹#›
Analysis of Impact Evaluation
Assess the following three components as detailed on the Student Evaluation Form
Sources
Content
Writing Skills
Remember that graphics go a long way in a visual presentation. Add them to play up the visual appeal of this slide but be sure to cite them in proper APA format.
Add additional slides as needed for this section.
Feel free to adjust the color and scheme of this template. Color and design are recommended in an appealing visual presentation.
‹#›
Ethical Considerations Evaluation
Assess the following three components as detailed on the Student Evaluation Form
Sources
Content
Writing Skills
Remember that graphics go a long way in a visual presentation. Add them to play up the visual appeal of this slide but be sure to cite them in proper APA format.
Add additional slides as needed for this section.
Feel free to adjust the color and scheme of this template. Color and design are recommended in an appealing visual presentation.
‹#›
Concluding Remarks
Summarize the areas of the writer's strengths and weakness as presented in your presentation and remember to always end on a positive note!
Feel free to adjust the color and scheme of this template. Color and design are recommended in an appealing visual presentation.
‹#›
References
Reference all sources used in completing this assignment.
Remember that in-text citations are just as important in a presentation as they are in papers.
The references listed here should be a list of what you have posted on your previous slides, including any images that you used, unless they are clipart.
Feel free to adjust the color and scheme of th ...
Contextually-Driven System Architecture ReviewsTechWell
When the World Trade Center collapsed, the telephone switching systems in the basement correctly diagnosed which lines were still working and continued to connect calls for several days using backup power. One factor contributing to this remarkable product reliability was the AT&T/Bell Labs practice of early systems architecture reviews. Michael Dedolph shares an architecture review method based on the Bell Labs Systems Architecture Review Board (SARB) process and discusses how that method was institutionalized and managed. The review method is a team process that uses a problem statement developed by the project as the basis for the review. The method is "low tech" and portable. SARB-style architecture reviews can be easily and flexibly tailored to your context. The flexibility of the method makes it suitable for many kinds of systems and problem domains. Take away an appreciation for the method and see if it might be useful in your organization.
Every organization needs to adapt to the ever-changing business environment. Sensing this need, we have come up with these content-ready change management PowerPoint presentation slides. These change management PPT templates will help you deal with any kind of an organizational change. Be it with people, goals or processes. The business solutions incorporated here will help you identify the organizational structure, create vision for change, implement strategies, identify resistance and risk, manage cost of change, get feedback and evaluation, and much more. With the help of various change management tools and techniques illustrated in this presentation design, you can achieve the desired business outcomes. This business transition PowerPoint design also covers certain related topics such as change model, transformation strategy, change readiness, change control, project management and business process. By implementing the change control methods mentioned in the presentation, you will be able to have a smooth transition in an organization. So, without waiting much, download our extensively researched change management framework presentation. With our Change Management Presentation slides, understand the need for change and plan to go through it without any hassles.
Agile development and open development practices share a great deal of features. But the distributed nature of open development can make some common Agile practices difficult, or even impossible to adopt. This presentation is an initial exploration of how the two may mesh together.
Delivering Results: How Do You Report User Research Findings?Bob Thomas
The long, textual written report is dead, isn’t it? So how do you deliver your findings to your clients? Is it PowerPoint? An email? A spreadsheet? Post-it notes? And what do you include? Positive findings? Screenshots with callouts? Just issues? Or recommendations as well? Are they prioritized? If you ask our panelists, some of us have developed templates that we use and modify for each research activity, and others change the deliverable based on the activity and client.
Transcript: Selling digital books in 2024: Insights from industry leaders - T...BookNet Canada
The publishing industry has been selling digital audiobooks and ebooks for over a decade and has found its groove. What’s changed? What has stayed the same? Where do we go from here? Join a group of leading sales peers from across the industry for a conversation about the lessons learned since the popularization of digital books, best practices, digital book supply chain management, and more.
Link to video recording: https://bnctechforum.ca/sessions/selling-digital-books-in-2024-insights-from-industry-leaders/
Presented by BookNet Canada on May 28, 2024, with support from the Department of Canadian Heritage.
Title of PresentationStudent’s nameFeel free to adjust the c.docxherthalearmont
Title of Presentation
Student’s name
Feel free to adjust the color and scheme of this template. Color and design are recommended in an appealing visual presentation.
1
Introduction
Includes
The name of the student evaluated and the topic
Also should detail the purpose and flow of the presentation
Feel free to adjust the color and scheme of this template. Color and design are recommended in an appealing visual presentation.
‹#›
Format of Paper
Evaluate the following three questions regarding the overall format of the paper.
Were all required sections included?
Were they clearly distinguished from one another?
If not, were reasons given for not including some?
Feel free to adjust the color and scheme of this template. Color and design are recommended in an appealing visual presentation.
‹#›
Historical Timeline and Predecessor Assessment Evaluation
Assess the following three components as detailed on the Student Evaluation Form
Sources
Content
Writing Skills
Remember that graphics go a long way in a visual presentation. Add them to play up the visual appeal of this slide but be sure to cite them in proper APA format.
Add additional slides as needed for this section.
Feel free to adjust the color and scheme of this template. Color and design are recommended in an appealing visual presentation.
‹#›
Analysis of Impact Evaluation
Assess the following three components as detailed on the Student Evaluation Form
Sources
Content
Writing Skills
Remember that graphics go a long way in a visual presentation. Add them to play up the visual appeal of this slide but be sure to cite them in proper APA format.
Add additional slides as needed for this section.
Feel free to adjust the color and scheme of this template. Color and design are recommended in an appealing visual presentation.
‹#›
Ethical Considerations Evaluation
Assess the following three components as detailed on the Student Evaluation Form
Sources
Content
Writing Skills
Remember that graphics go a long way in a visual presentation. Add them to play up the visual appeal of this slide but be sure to cite them in proper APA format.
Add additional slides as needed for this section.
Feel free to adjust the color and scheme of this template. Color and design are recommended in an appealing visual presentation.
‹#›
Concluding Remarks
Summarize the areas of the writer's strengths and weakness as presented in your presentation and remember to always end on a positive note!
Feel free to adjust the color and scheme of this template. Color and design are recommended in an appealing visual presentation.
‹#›
References
Reference all sources used in completing this assignment.
Remember that in-text citations are just as important in a presentation as they are in papers.
The references listed here should be a list of what you have posted on your previous slides, including any images that you used, unless they are clipart.
Feel free to adjust the color and scheme of th ...
Contextually-Driven System Architecture ReviewsTechWell
When the World Trade Center collapsed, the telephone switching systems in the basement correctly diagnosed which lines were still working and continued to connect calls for several days using backup power. One factor contributing to this remarkable product reliability was the AT&T/Bell Labs practice of early systems architecture reviews. Michael Dedolph shares an architecture review method based on the Bell Labs Systems Architecture Review Board (SARB) process and discusses how that method was institutionalized and managed. The review method is a team process that uses a problem statement developed by the project as the basis for the review. The method is "low tech" and portable. SARB-style architecture reviews can be easily and flexibly tailored to your context. The flexibility of the method makes it suitable for many kinds of systems and problem domains. Take away an appreciation for the method and see if it might be useful in your organization.
Every organization needs to adapt to the ever-changing business environment. Sensing this need, we have come up with these content-ready change management PowerPoint presentation slides. These change management PPT templates will help you deal with any kind of an organizational change. Be it with people, goals or processes. The business solutions incorporated here will help you identify the organizational structure, create vision for change, implement strategies, identify resistance and risk, manage cost of change, get feedback and evaluation, and much more. With the help of various change management tools and techniques illustrated in this presentation design, you can achieve the desired business outcomes. This business transition PowerPoint design also covers certain related topics such as change model, transformation strategy, change readiness, change control, project management and business process. By implementing the change control methods mentioned in the presentation, you will be able to have a smooth transition in an organization. So, without waiting much, download our extensively researched change management framework presentation. With our Change Management Presentation slides, understand the need for change and plan to go through it without any hassles.
Agile development and open development practices share a great deal of features. But the distributed nature of open development can make some common Agile practices difficult, or even impossible to adopt. This presentation is an initial exploration of how the two may mesh together.
Delivering Results: How Do You Report User Research Findings?Bob Thomas
The long, textual written report is dead, isn’t it? So how do you deliver your findings to your clients? Is it PowerPoint? An email? A spreadsheet? Post-it notes? And what do you include? Positive findings? Screenshots with callouts? Just issues? Or recommendations as well? Are they prioritized? If you ask our panelists, some of us have developed templates that we use and modify for each research activity, and others change the deliverable based on the activity and client.
Transcript: Selling digital books in 2024: Insights from industry leaders - T...BookNet Canada
The publishing industry has been selling digital audiobooks and ebooks for over a decade and has found its groove. What’s changed? What has stayed the same? Where do we go from here? Join a group of leading sales peers from across the industry for a conversation about the lessons learned since the popularization of digital books, best practices, digital book supply chain management, and more.
Link to video recording: https://bnctechforum.ca/sessions/selling-digital-books-in-2024-insights-from-industry-leaders/
Presented by BookNet Canada on May 28, 2024, with support from the Department of Canadian Heritage.
PHP Frameworks: I want to break free (IPC Berlin 2024)Ralf Eggert
In this presentation, we examine the challenges and limitations of relying too heavily on PHP frameworks in web development. We discuss the history of PHP and its frameworks to understand how this dependence has evolved. The focus will be on providing concrete tips and strategies to reduce reliance on these frameworks, based on real-world examples and practical considerations. The goal is to equip developers with the skills and knowledge to create more flexible and future-proof web applications. We'll explore the importance of maintaining autonomy in a rapidly changing tech landscape and how to make informed decisions in PHP development.
This talk is aimed at encouraging a more independent approach to using PHP frameworks, moving towards a more flexible and future-proof approach to PHP development.
Welocme to ViralQR, your best QR code generator.ViralQR
Welcome to ViralQR, your best QR code generator available on the market!
At ViralQR, we design static and dynamic QR codes. Our mission is to make business operations easier and customer engagement more powerful through the use of QR technology. Be it a small-scale business or a huge enterprise, our easy-to-use platform provides multiple choices that can be tailored according to your company's branding and marketing strategies.
Our Vision
We are here to make the process of creating QR codes easy and smooth, thus enhancing customer interaction and making business more fluid. We very strongly believe in the ability of QR codes to change the world for businesses in their interaction with customers and are set on making that technology accessible and usable far and wide.
Our Achievements
Ever since its inception, we have successfully served many clients by offering QR codes in their marketing, service delivery, and collection of feedback across various industries. Our platform has been recognized for its ease of use and amazing features, which helped a business to make QR codes.
Our Services
At ViralQR, here is a comprehensive suite of services that caters to your very needs:
Static QR Codes: Create free static QR codes. These QR codes are able to store significant information such as URLs, vCards, plain text, emails and SMS, Wi-Fi credentials, and Bitcoin addresses.
Dynamic QR codes: These also have all the advanced features but are subscription-based. They can directly link to PDF files, images, micro-landing pages, social accounts, review forms, business pages, and applications. In addition, they can be branded with CTAs, frames, patterns, colors, and logos to enhance your branding.
Pricing and Packages
Additionally, there is a 14-day free offer to ViralQR, which is an exceptional opportunity for new users to take a feel of this platform. One can easily subscribe from there and experience the full dynamic of using QR codes. The subscription plans are not only meant for business; they are priced very flexibly so that literally every business could afford to benefit from our service.
Why choose us?
ViralQR will provide services for marketing, advertising, catering, retail, and the like. The QR codes can be posted on fliers, packaging, merchandise, and banners, as well as to substitute for cash and cards in a restaurant or coffee shop. With QR codes integrated into your business, improve customer engagement and streamline operations.
Comprehensive Analytics
Subscribers of ViralQR receive detailed analytics and tracking tools in light of having a view of the core values of QR code performance. Our analytics dashboard shows aggregate views and unique views, as well as detailed information about each impression, including time, device, browser, and estimated location by city and country.
So, thank you for choosing ViralQR; we have an offer of nothing but the best in terms of QR code services to meet business diversity!
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...DanBrown980551
Do you want to learn how to model and simulate an electrical network from scratch in under an hour?
Then welcome to this PowSyBl workshop, hosted by Rte, the French Transmission System Operator (TSO)!
During the webinar, you will discover the PowSyBl ecosystem as well as handle and study an electrical network through an interactive Python notebook.
PowSyBl is an open source project hosted by LF Energy, which offers a comprehensive set of features for electrical grid modelling and simulation. Among other advanced features, PowSyBl provides:
- A fully editable and extendable library for grid component modelling;
- Visualization tools to display your network;
- Grid simulation tools, such as power flows, security analyses (with or without remedial actions) and sensitivity analyses;
The framework is mostly written in Java, with a Python binding so that Python developers can access PowSyBl functionalities as well.
What you will learn during the webinar:
- For beginners: discover PowSyBl's functionalities through a quick general presentation and the notebook, without needing any expert coding skills;
- For advanced developers: master the skills to efficiently apply PowSyBl functionalities to your real-world scenarios.
Accelerate your Kubernetes clusters with Varnish CachingThijs Feryn
A presentation about the usage and availability of Varnish on Kubernetes. This talk explores the capabilities of Varnish caching and shows how to use the Varnish Helm chart to deploy it to Kubernetes.
This presentation was delivered at K8SUG Singapore. See https://feryn.eu/presentations/accelerate-your-kubernetes-clusters-with-varnish-caching-k8sug-singapore-28-2024 for more details.
A tale of scale & speed: How the US Navy is enabling software delivery from l...sonjaschweigert1
Rapid and secure feature delivery is a goal across every application team and every branch of the DoD. The Navy’s DevSecOps platform, Party Barge, has achieved:
- Reduction in onboarding time from 5 weeks to 1 day
- Improved developer experience and productivity through actionable findings and reduction of false positives
- Maintenance of superior security standards and inherent policy enforcement with Authorization to Operate (ATO)
Development teams can ship efficiently and ensure applications are cyber ready for Navy Authorizing Officials (AOs). In this webinar, Sigma Defense and Anchore will give attendees a look behind the scenes and demo secure pipeline automation and security artifacts that speed up application ATO and time to production.
We will cover:
- How to remove silos in DevSecOps
- How to build efficient development pipeline roles and component templates
- How to deliver security artifacts that matter for ATO’s (SBOMs, vulnerability reports, and policy evidence)
- How to streamline operations with automated policy checks on container images
The Art of the Pitch: WordPress Relationships and SalesLaura Byrne
Clients don’t know what they don’t know. What web solutions are right for them? How does WordPress come into the picture? How do you make sure you understand scope and timeline? What do you do if sometime changes?
All these questions and more will be explored as we talk about matching clients’ needs with what your agency offers without pulling teeth or pulling your hair out. Practical tips, and strategies for successful relationship building that leads to closing the deal.
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf91mobiles
91mobiles recently conducted a Smart TV Buyer Insights Survey in which we asked over 3,000 respondents about the TV they own, aspects they look at on a new TV, and their TV buying preferences.
Essentials of Automations: Optimizing FME Workflows with ParametersSafe Software
Are you looking to streamline your workflows and boost your projects’ efficiency? Do you find yourself searching for ways to add flexibility and control over your FME workflows? If so, you’re in the right place.
Join us for an insightful dive into the world of FME parameters, a critical element in optimizing workflow efficiency. This webinar marks the beginning of our three-part “Essentials of Automation” series. This first webinar is designed to equip you with the knowledge and skills to utilize parameters effectively: enhancing the flexibility, maintainability, and user control of your FME projects.
Here’s what you’ll gain:
- Essentials of FME Parameters: Understand the pivotal role of parameters, including Reader/Writer, Transformer, User, and FME Flow categories. Discover how they are the key to unlocking automation and optimization within your workflows.
- Practical Applications in FME Form: Delve into key user parameter types including choice, connections, and file URLs. Allow users to control how a workflow runs, making your workflows more reusable. Learn to import values and deliver the best user experience for your workflows while enhancing accuracy.
- Optimization Strategies in FME Flow: Explore the creation and strategic deployment of parameters in FME Flow, including the use of deployment and geometry parameters, to maximize workflow efficiency.
- Pro Tips for Success: Gain insights on parameterizing connections and leveraging new features like Conditional Visibility for clarity and simplicity.
We’ll wrap up with a glimpse into future webinars, followed by a Q&A session to address your specific questions surrounding this topic.
Don’t miss this opportunity to elevate your FME expertise and drive your projects to new heights of efficiency.
Securing your Kubernetes cluster_ a step-by-step guide to success !KatiaHIMEUR1
Today, after several years of existence, an extremely active community and an ultra-dynamic ecosystem, Kubernetes has established itself as the de facto standard in container orchestration. Thanks to a wide range of managed services, it has never been so easy to set up a ready-to-use Kubernetes cluster.
However, this ease of use means that the subject of security in Kubernetes is often left for later, or even neglected. This exposes companies to significant risks.
In this talk, I'll show you step-by-step how to secure your Kubernetes cluster for greater peace of mind and reliability.
3. Documentation – Introduction (1/2) [ ] February 5, 2009 SIG A&D Siemens Four Views RUP / Kruchten 4+1 Image: Lack of agility
4.
5. Stakeholders (1/2) [ ] February 5, 2009 SIG A&D Designers (of interoperating systems) Set of operations provided and required and the protocols for their operation (interface). Requirements Engineers (customer representation) Negotiating and making trade-offs among competing requirements. Managers Basis for: 1) forming development teams corresponding to Identified work assignments, work breakdown structure, planning, allocation of project resources 2) tracking of progress Designers (of constituent parts) Resolve resource contention. Establish performance and other kinds of run-time resource consumption budgets.
6. Stakeholders (2/2) [ ] February 5, 2009 SIG A&D Architects Reasoning Implementation teams Provide “marching orders”, inviolable constraints (plus exploitable freedoms) on downstream development activities. Testers and integrators Correct black-box behaviour of pieces that must fit together. Quality assurance team Basis for conformance checking (for assurance that implementations have in fact been faithful to architectural prescriptions). Transfer Engineers (or Product line managers) If and by how much a new product family member is out of scope. Maintenance team Starting point for maintenance activities, revealing the effects of change.