SAP HANA/BW/ Consultant
Name: Santhosh
Email: thakursanthoshsingh@yahoo.co.in
Mobile: 08008423334
Career Objective
To obtain a challenging position that will utilize my technical skills, offer challenge, accountability and an
opportunity for career advancement.
Professional Summary –
SAP Certified BW Consultant—2008
SAP Certified Hana Consultant—2014
With a total of 5.7 years of experience which includes SAP HANA, BW on HANA and BW with
Business Objects expertise.
Experience as Native HANA or standalone HANA consultant
ď‚· Data Movement in HANA including Data Services or SLT, Worked on configuration and SAP SLT
advanced load management while replication.
ď‚· Worked on variables, input parameters, currency conversions, hierarchies, decision tables
ď‚· Worked on creating Attribute, Analytical (star join) and calculation views.
ď‚· Knowledge of SQL scripting for writing procedures and CE functions.
ď‚· Used Side car approach using DXC in one client POC.
ď‚· Experience in extraction of data from Excel, External data base, SAP BW, SAP ECC, SAP
LANDSCAPE TRANSFORMATION (SLT) to HANA Data Base.
ď‚· Experience in Creating and executing Data Service Job in SAP BODS to populate data in HANA
with basic transformations.
ď‚· Experience in User Management
ď‚· Leverage knowledge of data warehouse and software development methodologies.
ď‚· Experience in preparing technical design documents.
ď‚· Work with the design team to realize the architecture by providing suggestions on design options.
ď‚· Review and validate the design decisions taken by the design teams.
ď‚· Work with client architecture teams in - validate the non-functional requirements -discussing and
providing inputs on architecture options
ď‚· Fosters a culture of co-operation, knowledge sharing, and team integration
BW on HANA experience
ď‚· Involved in BW on HANA migrations in various geographical rollouts.
ď‚· Worked on post migration and pre migration activities includes synchronizing the system.
ď‚· Implemented accelerated approach of SLT continuing standard BW system as standalone.
ď‚· Application of HANA In-Memory concepts for converting cubes and DSOs to HANA optimized
ď‚· Creating Virtual providers, Composite providers, transient providers, semantically portioned objects
(SPOs), Hybrid providers.
BW 3.5/7.0/7.3 Experience
ď‚· End-to-End experience: Physical Data Modeling, Extraction, Reporting, Scheduling, Performance
Tuning
ď‚· Migration of 3.5 bex queries to 7.0.
SAP HANA/BW/ Consultant
Name: Santhosh
Email: thakursanthoshsingh@yahoo.co.in
Mobile: 08008423334
ď‚· Worked on performances issues like Reorganizing, Roles and Favorites workbooks, Delete
aggregate tables, Delete expired application logs, Reorganize PSA Error Log, Check and clean
PSA Tables, Delete inconsistent Error DTPs, Delete old Process Chain logs, Check and clean up
table change logs (DBTABLOG, Delete temporary BW database tables, Drop empty partitions in
F tables, Compress Info Cubes, Delete BW Statistic Tables, Delete unused Master data, Delete
old PSA Data.
ď‚· Involved in one complete project lifecycle implementation for BW.
ď‚· Design and development of Standard and Custom Info Cubes, Info Objects and Info Sources,
Web reporting, Extraction, Transformations, Transfer Structures, Multi-Providers, Process
Chains, Data Store Objects (DSO), and Business Explorer (BEx).
ď‚· Enhancement of data sources as per reporting requirements.
Cockpit and generic extractors for a variety of application areas such as SD, MM and from non-
R/3 systems such as Flat files.
ď‚· Worked with LO Cockpit, COPA, and FI.
ď‚· Modification of transformations.
ď‚· Business Content, Generic Extraction, Enhancements, external BW systems, both master and
transaction data using multiple source systems.
ď‚· Monitoring of process chains on daily basis.
ď‚· Created user reports in BEx query designer.
Education
Masters(MS) Master in Software Engineering with
commendation from University of Hertfordshire -
England
B-Tech Bachelors in Electrical and Electronics
engineering from JNTU University.
Work Experience
ď‚· Working as a HANA/BW consultant in Infosys Bangalore from September 2014 till
date.
ď‚· Working as SAP BW/Hana Consultant for Tech Mahindra (Mahindra satyam previously),
in Hyderabad since Jan 2011 to till 2014 September.
ď‚·
ď‚· Worked as SAP BW Associate Consultant for Dexler Information solutions (Client SAP
APJ) from Nov-2009 to Dec-2010.
SAP HANA/BW/ Consultant
Name: Santhosh
Email: thakursanthoshsingh@yahoo.co.in
Mobile: 08008423334
Project 5
Client: PepsiCo
Organization: Infosys
Role: SAP BW /HANA Consultant.
Location: Bangalore
PepsiCo is a world famous Food and Beverages client, with a huge database all over the world.
Roles and Responsibilities:
Role: Team Lead, Senior Software Consultant
Managing Production support team for more than 6 different sectors which includes North America, South
America, Europe, UK, AMEA and Ireland where some of the sectors are migrated to BW on HANA and
remaining in process.
ď‚· Creating Composite providers with HANA published information models like Calculation views
and Analytical views.
ď‚· Creating Hybrid providers, Transient providers and Virtual providers depending on the
requirement.
ď‚· Publishing Info cubes to HANA studio and analyzing the fact and dimension tables for direct
reporting purpose.
ď‚· Worked on Direct Extractor Connections.
ď‚· Involved in post migration and pre migration activities
ď‚· Optimizing the info cubes and DSOs.
ď‚· Monitoring BODS jobs which is one of the source system.
ď‚· Working on Bex reports for migrating to WEBI for one of our geographical base.
ď‚· Currently working on integrating the BW on HANA system with various tools like HP service
manager, X Matters, Solution Manager to reduce the manual effort.
Project 4
Client : Visy
Organization: Tech Mahindra
Role : SAP BW /HANA Consultant.
Location : Hyderabad.
SAP HANA/BW/ Consultant
Name: Santhosh
Email: thakursanthoshsingh@yahoo.co.in
Mobile: 08008423334
Migrating SAP BW 7.0 system to 7.4 with HANA DB
At Visy, we have an Insights & Innovation team. It's their job to analyze market and category
trends, as well as consumer and technological insights. Armed with this knowledge, they can give
our customers a unique strategic service. This can be used to help facilitate product development
programs that are both cost effective and highly successful. After all, we want our clients to keep
moving forward - and innovation is what will take them there. Building Attribute views, Analytical
views and Calculation views which includes SQL Scripting.
ď‚· Monitoring the SLT data load movement, rescheduling the BODS jobs.
ď‚· Creating Variables, Calculated and restricted Measures according to the functional specifications.
ď‚· Creating Decision tables and Analytical privileges.
ď‚· Analyzing the tables replicated from SAP ECC to model and to build reports.
ď‚· Migrating Bex queires to WEBI Reports
ď‚· Designing reports on SAP Lumira and SAP Analysis Office
Project 3
Client : ArcelorMittal Luxembourg (Jan2012-March2014)
Organization: Tech Mahindra
Role : SAP BW Consultant
Location : Belgium
It is a SAP BW Implementation and post implementation support project
Arcelor Mittal is the world’s leading steel and mining company. Guided by a philosophy to produce safe,
sustainable steel, it is the leading supplier of quality steel products in all major markets including
automotive, construction, household appliances and packaging. ArcelorMittal operates in 60 countries
and employs about 260,000 people worldwide. Long Carbon Europe is ArcelorMittals business unit
producing long products at 24 plants in 10 countries in Europe and North Africa.
Life Cycle Implementation
ď‚· Understanding the business requirements and preparing technical specifications.
ď‚· Implemented COPA, FI and SD modules for extracting data from SAP ECC to SAP BW 7.0
system
ď‚· Created Bex reports for the given requirements.
ď‚· Creating process chains, infocubes, DSOs, Infosets, MultiProviders,
ď‚· Identifying Business Content and installing required objects in specified areas.
ď‚· Created Generic Extractions, lo extractions and BI content data sources.
SAP HANA/BW/ Consultant
Name: Santhosh
Email: thakursanthoshsingh@yahoo.co.in
Mobile: 08008423334
Post implementation support
ď‚· Job Monitoring all the Master and Transaction data which keeps track of all the
information about the project; corrective action taken in case of Job failures and notifying
the users.
ď‚· Data Load & Scheduling-Data load from Source system / flat file and job Scheduling
according to the requirements
ď‚· Enhancements-Designing queries, workbooks, MultiProviders, Info Sets etc. in order to
enhance the models according to the changing needs of End users/clients.
ď‚· Correcting the errors in case of failure like: Attribute chain run(locking error), DTP error,
Rules inactive errors, Save Hierarchy Error, failures related to Aggregates, Index,
Compression etc., Space issues, Table issues (some entries need to be
edited/modified/deleted out from standard SAP tables)
ď‚· Handled tickets with different priority and never missed the SLA.
ď‚· Involved in developing the SLA reports at end of every month.
ď‚· Involved in submitting the Ticket Status (Open/Close) reports.
ď‚· Involved in both the activities monitoring and Production Support.
Project2
Client : ArcelorMittal Belgium (Jan 2011-Dec2012)
Organization : Tech Mahindra
Role : SAP BW consultant.
Location : Hyderabad
ď‚· This project basically involves in Extracting the data from SAP R3, building up the Data
Targets, providing validated reports to the user and Setting up the procedures for ETL
process.
 Involved in creation of Info Areas, Info Objects, Info Cubes, and DSO’s, and created
required Transformations and DTP to load data into Data Targets.
ď‚· Creating the generic data sources, Uploaded Master Data and Transaction Data from
Different Source systems.
ď‚· Involved in preparation and review of Unit Test Plans & Documentation
ď‚· Designing and mapping source and target structures to load transactional data and
master data.
ď‚· Involved in transporting the cubes, Transformations and Multi Providers from
Development to Quality system.
ď‚· As a Quality Team Lead involved in Unit and Acceptance Testing and delivered all the
objects within time with highest quality.
ď‚· Activated and Installed relevant Business Content Info Objects.
ď‚· Create Process chains for Master data and transaction data loads.
SAP HANA/BW/ Consultant
Name: Santhosh
Email: thakursanthoshsingh@yahoo.co.in
Mobile: 08008423334
ď‚· Designing universe based on sap ECC as a source system
Project1
Client : SAP APJ (Nov2009-Dec2010)
Organization : Dexler Information solutions.
Role : SAP-BW Associate Consultant
Location : Bangalore
Dexler Information Solutions is a learning solutions provider, which leverages technology to enable ... In
the education sector, Dexler has provided strategic solutions to several educational institutions.
ď‚· Involved in activating the business content Learning Solution (0HCM_LSO)
Loading the data to the 0LSO_C01 and 0LSO_C02 Infocubes.
ď‚· Provided work around and solutions for the issues.
ď‚· Interacting with the business to gather the requirements.
ď‚· Carried out data loadings depending on the requirement
ď‚· Worked in transporting the objects through the project landscape.
ď‚· Data loads from R/3 for master data as well as transaction data.
ď‚· Worked on Information Broadcasting
 Created the custom DSO’s and Info set.
 Created Transformations, DTP’s.
ď‚· Involved in Unit testing.
ď‚· Uploaded Transaction Data from the Flat File as the Source System.
ď‚· Worked on Start Routines and End Routines.
ď‚· Taking Offline Backup using CLP(Command Line Processor)
ď‚· Multi Dimensional Clustering the Info cubes.
ď‚· To find how much physical memory used by DB2 on the system by using CLP on daily basis
ď‚· Find out largest tables in the system, and run compression check on it
ď‚· Monitoring the Data base size history per day, per week and per month

SAP_BW-HANAv1

  • 1.
    SAP HANA/BW/ Consultant Name:Santhosh Email: thakursanthoshsingh@yahoo.co.in Mobile: 08008423334 Career Objective To obtain a challenging position that will utilize my technical skills, offer challenge, accountability and an opportunity for career advancement. Professional Summary – SAP Certified BW Consultant—2008 SAP Certified Hana Consultant—2014 With a total of 5.7 years of experience which includes SAP HANA, BW on HANA and BW with Business Objects expertise. Experience as Native HANA or standalone HANA consultant  Data Movement in HANA including Data Services or SLT, Worked on configuration and SAP SLT advanced load management while replication.  Worked on variables, input parameters, currency conversions, hierarchies, decision tables  Worked on creating Attribute, Analytical (star join) and calculation views.  Knowledge of SQL scripting for writing procedures and CE functions.  Used Side car approach using DXC in one client POC.  Experience in extraction of data from Excel, External data base, SAP BW, SAP ECC, SAP LANDSCAPE TRANSFORMATION (SLT) to HANA Data Base.  Experience in Creating and executing Data Service Job in SAP BODS to populate data in HANA with basic transformations.  Experience in User Management  Leverage knowledge of data warehouse and software development methodologies.  Experience in preparing technical design documents.  Work with the design team to realize the architecture by providing suggestions on design options.  Review and validate the design decisions taken by the design teams.  Work with client architecture teams in - validate the non-functional requirements -discussing and providing inputs on architecture options  Fosters a culture of co-operation, knowledge sharing, and team integration BW on HANA experience  Involved in BW on HANA migrations in various geographical rollouts.  Worked on post migration and pre migration activities includes synchronizing the system.  Implemented accelerated approach of SLT continuing standard BW system as standalone.  Application of HANA In-Memory concepts for converting cubes and DSOs to HANA optimized  Creating Virtual providers, Composite providers, transient providers, semantically portioned objects (SPOs), Hybrid providers. BW 3.5/7.0/7.3 Experience  End-to-End experience: Physical Data Modeling, Extraction, Reporting, Scheduling, Performance Tuning  Migration of 3.5 bex queries to 7.0.
  • 2.
    SAP HANA/BW/ Consultant Name:Santhosh Email: thakursanthoshsingh@yahoo.co.in Mobile: 08008423334 ď‚· Worked on performances issues like Reorganizing, Roles and Favorites workbooks, Delete aggregate tables, Delete expired application logs, Reorganize PSA Error Log, Check and clean PSA Tables, Delete inconsistent Error DTPs, Delete old Process Chain logs, Check and clean up table change logs (DBTABLOG, Delete temporary BW database tables, Drop empty partitions in F tables, Compress Info Cubes, Delete BW Statistic Tables, Delete unused Master data, Delete old PSA Data. ď‚· Involved in one complete project lifecycle implementation for BW. ď‚· Design and development of Standard and Custom Info Cubes, Info Objects and Info Sources, Web reporting, Extraction, Transformations, Transfer Structures, Multi-Providers, Process Chains, Data Store Objects (DSO), and Business Explorer (BEx). ď‚· Enhancement of data sources as per reporting requirements. Cockpit and generic extractors for a variety of application areas such as SD, MM and from non- R/3 systems such as Flat files. ď‚· Worked with LO Cockpit, COPA, and FI. ď‚· Modification of transformations. ď‚· Business Content, Generic Extraction, Enhancements, external BW systems, both master and transaction data using multiple source systems. ď‚· Monitoring of process chains on daily basis. ď‚· Created user reports in BEx query designer. Education Masters(MS) Master in Software Engineering with commendation from University of Hertfordshire - England B-Tech Bachelors in Electrical and Electronics engineering from JNTU University. Work Experience ď‚· Working as a HANA/BW consultant in Infosys Bangalore from September 2014 till date. ď‚· Working as SAP BW/Hana Consultant for Tech Mahindra (Mahindra satyam previously), in Hyderabad since Jan 2011 to till 2014 September. ď‚· ď‚· Worked as SAP BW Associate Consultant for Dexler Information solutions (Client SAP APJ) from Nov-2009 to Dec-2010.
  • 3.
    SAP HANA/BW/ Consultant Name:Santhosh Email: thakursanthoshsingh@yahoo.co.in Mobile: 08008423334 Project 5 Client: PepsiCo Organization: Infosys Role: SAP BW /HANA Consultant. Location: Bangalore PepsiCo is a world famous Food and Beverages client, with a huge database all over the world. Roles and Responsibilities: Role: Team Lead, Senior Software Consultant Managing Production support team for more than 6 different sectors which includes North America, South America, Europe, UK, AMEA and Ireland where some of the sectors are migrated to BW on HANA and remaining in process. ď‚· Creating Composite providers with HANA published information models like Calculation views and Analytical views. ď‚· Creating Hybrid providers, Transient providers and Virtual providers depending on the requirement. ď‚· Publishing Info cubes to HANA studio and analyzing the fact and dimension tables for direct reporting purpose. ď‚· Worked on Direct Extractor Connections. ď‚· Involved in post migration and pre migration activities ď‚· Optimizing the info cubes and DSOs. ď‚· Monitoring BODS jobs which is one of the source system. ď‚· Working on Bex reports for migrating to WEBI for one of our geographical base. ď‚· Currently working on integrating the BW on HANA system with various tools like HP service manager, X Matters, Solution Manager to reduce the manual effort. Project 4 Client : Visy Organization: Tech Mahindra Role : SAP BW /HANA Consultant. Location : Hyderabad.
  • 4.
    SAP HANA/BW/ Consultant Name:Santhosh Email: thakursanthoshsingh@yahoo.co.in Mobile: 08008423334 Migrating SAP BW 7.0 system to 7.4 with HANA DB At Visy, we have an Insights & Innovation team. It's their job to analyze market and category trends, as well as consumer and technological insights. Armed with this knowledge, they can give our customers a unique strategic service. This can be used to help facilitate product development programs that are both cost effective and highly successful. After all, we want our clients to keep moving forward - and innovation is what will take them there. Building Attribute views, Analytical views and Calculation views which includes SQL Scripting.  Monitoring the SLT data load movement, rescheduling the BODS jobs.  Creating Variables, Calculated and restricted Measures according to the functional specifications.  Creating Decision tables and Analytical privileges.  Analyzing the tables replicated from SAP ECC to model and to build reports.  Migrating Bex queires to WEBI Reports  Designing reports on SAP Lumira and SAP Analysis Office Project 3 Client : ArcelorMittal Luxembourg (Jan2012-March2014) Organization: Tech Mahindra Role : SAP BW Consultant Location : Belgium It is a SAP BW Implementation and post implementation support project Arcelor Mittal is the world’s leading steel and mining company. Guided by a philosophy to produce safe, sustainable steel, it is the leading supplier of quality steel products in all major markets including automotive, construction, household appliances and packaging. ArcelorMittal operates in 60 countries and employs about 260,000 people worldwide. Long Carbon Europe is ArcelorMittals business unit producing long products at 24 plants in 10 countries in Europe and North Africa. Life Cycle Implementation  Understanding the business requirements and preparing technical specifications.  Implemented COPA, FI and SD modules for extracting data from SAP ECC to SAP BW 7.0 system  Created Bex reports for the given requirements.  Creating process chains, infocubes, DSOs, Infosets, MultiProviders,  Identifying Business Content and installing required objects in specified areas.  Created Generic Extractions, lo extractions and BI content data sources.
  • 5.
    SAP HANA/BW/ Consultant Name:Santhosh Email: thakursanthoshsingh@yahoo.co.in Mobile: 08008423334 Post implementation support  Job Monitoring all the Master and Transaction data which keeps track of all the information about the project; corrective action taken in case of Job failures and notifying the users.  Data Load & Scheduling-Data load from Source system / flat file and job Scheduling according to the requirements  Enhancements-Designing queries, workbooks, MultiProviders, Info Sets etc. in order to enhance the models according to the changing needs of End users/clients.  Correcting the errors in case of failure like: Attribute chain run(locking error), DTP error, Rules inactive errors, Save Hierarchy Error, failures related to Aggregates, Index, Compression etc., Space issues, Table issues (some entries need to be edited/modified/deleted out from standard SAP tables)  Handled tickets with different priority and never missed the SLA.  Involved in developing the SLA reports at end of every month.  Involved in submitting the Ticket Status (Open/Close) reports.  Involved in both the activities monitoring and Production Support. Project2 Client : ArcelorMittal Belgium (Jan 2011-Dec2012) Organization : Tech Mahindra Role : SAP BW consultant. Location : Hyderabad  This project basically involves in Extracting the data from SAP R3, building up the Data Targets, providing validated reports to the user and Setting up the procedures for ETL process.  Involved in creation of Info Areas, Info Objects, Info Cubes, and DSO’s, and created required Transformations and DTP to load data into Data Targets.  Creating the generic data sources, Uploaded Master Data and Transaction Data from Different Source systems.  Involved in preparation and review of Unit Test Plans & Documentation  Designing and mapping source and target structures to load transactional data and master data.  Involved in transporting the cubes, Transformations and Multi Providers from Development to Quality system.  As a Quality Team Lead involved in Unit and Acceptance Testing and delivered all the objects within time with highest quality.  Activated and Installed relevant Business Content Info Objects.  Create Process chains for Master data and transaction data loads.
  • 6.
    SAP HANA/BW/ Consultant Name:Santhosh Email: thakursanthoshsingh@yahoo.co.in Mobile: 08008423334  Designing universe based on sap ECC as a source system Project1 Client : SAP APJ (Nov2009-Dec2010) Organization : Dexler Information solutions. Role : SAP-BW Associate Consultant Location : Bangalore Dexler Information Solutions is a learning solutions provider, which leverages technology to enable ... In the education sector, Dexler has provided strategic solutions to several educational institutions.  Involved in activating the business content Learning Solution (0HCM_LSO) Loading the data to the 0LSO_C01 and 0LSO_C02 Infocubes.  Provided work around and solutions for the issues.  Interacting with the business to gather the requirements.  Carried out data loadings depending on the requirement  Worked in transporting the objects through the project landscape.  Data loads from R/3 for master data as well as transaction data.  Worked on Information Broadcasting  Created the custom DSO’s and Info set.  Created Transformations, DTP’s.  Involved in Unit testing.  Uploaded Transaction Data from the Flat File as the Source System.  Worked on Start Routines and End Routines.  Taking Offline Backup using CLP(Command Line Processor)  Multi Dimensional Clustering the Info cubes.  To find how much physical memory used by DB2 on the system by using CLP on daily basis  Find out largest tables in the system, and run compression check on it  Monitoring the Data base size history per day, per week and per month