This document provides an aerial view of Green Primary School at a scale of 1:200. It was created on May 28th, 2011 for Sarah Ralphs as part of her Stage 4 project. The drawing shows the layout of the school buildings and grounds from above.
This document appears to be a sheet containing information about a building project. It lists Sarah Ralphs and Green Primary School. It also mentions a date of 28/05/11 and includes notes about a rear view and external renders.
Sarah Ralphs received an award from Cardiff University's Centre for Innovation and Academic Teaching (CIAT) in 2011 while she was a student at the University of Wales Institute, Cardiff (UWIC). The award recognized her work developing online resources to support students. However, the document does not provide any details about Sarah Ralphs' background, the specific online resources she developed, or what the CIAT award entailed.
This document is an architectural drawing of the first floor of Green Primary School at a scale of 1:200. It was produced by Sarah Ralphs on May 28, 2011 and is sheet 3 of 10 for the school's stage 4 plans. The drawing was created using Autodesk student design software.
The document is a scale floor plan drawing of the ground floor of Green Primary School produced by Autodesk student software. It includes the scale of 1:200 and identifies it as sheet 2 of 10 for the overall plans. The date of the drawing is 28/05/11 and it was produced by Sarah Ralphs.
This document is a roof plan and details for a proposed side and rear extension showing roof framing elements like rafters, fascia boards, and ridge beams. It specifies that rafters and trimmers around roof lights will be doubled up. The roofing materials and insulation are also outlined to meet certain insulation and ventilation standards.
The document discusses requirements for gas and electrical safety for a proposed home extension including:
1) Gas fittings must be installed by a certified gas safe installer and the installer must provide their license information.
2) Electrical work must meet Part P electrical safety standards and be designed, installed, and tested by a competent electrician. Inspection certificates must be provided.
3) The proposed ground floor construction includes a concrete floor, insulation, damp proof membrane, hardcore, and damp proof course.
This document contains information about gas and electrical safety requirements for a proposed home extension project located at 4 Ty-Newydd, Whitchurch, Cardiff. It specifies that gas work must be completed by a certified Gas Safe installer and lists the documentation required from the installer. Electrical work must comply with Part P electrical safety standards and be designed, installed, and tested by a qualified electrician according to BS 7671. Inspection and testing certificates must be provided to the local council.
This document contains drawings and notes for a proposed side and rear extension at an address in Whitchurch, Cardiff. The drawings show the existing and proposed elevations of the front, rear and side of the property. Notes provide details on materials and construction methods to match the existing building, as well as requirements for windows, doors, insulation and ventilation. Key aspects that must be addressed include using materials that match the existing brickwork, render and roof tiles, installing lintels and cavity trays properly, using safety glass where required, meeting energy efficiency standards for windows and doors, and adding trickle vents.
This document appears to be a sheet containing information about a building project. It lists Sarah Ralphs and Green Primary School. It also mentions a date of 28/05/11 and includes notes about a rear view and external renders.
Sarah Ralphs received an award from Cardiff University's Centre for Innovation and Academic Teaching (CIAT) in 2011 while she was a student at the University of Wales Institute, Cardiff (UWIC). The award recognized her work developing online resources to support students. However, the document does not provide any details about Sarah Ralphs' background, the specific online resources she developed, or what the CIAT award entailed.
This document is an architectural drawing of the first floor of Green Primary School at a scale of 1:200. It was produced by Sarah Ralphs on May 28, 2011 and is sheet 3 of 10 for the school's stage 4 plans. The drawing was created using Autodesk student design software.
The document is a scale floor plan drawing of the ground floor of Green Primary School produced by Autodesk student software. It includes the scale of 1:200 and identifies it as sheet 2 of 10 for the overall plans. The date of the drawing is 28/05/11 and it was produced by Sarah Ralphs.
This document is a roof plan and details for a proposed side and rear extension showing roof framing elements like rafters, fascia boards, and ridge beams. It specifies that rafters and trimmers around roof lights will be doubled up. The roofing materials and insulation are also outlined to meet certain insulation and ventilation standards.
The document discusses requirements for gas and electrical safety for a proposed home extension including:
1) Gas fittings must be installed by a certified gas safe installer and the installer must provide their license information.
2) Electrical work must meet Part P electrical safety standards and be designed, installed, and tested by a competent electrician. Inspection certificates must be provided.
3) The proposed ground floor construction includes a concrete floor, insulation, damp proof membrane, hardcore, and damp proof course.
This document contains information about gas and electrical safety requirements for a proposed home extension project located at 4 Ty-Newydd, Whitchurch, Cardiff. It specifies that gas work must be completed by a certified Gas Safe installer and lists the documentation required from the installer. Electrical work must comply with Part P electrical safety standards and be designed, installed, and tested by a qualified electrician according to BS 7671. Inspection and testing certificates must be provided to the local council.
This document contains drawings and notes for a proposed side and rear extension at an address in Whitchurch, Cardiff. The drawings show the existing and proposed elevations of the front, rear and side of the property. Notes provide details on materials and construction methods to match the existing building, as well as requirements for windows, doors, insulation and ventilation. Key aspects that must be addressed include using materials that match the existing brickwork, render and roof tiles, installing lintels and cavity trays properly, using safety glass where required, meeting energy efficiency standards for windows and doors, and adding trickle vents.
This document is a proposed first floor plan showing the layout of 4 bedrooms, 1 bathroom, and 1 en suite on the first floor of a home renovation project. Key details include the dimensions and proposed locations of bedrooms, bathrooms, and other spaces. Construction details are provided for the floor joists, including grades, spacing, reinforcement, and connections to walls.
This document contains information about the proposed foundation plan and drainage for a home renovation project. It includes details on radon protection measures like using a radon membrane on the floor and cavity walls. It also specifies that all underground drainage pipes are to be encased in concrete and that manholes are to be constructed from engineering bricks on a concrete base. Above ground drainage requirements are also outlined, like pipe sizes and vent locations.
This document provides existing floor plans and photographs of 4 Ty-Newydd in Whitchurch, Cardiff along with notes for a proposed side and rear extension project. The plans show the existing layout of the ground floor and first floor along with adjacent structures. Notes specify that exposed timber will be treated per building regulations, temporary supports will be used during demolition and construction, and party wall notices must be issued where applicable.
This document appears to be a sheet containing information about a 3D render project for Sarah Ralphs of Green Primary School. It lists her name, the school, the date of 28/05/11, and notes it is for "Stage 4", perhaps referring to a class or grade level. In 3 sentences or less.
This document appears to be a sheet for work being done at Green Primary School. It lists Sarah Ralphs and notes that the stage of work is stage 4. The only other information provided is that external renders are to be done from left to right from the rear of the building.
This document appears to be architectural plans or drawings for a building project. It includes a date of 28/05/11 and the name Sarah Ralphs. The title "Elevations from North to West" suggests it contains drawings showing the elevations or sides of a building as seen from the north and facing west.
This document appears to be a CAD file containing floor plans for a building project. The file name and date indicate it holds digital drawings related to the layout and design of floors. In a few short sentences, the summary captures the core information that the document file contains CAD floor plan drawings for a construction project.
This is a short document title indicating an AutoCAD drawing file with elevations. The file is located in the G drive folder and was last modified on November 8, 2016 at 9:26 am.
This document is a proposed first floor plan showing the layout of 4 bedrooms, 1 bathroom, and 1 en suite on the first floor of a home renovation project. Key details include the dimensions and proposed locations of bedrooms, bathrooms, and other spaces. Construction details are provided for the floor joists, including grades, spacing, reinforcement, and connections to walls.
This document contains information about the proposed foundation plan and drainage for a home renovation project. It includes details on radon protection measures like using a radon membrane on the floor and cavity walls. It also specifies that all underground drainage pipes are to be encased in concrete and that manholes are to be constructed from engineering bricks on a concrete base. Above ground drainage requirements are also outlined, like pipe sizes and vent locations.
This document provides existing floor plans and photographs of 4 Ty-Newydd in Whitchurch, Cardiff along with notes for a proposed side and rear extension project. The plans show the existing layout of the ground floor and first floor along with adjacent structures. Notes specify that exposed timber will be treated per building regulations, temporary supports will be used during demolition and construction, and party wall notices must be issued where applicable.
This document appears to be a sheet containing information about a 3D render project for Sarah Ralphs of Green Primary School. It lists her name, the school, the date of 28/05/11, and notes it is for "Stage 4", perhaps referring to a class or grade level. In 3 sentences or less.
This document appears to be a sheet for work being done at Green Primary School. It lists Sarah Ralphs and notes that the stage of work is stage 4. The only other information provided is that external renders are to be done from left to right from the rear of the building.
This document appears to be architectural plans or drawings for a building project. It includes a date of 28/05/11 and the name Sarah Ralphs. The title "Elevations from North to West" suggests it contains drawings showing the elevations or sides of a building as seen from the north and facing west.
This document appears to be a CAD file containing floor plans for a building project. The file name and date indicate it holds digital drawings related to the layout and design of floors. In a few short sentences, the summary captures the core information that the document file contains CAD floor plan drawings for a construction project.
This is a short document title indicating an AutoCAD drawing file with elevations. The file is located in the G drive folder and was last modified on November 8, 2016 at 9:26 am.