Assumptions – Agile Foundations

Agilex

www.agilex.com
Key Characteristics of Agile Delivery
Agile Principles and Values
Agile Manifesto Values &
Principles (DAD and SAFe)
Transparency, Program
Execution, Code Quality,
Alignment (SAFe)

Source: National Audit Office review of literature
Agilex

www.agilex.com
What do we mean by scaling?

Agilex

www.agilex.com
Agilex

Architecture Team

DevOps Team

Release Management

Product Management

Large Scale Agile Program Teams

4+ Service and Support Teams

10+ Delivery Teams

www.agilex.com
®

Scaled Agile Framework (SAFe) “Big Picture”
Well defined and proven
knowledge base for implementing
agile practices at enterprise scale

Scales successfully to large
numbers of practitioners and
teams
Building off of Scrum, XP, and Lean
agile development approaches
Synchronizes alignment,
collaboration and delivery

“Big Picture” highlights the individual
roles, teams, activities and artifacts
necessary to scale agile from the team
to program to the enterprise level

Elaborated in books: Agile
Software Requirements (2011) and
Scaling Software Agility (2007)

Source: Scaledagileframework.com
Agilex

www.agilex.com
Scaled Agile Framework (SAFe) – 3 Levels

Agilex

www.agilex.com

7
Scale to the Portfolio Level

Roles/Teams

• Enterprise
Architect
• Epic Owner
• Program Portfolio
Management

Agilex

Events

• Strategic
Investment
Planning
• Kanban Portfolio
(Epic) Planning

Artifacts

• Investment
Themes
• Business and
Architecture
Epics
• Portfolio Backlog
• Portfolio Vision
• Metrics
www.agilex.com
Scale to the Program Level

Roles/Teams
•
•
•
•
•
•
•
•

Agilex

Product Management
Release Management
System Team
DevOps
Business Owners
System Architect
Release Train Engineer
UX Architect

Events
• PSI/Release Planning
• System Demo
• Inspect & Adapt
Workshop

Artifacts
•
•
•
•
•
•
•

Product Roadmap
Vision
Program Backlog
Team Backlog
NFRs
Architecture Runway
Business and
Architecture Features
• PSI Objectives
• Metrics
www.agilex.com
Agile Team Level

Roles/Teams
• Agile Teams
• Product Owner
• Scrum/Agile
Master

Agilex

Events

Artifacts

• Sprint Planning
• Backlog Grooming
• Daily Stand-up
• Sprint Demo
• Sprint
Retrospective
• HIP Sprints

• Team Backlog (incl.
NFRs)
• Team PSI Objective
• Sprint Goals
• Working Software
• Spikes
• Metrics

www.agilex.com
Disciplined Agile Delivery (DAD) Delivery Process
Hybrid, end-to-end agile delivery
lifecycle with tailoring strategies
Building off of Scrum, XP, and
Lean agile development
approaches and methods
Scalable, people first, learning
oriented, agile, goal-driven,
enterprise aware, risk and value
driven

“DAD is a goal-driven process framework
that is people-first, learning-oriented
hybrid agile approach to IT solution
delivery. It has a risk-value lifecycle,
goal-driven and scalable”

Guidelines for governing
enterprise teams in an agile
manner
Elaborated in the book:
Disciplined Agile Delivery (2012

Source: Disciplined Agile Delivery, Ambler
Agilex

www.agilex.com
Disciplined Agile Delivery (DAD) “Big Picture”

Source: Disciplined Agile Delivery, Ambler
Agilex

www.agilex.com
DAD Inception
Goals for
Inception Phase
•
•

•
•

•
•
•

INCEPTION

Form initial Teams
Identify the vision for the
project and get approved
Align with enterprise
direction
Identify initial technical
strategy, requirements, and
release plan
Set up work environment
Secure funding
Identify risks

i

Source: Disciplined Agile Delivery, Ambler
Agilex

www.agilex.com
DAD Construction
Goals for
Construction Phase
•

•

•

•

•

CONSTRUCTION- ITERATIVE

Agilex

Produce a potentially
consumable solution
Address changing stakeholder
needs
Move closer to deployable
release
Maintain or improve upon
existing levels of quality
Prove architecture early

c

www.agilex.com
DAD Construction
Goals for
Construction Phase
•

•

•

•

•

CONSTRUCTION- INTEGRATED

Agilex

Produce a potentially
consumable solution
Address changing stakeholder
needs
Move closer to deployable
release
Maintain or improve upon
existing levels of quality
Prove architecture early

c

www.agilex.com
DAD Transition
Goals for
Transition Phase
•

•

Agilex

Ensure the stakeholders
are prepared to receive
the solution

•

TRANSITION

Ensure the solution is
production ready

Deploy the solution into
production

t

www.agilex.com
DAD Scaling Factors and Governance

DAD Scaling Factors
2
Co-located

Single Division

None

Team Size
Geographic Distribution

Organizational Distribution

Compliance

DAD Governance Strategies

1000s

Global

Outsourcing
•

Life Critical
•

Straightforward

Domain Complexity

Very Complex
•

Straightforward

Technical Complexity

Very Complex

Copyright 2013 Scott Ambler + Associates

•

•

Agilex

Scaled IT projects are governed in
some way
DAD supports different
governance types
Scope and breadth of governance
adapts with work environment
Leverage existing corporate assets
to address issues that optimize
performance
Push decisions to local level
wherever possible
www.agilex.com
Sample Government Deliverables and SAFe Alignments
•
•
•
•
•
•
•
•
•

Shared Resources
Operational Accept Plan (MS 1)
Accept Criteria Plan (MS 1)
Reqs Specification Doc (MS 1)
Sys Security Plan (MS 2)
Production Ops Manual (MS 2)
Security Guide (MS 2)
508 Certification (MS 2)
ATO (MS 2)
Privacy Impact Assess (MS 2)
User Guide (MS 2)
SLA (MS 2)

Architectural Standards
Data Exchange Standards
Hosting Strategies
Security Standards

Product and Release
Management
PMP (MS 1)
Transition Plan (MS 1)
Risk Register / Log (MS 1)
Outcome Stmt (MS 1)
Version Descrip Doc (MS 2)
Deployment Plan (MS 2)
Lessons Learned (MS 3)

•
•
•
•
•
•
•
•
•
•
•

•
•
•
•

Program Portfolio Mgmt
Quad Chart (MS 0)
IPT Charter (MS 0)
BRD (MS 0)
Project Charter (MS 0)
Acquisition Strategy (MS 0)

•
•
•
•
•
•
•

Legislation
Budget
Policy
Directives

System Team
• Test Evaluation (MS 2)
• Master Test Plan (MS 2)

System Architect
• System Design Doc (MS 1)

SAFe roles with software development lifecycle
documentation responsibilities
Agilex

www.agilex.com
Agilex

www.agilex.com
i

Inception

c

i

Agilex

t

Construction

c

t

i

c

Transition

t

www.agilex.com
i
Identify, prioritize, select and fund projects

i

Agilex

Inception

c

Construction

t

Transition

www.agilex.com
i

Inception

c

Construction

INCEPTION

t

Transition

i

i

Agilex

www.agilex.com
i

c

Inception

INCEPTION

Construction

t

Transition

i

i

Agilex

www.agilex.com
i

Inception

c

INCEPTION

Agilex

Construction

t

Transition

i

www.agilex.com
i

Inception

c

INCEPTION

Agilex

Construction

t

Transition

i

www.agilex.com
i

Inception

c

INCEPTION

Agilex

Construction

t

Transition

i

www.agilex.com
c

CONSTRUCTION

i

Agilex

Inception

c

Construction

t

Transition

www.agilex.com
c

CONSTRUCTION

i

Agilex

Inception

c

Construction

t

Transition

www.agilex.com
c

CONSTRUCTION

i

Agilex

Inception

c

Construction

t

Transition

www.agilex.com
c

CONSTRUCTION

i

Agilex

Inception

c

Construction

t

Transition

c

www.agilex.com
c

CONSTRUCTION

i

Agilex

Inception

c

Construction

t

Transition

www.agilex.com
t

TRANSITION

t

i

Agilex

Inception

c

Construction

t

Transition

www.agilex.com
t

TRANSITION

t

i

Agilex

Inception

c

Construction

t

Transition

www.agilex.com
t

i

c

Inception

TRANSITION

Agilex

Construction

t

Transition

t

www.agilex.com
t

TRANSITION

t

i

Agilex

Inception

c

Construction

t

Transition

www.agilex.com
i

c

Inception

TRANSITION

Agilex

Construction

t

Transition

t

www.agilex.com
t

TRANSITION

t

i

Agilex

Inception

c

Construction

t

Transition

www.agilex.com
SAFe Key Takeaways

SAFe “Pros”
Proven, well documented, and flexible
framework; lean underpinnings

SAFe “Cons”
Prescriptive

People-centric view on agile delivery
with clear roles, artifacts, events
Holistic, 3-tier view of value stream
including Portfolio level
Heavy weight
Strong Code Quality (Agile Engineering
and DevOps) focus
Established scaling framework in
marketplace
Constant refinement of SAFe knowledge
base

Agilex

Certification-centric

www.agilex.com
DAD Key Takeaways

DAD “Pros”
Hybrid framework having foundation in
proven lean & agile approaches

DAD “Cons”
Unknown marketplace adoption

Phases with milestones emphasize reality
of large-scale agile delivery lifecycle
Flexibility with strong emphasis on agile
adoption tailoring

Limited broad-based training certification
and knowledge-base refinement

Strong technical architecture / engineering
focus
Governance clarity for program / product
management

Agilex

Lack of prescriptiveness requiring agile
consultants

www.agilex.com
Agilex

www.agilex.com
Questions

Agilex

41

www.agilex.com
Agilex

www.agilex.com

Comparing Scaled Agile Framework (SAFe) and Disciplined Agile Delivery (DAD)

Editor's Notes

  • #2 Session Title:  Comparing Scaled Agile Approaches:  Scaled Agile Framework (SAFe) and Disciplined Agile Delivery (DAD)Session Description:  Leveraging established and proven Scrum, XP, and lean software development methods, agile scaling frameworks such as Dean Leffingwell's Scaled Agile Framework (SAFe) and Scott Ambler's Disciplined Agile Delivery (DAD) provide agile process frameworks for addressing large, complex software delivery initiatives through their full delivery lifecycle from project initiation to production.   These frameworks have received significant interest in both federal government and private industries, recognizing the need for team-based iterative and incremental adaptive approaches to software development, balanced with scaling processes and factors at the Program and Portfolio levels and the for an organizational governance model and guidance for large enterprise engagements.  This session will provide a brief overview of these two agile scaling models, address the benefits of what both are trying to accomplish, and compare and contrast specific similarities and differences.   Track:  Government or Improving your GameStyle:  LectureDuration:  60 minutesBoth DAD and SAFe are Hybrid Process frameworks - detailing how to scale agile to the enterpriseScaled Agile Framework (SAFe) since; Scaledagileframework.comDisciplined Agile Delivery (DAD); Disciplinedagiledelivery.comCertifications and Industry AwarenessSAFe SA and SPC certificationsDAD certifications - Yellow, Green, Black Belt http://disciplinedagileconsortium.org/
  • #3 Talking Points:We assume you have an understanding of agile, scrum, xp foundations (e.g. roles, teams, activities/events, artifacts)...this presentationis about agile scalingRoles: SM, PO, Self Organizing TeamEvents: Planning, Daily standup, Retro, DemoArtifacts: Backlog, DoD, Burndown metrics
  • #4 Talking Points:Review / highlight some Key Characteristics of Agile Delivery to establish baseline assumptions of agile benefits to agile deliveryEx: Iterative and incremental, Just-enough elaboration of requirements (user stories), Transparency, Code quality, Automated testingBoth scaling frameworks have Lean and Agile Underpinnings/FoundationsScrumKanbanXP/Agile EngineeringAgile Modeling (DAD)Agile Data (DAD)Lean Software Development - Product Development Flow (SAFe)Agile Architecture (SAFe and DAD)Principles and Values - Agile CultureAgile Manifesto & Principles (DAD and SAFe)Transparency, Program Execution, Code Quality, Alignment (SAFe)
  • #5 Talking Points:A typical agile teamHighlight automated test engineer
  • #6 Talking Points: Reference agile scaling supporting a dozen or more agile delivery teams with supporting governance constructs (supporting and service roles, teams, etc.) that allows you to execute agile-at-scaleMention Ch33 experience within the Federal Government ecosystem300 person programDozens of Scrum Delivery and Service teamsPre-SAFe and DAD
  • #7 Talking Points: A large-scale Agile enterprise approach – PARTICULARLY IN THE FEDERAL GOVERNMENT SPACE
  • #8 Talking Points:The “Big Picture” graphic  highlights the individual roles, teams, activities/events and artifacts necessary to scale agile from the team to program to the enterprise level - emphasizes continuous flowSAFe is about scaling software development for our programs and taking an enterprise approachNotice this framework can support multiple Programs under one Portfolio and multipleTeams under one ProgramThere are many icons across the Big Picture that represent people within the process framework Tiered governance results in timely decisions, accountability, and traceability Active collaboration ensures traceability, alignment to vision and continuous discovery of requirements Emphasis on Code Quality through eXtreme Programming (XP) to foster better code Daily builds and production-ready releases within a 3-month period Efficiency gained by a fully automated, Agile testing process that is consistent and repeatable Real-time dashboards provide valuable insight to all stakeholdersOther Points: Frequent backlog grooming lowers cost and yields higher quality code Scalability, responsiveness, and standards drive design Powerful, virtualized CI “ecosystem” provides faster time to market and higher quality code CI ecosystem automates many Configuration Management (CM) tasks in a repeatable, consistent fashion Experienced Information Assurance (IA) leadership knowledgeable on VA-specific security requirementsSAFe provides a formal 3-tiered governance structure with supporting processes torealize benefits of agile at the Team, Program, and Portfolio levels ANDmitigate risks associated with scaling and coordination across project teams and stakeholders with other VistA enterprise efforts. Portfolio Vision, Program Release management, and Team Sprint planningWe will deliver timely decision-making by following agile value and change management practices, prioritizing issues and requirements through regular reviews and retrospection, and resolving impediments at the appropriate tier. Access to Frequent, Transparent, Real-time Information—We will provide relevant program dashboards with real-time backlog delivery metrics, enabling insight into actual progress against objectives. Our approach ensures that customers actively set direction during project initiation and regularly refine the vision at subsequent release and Sprint start points.
  • #9 Talking Points:Talk to Flow of Work into Portfolio Level – Inputs and Outputs including investment themes drive business and architectural Program Epics and Vision Highlight key Portfolio Level Roles, Events, Artifacts, Inputs/Outputs:Specific Portfolio level roles, events, and artifacts exist to support agile-at-scale – Portfolio Management Team, Enterprise ArchitectEstablish a Portfolio Management Team composed of business and architecture organizational leadership to prioritize high-level Epic requirements that map to investment prioritiesVision guides investment priorities and enterprise architecture Kanban system provides a structured portfolio management approach to iteratively evolve Portfolio Backlog priorities.We will use a Kanban process to focus the high-level stakeholder ideas and requirements around the most impactful areas defined as a resulting set of Epics. Portfolio Backlog includes both functional and architectural epics and span multiple project Releases – enterprise architecture is a “first class citizen”.We will incorporate governance and direction from enterprise-level organizationsto ensure alignment to the organizationally-defined investment priorities. Objective, real-time portfoliometrics& dashboard support governance and continuous improvement============SAFe Guidelines: Lean principles emphasize sustainably fastest value delivery Portfolio vision guides investments and the enterprise architecture needed to support customer and business needsBusiness epic kanban system provides visibility and work-in-process limits to support continuous product development flowEnterprise architecture is a first class citizen; architectural epics are developed and maintained in a kanban systemObjective metrics (at all levels) support governance and kaizenStructured approach clarifying and approving Portfolio Backlog with EpicsClarifies additional Portfolio level roles, agile practices/techniques, teams needed for supporting agile-at-scale
  • #10 Talking Points:Talk to Flow of Work into Program Level – inputs and outputs and how Portfolio Vision drives Program Backlog, Product Roadmap and Product VisionHighlight what some acronyms meanHighlight key Program Level Roles, Events, Artifacts, Inputs/Outputs:System Level: Planning, Test, Integration, Demo, GovernanceProgram / PSI-Release focus supports the delivery of fully tested, full-featured solutionsevery 3 months Face-to-face PSI-Release planning cadence provides development collaboration, alignment, synchronization, evaluationProduct / ProgramManagement :Decomposes Epics into business and technical Features and regularly grooms the Program Backlog; consumed by Scrum Team (POs)Participates in System Demos and approves Feature increments every 2 weeksDevelops Product Roadmap and Vision lists desired functionality for up to 3 future PSI-Releases summarized from the prioritized Program Backlog FeaturesDevOps will manage and extend an automated CI ecosystem and self-service infrastructureSystem Team supports system integration,cross-team E2E testingactivities, and System DemosSystem Architect and UX defines the technical elements and standards across all Program Release deliverablesRelease Management and Defect Management roles with key cross-team coordination and collaboration rolesEmbedded UAT Team required for every PSI/Release to incrementally plan and test Feature solutionsAggregated, real-time program metrics & dashboardInspect & Adapt Workshopat end of every PSI-Release boundary==============SAFe Guidelines:A self-organizing, self-managing team-of-agile-teams committed to continuous value delivery, aligned to a common missionDelivers fully tested, system-level solutions every 8-12 weeksCommon sprint lengths and normalized velocityRegular Architecture alignment via the Architectural Features and RunwayFace-to-face planning cadence provides development collaboration, alignment, synchronization, evaluation through System DemoReoccurring embedded UAT approachClarifies additional Program level roles, agile practices/techniques, teams needed for supporting agile-at-scale
  • #11 Talking Points:Part of the SAFe framework most are probably already familiar with…Scrum, XP, etc.Talk to Flow of Work into Team Level – inputs and outputs and how Features drive and how things work highlighting new conceptsHighlight key Team Level Roles, Events, Artifacts, Inputs/Outputs:Empowered self-managing Teams that deliver fully tested, working software (user stories) every 2 weeksApply Scrum project management and eXtreme Programming (XP) technical approaches and practices (e.g. Sprint Planning, Daily Stand Ups, Sprint Demo, etc.)Dedicated Product Owner on each 7-9 member cross-functional Team – each with unique Domain focusThe Scrum Master serves as an Agile Coach for multiple TeamsTeams submit their component outputs to the program-level System Team for daily integration into the baselineTeams operate under common Vision linked through Epics, Features, StoriesBuilt in Hardening, Innovation, and Planning (HIP) Sprint supports needed refactoring and future event planningReal-time team metrics & dashboard support continuous improvement
  • #12 Talking Points:DAD founders recognized that mainstream agile does NOT provide enough guidance for typical enterprises – mature implementations recognize an additional level of rigor, such as governance, architecture planning, and modelingDAD takes a goal-driven approachthat describes agile implementation and tailoring strategies to meet the needs of your organization’s situationToolkit: Adopts, extends, tailors mainstream agile practices, strategies, patterns from a variety of sourcesDAD Agile Scaling Model (ASM)defines a roadmap to effectivelyadopt and tailor agile strategies by: Foundation: leverage core agile methods Framework: adopting a disciplined agile delivery lifecycle Factor: recognize agile Scaling Factors to tailor adopted strategies to address delivery team complexities
  • #13 Talking Points:End-to-end, full agile delivery lifecycle thatincludes:Inception, Construction, and Transition phases from beginning of project to production Each phase reflects agile Coordinate-Collaborate-Conclude (3C) rhythmLightweight explicit “milestones” and events to ensure program / teams focused on right things – not just construction aspects – governance and risk reduction strategyGoals driven approach = each agile delivery phase has a set of goals with correspondingcommon strategies and guidance for solution/delivery teams to tailor the process to address the context of their situationHybrid in that it extends Scrum, XP, and other proven agile methods to includes advice about technical practices (missing from Scrum) as well as modeling, documentation, and governance strategiesGoldilocks, just enough process to limit overly prescriptive or to tailor up processes that prevent reinventing / relearning techniques that Scrum/XP does not ocverProvides advice, alternatives and trade-offs in agile adoption strategy in a structured and disciplined wayOverall DAD delivery goals to fulfill project mission, grow team member skills, enhance existing infrastructure, improve team processes, address risks
  • #14 Talking Points:2 levels of Inception:During one-time Project Initiation event at Program Level to get things going – like "Iteration 0" project readiness activities including On-boarding and trainingDuring iterative Release Initiation events for each PSI-ReleaseInception Phase goalhighlights:Forming and on-boarding of teamSet up work environment Get enough infrastructure to get startedIdentify high level business objectives for the project and perform lightweight visioning activities to properly frame the projectPerform architecture envisioning to ensure design going in the right direction Perform PSI-Release PlanningIdentify risks and address other PMP component
  • #15 Talking Points:2 Paths to Construction Phase: Iterative Solution delivery - Emphasis on “standard” iterative working slice of solutionIntegrated Solution delivery – Emphasis on end to end working slice of solutionConstruction Phase goalhighlights:Period of time where required functionality is builtwithin timeboxed iterationsEnd of each iteration a demonstrable increment of potentially consumable solution has been produced and regression testedDelivery team applies a hybrid of “Standard” practices from Scrum, XP, Agile Modeling, Agile Data, and other methods to deliver the solutionSupports Daily Stand-up coordinationSupports Iteration planning and modelingBacklogsIteration DemoRetrosSpikesAgile metricsCIStrong emphasis on “Advanced” agile engineering practicesTDD/ATDDCDLook-Ahead planning and modelingContinuous documentationReleases determined by comparing whether there is sufficient functionality to justify the cost of transition – minimally marketable release (MMR)Performsome look-ahead planning and modeling, often referred to as backlog grooming, on a just-in-time basis to be more effective when implementing work items during each iterationLeverage the existing organizational ecosystem to reuse existing services, patterns, templates, code, guidelines and other assetsEncourage project specific process improvement through self-organization within the constraints that make sense for the organizationAdapt the types and formality of work products produced for the context of the projectsDoes not say who (person and team) performs action within approach like SAFe
  • #16 Talking Points:2 Paths to Construction Phase: Iterative Solution delivery - Emphasis on “standard” iterative working slice of solutionIntegrated Solution delivery – Emphasis on end to end working slice of solutionConstruction Phase goalhighlights:Period of time where required functionality is builtwithin timeboxed iterationsEnd of each iteration a demonstrable increment of potentially consumable solution has been produced and regression testedDelivery team applies a hybrid of “Standard” practices from Scrum, XP, Agile Modeling, Agile Data, and other methods to deliver the solutionSupports Daily Stand-up coordinationSupports Iteration planning and modelingBacklogsIteration DemoRetrosSpikesAgile metricsCIStrong emphasis on “Advanced” agile engineering practicesTDD/ATDDCDLook-Ahead planning and modelingContinuous documentationReleases determined by comparing whether there is sufficient functionality to justify the cost of transition – minimally marketable release (MMR)Performsome look-ahead planning and modeling, often referred to as backlog grooming, on a just-in-time basis to be more effective when implementing work items during each iterationLeverage the existing organizational ecosystem to reuse existing services, patterns, templates, code, guidelines and other assetsEncourage project specific process improvement through self-organization within the constraints that make sense for the organizationAdapt the types and formality of work products produced for the context of the projectsDoes not say who (person and team) performs action within approach like SAFe
  • #17 Talking Points:2 levels of Transition:During one-time Project Transition event at Program Level to address end of lifecycle testing and readiness before going into ProductionDuring iterative Release Transition event for each PSI-Release -- like “HIP Sprint" production readiness activities for a ReleaseTransition Phase goalhighlights:Focus on delivering system into Production across one or more PSI-ReleasesStakeholder training and documentationProduction infrastructure readiness and hardening; securityPerformEnd of lifecycle testing (e.g. UAT, performance, etc.)DAD recognizes that for sophisticated enterprise agile projects deploying the solution to the stakeholders is often not a trivial exerciseDAD teams, as well as the enterprise overall, will streamline their deployment processes so that over time this phase become shorters and ideally disappears from adopting continuous deployment strategiesIt takes discipline to evolve Transition from a phase to an activity.
  • #18 Talking Points: GOVERNANCEEncourages collaboration with corporate stakeholders such as Enterprise Architects, Portfolio Managers, Program Management, DevOps, IT InfrastructureGovernance issue that address corporate assets: team roles and responsibilities, governing bodies, exceptions and escalation processes, knowledge sharing processes, metrics strategy, risk mitigation, reward structure, status reporting, audit processes, policies/standards/guidelines, artifacts and their lifecycles, etc.SCALING FACTORSDAD process framework provides a scalable foundation for agile deliveriesDAD requires pragmatic adaption of methods and approaches in context with environment and constraintsLarge-scale agile projects range of problem and solution complexities, so scaling factors need to be consider when tailoring your agile strategy, such as: Team size. Agile teams may range from as small as two people to hundreds and potentially thousands of people.Geographical distribution. A team may be located in a single room, on the same floor but in different offices or cubes, in the same building, in the same city, or even in different cities around the globe.Organizational distribution. Some agile teams are comprised of people who work for the same group in the same company. Other teams have people from different groups of the same company. Some teams are made up of people from similar organizations working together as a consortium. Some team members may be consultants or contractors. Sometimes some of the work is outsourced to one or more external service provider(s).Regulatory compliance. Some agile teams must conform to industry regulations such as the Dodd-Frank act, Sarbanes-Oxley, or Food and Drug Administration (FDA) regulations.Domain complexity. Some teams apply agile techniques in straightforward situations, such as building an informational Web site, to more complex situations such as building an internal business application, and even in life-critical health-care systems.Technical complexity. Some agile teams build brand-new, “greenfield systems” from scratch running on a single technology platform with no need to integrate with other systems. At the other end of the spectrum some agile teams are working with multiple technologies, evolving and integrating with legacy systems, and evolving and accessing legacy data sources.Organizational complexity. In some organizations people work to the same vision and collaborate effectively. Other organizations suffer from politics. Some organizations have competing visions for how people should work and worse yet have various subgroups following and promoting those visions.Enterprise discipline. Many organizations want their teams to work toward a common enterprise architecture, take advantage of strategic reuse opportunities, and reflect their overall portfolio strategy.
  • #19 Talking Points: Documentation does not go away particularly on FedGovt programsLightweight approaches congruent/tailored to fit within frameworkTechniques include combine, living documentation, agile artifactsExamples include Tangent PMP and metrics
  • #39 Talking Points: Leverage these frameworks and make them work within the context of your environmentBoth DAD and SAFe are Hybrid Process frameworks - detailing how to scale agile to the enterpriseScaled Agile Framework (SAFe) since; Scaledagileframework.comDisciplined Agile Delivery (DAD); Disciplinedagiledelivery.comCertifications and Industry AwarenessSAFe SA and SPC certificationsDAD certifications - Yellow, Green, Black Belt http://disciplinedagileconsortium.org/
  • #40 Talking Points:Leverage these frameworks and make them work within the context of your environmentTechnical architecture & development focus includes XP, agile modeling, agile data, and lean software development. Both DAD and SAFe are Hybrid Process frameworks - detailing how to scale agile to the enterpriseScaled Agile Framework (SAFe) since; Scaledagileframework.comDisciplined Agile Delivery (DAD); Disciplinedagiledelivery.comCertifications and Industry AwarenessSAFe SA and SPC certificationsDAD certifications - Yellow, Green, Black Belt http://disciplinedagileconsortium.org/