15 villas project-November 04 2024 Page 1 of 3
INCIDENT REPORT
2.0
Injuries Dangerous Occurrence
Loss of company properties Loss of Melia Properties
Theft of construction material Theft of melia properties
Security breach Security bleach in melia premises
Theft of company material Destruction of Melia infrastructure
Construction of construction infrastructure Other, Specify:
Theft of personal proprieties
Reference to report Report No.:
3.0 Detailed Incident Description (filled by the involved party)
On 30/10/2024 we received a report from Melia Security Manager who claimed that an electrical cable (three
phase) had been found cut in their area which is near the construction site. The Melia security manager that
they discovered damage to the cable after their water systems were shut down for a whole day and then in the
inspection they found that the cable had been cut off in the area.
Immediate Cause(s):
 SECURITY NEGLIGENCE.
It was observed that the Costal security guard were in site and were taking the full responsibility of
securing the construction premises.
The act of the wheelbarrow being removed from the area they guard shows that there was a great
deal of negligence for the guards on duty. Refer to the same previous incident on 16/05/2024
15 villas security
incident report.pdf
Severity and Consequence(s):
1.0 Incident Initial Information (filled by the involved party)
Location of Incident: 15 VILLAS SITE (site office )
Incident Date 29/10/2024
Incident
Time:
Night
Involved People
NAME SHIFT COMPANY
1. JUNIOR EDSON NIGHT SHIFT COSTAL SECURITY
2. JERENIA KIJA NIGHT SHIFT COSTAL SECURITY
3.RUBBEA ABDALAH NIGHT SHIFT COSTAL SECURITY
4.SELEMAN BAKARI NIGHT SHIFT COSTAL SECURITY
5.TUZO SWAIBU Day shift CRJE
6. HUSSEIN Day shift CRJE
15 villas project-November 04 2024 Page 2 of 3
INCIDENT REPORT
COST OF MAINTAINANCE. To be described by Melia maintenance team.
Root Cause(s):
 LACK of INTEGRITY AND HONESTY THE SECURITY GUARDS,.
 In fact, there is every indication that this event was carried out with the cooperation of the guards on the
night shift. It should be noted that in the past the incident of a store being broken into and items taken
while security guards were on duty.
 It should also be noted that on July 15,2024 80 bags of cement and 20 marine woods was stolen at
Pongwe site store where guards were fully occupied to bring the car into the project store and make the
incident and went away. Refers to the attached file bellow:
FS SECURITY
INSIDENT (1).docx
 This makes also questions that since the store was broken into and the items stolen, we decided to
implement Massai (watcher) on the site to maintain security and since then there was no incident of theft
until the Costal security leader forced CRJE to remove Massai from the site on October 11 2024. so why
does their leader forced to remove Massai in the site?…And why does the incident happen after Massai
was removed…? It is clear that the incident couldn’t be happen by lucky but could have been planned
by guards in cooperation with some worker.
 There is evidence that a wheelbarrow has been found at the scene, and it seems that the wheelbarrow
have been used to move items from the construction site. This raises the specter that the event's
occupants are working in 15 villas project.
 Whoever during the investigation, it was observed that some wheelbarrow was kept in site at night.
Store keeper is hallways supposed to keep all work equipment in the designated storage room after work
but he did not what is supposed to be done instead he keep some wheelbarrows in site of which so used
to transfer construction material from site at the midnight. This shows exactly the involvement of guards
in this event.
15 villas project-November 04 2024 Page 3 of 3
INCIDENT REPORT
4.0 Immediate & Further Corrective Actions Taken.
Immediate Action(s) Responsibility Target Date
1 Internal investigation (by CRJE). Safety
Officer
01.11.2024
2 External investigation (by Police) if required. HSE officer 05.11.2024
Further Corrective Action(s) Responsibility Target Date
1 Must change the security guards company for 15 villas site and
Pongwe site.
CRJE Immediate
need
2 Must change store keeper for Manson team (Mr Tang), the store
keeper should be removed out in this project.
Mr Tang
(CRJE)
Immediate
need
Preventative Measure(s) Responsibility
Target Date
1 Given the seriousness of the protection issue on the 15 villas
project, CRJE should seek a careful security company that
will agree to hold CRJE in ensuring it is focused on
proactive safety and security at 15 villas to avoid
unforeseeable harm.
Whoever, the new security company shall cooperate closely with
CRJE safety and security team to improve and maintain a
proactive safety and security in the construction site and keep
positive reputation to the Melia hotels.
All work equipment to be stored at the designate storage area after
work.
CRJE
Continuously
Further Corrective Measures
Required:
Yes No
If yes, give details in Investigation
Report
5.0 Review and Approval (by the Contractor site Management)
Prepared
: JOVINUS
JOVENARY
HSSE Officer
Reviewed
:
ZHANG BANG SITE MANAGER
Approved
:
ENG RAHUL PROJECT ENG (AEE)
Name Title Date Signature

security incitent investigation report .

  • 1.
    15 villas project-November04 2024 Page 1 of 3 INCIDENT REPORT 2.0 Injuries Dangerous Occurrence Loss of company properties Loss of Melia Properties Theft of construction material Theft of melia properties Security breach Security bleach in melia premises Theft of company material Destruction of Melia infrastructure Construction of construction infrastructure Other, Specify: Theft of personal proprieties Reference to report Report No.: 3.0 Detailed Incident Description (filled by the involved party) On 30/10/2024 we received a report from Melia Security Manager who claimed that an electrical cable (three phase) had been found cut in their area which is near the construction site. The Melia security manager that they discovered damage to the cable after their water systems were shut down for a whole day and then in the inspection they found that the cable had been cut off in the area. Immediate Cause(s):  SECURITY NEGLIGENCE. It was observed that the Costal security guard were in site and were taking the full responsibility of securing the construction premises. The act of the wheelbarrow being removed from the area they guard shows that there was a great deal of negligence for the guards on duty. Refer to the same previous incident on 16/05/2024 15 villas security incident report.pdf Severity and Consequence(s): 1.0 Incident Initial Information (filled by the involved party) Location of Incident: 15 VILLAS SITE (site office ) Incident Date 29/10/2024 Incident Time: Night Involved People NAME SHIFT COMPANY 1. JUNIOR EDSON NIGHT SHIFT COSTAL SECURITY 2. JERENIA KIJA NIGHT SHIFT COSTAL SECURITY 3.RUBBEA ABDALAH NIGHT SHIFT COSTAL SECURITY 4.SELEMAN BAKARI NIGHT SHIFT COSTAL SECURITY 5.TUZO SWAIBU Day shift CRJE 6. HUSSEIN Day shift CRJE
  • 2.
    15 villas project-November04 2024 Page 2 of 3 INCIDENT REPORT COST OF MAINTAINANCE. To be described by Melia maintenance team. Root Cause(s):  LACK of INTEGRITY AND HONESTY THE SECURITY GUARDS,.  In fact, there is every indication that this event was carried out with the cooperation of the guards on the night shift. It should be noted that in the past the incident of a store being broken into and items taken while security guards were on duty.  It should also be noted that on July 15,2024 80 bags of cement and 20 marine woods was stolen at Pongwe site store where guards were fully occupied to bring the car into the project store and make the incident and went away. Refers to the attached file bellow: FS SECURITY INSIDENT (1).docx  This makes also questions that since the store was broken into and the items stolen, we decided to implement Massai (watcher) on the site to maintain security and since then there was no incident of theft until the Costal security leader forced CRJE to remove Massai from the site on October 11 2024. so why does their leader forced to remove Massai in the site?…And why does the incident happen after Massai was removed…? It is clear that the incident couldn’t be happen by lucky but could have been planned by guards in cooperation with some worker.  There is evidence that a wheelbarrow has been found at the scene, and it seems that the wheelbarrow have been used to move items from the construction site. This raises the specter that the event's occupants are working in 15 villas project.  Whoever during the investigation, it was observed that some wheelbarrow was kept in site at night. Store keeper is hallways supposed to keep all work equipment in the designated storage room after work but he did not what is supposed to be done instead he keep some wheelbarrows in site of which so used to transfer construction material from site at the midnight. This shows exactly the involvement of guards in this event.
  • 3.
    15 villas project-November04 2024 Page 3 of 3 INCIDENT REPORT 4.0 Immediate & Further Corrective Actions Taken. Immediate Action(s) Responsibility Target Date 1 Internal investigation (by CRJE). Safety Officer 01.11.2024 2 External investigation (by Police) if required. HSE officer 05.11.2024 Further Corrective Action(s) Responsibility Target Date 1 Must change the security guards company for 15 villas site and Pongwe site. CRJE Immediate need 2 Must change store keeper for Manson team (Mr Tang), the store keeper should be removed out in this project. Mr Tang (CRJE) Immediate need Preventative Measure(s) Responsibility Target Date 1 Given the seriousness of the protection issue on the 15 villas project, CRJE should seek a careful security company that will agree to hold CRJE in ensuring it is focused on proactive safety and security at 15 villas to avoid unforeseeable harm. Whoever, the new security company shall cooperate closely with CRJE safety and security team to improve and maintain a proactive safety and security in the construction site and keep positive reputation to the Melia hotels. All work equipment to be stored at the designate storage area after work. CRJE Continuously Further Corrective Measures Required: Yes No If yes, give details in Investigation Report 5.0 Review and Approval (by the Contractor site Management) Prepared : JOVINUS JOVENARY HSSE Officer Reviewed : ZHANG BANG SITE MANAGER Approved : ENG RAHUL PROJECT ENG (AEE) Name Title Date Signature